Suspension Initiatives Validation - HD Remarks
Suspension Initiatives Validation - HD Remarks
•First in industry
PU bushes for
better life and
low noise levels
12 grease free bushes for better maintaiability anCost saving by 800/-
Frequency
Provide wide range of damping at different
Sensitive speeds
Dampers(FSD)
13 Low noise and vibration levels
Rig validation
Timeline VDC Support Required
Requirement
•C Rel – Over
•Implementation – W2316
Target model - Pro 6046/54TT
PR Given - parts by W2230 NA
Field seeding of 5 sets
•C Rel – W2232
Validated on Pro 2049 & Pro 2095XP
Sample Size : 4 nos
Validation closure report required
Budget 2.0 lacs INR
Rig testing on slider parabolic spring
•PoC - Over
C-rel by W2248 Fitted on 2 vehicles - Pro 6049H & Pro
6028T Sample 2 Size: 2 nos.
Running till 1.2L kms - Maintainbility Budget : 1.5 lacs INR
monitoring Data aquiaition required
Ride comfort & RLDA activity Budget 1.0 lacs INR
Rig testing required - PR given
•PoC - Over
Fitted on Pro 3015 truck
Sample 2 Size: 2 nos.
Running target 1.2L kms
Budget : 1.5 lacs INR
Ride comfort & RLDA activity Data aquiaition required
•C Rel – W2245 Maintainability monitoring -
Budget 1.0 lacs INR
loosening, air leakage, bush failures
•PoC - Over
Fitted on - Pro 6049H Sample 2 Size: 2 nos.
•C Rel – W2248 Running till 2L kms
Budget : 1.5 lacs INR
Maintainability monitoring -
Data aquiaition required
loosening, air leakage, bush failures
Budget 1.0 lacs INR
Ride comfort & RLDA activity
•POC – Over
•Validation – W2252 Target models - Pro 2114, Pro 3015
rear springs Sample Size : 4 nos
POC to be done Budget 2.0 lacs INR
•C-release – W2242 Rig testing to be done - 4 springs
•Concept – W2223
•Concept – W2224
•PR W2228
PR by W2229
To be fitted on 2075 bus
Sample Size : 4 nos
Running till 80K kms
ride and maintainability monitoring Budget 2.0 lacs INR
•POC W2238
Rig testing on 4 samples
C-Rel by W2232