Actividades Modulo III

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 44

Proyecto

2018 2019
Actividades Trimestre 4 Trimestre 1 Trimestre 2
INICIO
Licencias y permisos $ 7,000,000.00 $ 20,000,000.00
Diseños $ 60,000,000.00 $ 200,000,000.00
Compras $ 85,000,000.00 $ 500,000,000.00
Construccion $ 90,000,000.00 $ 200,000,000.00
Instalacion de equipos
Pruebas y p en marcha
FIN $ 67,000,000.00 $ 395,000,000.00 $ 700,000,000.00

2018 2019
Trimestre 4 Trimestre 1 Trimestre 2
Inversion 67,000,000 395,000,000 700,000,000
Acumulado 67,000,000 $ 462,000,000 $ 1,162,000,000
Porcentaje 1 9 23

2018 2019
Trimestre 4 Trimestre 1 Trimestre 2
% planeado 1 9 23
% ejecutado 1 2 12

2018 2019
Trimestre 4 Trimestre 1 Trimestre 2
Inversion 67,000,000 $ 395,000,000 $ 700,000,000
Condominio Palladio
2019 2020
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2

$ 200,000,000.00 $ 350,000,000.00 $ 150,000,000.00 $ 240,000,000.00


$ 150,000,000.00 $ 230,000,000.00 $ 190,000,000.00 $ 210,000,000.00

$ 350,000,000.00 $ 580,000,000.00 $ 340,000,000.00 $ 450,000,000.00

2019 2020
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2
350,000,000 580,000,000 340,000,000 450,000,000
$ 1,512,000,000 $ 2,092,000,000 $ 2,432,000,000 $ 2,882,000,000
30 41 48 57

2019 2020
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2
30 41 48 57
20 33 40 51

2019 2020
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2
$ 350,000,000 $ 580,000,000 $ 340,000,000 $ 450,000,000

Curva S de costo Diagrama Límite


800,000,000
120
700,000,000
100 600,000,000
80 500,000,000
60 400,000,000
300,000,000
40
200,000,000
20 100,000,000
0 0
Trimestre 4

Trimestre 1

Trimestre 2
Trimestre 4

Trimestre 1

Trimestre 2

Trimestre 3

Trimestre 4

Trimestre 1
Trimestre 2

Trimestre 3

Trimestre 4

Trimestre 1

Trimestre 2

Trimestre 3

Trimestre 4

2018 2019 2020 2021 2018 2019

% planeado % ejecutado
o Palladio
2020 2021
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2

$ 100,000,000.00 $ 70,000,000.00 $ 175,000,000.00


$ 300,000,000.00 $ 250,000,000.00 $ 244,000,000.00 $ 292,000,000.00
$ 50,000,000.00 $ 150,000,000.00
$ 40,000,000.00
$ 400,000,000.00 $ 320,000,000.00 $ 469,000,000.00 $ 482,000,000.00

2020 2021
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2
400,000,000 320,000,000 469,000,000 482,000,000
$ 3,282,000,000 $ 3,602,000,000 $ 4,071,000,000 $ 4,553,000,000
65 71 80 90

2020 2021
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2
65 71 80 90
58 65 75 84

2020 2021
Trimestre 3 Trimestre 4 Trimestre 1 Trimestre 2
$ 400,000,000 $ 320,000,000 $ 469,000,000 $ 482,000,000

Diagrama Límite de Conciliación de la Financiación


800,000,000
700,000,000
600,000,000
500,000,000
400,000,000
300,000,000
200,000,000
100,000,000
0
Trimestre 4

Trimestre 1

Trimestre 3

Trimestre 4

Trimestre 1

Trimestre 2

Trimestre 3

Trimestre 4

Trimestre 1

Trimestre 2

Trimestre 3

Trimestre 4
Trimestre 2

2018 2019 2020 2021

Inversion
2021
Trimestre 3 Trimestre 4
Total $
$ 27,000,000
$ 260,000,000
$ 1,870,000,000
$ 213,000,000.00 $ 2,369,000,000
$ 125,000,000.00 $ 325,000,000
$ 100,000,000.00 $ 89,000,000.00 $ 229,000,000
$ 438,000,000.00 $ 89,000,000.00 $ 5,080,000,000

2021
Trimestre 3 Trimestre 4
438,000,000 89,000,000
$ 4,991,000,000 $ 5,080,000,000
98 100

2021
Trimestre 3 Trimestre 4
98 100
92

2021
Trimestre 3 Trimestre 4
$ 438,000,000 $ 89,000,000
Proyecto
2019
Actividades Trimestre 1 Trimestre 2
INICIO
Licencias y permisos $ 20,000,000
Diseños $ 200,000,000
Compras $ 500,000,000
Construccion $ 200,000,000
Instalacion de equipos
Pruebas y p en marcha
FIN $ 220,000,000 $ 700,000,000

Trimestre 1 Trimestre 2
$ 220,000,000 $ 700,000,000

FACTORES DE INCERTIDUMBRE
Licencias y permisos Valor inicial
Contrato 1 $ 20,000,000.00
Contrato 2 $ 30,000,000.00
Contrato 3 $ 60,000,000.00
Contrato 4 $ 60,000,000.00
Contrato 5 $ 75,000,000.00

FACTORES DE INCERTIDUMBRE
Diseños Valor inicial
Contrato 1 $ 200,000,000.00
Contrato 2 $ 300,000,000.00
Contrato 3 $ 450,000,000.00
Contrato 4 $ 900,000,000.00
Contrato 5 $ 750,000,000.00

FACTORES DE INCERTIDUMBRE
Gestion de compras Valor inicial
Contrato 1 $ 500,000,000.00
Contrato 2 $ 700,000,000.00
Contrato 3 $ 1,500,000,000.00
Contrato 4 $ 900,000,000.00
Contrato 5 $ 500,000,000.00

FACTORES DE INCERTIDUMBRE
Construccion Valor inicial
Contrato 1 $ 200,000,000.00
Contrato 2 $ 700,000,000.00
Contrato 3 $ 1,200,000,000.00
Contrato 4 $ 900,000,000.00
Contrato 5 $ 400,000,000.00

FACTORES DE INCERTIDUMBRE
Instalacion de equipos Valor inicial
Contrato 1 $ 150,000,000.00
Contrato 2 $ 180,000,000.00
Contrato 3 $ 350,000,000.00
Contrato 4 $ 300,000,000.00
Contrato 5 $ 200,000,000.00

FACTORES DE INCERTIDUMBRE
Pruebas y P en marcha Valor inicial
Contrato 1 $ 100,000,000.00
Contrato 2 $ 200,000,000.00
Contrato 3 $ 350,000,000.00
Contrato 4 $ 320,000,000.00
Contrato 5 $ 250,000,000.00
Condomi
2019 2
Trimestre 3 Trimestre 4 Trimestre 1

$ 200,000,000 $ 350,000,000 $ 150,000,000


$ 150,000,000 $ 230,000,000 $ 190,000,000

$ 350,000,000 $ 580,000,000 $ 340,000,000

PRESUPUE
Trimestre 3 Trimestre 4 Trimestre 1
$ 350,000,000 $ 580,000,000 $ 340,000,000

TORES DE INCERTIDUMBRE
Valor final Desviacion
$ 30,000,000.00 50%
$ 45,000,000.00 50%
$ 45,000,000.00 -25%
$ 75,000,000.00 25%
$ 90,000,000.00 20%
24%

TORES DE INCERTIDUMBRE
Valor final Desviacion
$ 300,000,000.00 50%
$ 450,000,000.00 50%
$ 400,000,000.00 -11%
$ 1,100,000,000.00 22%
$ 900,000,000.00 20%
26%

TORES DE INCERTIDUMBRE
Valor final Desviacion
$ 700,000,000.00 40%
$ 1,150,000,000.00 64%
$ 2,000,000,000.00 33%
$ 1,100,000,000.00 22%
$ 650,000,000.00 30%
38%

TORES DE INCERTIDUMBRE
Valor final Desviacion
$ 400,000,000.00 100%
$ 1,150,000,000.00 64%
$ 1,350,000,000.00 13%
$ 950,000,000.00 6%
$ 500,000,000.00 25%
41%

TORES DE INCERTIDUMBRE
Valor final Desviacion
$ 135,000,000.00 -10%
$ 300,000,000.00 67%
$ 430,000,000.00 23%
$ 350,000,000.00 17%
$ 175,000,000.00 -13%
17%

TORES DE INCERTIDUMBRE
Valor final Desviacion
$ 125,000,000.00 25%
$ 185,000,000.00 -7%
$ 380,000,000.00 9%
$ 300,000,000.00 -6%
$ 235,000,000.00 -6%
3%
Condominio Palladio
2020
Trimestre 2 Trimestre 3 Trimestre 4

$ 240,000,000 $ 100,000,000 $ 70,000,000


$ 210,000,000 $ 300,000,000 $ 250,000,000

$ 450,000,000 $ 400,000,000 $ 320,000,000

PRESUPUESTO ORIGINAL
Trimestre 2 Trimestre 3 Trimestre 4
$ 450,000,000 $ 400,000,000 $ 320,000,000
2021
Trimestre 1 Trimestre 2 Trimestre 3

$ 175,000,000
$ 244,000,000 $ 292,000,000 $ 213,000,000
$ 150,000,000 $ 125,000,000
$ 100,000,000
$ 419,000,000 $ 442,000,000 $ 438,000,000

Trimestre 1 Trimestre 2 Trimestre 3


$ 419,000,000 $ 442,000,000 $ 438,000,000
EXPERTO BASE DE DATOS
Trimestre 4
Incertidumbre
Total $
$ 20,000,000 24%
$ 200,000,000 26%
$ 1,785,000,000 38%
$ 2,279,000,000 41%
$ 275,000,000 17%
$ 89,000,000 $ 189,000,000 3%
$ 89,000,000 $ 4,748,000,000

Trimestre 4 INCERTIDUMBRE + ESCALACIÓN


$ 89,000,000 $ 2,097,933,547.62

P+i+e
$ 6,845,933,547.62
PERTO BASE DE DATOS BANREP

Contingencia I Escalacion Contingencia E


$ 4,800,000.00 2.00% $ 400,000.00
$ 52,444,444.44 2.00% $ 4,000,000.00
$ 677,733,333.33 8.00% $ 142,800,000.00
$ 945,061,507.94 8.00% $ 182,320,000.00
$ 46,029,761.90 8.00% $ 22,000,000.00
$ 5,224,500.00 8.00% $ 15,120,000.00

$ 1,731,293,547.62 $ 366,640,000.00
TOTAL DESVIACION VALOR FINAL

$ 5,200,000.00 26% $ 25,200,000.00


$ 56,444,444.44 28% $ 256,444,444.44
$ 820,533,333.33 46% $ 2,605,533,333.33
$ 1,127,381,507.94 49% $ 3,406,381,507.94
$ 68,029,761.90 25% $ 343,029,761.90
$ 20,344,500.00 11% $ 209,344,500.00

$ 2,097,933,547.62 44% $ 6,845,933,547.62


PLAN DE RIESGOS
PROYECTO: CONDOMINIO PALLADIO

INDENTIFICADOR DE RIESGOS EXPERTO


ITEM PROBABILIDAD
1 LICENCIAS Y PERMISOS
1.1 Cambio de Normativa Ambiental 55%
1.2 EIA mal elaborado 85%
1.3 Estudios Incompletos 45%
1.4 Negación de Licencias y Permisos 45%
1.5 Retrasos en la aprobación de la licencia 55%
1.6 Documentos de la Licencia Falsos 35%
1.7 Sobrecostos en la Licencia 75%

2 DISEÑOS
2.1 Datos de especificacion y/o incompletos 54%
2.2 Diseños mal elabarados 64%
2.3 Entrega tardia de los planos 85%
2.4 Diseños fuera de las normas 45%
2.5 Sobrecostos en los diseños 75%

3 GESTION DE COMPRAS
3.1 Falta de materiales 92%
3.2 Sobrecostos en los precios de los materiales 55%
3.3 Demora en los despachos 30%
3.4 No se compra lo necesitado en el proyecto 45%
3.5 Mala calidad de los materiales comprados 40%
3.6 Fluctuacion del precio del dólar 80%

4 CONSTRUCCIÓN
4.1 RRHH insuficientes 60%
4.2 Financiacion deficiente (Mal flujo de caja) 50%
4.3 Fenomenos metereologicos 90%
4.4 Cumplimiento de especificaciones 65%
4.5 Falta de materiales 35%
4.6 Personal no calificado 80%
4.7 Acciedentes laborales 80%

5 MONTAJE DE EQUIPOS
5.1 Retrasos en la llegada de los equipos 45%
5.2 Accidentes laborales 85%
5.3 Personal no competente para las instalaciones 35%
5.4 Bajo rendimiento del montaje 65%

6 MONTAJE DE EQUIPOS
6.1 Daños de equipos durante las pruebas 95%
6.2 No disponibilidad del personal competente 80%
EXPERTO
PXI PLAN RESPUESTA
IMPACTO

95% 52%
95% 81% Contrato un experto
90% 41%
97% 44%
92% 51%
92% 32%
94% 71% Acuerdos con las entes correspondientes

75% 41%
85% 54%
90% 77% Aumento de nomina ingenieril
65% 29%
85% 64%

95% 87% Gestion de preacuerdo con empresas


85% 47%
75% 23%
92% 41%
85% 34%
99% 79% Adecuear recursos de reserva

95% 57%
85% 43%
75% 68%
92% 60%
85% 30%
95% 76% Dictar capacitaciones
99% 79% Contratar experto en SISO

85% 38%
60% 51%
75% 26%
85% 55%
95% 90% Comprar equipos de recambio
55% 44%
RESPONSABLE FECHA LIMITE ESTADO CONTINGENCIA

Gustavo Duque 3/31/2019 ACTIVO $ 15,000,000.00

Oscar Ortiz 3/31/2019 PASIVO

Andres Valenzuela 3/31/2019 ACTIVO $ 30,000,000.00

Pedro Quiroz 4/15/2019 PASIVO $ 100,000,000.00

Julio Gonzalez 4/25/2019 PASIVO $ 120,000,000.00

Ricardo Olmos 4/30/2019 PASIVO $ 30,000,000.00


Rafael Andrade 5/10/2019 PASIVO $ 15,000,000.00
Felix Lopez 5/25/2019 PASIVO $ 90,000,000.00

$ 400,000,000.00
$ 180,000,000.00
$ 580,000,000.00
$ 4,748,000,000.00
$ 5,328,000,000.00
DISPARADOR ESTRATEGIA ESTRATEGIA

Negativo
Mitigar
Ineficacia del contratista Transferir Transferir
Evitar
Aceptar
Escalar

Tardias en el proceso de obtencion de licencias

Muchos trabajos en simultaneo para el contratista Mitigar

Escaces de materiales por la pandemia Transferir

Disminucion de inversion extranjera Mitigar

Baja gestion para acceder al proyecto Transferir


Aumentos en indices de seguridad en el proyecto Transferir
Inexperiecia del personal en ejecuccion Mitigar

RESERVA DE CONTINGENCIA
RESERVA GERENCIAL
TOTAL RESERVAS
PRESUPUESTO ORIGINAL
PRESUPUESTO DEL PROYECTO
ESTRATEGIA

Positivo
Explorar
Compartir
Mejorar
Aceptar
Escalar
RIESGOS NEGATIVOS

100% 10% 20% 30% 40% 50% 60% 70%

90% 9% 18% 27% 36% 45% 54% 63%

80% 8% 16% 24% 32% 40% 48% 56%

70% 7% 14% 21% 28% 35% 42% 49%


IMPACTO

60% 6% 12% 18% 24% 30% 36% 42%

50% 5% 10% 15% 20% 25% 30% 35%

40% 4% 8% 12% 16% 20% 24% 28%

30% 3% 6% 9% 12% 15% 18% 21%

20% 2% 4% 6% 8% 10% 12% 14%

10% 1% 2% 3% 4% 5% 6% 7%

10% 20% 30% 40% 50% 60% 70%

PROBABILIDAD

CATEGORIAS DEL RIESGO NEGATIVO

0% - 30% RIESGO BAJO

31% - 70% RIESGO MEDIO

71% - 100% RIESGO ALTO


TIVOS RIESGOS POSITIVOS

80% 90% 100% 100% 90% 80% 70% 60%

72% 81% 90% 90% 81% 72% 63% 54%

64% 72% 80% 80% 72% 64% 56% 48%

56% 63% 70% 70% 63% 56% 49% 42%

IMPACTO
48% 54% 60% 60% 54% 48% 42% 36%

40% 45% 50% 50% 45% 40% 35% 30%

32% 36% 40% 40% 36% 32% 28% 24%

24% 27% 30% 30% 27% 24% 21% 18%

16% 18% 20% 20% 18% 16% 14% 12%

8% 9% 10% 10% 9% 8% 7% 6%

80% 90% 100% 100% 90% 80% 70% 60%

AD PROBABILIDAD

O NEGATIVO CATEGORIAS DEL RIESGO POSI

RIESGO BAJO 0% - 30%

RIESGO MEDIO 31% - 70%

RIESGO ALTO 71% - 100%


RIESGOS POSITIVOS

50% 40% 30% 20% 10% 100%

45% 36% 27% 18% 9% 90%

40% 32% 24% 16% 8% 80%

35% 28% 21% 14% 7% 70%

30% 24% 18% 12% 6% 60%

25% 20% 15% 10% 5% 50%

20% 16% 12% 8% 4% 40%

15% 12% 9% 6% 3% 30%

10% 8% 6% 4% 2% 20%

5% 4% 3% 2% 1% 10%

50% 40% 30% 20% 10%

PROBABILIDAD

RIAS DEL RIESGO POSITIVO

RIESGO BAJO

RIESGO MEDIO

RIESGO ALTO
PROYECTO: CONDOMINIO PALLADIO
ESTIMACION COSTOS (d) METODO PERT

COSTO OPTIMISTA COSTO MÁS PROBABLE COSTO PESIMISTA

INICIO
Licencias y permisos $ 20,000,000.00 $ 35,000,000.00 $ 45,000,000.00
Diseños $ 200,000,000.00 $ 225,000,000.00 $ 240,000,000.00
Compras $ 1,785,000,000.00 $ 1,900,000,000.00 $ 2,300,000,000.00
Construccion $ 2,279,000,000.00 $ 2,500,000,000.00 $ 3,000,000,000.00
Instalacion de equipos $ 275,000,000.00 $ 300,000,000.00 $ 385,000,000.00
Pruebas y p en marcha $ 189,000,000.00 $ 210,000,000.00 $ 260,000,000.00
FIN
TOTALES $ 4,748,000,000.00 $ 5,170,000,000.00 $ 6,230,000,000.00
OMINIO PALLADIO
±1 ơ 84.13% (D)

COSTO MEDIO 50% DE ơ T=ơ²


PROBABILIDAD DESVIACION ESTANDAR (Varianza)

$ 34,166,666.67 $ 2,361,111.11 $ 5,574,845,679,012


$ 223,333,333.33 $ 3,888,888.89 $ 15,123,456,790,124
$ 1,947,500,000.00 $ 27,083,333.33 $ 733,506,944,444,444
$ 2,546,500,000.00 $ 44,583,333.33 $ 1,987,673,611,111,110
$ 310,000,000.00 $ 5,833,333.33 $ 34,027,777,777,778
$ 214,833,333.33 $ 4,305,555.56 $ 18,537,808,641,975

$ 5,276,333,333.33 $ 2,794,444,444,444,440
±1 ơ
DESVIACION ESTANDAR $ 52,862,505.09 $ 5,329,195,838.42
PROBABILIDAD 84.13%
$ 264,920,848.60 RESERVA DE CONTINGENCIA
±2 ơ 97.73% (D) ±3 ơ 99.99% (D)

±2 ơ ±3 ơ
$ 5,382,058,343.51 $ 5,434,920,848.60
97.73% 99.99%
SERVA DE CONTINGENCIA 0.0512419436373055
ANALISIS CUANTITATIVO DE RIESGOS
VALOR MONETARIO ESPERADO

Televisor 50¨ LG UHD TV Ganancia COP 2,099,900


Probabilidad 80%

Pérdida COP 400,000


Probabilidad 20%

Comprar Televisor Televisor 50¨ LG Nanocell Ganancia COP 2,599,900


UHD TV, Nanocell o OLED Probabilidad 88%

Pérdida COP 400,000


Probabilidad 12%

Televisor 50¨ LG OLED Ganancia COP 3,800,000


Probabilidad 95%

Pérdida COP 400,000


Probabilidad 5%
Funcione Bien COP 1,679,920
Funcion Mal COP 80,000
COP 1,599,920

Funcione Bien COP 2,287,912


Funcion Mal COP 48,000
COP 2,239,912

Funcione Bien COP 3,610,000


Funcion Mal COP 20,000
COP 3,590,000
PLAN DE GESTION

Nombre del Proyecto: CONDOMINIO PALLADIO

TIPO
No. CONTRATO # EDT
(F, R, T-M)

1 Contratación licencias y permisos 1.1 F

2 Contratación diseños 2.1 F

3 Contratación de Gestión de compras 3.1 R

4 Contratación de construcción 4.1 T-M

5 Contratación de Instalación de equipos 5.1 F

6 Contratación de Pruebas y P. en marcha 6.1 F

TIPO DE CONTRATO:

F: PRECIO FIJO

R: COSTO REEMBOLSABLE

T-M: TIEMPO Y MATERIALES


PLAN DE GESTION DE ADQUISICIONES

Fecha
Actualización:

DURACIÓN
MONTO $ RESPONSABLE
trimestres

$ 20,000,000 Un trimestre Adriana Carmona

$ 200,000,000 Un trimestre Indira Serrano

$ 1,785,000,000 Ocho trimestres Eva Díaz

$ 2,279,000,000 Díez Trimestres Roberto Maldonado

$ 275,000,000 Dos trimestres Julio Sanchéz

$ 189,000,000 Dos trimestres Daniela Castillo


Versión: 1A

RIESGOS

Licencias falsas

Altos costos de los diseños del proyecto

Mala calidad de materiales

Contratar mano de obra no calificado o con poca experiencia

Demoras en el montaje de los equipos

Personal sin experiencia


PLAN DE GESTION DE COM

Nombre del Proyecto: CONDOMINIO PALLADIO

No. INFORME / REUNION FRECUENCIA

1 Reunión de planificación de la línea base del alcance Unica

2 Reunión del inicio del proyecto Unica

3 Reunión del plan de dirección del proyecto Unica

4 Reunión del avance del proyecto Semanal

5 Reunión del avance del proyecto Mensual

FRECUENCIA: Diaria, Semanal, Quincenal, Mensual, Bimestral

PARA QUIEN: Directores, Gerentes, Cliente, Trabajadores

CUANDO: Colocar Fecha y Hora

DONDE: Lugar Físico o Virtual


PLAN DE GESTION DE COMUNICACIONES

Fecha
Actualización:01/03/2019

PARA QUIEN CUANDO DONDE

Interesados y Gerente
Marzo 03/2019 Oficina
del proyecto

Gerente del proyecto Marzo 24/2019 Campamento

Interesados y Gerente
Abril 20/2019 Oficina
del proyecto

Grupo de trabajo Mayo 05/2019 Campamento

Cliente Marzo 30/2019 Campamento


Versión: 1-A

RESPONSABLE

Dana Morales

Mara Castro

María Martínez

Carlos Carmona

Daniel Torres
Nombre del Proyecto: CONDOMINIO PALLADIO
IDENTIFICACION

NOMBRE EMPRESA LOCALIZACION ROL EN EL PROYECTO

INTERNOS

Ándres Castillo AMARILO Director del proyecto

Carlos Serrano AMARILO Ingeniero

Omar Augusto AMARILO Maestro de Obra

Ricardo Benavidez AMARILO Gestor del proyector

Juan Martínez AMARILO Albañil

EXTERNOS

Martina Gonzáles INDEPENDIENTE Cliente

Dairo Matelo CONSTRUAGIL Proveedor

Gustavo Pedroza INDEPENDIENTE Patricinador

Felipe Monterroza CURADURIA Curador


PLAN DE GESTION DE INTERESADOS

EVALUACION

INFORMACION CONTACTO REQUERIMIENTOS EXPECTATIVAS INFLUENCIA

3014568796

3102458746

3006487854

3215445874

3046981245

3158759602

3057895005

3045786556

3125677844

Nombre del Proyecto: CONDO


Com

Desconoc
Interesado

e
Director del
proyecto
Equipo de
ingenieros
Equipo de
direccion del
proyecto

Maestros de obra

Equipo de
albañiles
Clientes X
Proveedores X
Curaduria
Patrocinador

Notas:
X: Actual ; D: deseado
A: Alto ; B: Bajo
Estrategias: Gestionar de cerca (A-A); Mantener satisfe
Fecha
Actualización: 27-Oct-22 Versión: 1-A

CLASIFICACION PLAN DE GESTION

INTERNO / APOYO / NEUTRAL /


FASE DE INTERES PODER INTERES ESTRATEGIA
EXTERNO OPOSITOR

INTERNO APOYO A A GESTIONAR CERCA

INTERNO APOYO A A GESTIONAR CERCA

INTERNO NEUTRAL B B MONITOREAR

INTERNO APOYO B A INFORMAR

INTERNO NEUTRAL B B MONITOREAR

EXTERNO APOYA A B MANTENER SATISFECHO

EXTERNO APOYA B A INFORMAR

EXTERNO APOYA A B MANTENER SATISFECHO

EXTERNO NEUTRAL B B MONITOREAR

MATRIZ DE INTERESADOS

Directo
r del
Nombre del Proyecto: CONDOMINIO PALLADIO Fecha actualización:
Proyect
o:
Influencia
Compromiso

Poder /

Interés
Se resiste

Neutral

Apoya

Líder
X A A A

X A A

X B A

X B B

X B B
D A B
D B A
X B B
D A B

de cerca (A-A); Mantener satisfecho (A-B); Informar (B-A); Monitorear (B-B)


Versión:
Estrategia

Gestionar cerca

Gestionar cerca

Informar

Monitorear

Monitorear
Mantener satisfecho
Informar
Monitorear
Mantener satisfecho