BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 01
NAMA PEKERJAAN : BAHU BETON K 225
SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)

0 + 219 R 1.30 0.20


1.250 0.190 6.00 1.425
0 + 225 1.20 0.18
1.200 0.190 25.00 5.700
0 + 250 1.20 0.20
1.175 0.200 25.00 5.875
0 + 275 1.15 0.20
1.175 0.200 25.00 5.875
0 + 300 1.20 0.20
1.250 0.200 25.00 6.250
0 + 325 1.30 0.20
1.175 0.200 25.00 5.875
0 + 350 1.05 0.20
1.125 0.200 25.00 5.625
0 + 375 1.20 0.20
1.275 0.195 25.00 6.216
0 + 400 1.35 0.19
1.275 0.195 25.00 6.216
0 + 425 1.20 0.20
1.250 0.200 17.00 4.250
0 + 450 1.30 0.20
1.275 0.200 25.00 6.375
0 + 475 1.25 0.20
1.250 0.200 25.00 6.250
0 + 500 1.25 0.20
1.225 0.200 25.00 6.125
0 + 525 1.20 0.20
1.150 0.200 25.00 5.750
0 + 550 1.10 0.20
1.200 0.200 25.00 6.000
0 + 575 1.30 0.20

JUMLAH SUB TOTAL 83.806


323.00
JUMLAH S/D LEMBAR INI 83.806

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
LOKASI : KEC. LABAKKANG
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 02

NAMA PEKERJAAN : BAHU BETON K 225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
0 + 575 R 1.30 0.20
1.250 0.200 25.00 6.250
0 + 600 1.20 0.20
1.250 0.200 25.00 6.250
0 + 625 1.30 0.20
1.200 0.200 25.00 6.000
0 + 650 1.10 0.20
1.200 0.200 25.00 6.000
0 + 675 1.30 0.20
1.250 0.200 25.00 6.250
0 + 700 1.20 0.20
1.200 0.200 25.00 6.000
0 + 725 1.20 0.20
1.175 0.200 25.00 5.875
0 + 750 1.15 0.20
1.175 0.200 25.00 5.875
0 + 775 1.20 0.20
1.150 0.200 25.00 5.750
0 + 800 1.10 0.20
1.150 0.200 25.00 5.750
0 + 825 1.20 0.20
1.250 0.200 25.00 6.250
0 + 850 1.30 0.20
1.225 0.200 25.00 6.125
0 + 875 1.15 0.20
1.175 0.200 25.00 5.875
0 + 900 1.20 0.20
1.175 0.200 25.00 5.875
0 + 925 1.15 0.20
1.150 0.200 25.00 5.750
0 + 950 1.15 0.20
1.125 0.200 25.00 5.625
0 + 975 1.10 0.20

JUMLAH SUB TOTAL 95.500


125.00 83.806
JUMLAH S/D LEMBAR INI 179.306

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
DIPERIKSA OLEH DIAJUKAN OLEH
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
LOKASI : KEC. LABAKKANG
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 03

NAMA PEKERJAAN : BAHU BETON K 225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
0 + 975 R 1.10 0.20
1.175 0.200 25.00 5.875
1 + 0 1.25 0.20
1.325 0.200 25.00 6.625
1 + 25 1.40 0.20
1.375 0.200 25.00 6.875
1 + 50 1.35 0.20
1.275 0.200 25.00 6.375
1 + 75 1.20 0.20
1.250 0.200 25.00 6.250
1 + 100 1.30 0.20
1.325 0.200 25.00 6.625
1 + 125 1.35 0.20
1.325 0.200 25.00 6.625
1 + 150 1.30 0.20
1.300 0.200 25.00 6.500
1 + 175 1.30 0.20
1.275 0.200 25.00 6.375
1 + 200 1.25 0.20
1.275 0.200 25.00 6.375
1 + 225 1.30 0.20
1.300 0.200 25.00 6.500
1 + 250 1.30 0.20
1.300 0.200 25.00 6.500
1 + 275 1.30 0.20
1.350 0.200 25.00 6.750
1 + 300 1.40 0.20
1.350 0.200 25.00 6.750
1 + 325 1.30 0.20
1.300 0.200 25.00 6.500
1 + 350 1.30 0.20
1.375 0.200 25.00 6.875
1 + 375 1.45 0.20

JUMLAH SUB TOTAL 104.375

JUMLAH S/D LEMBAR INI 283.681

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 04

NAMA PEKERJAAN : BAHU BETON K 225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
1 + 375 R 1.45 0.20
1.275 0.200 25.00 6.375
1 + 400 1.10 0.20
1.175 0.200 25.00 5.875
1 + 425 1.25 0.20
1.325 0.200 25.00 6.625
1 + 450 1.40 0.20
1.625 0.200 25.00 8.125
1 + 475 1.85 0.20
1.675 0.200 25.00 8.375
1 + 500 1.50 0.20
1.550 0.200 25.00 7.750
1 + 525 1.60 0.20
1.550 0.200 25.00 7.750
1 + 550 1.50 0.20
1.250 0.200 25.00 6.250
1 + 575 1.00 0.20
1.000 0.200 25.00 5.000
1 + 600 1.00 0.20
1.125 0.200 25.00 5.625
1 + 625 1.25 0.20
1.275 0.200 25.00 6.375
1 + 650 1.30 0.20
1.225 0.200 25.00 6.125
1 + 675 1.15 0.20
1.325 0.200 25.00 6.625
1 + 700 1.50 0.20
1.600 0.200 25.00 8.000
1 + 725 1.70 0.20
1.600 0.200 25.00 8.000
1 + 750 1.50 0.20
1.500 0.200 25.00 7.500
1 + 775 1.50 0.20

JUMLAH SUB TOTAL 110.375

JUMLAH S/D LEMBAR INI 394.056

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL
Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 05

NAMA PEKERJAAN :BAHU BETON K.225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
1 + 775 R 1.50 0.20
1.450 0.200 25.00 7.250
1 + 800 1.40 0.20
1.450 0.200 23.00 6.670
1 + 825 1.50 0.20
1.350 0.200 25.00 6.750
1 + 850 1.20 0.20
1.400 0.200 25.00 7.000
1 + 875 1.60 0.20
1.400 0.200 25.00 7.000
1 + 900 1.20 0.20
1.250 0.200 25.00 6.250
1 + 925 1.30 0.20
1.300 0.195 15.00 3.803
1 + 940 1.30 0.19

JUMLAH SUB TOTAL 44.723

JUMLAH S/D LEMBAR INI 438.779

PANGKEP, 2016
DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
LOKASI : KEC. LABAKKANG
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 06
NAMA PEKERJAAN : BAHU BETON K 225
SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)

0 + 219 L 1.20 0.20


1.200 0.190 6.00 1.368
0 + 225 1.20 0.18
1.200 0.190 25.00 5.700
0 + 250 1.20 0.20
1.100 0.200 25.00 5.500
0 + 275 1.00 0.20
1.125 0.200 25.00 5.625
0 + 300 1.25 0.20
1.150 0.200 25.00 5.750
0 + 325 1.05 0.20
1.150 0.200 25.00 5.750
0 + 350 1.25 0.20
1.225 0.200 25.00 6.125
0 + 375 1.20 0.20
1.175 0.200 25.00 5.875
0 + 400 1.15 0.20
1.175 0.200 17.00 3.995
0 + 425 1.20 0.20
1.100 0.200 17.00 3.740
0 + 450 1.00 0.20
1.000 0.200 25.00 5.000
0 + 475 1.00 0.20
1.025 0.200 25.00 5.125
0 + 500 1.05 0.20
1.125 0.200 25.00 5.625
0 + 525 1.20 0.20
1.125 0.200 25.00 5.625
0 + 550 1.05 0.20
1.125 0.200 25.00 5.625
0 + 575 1.20 0.20

JUMLAH SUB TOTAL 76.428


315.00 438.779
JUMLAH S/D LEMBAR INI 515.207

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
LOKASI : KEC. LABAKKANG
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 07

NAMA PEKERJAAN : BAHU BETON K 225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
0 + 575 L 1.20 0.20
1.225 0.200 25.00 6.125
0 + 600 1.25 0.20
1.200 0.200 25.00 6.000
0 + 625 1.15 0.20
1.075 0.200 25.00 5.375
0 + 650 1.00 0.20
1.125 0.200 25.00 5.625
0 + 675 1.25 0.20
1.225 0.200 25.00 6.125
0 + 700 1.20 0.20
1.200 0.200 25.00 6.000
0 + 725 1.20 0.20
1.200 0.200 25.00 6.000
0 + 750 1.20 0.20
1.200 0.200 25.00 6.000
0 + 775 1.20 0.20
1.200 0.200 25.00 6.000
0 + 800 1.20 0.20
1.175 0.200 25.00 5.875
0 + 825 1.15 0.20
1.200 0.200 25.00 6.000
0 + 850 1.25 0.20
1.250 0.200 25.00 6.250
0 + 875 1.25 0.20
1.175 0.200 25.00 5.875
0 + 900 1.10 0.20
1.175 0.200 25.00 5.875
0 + 925 1.25 0.20
1.225 0.200 25.00 6.125
0 + 950 1.20 0.20
1.200 0.200 25.00 6.000
0 + 975 1.20 0.20

95.250
125.00 515.207
JUMLAH S/D LEMBAR INI 610.457

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
DIPERIKSA OLEH DIAJUKAN OLEH
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
LOKASI : KEC. LABAKKANG
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 08

NAMA PEKERJAAN : BAHU BETON K 225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
0 + 975 L 1.20 0.20
1.250 0.200 25.00 6.250
1 + 0 1.30 0.20
1.300 0.200 25.00 6.500
1 + 25 1.30 0.20
1.200 0.200 25.00 6.000
1 + 50 1.10 0.20
1.150 0.200 25.00 5.750
1 + 75 1.20 0.20
1.200 0.200 25.00 6.000
1 + 100 1.20 0.20
1.250 0.200 25.00 6.250
1 + 125 1.30 0.20
1.275 0.200 25.00 6.375
1 + 150 1.25 0.20
1.225 0.200 25.00 6.125
1 + 175 1.20 0.20
1.175 0.200 25.00 5.875
1 + 200 1.15 0.20
1.125 0.200 25.00 5.625
1 + 225 1.10 0.20
1.200 0.200 25.00 6.000
1 + 250 1.30 0.20
1.350 0.200 17.00 4.590
1 + 275 1.40 0.20
1.400 0.200 25.00 7.000
1 + 300 1.40 0.20
1.350 0.200 25.00 6.750
1 + 325 1.30 0.20
1.300 0.200 25.00 6.500
1 + 350 1.30 0.20
1.200 0.200 25.00 6.000
1 + 375 1.10 0.20

JUMLAH SUB TOTAL 97.590

JUMLAH S/D LEMBAR INI 708.047

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 09

NAMA PEKERJAAN : BAHU BETON K 225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
1 + 375 L 1.10 0.20
1.000 0.200 25.00 5.000
1 + 400 0.90 0.20
0.900 0.200 25.00 4.500
1 + 425 0.90 0.20
0.825 0.200 25.00 4.125
1 + 450 0.75 0.20
1.025 0.200 25.00 5.125
1 + 475 1.30 0.20
1.400 0.200 25.00 7.000
1 + 500 1.50 0.20
1.550 0.200 25.00 7.750
1 + 525 1.60 0.20
1.450 0.200 25.00 7.250
1 + 550 1.30 0.20
1.300 0.200 25.00 6.500
1 + 575 1.30 0.20
1.300 0.200 25.00 6.500
1 + 600 1.30 0.20
1.275 0.200 25.00 6.375
1 + 625 1.25 0.20
1.225 0.200 25.00 6.125
1 + 650 1.20 0.20
1.225 0.200 25.00 6.125
1 + 675 1.25 0.20
1.150 0.200 25.00 5.750
1 + 700 1.05 0.20
1.225 0.200 25.00 6.125
1 + 725 1.40 0.20
1.400 0.200 25.00 7.000
1 + 750 1.40 0.20
1.450 0.200 25.00 7.250
1 + 775 1.50 0.20

JUMLAH SUB TOTAL 98.500

JUMLAH S/D LEMBAR INI 806.547

PANGKEP, 2016

DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH


DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager
MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL
Pengawas Lapangan Site Engineer Site Manager
KONTRAKTOR : CV. TORINDO NUSANTARA
KONSULTAN : CV. DWITAMA ABADI KONSULTAN
RUAS : TAPOLE - ATANGSALO
BACK UP DATA
MONTHLY CERTIFICATE :
Halaman : 15

NAMA PEKERJAAN :BAHU BETON K.225


SKETSA RUMUS PERHITUNGAN

L rata-rata = (L1 + L2) / 2


H
H rata-rata = (H1 + H2) / 2
L Vol = L rata-rata x H rata-rata x Panjang

Sisi UKURAN (m) L rata H rata rata Panjang


STATION Vol (m3)
L/R L H rata (m) (m) (m)
1 + 775 L 1.50 0.20
1.350 0.200 25.00 6.750
1 + 800 1.20 0.20
1.300 0.200 23.00 5.980
1 + 825 1.40 0.20
1.400 0.200 25.00 7.000
1 + 850 1.40 0.20
1.400 0.200 25.00 7.000
1 + 875 1.40 0.20
1.400 0.200 25.00 7.000
1 + 900 1.40 0.20
1.400 0.200 25.00 7.000
1 + 925 1.40 0.20
1.400 0.200 25.00 7.000
1 + 950 1.40 0.20
1.275 0.200 25.00 6.375
1 + 975 1.15 0.20
1.175 0.200 25.00 5.875
2 + 0 1.20 0.20
1.150 0.200 25.00 5.750
2 + 25 1.10 0.20
1.100 0.195 25.00 5.363
2 + 50 1.10 0.19

JUMLAH SUB TOTAL 71.093

JUMLAH S/D LEMBAR INI 877.639

PANGKEP, 2016
DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH
DINAS PU PANGKEP KONSULTAN KONTRAKTOR

MUH. AMIL AMRILLAH, A.Md KRISTA BUDI NURCAHYO, ST SAIFUL


Pengawas Lapangan Site Engineer Site Manager