GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES


2022-23
ABSTRACT BOOKLET
(Applicable from 01.06.2022)
DETAILS OF COMMITTEE FORMED FOR PREPARATION OF
COMMON SCHEDULE OF RATES FOR 2022-23
(Reference - Government Resolution Marathi No.MIS-2212/(343/12)/MI-2
Mantralaya Mumbai 400032 dated 05/07/2014)

1) C.E.(SP), W.R.D., Pune - President

2) C.E. Kokan Region, W.R.D. Mumbai - Member

3) C.E.(SP), W.R.D., Amaravati - Member

4) C.E. & C.A. (CADA) Aurangabad - Member

5) C.E.(WR), W.R.D., Nagpur - Member

6) C.E. Koyana Project, Pune - Member

7) C.E. (WR), W.R.D. Pune - Member

8) S.E. Thane irrigation circle ,Thane - Member

9) S.E. Kukadi Irrigation Circle, Pune - Member Secretary


DETAILS OF SUBCOMMITTEE FOR PREPARATION OF
COMMON SCHEDULE OF RATES FOR 2022-23
Sr.No. Component of work Members of subcommittee
(1) Additional Lead Charges of all CO-ORDINATOR
Materials Upto 500 Km & Lift C.E., (Civil) Hydro Electrical Project
Charges by Head Load
And Quality Control
MEMBERS
1)S.E.Koyana Design Circle, Pune
(2) Excavation & Embankment CO-ORDINATOR
C.E., (Civil) Hydro Electrical Project
And Quality Control
MEMBERS
1)S.E. Quality Control Circle, Pune.
(3) Concrete Work including CO-ORDINATOR
Centering, UCR Masonry, Brick
Masonry & R.C.C. Pipes C.E.(WR), WRD, Pune
MEMBERS
1) S.E. Sangli Irrigation Circle, Sangli
2) S.E. South Kokan Irrigation Circle, Oras,
Sindhudurga.
(4) Tunnel Works CO-ORDINATOR
C.E.(SP), WRD, Pune
MEMBERS
1) S.E.Kukadi Irrigation Circle, Pune.
2) S.E.Osmanabad Irrigation Circle,
Osmanabad.
(5) Surveying & Investigation CO-ORDINATOR
C.E.(SP), WRD, Amravati
MEMBERS
1) S.E. Akola Irrigation Circle, Akola
2) S.E. Buldhana Project Circle, Buldhana.
(6) Hydrometeorology CO-ORDINATOR
C.E. Planning & Dam Safety, Nashik,
MEMBERS
1) S.E.DCP and H Circle, Nashik.
(7) Valuation and Rehabilitation CO-ORDINATOR
Work C.E.(SP), WRD, Amaravati.
MEMBERS
1) S.E. A.I.P.C. Amaravati.
(8) Flow Measuring Devices CO-ORDINATOR
C.E.(WR), WRD, Nagpur
MEMBERS
1) S.E. (CADA), Nagpur
Sr.No. Component of work Members of subcommittee

(9) Marking Blue Line & Red Line CO-ORDINATOR


C.E.(WR), WRD, Pune
MEMBERS
1)S.E., Pune Irrigation Circle, Pune.
(10) Land Reclamation Work & Soil CO-ORDINATOR
Survey
C.E. (WR), WRD, Pune.
MEMBERS
1) S.E. & Director, Irrigation Research &
Development, Pune.
(11) Maintenance & Repairs CO-ORDINATOR
C.E. & C.A., CADA, Aurangabad
MEMBERS
1) S.E., Thane Irrigation Circle, Thane.
2) S.E. (CADA), Aurangabad
3) S.E. Upper Wardha Circle, Amravati
(12) Lift and Gravity Drain Pipe CO-ORDINATOR
Distribution Network C.E.(WR), WRD, Pune
C.E.(WR), WRD, Nagpur
MEMBERS
1) S.E. Sangli Irrigation Circle, Sangli.
2) S.E. Mechanical Circle, Pune
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
INDEX
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

General Note with annexure 1 & 2 1 to 7

Rates of consruction materials,Labour & Machinary rates 8 to 14


SECTION-01-Lead Charges Statements 15 to 20
I I Lead Charges Statement I
II II Lead Charges Statement II
SECTION-02 -Excavation & Embankment (Item No. EW 1 to EW 26) 21 to 25
1 EW 1 Excavation in Soil

2 EW 2 Excavation in Hard Murum

3 EW 3 Excavation in Soft Rock

4 EW 4 Excavation in Hard rock by Blasting

5 EW 5 Excavation in Hard rock by Control Blasting

6 EW 6 Excavation in hard rock by Breaker

7 EW 7 Watering the embankment

8 EW 8 Compaction of bankwork

9 EW 9 Cut off trench filling using available material


10 EW 10 Hearting embankment using available material
11 EW 11 Casing embankment using available material
12 EW 12 C.O.T. filling - material from borrow areas (Government acquired land)
13 EW 13 Hearting embankment from borrow areas (Government acquired land)
14 EW 14 Casing embankment from borrow areas (Government acquired land)

15 EW 15 C.O.T. filling - material from borrow areas (Private land- contractors own material)

16 EW 16 Hearting embankment from borrow areas (Private land- contractors own material)

17 EW 17 Casing embankment from borrow areas (Private land- contractors own material)

18 EW 18 CNS material lining to canals- borrow area (Government acquired land)

19 EW 19 CNS material lining to canals - borrow area (Private land- contractors own material)

20A EW 20A Providing and constructing 150 mm thick unscreened sand layer
20B EW 20B Providing and constructing Quarry Spalls
21 EW 21 Providing and constructing 300 mm thick dry rubble stone pitching layer
22 EW 22 Providing and constructing 450 mm thick dry rubble stone pitching
23 EW 23 Dry rubble rock-toe
24 EW 24 Longitudinal and Cross graded filter drains
25 EW 25 Vetical or inclined graded filter media

26 EW 26 Dewatering by pumping out water collected with 10 to 19 HP Diesel & Electrical pumps
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

SECTION-03- Concrete Works including Centering, Masonry & RCC Pipes (CC 1 to CC 47) 26 to 39

Dam and allied works

Foundation and bedding


Cement concrete M-10 for foundation and bedding
27 CC 1A
a)M10(20MSA) b)M10(40 MSA) c)M10(80 MSA)
Cement concrete M-10 for foundation and bedding (With 50 % GGBS)
CC 1B
a)M10(20MSA) b)M10(40 MSA) c)M10(80 MSA)
Cement concrete M-15 for foundation and bedding
28 CC 2A
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Cement concrete M-15 for foundation and bedding (With 50 % GGBS)
CC 2B
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Sub and Superstructure
Cement concrete M-15 for P.C.C.
29 CC 3A
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Cement concrete M-15 for P.C.C. (With 50 % GGBS)
CC 3B
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Cement concrete M-20 for R.C.C.
30 CC 4A
a)M20(20MSA) b)M20(40 MSA)
Cement concrete M-20 for R.C.C. (With 50 % GGBS)
CC 4B
a)M20(20MSA) b)M20(40 MSA)
31 CC 5A Cement concrete M-25(20 MSA) for R.C.C.
CC 5B Cement concrete M-25(20 MSA) for R.C.C. (With 50 % GGBS)
Canal and Allied works
Cement concrete M-15(20 MSA) for Canal Lining
32 CC 6A
a)Bed lining b)Side lining i)curing compound ii)curing with water
Cement concrete M-15(20 MSA) for Canal Lining (With 50 % GGBS)
CC 6B
a)Bed lining b)Side lining i)curing compound ii)curing with water
Cement concrete M-15(20 MSA) for Mechanical Paver Canal Lining
33 CC 7A
A)Bed lining B)Side lining i)curing compound ii)curing with water

Cement concrete M-15(20 MSA) for Mechanical Paver Canal Lining (With 50 % GGBS)
CC 7B
A)Bed lining B)Side lining i)curing compound ii)curing with water

34 CC 8 Chip masonry in CM 1:8


35 CC 9 Providing, laying, erecting and dismantling M.S. plates form work for side lining
Providing and laying polythene film
36 CC 10
A)200 micron B)400 micron C)600 micron
37 CC 11 UCR masonry 40 and 45 cm. thickin C.M. 1:5 for side lining of the canal
38 CC 12 Cement plaster 6 mm thick in C.M. 1:3 single coat

Canal Structures

Cement concrete M-10 for foundation and bedding


39 CC 13A
a)M10(20MSA) b)M10(40 MSA) c)M10(80 MSA)
Cement concrete M-10 for foundation and bedding (With 50 % GGBS)
CC 13B
a)M10(20MSA) b)M10(40 MSA) c)M10(80 MSA)
Cement concrete M-15 for foundation and bedding
40 CC 14A
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Cement concrete M-15 for foundation and bedding (With 50 % GGBS)
CC 14B
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Cement concrete M-15 for R.C.C.
41 CC 15A
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Cement concrete M-15 for R.C.C. (With 50 % GGBS)
CC 15B
a)M15(20MSA) b)M15(40 MSA) c)M15(80 MSA)
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23
Cement concrete M-20 for R.C.C.
42 CC 16A
a)M20(20MSA) c)M20(40 MSA)
Cement concrete M-20 for R.C.C. (With 50 % GGBS)
CC 16B
a)M20(20MSA) c)M20(40 MSA)
43 CC 17A Cement concrete M-25(20 MSA) for R.C.C.

CC 17B Cement concrete M-25(20 MSA) for R.C.C. (With 50 % GGBS)

44 CC 18A Cement concrete M-25(20 MSA) for trough of aqueduct


CC 18B Cement concrete M-25(20 MSA) for trough of aqueduct (With 50 % GGBS)
45 CC 19 Expansion / construction joint with 18 SWG copper plate
46 CC 20 Expansion / construction joint with shalitex super expansion pad
47 CC 21 Expansion / construction joint with G.I. sheet 24 gauge and 22.5 cm. wide
48 CC 22 Cutting, bending, hooking, laying in position and tying M.S./HYSD/TMT bars
Centering Items

49 CC 23 Providing, erecting and laying steel shuttering formwork


50 CC 24 Providing and erecting steel props centering

U.S.R.Masonary

51 CC 25 U.C.R. masonry in C.M. 1:5 in foundation


52 CC 26 U.C.R. masonry in C.M. 1:6 in foundation
53 CC 27 U.C.R. masonry in C.M. 1:5 in superstructure
54 CC 28 Providing khandki facing to the face of masonry with pointing in C.M. 1:2
55 CC 29 Dry stone rubble masonry excluding pointing
56 CC 30 Providing pointing with cement mortar for stone masonry
57 CC 31 Coarse rubble masonry II sort in C.M. 1:4.5 for super structure
58 CC 32 Cutting rectangular grooves of size 10 cm. x 10 cm. in stone masonry
59 CC 33 Rough dressed cut stone coping 23 cm. thick in C.M. 1:5

60 CC 34 Colgrout U.C.R. masonry in C.M. 1:3 (43% mortar)


Brick Masonary
61 CC 35 B.B. masonry for super structure
62 CC 36 B.B. masonry for super structure (Half brick wall)
Pipe Laying
63A CC 37A Providing and suppling R.C.C. pipe of NP2 class
63B CC 37B Laying and jointing R.C.C. pipe of NP2 class
64A CC 38A Providing and suppling R.C.C. pipe of NP3 class
64B CC 38B Laying and jointing R.C.C. pipe of NP3 class
65 CC 39 Laying and jointing R.C.C. pipe of P1 class
66 CC 40 Cement concrete of grade M-20 for Staunch wall
67 CC 41 RCC Boundary/Guard/Chainage blocks of size 75 x 20 x 20 cm
68 CC 42 RCC Km/half km/submergency boundary blocks of size 95 x 20 x 20 cm
69 CC 43 Canal information board of 1.2x0.75 m
70 CC 44 Rubble soling below foundation
71 CC 45 Back filling up to ground level behind the canal structures

72 CC 46 Providing and constructing contraction joints by fixing 310 mm wide PVC water stop

CC 47 Supplying, laying and joining Bituminous Geomembrane (BGM) as hydraulic liner over canal
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23
SECTION-04- Tunnel Works (Item TN 1 to TN 11 ) 40 to 42

73 TN 1 Excavation of tunnel in all types of rock through itself / adit


74 TN 2 Excavation of tunnel in all types of rock through Shaft
75 TN 3 Excavation of Shaft
76 TN 4A Steel rock bolts 25 mm dia with resin bond cement capsule anchorage (Through adit )
TN 4B Steel rock bolts 25 mm dia with resin bond cement capsule anchorage (Through Shaft )
77 TN 5A Anchor bar of 25 mm diameter with resin bond cement capsule anchorage (Through adit )
TN 5B Anchor bar of 25 mm diameter with resin bond cement capsule anchorage (Through Shaft )

78 TN 6A Anchor bar of 32 mm diameter with resin bond cement capsule anchorage(Through adit )

TN 6B Anchor bar of 32 mm diameter with resin bond cement capsule anchorage (Through Shaft )
79 TN 7A Permanent structural steel supports (Through adit )
TN 7B Permanent structural steel supports (Through Shaft )
80 TN 8A Reinforcement steel for tunnel RCC works (Through adit )
TN 8B Reinforcement steel for tunnel RCC works (Through Shaft )
81 TN 9A M-30 plain Wet Shotcrete 50 mm thick (Through adit )
TN 9B M-30 plain Wet Shotcrete 50 mm thick (Through Shaft )
82 TN 10A Cement concrete M-20 for side and arch lining (Through adit )
TN 10B Cement concrete M-20 for side and arch lining (Through Shaft )
83 TN 11A Cement concrete M-20 for Invert (Kerb and bed) lining (Through adit )
TN 11B Cement concrete M-20 for Invert (Kerb and bed) lining (Through Shaft )
SECTION-05 Surveying & Investigation (Item SI 1 to SI 17) 43 to 46

84 SI 1 Double levelling using Auto level


Block contour survey of 10m x 10m grid
85 SI 2
A)Total station B)DGPS
Block contour survey of 15 m x 15 m grid
86 SI 3
A)Total station B)DGPS
Block contour survey of 20m x 20m grid
87 SI 4
A)Total station B)DGPS
Block contour survey of 30m x 30m grid
88 SI 5
A)Total station B)DGPS
Block contour survey of 60m x 30m grid
89 SI 6
A)Total station B)DGPS
Block contour survey of 150m x 30m grid
90 SI 7
A)Total station B)DGPS
91 SI 8 Carrying out line survey with Total Station

92 SI 9 Survey for main canal, branches, distributaries with Total Station


Preparation of detailed construction plan for Piped Distribution network
93 SI 10 A)Total station B)DGPS

94 SI 11 Providing permanent bench mark

95 SI 12 Fixing precast RCC alignment blocks (Pillar)


96 SI 13 Supplying labour for Double levelling
97 SI 14 Taking trial bore for detailed investigation with NX diamond drill
98 SI 15 Providing core box of M.S.of size 1.25mx0.35mx0.15m for
99 SI 16 Carrying out water intake test / permeability test
100 SI 17 Excavation for taking trial pits on final alignment of dam and canal
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

SECTION-06 Hydrometeorology (Item HD 1 to HD 7) 47 to 48

101 HD 1 Standard rain gauge station (Measurerement Clerk)

102 HD 2 Autographic Rain Gauge (Measurerement Clerk)

103 HD 3 Full climatic station [Measurerement Clerk]

104 HD 4 Gauge Discharge (Gauge Inspector)

105 HD 5 Gauge Discharge [ Measurment Clerk ]

106 HD 6 Gauge Discharge (Boat Driver)

107 HD 7 Gauge Discharge (Boat Chowkidar)


SECTION-07 Valuation of Rehabilitation works (Item VAL 1 to VAL 31 ) 49 to 52

108 VAL 1 Stone masonry in mud mortar in foundation and plinth


109 VAL 2 U.C.R.masonry in lime 1:6 mortar in foundation and plinth
110 VAL 3 B.B.masonry mud mortar in super structures
111 VAL 4 Arch like B.B. Masonry slab roofing
112 VAL 5 Providing 50 mm. mud plaster
113 VAL 6 Kud Walls with vertical posts, bamboos and tur/cotton/Paddy bushes
114 VAL 7 Providing 25 mm thick mud plaster

115 VAL 8 Kud walls with clothing of grass / other vegetation with vertical posts and bamboos

116 VAL 9 Kud walls including mud plaster 25 mm thick

117 VAL 10 Kud walls, split Bamboo knitted together and covered with 12 mm. thick mud plaster

118 VAL 11 Kud roofing with bamboos and balli rafter


119 VAL 12 Non teak wood Dhaba
120 VAL 13 Teak wood Dhaba
121 VAL 14 Split bamboo mesh
122 VAL 15 Mud boulder otta with earthen Ranjan
123 VAL 16 Mud Wall
124 VAL 17 Non teak doors/windows 40 mm. Thick with planked shutters
125 VAL 18 Non teak doors/windows fully pannelled
126 VAL 19 Doors ledged and braced with planked shutters
127 VAL 20 Jungle wood door
128 VAL 21 Country Teak Wood frame
129 VAL 22 Country Teak Wood plank ceiling
130 VAL 23 Non teak wood plank ceiling
131 VAL 24 Wooden shelf of country teak wood plank
132 VAL 25 Eaves board of country teak wood plank
133 VAL 26 T.W.frame and shutter to wall cupboard
134 VAL 27 Xpm Jalli with teak wood/ non teak wood frame
135 VAL 28 Half round single country tiled roofing
136 VAL 29 Medium grade G.I. pipe below C.G.I sheet roofing
137 VAL 30 Providing & fixing M.S.angle of size 35 x 35 x 6 mm.
138 VAL 31 Half round single country tiled roofing
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

SECTION-08 Flow Measuring Devices (Item FMD 1 to FMD 4) 53 to 55

139 FMD 1 Gauge plate of F.R.P.Sheet


140 FMD 2 Fiber glass reinforced plastics(FRP) " V notch"
141 FMD 3 Fiber glass reinforced plastics(FRP) cut throat flume ( CTF )
142 FMD 4 Fiber glass reinforced plastics(FRP) parshall flume
SECTION-09 Marking Blue Line & Red Line (Item BRL 1 to BRL 7) 56 to 58

143 BRL 1 Fixing control points by DGPS every One Km. along the both side of river .
144 BRL 2 Traverse Survey along river with cross section at 100 m .c/c
145 BRL 3 Delivering Contour map of 0.50 m. contour interval
146 BRL 4 Providing computerised detailed C/S drawings at 100 m interval with profile of river
147 BRL 5 Computation of Blue line and red line by using HEC-RAS software
148 BRL 6 Providing computerised detailed river alignment with contours
149 BRL 7 Marking of blue line& Red line on permanent structures like Bridges
SECTION-10 Land reclaimation Work & Soil Survey (Item LR 1 to LR 12) 59 to 60

150 LR 1 Collecting and filling soil samples


151 LR 2 Taking well observations in the command area
152 LR 3 Taking augur bores of 10 cm.dia. (Augur karkoon Not engaged departmentally )
153 LR 4 Taking augur bores of 10 cm.dia. (Augur karkoon engaged departmentally)
154 LR 5 Measuring drain discharge in every season
155 LR 6 Collecting & filling water samples
156 LR 7 Testing of soil sample
157 LR 8 Labour charges for removing grass, thorny shurbs,
158 LR 9 Taking open pits
159 LR 10 Carrying out infiltration tests at the location of open pits in the command area.
160 LR 11 Carrying out phase level mapping
161 LR 12 Carrying out drying, pounding, sieving of soil samples
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

SECTION-11 Maintenance & Repairs (Item MR 1 to MR 32 ) 61 to 67

162 MR 1 Dismantling the Stone Massonary in cement morter


163 MR 2 Dismantling the old lime concrete or cement concrete
164 MR 3 Dismantling R.C.C. works
165 MR 4 Cleaning cutting thorny shrubs bushes, grass
166 MR 5 Cutting down trees
167 MR 6 Numbering road and canal sides trees
168 MR 7 Removing dry silt from the canal bed
169 MR 8 Removing wet silt from canal bed
170 MR 9 Removing old paint from steel
171 MR 10 Primer Red Oxide Paint in two coats
172 MR 11 Anticorrosive coal tar black paint
173 MR 12 Anticorrosive Coal Tar Epoxy paint
174 MR 13 Two coats of flat oil paint to internal / external plastered surfaces
175 MR 14 Two coats of flat oil paint of approved colour to structural steel work and iron work
176 MR 15 Two coats of lead / zinc base oil paint / bituminous paint to wood
177 MR 16 Coal tar in one coat on previously painted wood work

178 MR 17 Applying geru wash and white wash to canal road side Km stones/Boundary stones

179 MR 18 Removing M.S. needles from the K.T. Weir


180 MR 19 Transportation of M.S.Needles

181 MR 20 Red oxide to the steel structure as a primary coat


182 MR 21 Fixing of M.S. Needles in weir openings after offset of the monsoon
183 MR 22 Cleaning by redrilling the vertical porous drain pipe
184 MR 23 Single coat of epoxy primer on old UCR
185 MR 24 Providing & applying of Epoxy Mortar layers to Monolith joint of Masonry Dam

186 MR 25 Welding 8 mm MS barfor ferrocement walling


187 MR 26 Ferrocement wall in CM 1:3
188 MR 27 Providing a Casagrande type Piezometer
189 MR 28 Providing electronic water level indicator
190 MR 29 Providing Twin Tube Piezometer
191 MR 30 Providing accessories required for Repairs to manifold system of twin tube piezometer
192 MR 31 Manufacturing, Supplying and Erection of sub assemblies of conventional plumb bob

193 MR 32 Manufacturing, Supplying, erection of sub assemblies of Inverted plumb bob

MR 33 Drilling 52-57 mm dia grout holes by percusson drilling equipment through masonry / rock.(A to D )
MR 34 Drilling 75 mm dia hole in masonry / rock by diamond drilling from foundation gallery
MR 35 Providing & injecting cementatious grout as per specification in the drilled holes.
Additional items MR 36 Racking and cleaning of masonary joints on upstrem face of dam.
MR 37 pointing of masonary joint on upstream face of dam with UV resinstance and anti shrink materials.
MR 38 filling deeper cavities or loose material area inside the masonary joints.

MR 39 Drilling 75 mm dia hole in masonry / rock by core drilling at required depth.


Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

SECTION-12-Lift Iirrigation Scheme & Pipe Distribution Network ( LIPDN 1 to LIPDN 71 ) 68 to 126

194 LIPDN 1 Excavation for deep trenches for laying rising main in Earth Soil
195 LIPDN 2 Excavation for deep trenches for laying rising main in Hard Murum
196 LIPDN 3 Excavation for deep trenches for laying rising main in Soft Rock
197 LIPDN 4 Excavation for deep trenches for laying rising main in Hard Rock by blasting
198 LIPDN 5 Murum bedding in trenches from available material
199 LIPDN 6 Murum bedding in trenches from borrow (Private land Contractors own material)
200 LIPDN 7 Providing and filling sand in trenches
201 LIPDN 8 Backfilling the trenches
202 LIPDN 9 Providing and Erecting , lowering and laying M.S. pipes
203 LIPDN 10 Lowering, laying M.S. pipes
204 LIPDN 11 Providing and Erecting tapers made out of MS plate
205 LIPDN 12 Providing and Erecting "Y" connection
206 LIPDN 13 Providing and Erecting "Y" and "T" branches
207 LIPDN 14 Providing and Erecting manhole covers
208 LIPDN 15 Providing and Erecting M S bends
209 LIPDN 16 Providing and Erecting short pipes, cants
210 LIPDN 17 Radiographic testing of welded butt joints in Rising main
211 LIPDN 18 Ultrasonic testing of field welded joints
212 LIPDN 19 Cleaning the surface of rising main pipe by Sand Blasting
213 LIPDN 20 Liquid epoxy coating system to the external surface of Rising Main Pipes
214 LIPDN 21 Liquid epoxy coating system to the interior surface of Rising Main Pipes
215 LIPDN 22 External 25 mm thick cement mortar coating in CM 1 : 3
216 LIPDN 23 Inner cement mortar in CM 1:1.5
217 LIPDN 24 Providing 'X' Ray Quality M.S. Welding for M.S. pipes
D.I.Pipe
218 LIPDN 25 Providing and supplying D.I. Pipes
219 LIPDN 26 Lowering, laying and jointing in proper grade and alignment D.I. Pipes
220 LIPDN 27 Providing and supplying ISI standard D. I. specials & fitting
221 LIPDN 28 Hydraulic testing of D.I. pipe line

P.V.C.Pipe
222 LIPDN 29 Providing and supplying P.V.C.Pipe
223 LIPDN 30 Lowering, laying and jointing in proper grade and alignment P.V.C.Pipe
224 LIPDN 31 Providing and supplying ISI standard P.V.C. specials & fitting
225 LIPDN 32 Hydraulic testing of P.V.C.Pipe line

P.V.C.O.Pipe
226 LIPDN 33 Providing and supplying P.V.C.O. Pipes
227 LIPDN 34 Lowering, laying and jointing in proper grade and alignment P.V.C.O. Pipes
228 LIPDN 35 Providing and supplying ISI standardP.V.C.O. specials & fitting
229 LIPDN 36 Hydraulic testing of P.V.C.O. pipe line
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23

P.S.C.Pipe
230 LIPDN 37 Providing and supplying P.S.C. Pipes
231 LIPDN 38 Lowering, laying and jointing in proper grade and alignment P.S.C. Pipes
232 LIPDN 39 Providing and supplying ISI standard P.S.C. specials & fitting
233 LIPDN 40 Hydraulic testing ofP.S.C. pipe line

B.W.S.C.Pipe
234 LIPDN 41 Providing and supplying B.W.S.C. Pipes
235 LIPDN 42 Lowering, laying and jointing in proper grade and alignmentB.W.S.C. Pipes
236 LIPDN 43 Providing and supplying ISI standard B.W.S.C.specials & fitting
237 LIPDN 44 Hydraulic testing of B.W.S.C.pipe line

G.R.P.Pipe
238 LIPDN 45 Providing and supplying G.R.P. Pipes
239 LIPDN 46 Lowering, laying and jointing in proper grade and alignment G.R.P. Pipes
240 LIPDN 47 Providing and supplying ISI standard G.R.P. specials & fitting
241 LIPDN 48 Hydraulic testing of G.R.P. pipe line

H.D.P.E.Pipe

242 LIPDN 49 Providing and supplying H.D.P.E. Pipes

243 LIPDN 50 Lowering, laying and jointing in proper grade and alignment H.D.P.E. Pipes

244 LIPDN 51 Providing and supplying ISI standard H.D.P.E. specials & fitting

245 LIPDN 52 Hydraulic testing of H.D.P.E. pipe line

P.C.C. Pipe

246 LIPDN 53 Providing and supplying P.C.C. Pipes

247 LIPDN 54 Lowering, laying and jointing in proper grade and alignment P.C.C. Pipes

248 LIPDN 55 Providing and supplying ISI standard P.C.C. specials & fitting

249 LIPDN 56 Hydraulic testing of P.C.C. pipe line

Valves

250 LIPDN 57 Providing, supplying & erecting of approved make CI D/F reflux valves 100 to 600 mm

251 LIPDN 58 Providing, supplying & erecting of multi door CI D/F reflux valves 700 to 1200 mm

252 LIPDN 59 Providing, supplying & erecting of approved make DI or SGI D/F reflux valves

253 LIPDN 60 Providing, supplying & erecting of approved make multi door DI D/F reflux valves

254 LIPDN 61 Providing, supplying & erecting of approved make CS D/F reflux valves

255 LIPDN 62 Providing, supplying & erecting of approved make multi door CS D/F reflux valves

256 LIPDN 63 Providing, supplying & erecting of CI double flange sluice valve

257 LIPDN 64 P. S. & E. double flange Ductile Iron non-rising spindle soft seated Resilient seated sluice Valves

258 LIPDN 65 P. S. & E.of double flanged short body pattern type manually operated C.I. Butterfly Valve

259 LIPDN 66 P. S. & E. of Ductile Iron Double Flanged Double Eccentric Butterfly Valves

260 LIPDN 67 Providing, supplying & erecting of Air Valves - double orifice type

261 LIPDN 68 Providing, supplying & erecting of Kinetic Double Orifice type Air Valves

262 LIPDN 69 Electric Valve Actuator for non rising spindle type sluice valve, PN 1 & PN 1.6 rating

263 LIPDN 70 Dismantling Joints

264 LIPDN 71 Metallic Expansion Joints


GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-1

1.1 General Note with Annexure No. 1 & 2

1.2 Rates of Construction Materials,


Labour and Machinery use

1.3 Lead charges statement for Materials


महाराष्ट्र शासन, जलसंपदा विभाग

सामाईक दरसूची सन २०२२-२३


(1.1) सर्वसाधारण टिपणी

सामाईक दरसूची सन २०२२-२३ ही ददनाांक 01/06/2022 पासून अांमलात येईल. सदर दरसूची
सन २०२२-२३ मध्ये खालील प्रमुख बाबींचा समावेश करण्यात आला आहे .
1)र्स्तू र् सेर्ा कर :-
सामाईक दरसूची सन 2022-23 मधील सवव बाां धकाम सादहतयाांचे दर, सवव यांत्र सामग्रीचे दर
तसेच सवव बाबींचे दर हे वस्तु व सेवाकर दवरहीत (without GST) आहे त. अांदाजपत्रके मांजुर
करणा-या सक्षम अदधकारी याांनी Government of India, Ministry of finance (Dept. of
revenue) याांचे मार्फवत वेळोवेळी अद्ययावत प्रदसद्ध करण्यात येणा-या notifications
(Government of India, Ministry of Finance (Department of Revenue),
Notification No.15/2021-Central Tax (Rate), New Delhi, Dt.18th November,
2021) मधील प्रचदलत दराप्रमाणे वस्तु व सेवा कराच्या दराांची अांदाजपत्रकाांमध्ये गोषवा-या
(recapitulation sheet) मध्ये तरतूद करण्यात यावी.

2) स्र्ाटमत्र् शुल्क:-
वाळू, दगड, खडी, तसेच मातीकामाच्या बाबींसाठी लागणारे मुरूम, माती या गौण खदनजाांचे
स्वादमतव शुल्क या बाबीच्या दरामध्ये तसेच तयाचा वापर करून केलेल्या दरपृथ:करणात
अांतर्ूवत नाहीत. महसूल व वनदवर्ागाच्या वेळोवेळीच्या अदधसूचनेनस
ु ार गौणखदनज कदरताचे
स्वादमतव शुल्क अांदाजपत्रकाच्या गोषवाऱ्यामध्ये स्वतांत्रपणे घेण्यात यावे. मुरुम, खडी, दगड व
वाळू या गौण खदनजाांच्या स्वादमतव शुल्कावरील अदधर्ाराबाबत अांदाजपत्रके तयार करताांना
महाराष्ट्र शासन, उद्योग, उजा व कामगार मांत्रालय, मुांबई याांचेकडील पदरपत्रक दवचारात घ्यावे.

3) नैसर्गिक र्ाळू(Natural Sand):-


ज्या बाबींच्या दरपृथ:करणामध्ये वाळूचा अांतर्ाव आहे अशा सवव बाबींच्या दरपृथ:करणामध्ये
नैसर्गगक वाळुचा वापर गृहीत धरलेला आहे . नैसर्गगक वाळूचा दर रु.९८०.९० प्रदत घ.मी
(वाळूचा दर: रु.७४४.५० घ.मी. + उतखननाचा खचव :रु.२३६.४० प्रदत घ.मी.) इतका दवचारात
घेतलेला आहे . अांदाजपत्रक तयार करताना प्रतयक्षात नैसर्गगक वाळूसाठी गृहीत धरलेल्या
स्रोताच्या (source ) दठकाणचा मुळ दर तया दठकाणी दललाव झाले असल्यास दललावाचा दर
व तया दठकाणी दललाव झाले नसल्यास अशा दठकाणच्या वाळूसाठी दजल्हादधकारी याांनी
दनश्चचत केलेली हातची दकमत (offset price) आदण उपरोक्त नमुद केल्याप्रमाणे रु.
७४४.५० प्रदत घमी यामधील फरक दवचारात घेण्यात यावा .

1
महाराष्ट्र शासन, जलसंपदा विभाग

(उदाहरण :- वाळूच्या दललावाचा दर रु. 900 प्रदत घमी. वाळूच्या दरात अदतदरक्त घ्यावयाची
वाढ =900.00-७४४.५०=१५५.५० प्रदतघमी.)
4) कृ टिम र्ाळू (Artificial / Crushed Sand):-
4.1 ज्या कामाांमध्ये कृ त्रीम वाळू वापरणे प्रस्तादवत आहे , अशा कामाांची अांदाजपत्रके तयार
करताना तयामध्ये कृ त्रीम वाळू वापरासाठी रु.१७७०.२० प्रति घमी असा दर घेण्याि यावा
म्हणजेच दरपृथ:करण करिाना हा दर (रु.१७७०.२०प्रतिघमी) व अ क्र ३ मधील नैसर्गिक
वाळू चा दर (रु.९८०.९० प्रति घमी) यामधील फरक (रु.७८९.३० प्रतिघमी) तवचाराि घेण्याि
यावा.
4.2 कृ दत्रम वाळूसाठी आवचयक असणारी वहन अांतराची तरतूद ही कामाच्या दठकाणापासून
जवळच्या उपलब्ध क्रशर (CRUSHER) पासून दवचारात घेण्यात यावी.
5) मजुराांच्या सुटर्धा :-
शासन दनणवय क्रमाांक.दडएसआर-1090/सीआर-6453/पीएलएन-3, दद.14.07.1993 नुसार
मजुराांच्या सुदवधाांसाठी दरसूचीतील प्रतयेक बाबीमध्ये 1% तरतूद करण्यात आली आहे .
6) कामिार कल्याण उपकर :-
उद्योग व उजा दवर्ागाचे शासन दनणवय क्रमाांक बीसीए-2009/सीआर-108/लेबर 7-अ,
दद.17/06/2010 नुसार कामगार कल्याण उपकरासाठीची १ %ची तरतूद सामाईक दरसूचीतील
बाबीमध्ये दर दनश्चचत करताना दवचारात घेतलेली नाही. अांदाजपत्रक तयार करताना प्रतयेक
बाबीच्या दरपृथ:करणामध्ये कामगार कल्याण उपकराची 1 टक्के इतकी तरतूद करण्यात यावी.
7) टर्मा :-
दवत्त दवर्ागाचा शासन दनणवय क्रमाांक दवमासां-1008/प्र.क्र.28/98/शा.हमी, दद.19/08/1998
नुसार कामाच्या ककमतीच्या 1% ची दवमा कदरताची तरतूद सामाईक दरसूचीतील बाबीमध्ये दर
दनश्चचत करताना दवचारात घेतलेली नाही. अांदाजपत्रक तयार करताना दवमा कदरताची 1 टक्के
इतकी तरतूद अांदाजपत्रकाच्या गोषवाऱ्यात करण्यात यावी. कांत्राटदाराने प्रतयक्ष र्रल्यानुसार
दवमा शुल्काची प्रदतपूती १% च्या मयादे त करावेत.
8) मजुराांचे दर :- सन २०२२-२३ या वषाची सामाईक दरसूची तयार करताांना मजुराांचे दर हे
महाराष्ट्र शासन, जलसांपदा दवर्ाग, शासन दनणव य क्र.सांकीणव 2014/(289/14)/लपा-2,
मांत्रालय, मुांबई दद. 22.05.2017 नुसार व कामगार उपायुक्त, कायालयाकडू न प्राप्त पत्र
जा.क्र./काउआ/१९९४ तदनाांक ०२/०२/२०२२ नुसार मजुराांचे दर दनश्चचत करणेत आलेले
आहे त.
9) बाांधकाम साटित्याचे दर:-
9.1.लोह: दरसूची तयार करताना M.S./HYSD/TMT स्टीलचे round bar, structural steel,
MS plates इतयादी साठी दद.06/01/2022 रोजीचे जॉइन्ट प्लॅन्ट कदमटीने मुांबई साठी
दनश्चचत केलेले दर (GST दवरदहत) दवचारात घेतलेले आहे त. (उदा. JPC प्रमाणे PIG IRON

2
महाराष्ट्र शासन, जलसंपदा विभाग

चा मुांबईचा दर रु.57820/- , दरसूचीसाठी दवचारात घेतलेला दर = 57820/ 1.18 =


49000/-).
M.S./HYSD/TMT स्टीलचे round bar, structural steel चे दर हे कामाच्या जवळच्या
दजल्हा मुख्यालयाच्या दठकाणचे आहे त, असे गृहीत धरून तयानुसार अांदाजपत्रक करताना
वहन अांतर दवचारात घ्यावे. अांदाजपत्रक करते वेळी दर दवचलेषणासाठी तया तया वेळी
प्रचदलत असलेले जॉइन्ट प्लाांट कदमटीचे मुांबईसाठीचे दर आदण दरसूचीत दवचारात घेतलेले
दर यातील फरक दवचारात घ्यावा.
9.2 MS पाईप प्लेट साठीचे दर हे कळां बोली, दजल्हा- रायगड येथे उपलब्ध होतील असे दवचारात
घेऊन तयानुसार अांदाजपत्रकात तरतूद करणेत यावी.
9.3 दसमेंट: दरसूची तयार करताना दसमेंटचा दर (वस्तू सेवाकर दवरहीत) हा रु.258/- प्रदत बॅग
(50 दकलो) दवचारात घेतलेला आहे . अांदाजपत्रक करतेवळ
े ी दर दवचलेषणासाठी तया तया वेळी
प्रादे दशक सदमतीने दनश्चचत केलेले दर (वस्तू आदण सेवाकर दवरहीत) आदण दरसूचीतील दर
(रु.258/- प्रदत बॅग) यातील फरक दवचारात घ्यावा. दसमेंटचे दर हे जवळच्या टजल्िा
मुख्यालयाच्या दठकाणचे आहे त असे गृहीत धरून तयानुसार अांदाजपत्रक करताना वहन अांतर
दवचारात घ्यावे.
10) सर्वसाधारण बाबी:-
10.1 इमारती,पांपगृहाची स्थापतय कामे व रस्तयाांच्या कामाांसाठी साववजदनक बाांधकाम दवर्ागाची
दरसुची वापरण्यात यावी.तथादप कालव्यास छे दणाऱ्या रस्तापुलाच्या कामासाठी जलसांपदा
दवर्ागाची अदयावत दरसूची वापरण्यात यावी.
10.2 जलदनष्ट्कासन :
नाल्यावरील जलदनष्ट्कासन : या कामासाठी जलदनष्ट्कासन (Dewatering) आवचयक
असल्यास, अशा कामाांसाठी जलदनष्ट्कासनाकदरता नाला पातळी पयंतच्या कामाच्या एकू ण
ककमतीच्या 1 टक्का तरतूद अांदाजपत्रकात ठे वण्यात यावी.
नदीवरील जलदनष्ट्कासन : नदी वरील कामाांमध्ये जलदनष्ट्कासन (Dewatering) आवचयक
असल्यास, अशा कामाांसाठी जलदनष्ट्कासना कदरता नदी तळपातळी पयंतच्या कामाच्या
एकू ण ककमतीच्या 3 टक्के तरतूद ठे वण्यात यावी.
10.3 सामाईक दरसूची २०२२-२३ मध्ये फक्त खोदकाम आदण र्राव (बाब क्रमाांक EW 1 ते
EW26) या घटकबाबी कदरता व LIS &PDN या घटक बाबी अांतगवत बाब क्र LIPDN 1
ते LIPDN 4 या बाबी साठी सादहतया मध्ये 1 km initial lead गृहीत धरलेले आहे . ज्या
बाबी मध्ये वहनावळी साठी दटप्परची आवचयकता नाही तया बाबीमधून एक दकमी साठीची
वहनावळ वजा करावी.
10.4 जलसांपदा दवर्ाग, शासन पत्र क्र. सांकीणव -२०२०/२२०/ प्र. क्र.७२ /दनवसां -२ ददनाांक.
२५/११/२०२० व जा.क्र. सांकीणव -२०१९/प्र. क्र. ०३/२१९/ जसां(धोरण), ददनाांक

3
महाराष्ट्र शासन, जलसंपदा विभाग

२३/०७/२०२० अन्वये मांजरू केलेल्या Standard Specifications चा सांदर्व दरसूची मधील


स्तांर् क्र. ३ मध्ये दशवदवण्यात आलेला आहे .
11) टर्टशष्ि क्षे िातील कामाच्या स्र्रूपानुसार टर्टर्ध दराांमधील अनुज्ञेय र्ाढ
11.1 जनजाती क्षेत्रातील तसेच दवशेष कृ ती कायवक्रम अशा दोन्ही क्षेत्राांतगवत एखादे क्षेत्र समादवष्ट्ट
होत असल्यास तया दठकाणी 10 टक्के इतकी वाढ घ्यावी.
11.2 गडदचरोली दजल्यातील सवव तालुक्यातील कामा कदरता 20 टक्के.
11.3 सदरतामापन केंद्राच्या फक्त उर्ारणीच्या कामा करीता 30 टक्के.
11.4 योजनेच्या सांपण
ू व क्षेत्राांसाठी वन्यजीव प्राणी उपद्रव असल्यास, ककवा सदर योजनेच्या काही
र्ागातील क्षेत्राांसाठी वन्यजीव प्राणी उपद्रव असल्यास, जशी पदरश्स्थती असेल तया प्रमाणे
सदर योजनेच्या दवदशष्ट्ठ क्षेत्रासाठी महसुल व वन दवर्ागाकडू न वन्यजीव प्राणी उपद्रव
असल्याचे सक्षम स्तरावरील प्रमाणपत्र घेऊन 5 % अदतदरक्त तरतूद अांदाजपत्रकात
करण्यात यावी.
11.5 डोंगराळ क्षेत्र (दनयोदजत दवर्ागाने घोदषत केलेले) अांतगवत एखादे क्षेत्र समादवष्ट्ट होत
असल्यास तया दठकाणी 10% इतकी वाढ घ्यावी.
11.6 खारर्ूमी दवकास कामाांतील मातीकाम व सांधानक सांबांदधत बाबीसाठी जलसांपदा दवर्ागाच्या
अद्ययावत सामाईक दरसूचीतील खोदकाम व मातीकाम मधील दराांचा वापर करावा व सदर
दर वापरताना मातीकामासाठी 25 % व सांधानकासाठी 10 % अदतदरक्त तरतूद करावी.
11.7 वरील अ.क्र. 11.1 ते 11.6 यापैकी एकावेळी केवळ एकच तरतूद (Completed Item साठी)
अनुज्ञेय राहील.
11.8 ज्या प्रकल्पामध्ये कसचन होत आहे अशा प्रकल्पाांच्या कालव्याच्या दुरुस्तीची / पुनस्थापनेची
कामे यांत्रसामुग्री वापरुन (कालवा बांद कालावधीत) करताना सामाईक दरसूची मधील
दवदवध बाबींच्या दरामध्ये अदतदरक्त 10 टक्के वाढ दवचारात घेण्यात यावी. सदर वाढ कसचन
व्यवस्थापनाच्या सववसाधारण कामासाठी लागू राहणार नाही.
12) Section-2 (खोदकाम र् मातीकाम): -
12.1 Section-2 (खोदकाम व मातीकाम) मधील बाब क्र. EW15, EW 16, EW 17 व
EW19 बाबत Borrow area from private land (Contractor’s own material) चे
दरपृथ:करणाां मध्ये मुरूम/माती करीता खाजगी जमीन वापरासाठी रु.25 लक्ष प्रदत हे क्टर
हा दर दवचारात घेण्यात आला आहे . तयावरुन मुरुम/ मातीचा दर रु.46.88 प्रदत घमी
आलेला आहे . परां तु, प्रतयक्षात अांदाजपत्रक तयार करताांना सांबांधीत खाणीच्या जदमनीचा रे डी
रे कनरचा दर दवचारात घ्यावा. व तया प्रमाणामध्ये मुरुमाची/ मातीची ककमत कमी जास्त
करावी.
उदािरण (1) जदमनीचा दर रु 25 लक्ष प्रदत हे . पेक्षा जास्त.
दरपृथ:करणात गृहीत धरलेला जदमनी चा दर = रू. 25.00 लक्ष/हे .
जदमनीचा रे डीरे कनरचा दर = रू. 30.00 लक्ष/हे .

4
महाराष्ट्र शासन, जलसंपदा विभाग

फरक = रू. 5.00 लक्ष/हे .


माती कामाच्या दरामधील वाढ = 5.00 X 1.8752 =रु.9.376
प्रदतघमी
(म्हणजेच मातीकामाचा दर हा दरपृथ:करणा पेक्षा रु. 9.376 प्रदत घमीने जास्त होईल.)

उदािरण(2) जदमनीचा दर रु 25 लक्ष प्रदत हे पेक्षा कमी.


दरपृथ:करणात गृहीत धरलेला जदमनीचा दर = रू. 25.00 लक्ष/हे .
जदमनीचा रे डीरे कनरचा दर = रू. 20.00 लक्ष/हे .
फरक = रू. (-)5.00लक्ष/हे .
मातीकामाच्या दरामधील घट = (-)5.00 X 1.8752 =रू. (-)9.376
प्रदतघमी
(म्हणजेच माती कामाचा दर हा दरपृथ:करणापेक्षा रु 9.376 प्रदत घमीने कमी होईल.)
12.2 कालव्यावरील बाांधकामाांसाठीच्या खोदकामाचे अवघड स्वरूप दवचारात घेता अशा
खोदकामासाठी या Section मधील खोदकाम या बाबीचे दरामध्ये 50% वाढ घेण्यात यावी.
13) Section 3 सांधानक कामे:-
13.1 सांधानकाच्या दवदवध बाबींच्या दरपृथकरणामध्ये Concrete with batching plant &
Transit Mixer ची तरतूद गृहीत धरण्यात आलेली आहे . सांधानकाचे पदरणाम आदण कामाचे
स्वरुप दवचारात घेता ज्या कामासाठी Batching plant& transit mixer चा वापर सांयश्ु क्तक
होत नाही अशा दठकाणी सांधानकाचे काम Mixer ने करणे अपदरहायव असल्यास सांधानकाच्या
बाबीचा मूळ दर 5 टक्क्याने कमी करण्यात यावा. तसेच अपवादातमक पदरश्स्थतीत Self
loading दमक्सरच्या (eg. AJEX) सहाय्याने सांधानक करणे प्रस्तादवत असल्यास तया बाबीचे
दर मूळ दराच्या 2 टक्क्याने कमी करावेत.
13.2 जर सांधानकाचे काम 10 मी. पेक्षा जास्त उां चीवर करावयाचे असेल अथवा सांधानकाचे काम
पांपाने अगर टॉवर क्रेनच्या सहाय्याने करण्याचे दनयोजन असेल तर तयासाठी अदतदरक्त रू.
178.35/घमी एवढा दर अांतर्ूवत करण्यात यावा. तसेच सांधानकाच्या दर पृथ:करणात 2%
sundries, 1% labour amenities व 20%(ओव्हरहे ड चाजेस व ठे केदाराांचा फायदा) याांचा
अांतर्ाव असल्याने ही तरतूद करताना याबाबी दुबार होणार नाहीत, याची दक्षता घ्यावी.
13.3 कामाच्या स्वरूपानुसार दवदवध बाबींच्या सांधानकासाठी लागणारे सेंटरींग व शटरींग सांबांदधत
बाबींच्या दरात दवचारात घेतलेले आहे . तयानुसार कामाचे स्वरूप दवचारात घेऊन दरसूचीतील
यथा योग्य दराची दनवड करण्यात यावी.
13.4दवदवध बाबीच्या सांधानक करीताचे लागणारे दर हे Centering, Shuttering and
Scaffolding सदहत असून हे पदरगदणत करताना तया घटकाची जदमनीपासुनची जास्तीत
जास्त उां ची 10 मी पयंत आहे असे गृहीत धरलेले आहे . ज्या दठकाणी यापेक्षा जास्ती उां चीवर
सांधानक करने अपेदक्षत आहे , तयाकदरता जादा लागणारे शटकरग दवचारात घेऊन दर

5
महाराष्ट्र शासन, जलसंपदा विभाग

पृथ:करणामध्ये आवचयक ती जादाची तरतूद (अांदाजपत्रक मांजरू करण्यात समक्ष असणाऱ्या


अदधकाऱ्याच्या मान्यतेने) करण्यात यावी.
14) Section 4 (Tunnel Work): -
बोगद्यासाठीच्या शाफ्टच्या खोदकामाकदरता आधारकर्तीच्या पाया पयंतच्या खोदकामासाठी
section-2 (खोदकाम व मातीकाम) मधील दर दवचारात घ्यावेत. यानांतरच्या खोलीमधील
शाफ्ट च्या खोदकामासाठी Section-4 मधील दर दवचारात घ्यावेत.
1५) Section-7(मूल्याांकन र् पुनर्वसन):-
मूल्याांकन व पुनववसनमधील बाबी या बाधीत गावठाणातील दवदवध स्थापतय कामाांच्या
(उदा.घरे शाळा ई .) मुल्याांकनासाठी वापरण्यात याव्यात.
1६ ) Section-12 (LIS &PDN)
नदलका दवतरण प्रणालीसाठी अांतर्ूवत केलेल्या सवव प्रकारच्या पाईप्सचे पुरवठा दर हे पाईपची
ककमत (Ex -Factory),त्रयस्थ अदर्करणामाफवत दजा तपासणी (Third Party Inspection)
र्राई (Loading) पाईपची वाहतूक करून कायवक्षेत्रावर पुरवठा (Transport),उतरनी
(Unloading) व साठवणूक करणे याांसह एकदत्रत असून सदरचे दर हे वस्तू व सेवाकर
दवरदहत (Without GST) आहे त.
17)Bituminous Geomembrane (BGM):-
17.1 जलसांपदा दवर्ागाचे ददनाांक 09/07/२०२१ रोजीच्या पदरपत्रकानुसार Bituminous
Geomembrane (BGM) या बाबी कदरताची आर्गथक व्यवहायवता ही सांबांदधत कायवकारी
सांचालक याांचे माफवत तपासली जावी तसेच BGM LINING च्या दराचा वापर क्षेदत्रय
स्थळी करताना आर्गथक व्यवहायवता सांबांदधत महामांडळामाफवत तपासूनच अांदतम मान्यता
द्यावी.
17.2 Bituminous Geomembrane (BGM)चा वापर नवीन कामासाठी करताना तयाखाली
CNS material ची तरतूद करण्यात येऊ नये.
18) (M&R) या घिकबाबी अांतिवत Grouting चे कामाबाबत
धरणाचे कामाकदरता आवचयक Providing and injecting cementitious grout या बाबी
(Item No. MR २७) मध्ये इतर घटकाांच्या injection चा दर ही cement बरोबर घेतलेला
आहे . तयामुळे मोजमाप फक्त cement च्या प्रतयक्ष वापरावर घेण्यात यावे.
19) जलसांपदा दवर्ागाची सामाईक दरसूची कदरता दवदनर्गदष्ट्टे जलसांपदा दवर्ागाच्या अदधकृ त
सांकेतस्थळावर प्रदसद्ध करणेत आले आहे त ही दवदनर्गदष्ट्टे सववसाधारण स्वरूपाची आहे त.
क्षेत्रीय स्तरावरून दनदवदा प्रदक्रया राबदवताना प्रतयक्ष कामाच्या स्वरूपानुसार व
आवचयकतेनस
ु ार सदवस्तर दवदनर्गदष्ट्टे तयार करणेत यावीत.
20) दरसूची भार्र्ाढ टनदे शाांक २०२२-२३ - “प्रदतवषी दरसूचीवर आधादरत र्ाववाढ
दनदे शाांक” सोबतच्या पदरदशष्ट्ट -1 मध्ये जोडण्यात आलेले आहे .

6
महाराष्ट्र शासन, जलसंपदा विभाग

पररशशष्ट्ट-1
स िंचन प्रकल्पा ाठीचे वर्षसनहाय भाववाढ सनर्दे शािंक

अ. क्र. वर्ष र्दर ूची भाववाढ शेरा


सनर्दे शािंक

1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37 आधारर्ूत वषव
9 2008 167.31 2000
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23
18 2017 240.77
19 2018 258.11 आधारर्ूत वषव
20 2019 273.94 2011
21 2020 277.36
22 2021 299.88
23 2022 326.88

7
GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

(1.2) Rates of Construction Materials, Labour and


Machinery use.
TABLE "1"
जलसंपदा िवभाग, सामाईक दरसूची सन 2022-23 साठी सािह ांचे ािवत दर
सामाईक सामाईक
जलसंपदा
दरसूची सन दरसूची सन
िवभाग, सामाईक
अ. . सािह एकक 2022-23 ा 2022-23 साठी
दरसूची सन
दरासाठीचा ािवत दर
2021-22 चा दर
गुणांक
1 2 3 4 5 6
1 Acetylene Cum 387.40 1.096 424.60
2 Admixture Kg 74.95 1.096 82.15
3 Air hose hour 8.45 1.096 9.25
4 Aldrop 30 cm No. 118.75 1.096 130.15
5 Bamboo 25 mm Rmt. 19.50 1.096 21.35
6 Binding Wire Kg 64.25 1.096 70.40
7 Brick No. 6.55 1.096 7.20
8 Butt Hinges Iron 125 mm No. 35.00 1.096 38.35
9 Cement (50Kg Bag) Bag 228.00 258.00
10 Coal Tar Paint Kg 50.25 1.096 55.05
11 Copper Plate Kg 567.40 1.096 621.85
12 Copper water stopper 16 gauge Sqm 9034.25 1.096 9901.55
13 Cotton waste Kg 51.40 1.096 56.35
Crushed Sand (Excluding Royalty
14 Cum. 1615.15 1.096 1770.20
Charges)
15 Curing Compound Litre 133.35 1.096 146.15
16 Delay Detonator No. 19.50 1.096 21.35
17 Diesel Litre 86.56 94.14
18 Drill rod Rmt 11905 1.096 13047.90
19 Electric Detonator No. 11.70 1.096 12.80
20 Empty cement Bag No. 11.50 1.096 12.60
21 Epoxy Paint Litre 228.80 1.096 250.75
22 Explosive Kelvex-220 Kg 61.35 1.096 67.25
Fibre fibrillated polypropylene fibres
23 (910 gm/cum of any grade of Kg 275.60 1.096 302.05
concrete)
24 First Aid Kit No. 278.95 1.096 305.75
25 Fly Ash Kg 1.05 1.096 1.15
26 Fuse coil Rmt. 19.50 1.096 21.35
27 G.I.Pipe 100 mm dia. Rmt. 710.50 1.096 778.70
28 G.P. Electrodes No. 10.70 1.096 11.75
29 Gelatin Kg. 143.10 1.096 156.85
30 Geru Kg. 13.15 1.096 14.40
31 Goggles No. 161.05 1.096 176.50
32 Hand Gloves Pair 231.65 1.096 253.90
33 Handle Iron 125 mm No. 35.00 1.096 38.35
34 Hook Iron & eye oxi 75 mm No. 17.55 1.096 19.25
35 Hose pipe oxygen & DA Rmt. 81.80 1.096 89.65
36 J-Bolt (for soldier fixing) No. 36.00 1.096 39.45
37 Kerosene Litre 35.60 1.096 39.00
38 L.H.Electrodes No. 14.60 1.096 16.00
39 Latches 250 mm No. 44.75 1.096 49.05
Metal size 40 mm & above
40 Cum. 600.55 1.096 658.20
(Excluding Royalty charges)
Metal size less than 40 mm
41 Cum. 712.05 1.096 780.40
(Excluding Royalty charges)
42 Nails 4 cm Kg 67.10 1.096 73.55
Natural Sand (Excluding Royalty
43 Cum. 679.30 1.096 744.50
Charges)
44 Neoprene Pad Cu.cm 1.95 1.096 2.15
45 Non Teak wood Cum. 36732.55 1.096 40258.85
46 Nozzle-3/64 No. 842.85 1.096 923.75

8
सामाईक सामाईक
जलसंपदा
दरसूची सन दरसूची सन
िवभाग, सामाईक
अ. . सािह एकक 2022-23 ा 2022-23 साठी
दरसूची सन
दरासाठीचा ािवत दर
2021-22 चा दर
गुणांक
47 Nut Bolts Kg 63.25 1.096 69.30
48 Nut Bolts & Washer Kg 98.30 1.096 107.75
49 Nylon Rope Kg 278.30 1.096 305.00
50 Oil Paint Litre 228.80 1.096 250.75
51 Ordinary Detonator No. 6.80 1.096 7.45
52 Oxygen Cum. 49.20 1.096 53.90
P.V.C. Water Stopper, 310 mm wide
53 Rmt. 215.35 1.096 236.00
central bulb type
54 Painting Brush 4" No. 99.25 1.096 108.80
55 Pickaxe No. 148.90 1.096 163.20
56 Pin Header of Standard size No. 32.75 1.096 35.90
57 Plum bob No. 99.25 1.096 108.80
58 Polyethylene Film 200 Gauge Kg. 237.50 1.096 260.30
59 Primer Litre 146.30 1.096 160.35
60 Red Oxide Litre 128.30 1.096 140.60
61 Rust Cleaner Litre 327.50 1.096 358.95
62 Safety Helmet No. 248.20 1.096 272.05
63 Safety Shoes Pair 1433.65 1.096 1571.30
64 Sand blast gun nozzle hour 3.15 1.096 3.45
Shalitex Super Expansion Pad - 12
65 Sqm 617.10 1.096 676.35
mm thick
66 Spinning belt Hour 30.90 1.096 33.85
67 Spirit Level - 150 mm. No. 118.75 1.096 130.15
68 Steel MT As per Table no.5
69 Stone (Excluding Royalty Charges) Cum 377.35 1.096 413.60
Stone Chips (Excluding Royalty
70 Cum 228.20 1.096 250.10
Charges)
71 Super Plasticizer Kg 96.95 1.096 106.25
72 Tower Bolt Iron 200 mm No. 69.05 1.096 75.70
73 Tower Bolt Iron 250 mm No. 79.85 1.096 87.50
74 Tripod for chain pully block Day 206.10 1.096 225.90
75 Turpentine Litre 69.05 1.096 75.70
76 Water 1000 Litres 37.90 1.096 41.55
77 Water Proofing Compound Kg 52.90 1.096 58.00
78 Welding Cable 600 AMP Rmt. 747.50 1.096 819.25
79 Welding holder hour 8.05 1.096 8.80
80 White Glass No. 4.85 1.096 5.30
81 Wire Brush No. 79.85 1.096 87.50
82 Wire Mesh 50 X 50 - 13 Gauge Sqm 198.60 1.096 217.65
83 Zink Base Oil Paint Litre 290.80 1.096 318.70
84 Zink Rich Epoxy Primer Litre 264.65 1.096 290.05

9
TABLE "2"
जलसंपदा िवभाग, सामाईक दरसूची सन 2022-23 साठी मजुरांचे ािवत दर
सामाईक
जलसंपदा दरसूची सन सामाईक दरसूची सन
िवभाग, सामाईक 2022-23 2022-23 साठी
अ. . मजूर एकक
दरसूची सन ा ािवत दर
2021-22 चा दर दरासाठीचा
गु णां क
1 2 3 4 5 6
1 Bar Bender Day 597.00 614
2 Bhisti Day 597.00 614
3 CAD Operator / Civil Engg. Assistant Day 751.00 1.053 791
4 Carpenter Day 597.00 614
5 Civil Engineer Day 1215.00 1.053 1279
6 Electrician Day 639.00 1.053 673
7 Fitter Day 597.00 614
8 Fitter for Shuttering / Pipe fitter Day 597.00 614
9 Foreman Day 597.00 614
10 Gas Cutter Day 597.00 614
11 Grinder Day 597.00 614
12 Gauge Inspector Day 597.00 614
13 Mason Day 597.00 614
14 Mazdoor (Heavy) Day 597.00 614
15 Mazdoor (Light) Day 551.00 568
16 Measurement Clerk Day 597.00 614
17 Mechanic / Operator Day 597.00 614
18 Mistri / Mukadam Day 597.00 614
19 Painter Day 597.00 614
20 Semiskilled Mazdoor Day 597.00 614
21 Skilled Mazdoor Day 597.00 614
22 Surveyor Day 837.00 1.053 881
23 Tile Turner Day 597.00 614
24 Tracer / Laminator Day 714.00 1.053 752
25 Unskilled Mazdoor / Helper Day 551.00 568
26 Welder Day 597.00 614

10
TABLE "3"
"सामाईक दरसूची सन 2022-23 साठी यं वापर दराचा तपशील
जलसंपदा िवभाग,
जलसंपदा िवभाग, सामाईक सामाईक दरसूची सन
अ. . यं ाचे नाव एकक दरसूची सन 2021-22 साठीचे 2022-23 साठी ािवत
दर
Total POL Total POL
1 2 3 4 5 6 7
1 Ace hydralic mobile crane 12.5 T Hour 709.00 312.00 720.00 296.00
Air compressor 105 CFM
2 Hour
(Electric) 433.00 161.00 445.00 196.00
3 Air compressor 280 CFM Hour 955.00 713.00 967.00 725.00
4 Air compressor 400 CFM (Diesel) Hour 1174.00 975.00 1239.00 1035.00
5 Batching plant 25 Cum/Hour Hour 1712.00 --- 1758.93 ---
6 Bending Machine Day 238.00 97.60 254.72 104.46
7 Compressor 510 CFM Hour 1012.00 812.00 1127.00 945.00
8 Concrete mixer 10/7 cft Hour 195.00 --- 208.62 ---
9 Concrete mixer 100 ltr capacity Hour 454.00 --- 485.77 ---
10 Diesel pump 3 HP Hour 177.00 --- 181.00 ---
11 Diesel pump 5 HP Hour 272.00 98.00 212.00 82.00
12 Diesel pump 10 HP Hour 272.00 98.00 295.00 163.00
13 Diesel pump 20 HP Hour 302.00 120.00 352.00 217.00
14 Dozer (Beml BD 80) Hour 3446 1581 3605.00 1673.00
15 Dozer 300 hp /Dozer CAT D 8 K Hour 4196.00 2729.00 4401.00 2900.00
16 DRR 8 to 10 Tons Hour 575.00 292.00 593.00 297.00
17 Escort Mobile crane 3 T Hour 608.00 312.00 537.00 237.00
18 Excavator -0.3 Cum Hour 866.00 474.00 909.00 495.00
19 Excavator -0.6 Cum Hour 1355.00 853.00 1419.00 890.00
20 Excavator -0.9 Cum Hour 1767.00 1137.00 2037.00 1285.00
21 Explosive Van Hour --- --- 851.00 457.00
22 Generating set41-60 KVA Hour 659.00 559.00 693.00 593.00
23 Grinding Machine Hour 25.00 --- 25.00 ---
24 Guniting equipment Hour 219.00 --- 227.00 ---
25 Hydra crane Capacity 09 T Hour 608.00 312.00 631.00 296.00
26 Hydra crane Capacity 11 T Hour 709.00 312.00 720.00 296.00
27 Hydra crane Capacity 12 T Hour 709.00 312.00 720.00 296.00
28 Hydra crane Capacity 14 T Hour 709.00 312.00 785.00 296.00
29 Hydra crane Capacity 15 T Hour 709.00 312.00 785.00 296.00
30 Hydra crane Capacity 20 T Hour 1082.00 621.60 1187.00 593.00
31 Hydra crane Capacity 25 T Hour 1601.00 975.00 1688.00 1035.00
32 Jack Hammer Day 40.00 --- 41.43 ---
33 JCB JS 3C /(Tata Hitachi TH86) Hour 1393.00 744.00 1497.00 791.00
34 L & T Sismopactor TT 900 Hour 1892.00 877.00 1973.00 932.00
35 Mobile Crane 12.5 T 709.00 312.00 720.00 296.00
36 Needle Vibrator Hour 158.00 --- 169.04 ---

11
जलसंपदा िवभाग,
जलसंपदा िवभाग, सामाईक सामाईक दरसूची सन
अ. . यं ाचे नाव एकक दरसूची सन 2021-22 साठीचे 2022-23 साठी ािवत
दर
37 Passanger wintch Hour 575.00 --- 586.00 ---
38 Pug machine for cutting Hour 16.00 4.33 18.27 4.95
39 Sand blasting equipment Hour 119.00 --- 123.00 ---
40 Scraper Euclid B-FDT model Hour 2924.00 2002.00 OUT DATED
41 Spinning Machine Hour 164.00 117.00 170.00 121.00
42 Tata Hitachi Ex 100 Hour --- --- 1253.00 652.00
Tata Hitachi EX 200 With
43 Hour
Breaker & slope compactor 1983.00 1116.00 2154.00 1243.00
44 TATA Truck 10 T Hour --- --- 1112.00 571.00
45 Tata Wheel loader 3036 Hour 2074.00 1116.00 2178.00 1186.00
46 Tipper Hour 1039.00 559.00 1104.00 571.00
47 Tipper mounting Drilling Jumbo Hour 853.00 --- 883.00 ---
48 Water tanker 10 T Hour 816.00 326.00 853.00 347.00
49 Water tanker 7.5 T Hour 561.00 244.00 574.00 247.00
50 Welding Transformer Hour 100.00 98.66 104.47 103.07

12
TABLE "4"
"सामाईक दरसूची सन 2022-23 साठी फ बोगदा कामासाठी वापरले ा अित र यं वापर
दराचा तपशील

जलसंपदा िवभाग, सामाईक


दरसूची सन 2022-23 साठी
अ. . यं ाचे नाव एकक
ािवत दर

Total POL
1 2 3 6 7
1 Tata Hitachi (EX-100) Hour 1563.00 979.00
2 Dozer (D 80 A12/BD 80) Hour 4507.00 2231.00
Double Crabe EOT crane (13.5 mt+13.5
3 Hour 4623.00 3277.00
mt)

13
TABLE "5"
जलसंपदा िवभाग, सामाईक दरसूची सन 2022-23 साठी ीलचे ािवत दर

Rate of Item with GST are as per Joint Plant Committee as on 06 JAN 2022 vide letter dated 02/02/2022

Rate of Item for CSR Rate of Item for CSR 2022-


Sr.No. Item 2022-23 with GST in 23 without GST in (Rs.per
(Rs.per Tonne) Tonne)

1 2 3 3
1 PIG IRON 57820 49000
2 BILLETS 100 MM 53940 45712
3 BLOOME 150X150 MM 56330 47737
4 PENCIL INGOTS 52510 44500
5 WIRE RODS 6 MM 66910 56703
6 WIRE RODS 8 MM 66320 56203
7 ROUNDS 12 MM 65380 55407
8 ROUNDS 16 MM 65260 55305
9 ROUNDS 25 MM 65260 55305
10 TMT 10 MM 62010 52551
11 TMT 12 MM 61530 52144
12 TMT 25 MM 61100 51780
13 ANGLES 50X50X6 MM 62460 52932
14 ANGLES 75X75X6 MM 61240 51898
15 JOISTS 125X70 MM 62660 53102
16 JOISTS 200X100 MM 62420 52898
17 CHANNELS 75X40 MM 62940 53339
18 CHANNELS 150X75 MM 64340 54525
19 PLATES 6 MM 78270 66331
20 PLATES 10 MM 78430 66466
21 PLATES 12 MM 78390 66432
22 PLATES 25 MM 77340 65542
23 H. R. COILS 2.00 MM 79380 67271
24 H. R. COILS 2.50 MM 78330 66381
25 H. R. COILS 3.15 MM 77840 65966
26 C. R. COILS 0.63 MM 83910 71110
27 C. R. COILS 1.00 MM 83380 70661
28 G. P. SHEETS 0.40 MM 94290 79907
29 G. P. SHEETS 0.63 MM 92680 78542
30 G. C. SHEETS 0. 40 MM 94870 80398
31 G. C. SHEETS 0. 63 MM 92510 78398
32 MELTING SCRAP H M S - I 43910 37212
33 MELTING SCRAP H M S - II 43790 37110
34 SPONGE IRON (COAL BASED) 39240 33254

14
GOVERNMENT OF MAHARASHTRA

WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

(1.3) LEAD CHARGES STATEMENT


FOR MATERIALS
SECTION -1

ADDITIONAL LEAD CHARGES FOR ALL .


MATERIALS UPTO S00KM & LIFT CHARGES

CO-ORD INA TOR

( s. Aw AR)
~ U H M. I

CHI F ENGINEER (CIVIL)


HYDROELECTRICAL PROJECT
AND QUALITY CONTROL,
PUNE

~.
Lead Charges Statement for 2022-23 (Excluding Loading and Unloading Charges)
Statement I

Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per Trip
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including (Rs)
(4 Rs 94.14 / (10 % of Truck Charges & Overhead
Km/Litre) Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)

1 2 3 4 5 6 7 8 9 10 11 12
col 6 + col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 94.14 col 6 X 0.10 Rs 2030/day col 9 x 0.20 col 9 + col 10 col 11 / col 3
7 + col 8
0.50 15.00 48.00 54.00 13.50 1270.89 127.09 2030.00 3427.98 685.60 4113.58 85.70
1.00 16.00 35.56 77.12 19.28 1815.02 181.50 2030.00 4026.52 805.30 4831.82 135.88
1.50 16.50 28.39 91.17 22.79 2145.45 214.55 2030.00 4390.00 878.00 5268.00 185.56
2.00 17.00 23.86 101.44 25.36 2387.39 238.74 2030.00 4656.13 931.23 5587.36 234.17
2.50 17.25 20.52 108.60 27.15 2555.90 255.59 2030.00 4841.49 968.30 5809.79 283.13
3.00 17.50 18.06 114.36 28.59 2691.46 269.15 2030.00 4990.61 998.12 5988.73 331.60
3.50 17.75 16.18 119.26 29.82 2807.25 280.73 2030.00 5117.98 1023.60 6141.58 379.58
4.00 18.00 14.69 123.52 30.88 2907.04 290.70 2030.00 5227.74 1045.55 6273.29 427.04
4.50 18.25 13.49 127.41 31.85 2998.36 299.84 2030.00 5328.20 1065.64 6393.84 473.97

5.00 18.50 12.49 130.90 32.73 3081.20 308.12 2030.00 5419.32 1083.86 6503.18 520.67
5.50 18.50 11.52 132.72 33.18 3123.57 312.36 2030.00 5465.93 1093.19 6559.12 569.37
6.00 18.75 10.81 135.72 33.93 3194.17 319.42 2030.00 5543.59 1108.72 6652.31 615.38
6.50 18.85 10.13 137.69 34.42 3240.30 324.03 2030.00 5594.33 1118.87 6713.20 662.70
7.00 19.00 9.56 139.84 34.96 3291.13 329.11 2030.00 5650.24 1130.05 6780.29 709.24
7.50 19.15 9.06 141.90 35.48 3340.09 334.01 2030.00 5704.10 1140.82 6844.92 755.51
8.00 19.30 8.61 143.76 35.94 3383.39 338.34 2030.00 5751.73 1150.35 6902.08 801.64
8.50 19.45 8.21 145.57 36.39 3425.75 342.58 2030.00 5798.33 1159.67 6958.00 847.50
9.00 19.60 7.86 147.48 36.87 3470.94 347.09 2030.00 5848.03 1169.61 7017.64 892.83
9.50 19.80 7.55 149.45 37.36 3517.07 351.71 2030.00 5898.78 1179.76 7078.54 937.55

10.00 20.00 7.27 151.40 37.85 3563.20 356.32 2030.00 5949.52 1189.90 7139.42 982.04

15
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per Trip
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including (Rs)
(4 Rs 94.14 / (10 % of Truck Charges & Overhead
Km/Litre) Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)

1 2 3 4 5 6 7 8 9 10 11 12
col 6 + col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 94.14 col 6 X 0.10 Rs 2030/day col 9 x 0.20 col 9 + col 10 col 11 / col 3
7 + col 8
11.00 21.00 6.97 159.34 39.84 3750.54 375.05 2030.00 6155.59 1231.12 7386.71 1059.79
12.00 22.00 6.72 167.28 41.82 3936.93 393.69 2030.00 6360.62 1272.12 7632.74 1135.82
13.00 23.00 6.50 175.00 43.75 4118.63 411.86 2030.00 6560.49 1312.10 7872.59 1211.17
14.00 24.00 6.32 182.96 45.74 4305.96 430.60 2030.00 6766.56 1353.31 8119.87 1284.79
15.00 25.00 6.15 190.50 47.63 4483.89 448.39 2030.00 6962.28 1392.46 8354.74 1358.49

20.00 25.00 4.71 194.40 48.60 4575.20 457.52 2030.00 7062.72 1412.54 8475.26 1799.42
25.00 25.00 3.81 196.50 49.13 4625.10 462.51 2030.00 7117.61 1423.52 8541.13 2241.77
30.00 30.00 3.81 234.60 58.65 5521.31 552.13 2030.00 8103.44 1620.69 9724.13 2552.27
35.00 30.00 3.29 236.30 59.08 5561.79 556.18 2030.00 8147.97 1629.59 9777.56 2971.90
40.00 30.00 2.89 237.20 59.30 5582.50 558.25 2030.00 8170.75 1634.15 9804.90 3392.70
45.00 30.00 2.58 238.20 59.55 5606.04 560.60 2030.00 8196.64 1639.33 9835.97 3812.39

50.00 30.00 2.33 239.00 59.75 5624.87 562.49 2030.00 8217.36 1643.47 9860.83 4232.12
60.00 35.00 2.27 278.40 69.60 6552.14 655.21 2030.00 9237.35 1847.47 11084.82 4883.18
70.00 35.00 1.95 279.00 69.75 6566.27 656.63 2030.00 9252.90 1850.58 11103.48 5694.09
80.00 35.00 1.71 279.60 69.90 6580.39 658.04 2030.00 9268.43 1853.69 11122.12 6504.16
90.00 35.00 1.53 281.40 70.35 6622.75 662.28 2030.00 9315.03 1863.01 11178.04 7305.91
100.00 35.00 1.38 282.00 70.50 6636.87 663.69 2030.00 9330.56 1866.11 11196.67 8113.53

16
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per Trip
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including (Rs)
(4 Rs 94.14 / (10 % of Truck Charges & Overhead
Km/Litre) Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)

1 2 3 4 5 6 7 8 9 10 11 12
col 6 + col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 94.14 col 6 X 0.10 Rs 2030/day col 9 x 0.20 col 9 + col 10 col 11 / col 3
7 + col 8
125.00 40.00 1.26 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 9847.82
150.00 40.00 1.05 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 11817.38
175.00 40.00 0.90 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 13786.94
200.00 40.00 0.79 322.00 80.50 7578.27 757.83 2030.00 10366.10 2073.22 12439.32 15745.97
250.00 40.00 0.63 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 19695.63
300.00 40.00 0.53 324.00 81.00 7625.34 762.53 2030.00 10417.87 2083.57 12501.44 23587.62
350.00 40.00 0.45 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 27573.89
400.00 40.00 0.40 326.00 81.50 7672.41 767.24 2030.00 10469.65 2093.93 12563.58 31408.95
450.00 40.00 0.35 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 35452.14
500.00 40.00 0.32 326.00 81.50 7672.41 767.24 2030.00 10469.65 2093.93 12563.58 39261.19

Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3) The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval, 100 km to 200 km are with 25 km
interval and 200 km to 500 km are with 50 km interval. The transportation charges for intermediate Km within the range shall be worked out by lineraly
interpolating between rates of lower and upper values in the range.
4) For calculating additional lead charges, difference of lead charges i.e (lead charges - lead charges considered in basic rate analysis) shall be considered.)

17
Lead Charges Statement for 2022-23 (Excluding Loading and Unloading Charges)

Statement II
Cost of
Lead in Km Trip Lead Charges in Rs / Unit
( Rs)

As per col Sand , Murum,Earth, Steel


Excavated Rock
L no 12 of Metal Below 40 Metal 40 mm & Concrete Block Cement Water Bricks
Rubble
Statement I mm above Stone Block

Carrying
capacity of 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
0.50 85.70 18.23 14.90 14.28 12.24 8.57 9.52 17.14
1.00 135.88 28.91 23.63 22.65 19.41 13.59 15.10 27.18
1.50 185.56 39.48 32.27 30.93 26.51 18.56 20.62 37.11
2.00 234.17 49.82 40.73 39.03 33.45 23.42 26.02 46.83
2.50 283.13 60.24 49.24 47.19 40.45 28.31 31.46 56.63
3.00 331.60 70.55 57.67 55.27 47.37 33.16 36.84 66.32
3.50 379.58 80.76 66.01 63.26 54.23 37.96 42.18 75.92
4.00 427.04 90.86 74.27 71.17 61.01 42.70 47.45 85.41
4.50 473.97 100.84 82.43 79.00 67.71 47.40 52.66 94.79
5.00 520.67 110.78 90.55 86.78 74.38 52.07 57.85 104.13
5.50 569.37 121.14 99.02 94.90 81.34 56.94 63.26 113.87
6.00 615.38 130.93 107.02 102.56 87.91 61.54 68.38 123.08
6.50 662.70 141.00 115.25 110.45 94.67 66.27 73.63 132.54
7.00 709.24 150.90 123.35 118.21 101.32 70.92 78.80 141.85
7.50 755.51 160.75 131.39 125.92 107.93 75.55 83.95 151.10

18
Cost of
Lead in Km Trip Lead Charges in Rs / Unit
( Rs)

As per col Sand , Murum,Earth, Steel


Excavated Rock
L no 12 of Metal Below 40 Metal 40 mm & Concrete Block Cement Water Bricks
Rubble
Statement I mm above Stone Block

Carrying
capacity of 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
8.00 801.64 170.56 139.42 133.61 114.52 80.16 89.07 160.33
8.50 847.50 180.32 147.39 141.25 121.07 84.75 94.17 169.50
9.00 892.83 189.96 155.27 148.81 127.55 89.28 99.20 178.57
9.50 937.55 199.48 163.05 156.26 133.94 93.76 104.17 187.51
10.00 982.04 208.94 170.79 163.67 140.29 98.20 109.12 196.41
11.00 1059.79 225.49 184.31 176.63 151.40 105.98 117.75 211.96
12.00 1135.82 241.66 197.53 189.30 162.26 113.58 126.20 227.16
13.00 1211.17 257.70 210.64 201.86 173.02 121.12 134.57 242.23
14.00 1284.79 273.36 223.44 214.13 183.54 128.48 142.75 256.96
15.00 1358.49 289.04 236.26 226.42 194.07 135.85 150.94 271.70
20.00 1799.42 382.86 312.94 299.90 257.06 179.94 199.94 359.88
25.00 2241.77 476.97 389.87 373.63 320.25 224.18 249.09 448.35
30.00 2552.27 543.04 443.87 425.38 364.61 255.23 283.59 510.45
35.00 2971.90 632.32 516.85 495.32 424.56 297.19 330.21 594.38
40.00 3392.70 721.85 590.03 565.45 484.67 339.27 376.97 678.54
45.00 3812.39 811.15 663.02 635.40 544.63 381.24 423.60 762.48
50.00 4232.12 900.45 736.02 705.35 604.59 423.21 470.24 846.42
60.00 4883.18 1038.97 849.25 813.86 697.60 488.32 542.58 976.64
70.00 5694.09 1211.51 990.28 949.02 813.44 569.41 632.68 1138.82
80.00 6504.16 1383.86 1131.16 1084.03 929.17 650.42 722.68 1300.83

19
Cost of
Lead in Km Trip Lead Charges in Rs / Unit
( Rs)

As per col Sand , Murum,Earth, Steel


Excavated Rock
L no 12 of Metal Below 40 Metal 40 mm & Concrete Block Cement Water Bricks
Rubble
Statement I mm above Stone Block

Carrying
capacity of 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
90.00 7305.91 1554.45 1270.59 1217.65 1043.70 730.59 811.77 1461.18
100.00 8113.53 1726.28 1411.05 1352.26 1159.08 811.35 901.50 1622.71
125.00 9847.82 2095.28 1712.66 1641.30 1406.83 984.78 1094.20 1969.56
150.00 11817.38 2514.34 2055.20 1969.56 1688.20 1181.74 1313.04 2363.48
175.00 13786.94 2933.39 2397.73 2297.82 1969.56 1378.69 1531.88 2757.39
200.00 15745.97 3350.21 2738.43 2624.33 2249.42 1574.60 1749.55 3149.19
250.00 19695.63 4190.56 3425.33 3282.61 2813.66 1969.56 2188.40 3939.13
300.00 23587.62 5018.64 4102.19 3931.27 3369.66 2358.76 2620.85 4717.52
350.00 27573.89 5866.79 4795.46 4595.65 3939.13 2757.39 3063.77 5514.78
400.00 31408.95 6682.76 5462.43 5234.83 4486.99 3140.90 3489.88 6281.79
450.00 35452.14 7543.01 6165.59 5908.69 5064.59 3545.21 3939.13 7090.43
500.00 39261.19 8353.44 6828.03 6543.53 5608.74 3926.12 4362.35 7852.24

Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3) The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval, 100 km to 200
km are with 25 km interval and 200 km to 500 km are with 50 km interval.The transportation charges for intermediate Km within
the range shall be worked out by lineraly interpolating between rates of lower and upper values in the range.
4) For calculating additional lead charges, difference of lead charges i.e (lead charges - lead charges considered in basic rate analysis)
shall be considered.)

20
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-2

EXCAVATION AND EMBANKMENT

ITEM NO. EW 1 to EW 26
SECTION -2

EXCAVATION AND EMBANKMENT

CO-ORD INA TOR

(S. ~ WAR)
CHIEF ENGINEER (CIVIL)
HYDROELECTRICAL PROJECT
AND QUALITY CONTROL,
PONE
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 2:- EXCAVATION & EMBANKMENT

Rate for 2022-23


(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 1 Excavation in all kinds of soil including boulders up to
0.6 m diameter ( 0.113 cum) for canal, seating of
embankment, filter drains / catch water drains etc., and
placing the excavated stuff neatly in dump area or for
formation of service road / embankment including cost Section 2.1 Cum. 98.90 13.64
of all materials, machinery, labour, dressing bed and
sides to required level and profile etc. Complete with
lead up to 1 km and all lifts as directed.

EW 2 Excavation in hard murum including boulders upto 0.6


m diameter ( 0.113 cum) for canal, seating of
embankment, filter drains / catch water drains etc., and
placing the excavated stuff neatly in dump area or for
formation of service road / embankment including cost Section 2.1 Cum. 116.65 17.83
of all materials, machinery, labour, dressing bed and
sides to required level and profile etc., complete with
lead upto 1 km and all lifts as directed.

EW 3 Excavation in soft rock including boulders upto 0.6 m


diameter ( 0.113 cum) for canal, seating of
embankment, filter drain / catch water drains etc., and
placing the excavated soft rock neatly in dump area or
for formation of service road including cost of all Section 2.1 Cum. 138.70 23.76
materials, machinery, labour, dressing bed and sides to
required level and profile etc. complete with lead upto 1
km and all lifts as directed.

EW 4 Excavation in hard rock of all toughness by ordinary


blasting methods including boulders above 0.6 m
dia.(0.113Cum) minimising damage to side slopes of
excavation in water prism area by adopting any one or
combination of line drilling /pre-splitting /smooth
Section 2.1 Cum. 500.65 86.00
blasting techniques and placing the excavated rock
neatly in approved dump area including cost of all
materials, machinery, labour,levelling bed etc.,
complete with lead upto 1 km and all lifts as directed.

EW 5 Excavation in hard rock of all toughness by


control blasting methods including boulders above
0.6 m dia.(0.113Cum)for canals cut-off trench of
embankment filter/catch water drains and other
appurtenent structures including control of vibrations
by use of delay detonators and control of fly rocks by
muffling arrangements and adopting only jack
hammers for drilling holes and minimising damage to Section 2.1 Cum. 575.75 57.44
side slopes of canal in water prism area by adopting
any one or combination of line drilling /pre-splitting
/smooth blasting techniques including cost of all
materials,machinery, labour,placing excavated rock
neatly approved dump area as directed etc., complete
with lead upto 1 km and all lifts as directed.

21
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 6 Excavation in hard rock of all toughness by breaker
including boulders above 0.6 m dia.(0.113Cum)
minimising damage to side slopes of excavation and
placing the excavated rock neatly in approved dump
Section 2.1 Cum. 629.65 42.60
area including cost of all materials, machinery, labour,
levelling bed etc., complete with lead upto 1 km and all
lifts as directed .

EW 7 Watering the embankment in proper layers including


cost of water, lead of water upto 1 km and all lifts etc. Section 2.2 Cum. 20.55 ---
complete as directed.
EW 8 Compaction of bankwork with vibratory Compactor
to 95 % of Proctor density with a lead upto 1.00 Km. as Section 2.2 Cum. 10.55 ---
directed.
EW 9 Providing cut off trench filling using selected
impervious soil directly available from material of
excavation including cost of all materials,
machinery,labour, all other operations such as
collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling,
Section 2.2 Cum. 57.50 2.59
sectioning edges / sides, watering, compacting each
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.

EW 10 Providing hearting embankment using selected


impervious material available directly from
excavation in layers including cost of all materials,
machinery, labour, all other operations such as
collection of material, spreading soil in layer of
specified thickness, sorting out, breaking clods,
levelling, sectioning edges / sides, watering, Section 2.2 Cum. 57.50 2.59
compacting each layer to density control of not less
than 95% of Proctor density using vibratory compactor
including cost of water etc.complete with lead upto1 km
for water and all lifts as directed.

EW 11 Providing casing embankment using selected


pervious material available directly from
excavation in layers including cost of all materials,
machinery, labour, all other operations such as
collection of material, spreading material in layer of
specified thickness, sorting out, breaking clods,
levelling, sectioning edges / sides, watering, Section 2.2 Cum. 76.40 3.41
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc. complete with lead upto1
km for water and all lifts as directed.

22
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 12 Providing cut off trench filling using selected
impervious soil from approved borrow areas
(Government acquired land) including cost of all
materials, machinery,labour, all other operations such
as collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling,
sectioning edges / sides, watering, compacting each Section 2.2 Cum. 164.90 2.76
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.

EW 13 Providing hearting embankment using selected


impervious soil from approved borrow areas
(Government acquired land) in layers including cost
of all materials, machinery, labour, all other operations
such as collection of soil, spreading soil in layer of
specified thickness, sorting out, breaking clods,
levelling, sectioning edges / sides, watering, Section 2.2 Cum. 147.25 2.60
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.

EW 14 Providing casing embankment using selected


pervious material from approved borrow areas
(Government acquired land) in layers including cost
of all materials, machinery,labour, all other operations
such as collection of soil, spreading soil in layer of
specified thickness, sorting out, breaking clods,
levelling, sectioning edges / sides, watering, Section 2.2 Cum. 180.40 3.40
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km and all lifts as directed.

EW 15 Providing cut off trench filling using selected


impervious soil from approved borrow areas
(Private land- contractors own material) including
cost of all materials, machinery,labour, all other
operations such as collection of soil, spreading soil in
layer of specified thickness, sorting out, breaking clods,
levelling, sectioning edges / sides, watering, Section 2.2 Cum. 226.65 3.14
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc. complete with lead upto1
km for water and all lifts as directed.

EW 16 Providing Hearting embankment using selected


impervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery,labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking
clods, levelling, sectioning edges / sides, watering, Section 2.2 Cum. 194.15 2.62
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.

23
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 17 Providing casing embankment using selected
pervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery, labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking
clods, levelling, sectioning edges / sides, watering,
Section 2.2 Cum. 227.35 3.44
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.

EW 18 Providing cohesive non-swelling (CNS) material


lining to canals using selected material from
approved borrow area (Government acquired land)
including cost of all materials, machinery, labour,
spreading soil in layers of thickness not more than 150
mm including providing 20 cm or so (perpendicular to
side slope) of extra pride ,removing pride just prior to
Section 2.2 Cum. 214.00 35.80
the placement of lining, breaking clods, watering,
compacting to density control of not less than 95 % of
Proctor density, dressing to required profile including
cost of water etc. complete with lead upto1 km for
water and all lifts as directed.

EW 19 Providing cohesive non-swelling (CNS) material


lining to canals using selected material from
approved borrow area's (Private land- contractor's
own material) including cost of all materials,
machinery, labour, spreading soil in layers of thickness
not more than 150 mm including providing 20 cm or so
(perpendicular to side slope) of extra pride ,removing
Section 2.2 Cum. 259.60 35.80
pride just prior to the placement of lining, breaking
clods, watering, compacting to density control of not
less than 95 % of Proctor density, dressing to required
profile including cost of water etc. complete with lead
upto1 km for water and all lifts as directed .

EW 20A Providing and constructing 150 mm thick


unscreened/screened sand layer from approved
source including cost of all materials, labour, Section 2.3
machinary etc.complete with lead upto 1 km and all
lifts as directed .
a)unscreened sand layer Sqm. 201.05 14.86
b)screened sand layer Sqm. 262.50 29.76
EW 20B Providing and constructing 150 mm thick Quarry
Spalls of approved trap stone quality of specified
thickness from approved source including cost of all
materials, labour, machinary etc.complete with lead Section 2.4 Sqm. 64.80 14.30
upto 1 km and all lifts as directed.

EW 21 Providing and constructing 300 mm thick dry rubble


stone pitching with pin headers at 2 per sqm using
stones and stone chips from approved source
including cost of all materials, labour,machinary ,hand Section 2.3 Sqm. 298.20 44.07
packing / wedging stone chips, finishing etc.,complete
with lead upto 1km and all lifts as directed.

24
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 22 Providing and constructing 450 mm thick dry rubble
stone pitching with pin headers at 2 per sqm using
stones and stone chips from approved source including
cost of all materials, labour,hand,machinary ,packing / Section 2.3 Sqm. 378.70 44.10
wedging stone chips, finishing etc.complete with lead
up to 1 km and all lifts as directed.

EW 23 Providing and constructing dry rubble rock-toe with


filter below and behind the rock toe using sand
,graded gravel ,quarry spaul ,rubble and stone chips
from approved source including cost of all materials,
machinery, labour, hand packing rubble and stone Section 2.5 Cum. 3137.15 251.32
chips, finishing top and sides to required slopes
etc.complete with lead upto 1 km and all lifts as
directed.

EW 24 Providing and constructing longitudinal and cross


graded filter drains using sand and 20 mm down
coarse approved clean, hard, graded aggregates
satisfying specified filter criteria in layers of specified
thickness including cost of all materials, machinery, Section 2.6 Cum. 1382.60 265.31
labour, laying to required slopes, compaction etc.,
complete as per specifications and approved drawings
with lead up to 1 km and all lifts as directed.

EW 25 Providing and constructing 0.50 m thick vertical or


inclined graded filter media consisting of 150 mm
thick sand layers and 200 mm thick 20 mm down
coarse approved clean, hard, graded aggregates
satisfying specified filter criteria in layers of specified
Section 2.6 Cum. 1430.25 265.29
thickness including cost of all materials, machinery,
labour, laying to required slopes, compaction etc.,
complete as per specifications and approved drawings
with lead up to 1 km and all lifts as directed .

EW 26 Dewatering by pumping out water collected with


Diesel or Electrical pumps including cost of all
materials, machinery, labour, providing sump and all
other ancillary operations whenever necessary etc.
complete under specific and indispensable BHP
circumstances with prior approval from competent Section 2.7 12.60 0.84
Hr.
authority with authentic evidence of records justifying
dewatering etc. complete as directed .

25
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23

SECTION 3

CONCRETE WORK INCLUDING


CENTERING, UCR MASONRY, BRICK MASONRY
AND R.C.C. PIPES

ITEM NO. CC 1 TO CC 47
CONSUMPTION OF MATERIAL CONSIDERED IN RATE ANALYSIS
Item Item in brief Cement Coarse Fine
No. In bags Aggregate Aggregate
CC1A CC M-10 (20 MSA) 4.4 0.94 0.47
CC M-10 (40 MSA) 4.4 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
CC2A CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
CC3A CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.90 0.45
CC4A CC M-20 (20 MSA) 6.60 0.90 0.45
CC M-20 (40 MSA) 6.08 0.89 0.45
CC5A CC M-25 (20 MSA) 7.62 0.90 0.45
CC6A CC M-15 (20 MSA) for Bed lining per Cum 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
CC7A CC M-15 (20 MSA) Mechanized lining for bed lining 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
CC8A Chip Masonry behind concrete lining 1.25 1.24 0.35
(Rubble)
CC11 UCR Masonry in CM 1:5 for side lining 2.00 1.24 0.35
(Rubble)
CC12 Cement Plaster 6 mm thick in CM 1:3 0.057 0.006
CC13 CC M-10 (20 MSA) 4.40 0.94 0.47
CC M-10 (40 MSA) 4.40 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
CC14 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
CC15 CC M-15 (20 MSA) for abutment, pier 5.64 0.90 0.45
CC M-15 (40 MSA) for abutment, pier 5.20 0.89 0.45
CC M-15 (80 MSA) for abutment, pier 4.99 0.90 0.45
CC16 CC M-20 (20 MSA) for abutment, wing wall, returns, 6.60 0.90 0.45
transition walls, piers, columns, beams & Slabs, road
slab, kerb, super passage/slab culvert, trough
resting on ground, trough for aqueduct, wearing coat
& other concrete
CC M-20 (40 MSA) for abutment, retaining walls, 6.08 0.89 0.45
piers
CC17 CC M-25 (20 MSA) for column, beams and slabs, 7.62 0.90 0.45
road slab, kerb, super passage/slab culvert, trough
resting on ground, trough aqueduct, wearing coat
CC18 CC M-30 (20 MSA) for trough aqueduct, slab 9.20 0.85 0.425
CC25,CC27 UCR Masonry in CM 1:5 for foundation and super 1.71 1.15 0.30
structure (30% mortar) (Rubble)
(35% mortar) 2.00 1.1 0.35
(Rubble)
(45% mortar) 2.57 1.00 0.45
(Rubble)
CC28 UCR Masonry in CM 1:6 for foundation (30% mortar) 1.43 1.15 0.30
(Rubble)
(35% mortar) 1.67 1.1 0.35
(Rubble)
(45% mortar) 2.14 1.00 0.45
(Rubble)
CC30 Cement Pointing in CM 1:3 0.0295 0.003
Cement Pointing in CM 1:2 0.0449 0.003
CC35 B.B. Masonry in CM 1:5 1.77 480 0.31
(Bricks)

26
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 3:- CONCRETE WORK INCLUDING CENTERING, UCR MASONRY,
BRICK MASONRY AND R.C.C. PIPES
Dam and Allied Works

Rates for 2022-23 (Rate in Rs.)


Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Foundation and Bedding
CC 1A Providing and laying in situ cement concrete of grade Section 3.1
M-10 of trap/ granite / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, compacting, curing etc. complete
with all lifts as directed.
(a) M-10 (20 MSA) (Cement 4.4 bags/Cum) Cum 3903.25 758.98
(b) M-10 (40 MSA) (Cement 4.4 bags/Cum) Cum 4042.00 758.98
(c) M-10 (80 MSA) (Cement 4.33 bags/Cum) Cum 3969.70 758.98
CC 1B Providing and laying in situ cement concrete of grade Section 3.1
M-10,With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap/ granite / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, compacting, curing etc. complete
with all lifts as directed.

(a) M-10 (20 MSA) (Cement Cum 3951.35 758.98


2.2 bags/Cum, GGBS 2.2 bags/Cum)
(b) M-10 (40 MSA) (Cement Cum 3951.35 758.98
2.2 bags/Cum, GGBS 2.2 bags/Cum)
(c) M-10 (80 MSA) (Cement Cum 3880.50 758.98
2.165 bags/Cum, GGBS 2.165 bags/Cum)
CC 2A Providing and laying in situ cement concrete of grade Section 3.1
M-15 of trap / granite / gneiss / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, compacting, curing etc. complete
with all lifts as directed.

(a) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4357.85 758.98
(b) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4213.15 758.98
(c) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4104.15 758.98
CC 2B Providing and laying in situ cement concrete of grade Section 3.1
M-15 With 50% Ground Granulated blast Furnance
Slag (GGBS),of trap / granite / gneiss / quartzite / graded
metal for foundation and bedding with Batching Plant and
Transit Mixer including placing, compacting, curing etc.
complete with all lifts as directed.

(a) M-15 (20 MSA) (Cement 2.82 bags/Cum, GGBS Cum 4241.65 758.98
2.82 bags/Cum)
(b) M-15 (40 MSA) (Cement 2.6 bags/Cum, GGBS 2.6 Cum 4106.05 758.98
bags/Cum)
(c) M-15 (80 MSA) (Cement 2.5 bags/Cum, GGBS 2.5 Cum 4001.35 758.98
bags/Cum)

27
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Sub and Super Structure
CC 3A Providing and laying in situ cement concrete of grade M- Section 3.1
15 of trap / granite / gneiss / quartzite / graded metal for
PCC with or without surface reinforcement/ RCC
concreting requiring heavy or special type of
shuttering for works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments etc. with Batching Plant and Transit mixer
with centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts etc.
complete as directed.
(a) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 5548.00 1083.13

(b) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 5403.30 1083.13
(c) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 5299.50 1083.13
CC 3B Providing and laying in situ cement concrete of grade M- Section 3.1
15 With 50% Ground Granulated blast Furnance Slag
(GGBS),of trap / granite / gneiss / quartzite / graded metal
for PCC with or without surface reinforcement/RCC
concreting requiring heavy or special type of
shuttering for works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments etc. with Batching Plant and Transit mixer
with centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts etc.
complete as directed.

(a) M-15 (20 MSA) (Cement Cum 5431.80 1083.13


2.82 bags/Cum, GGBS 2.82 bags/Cum)
(b) M-15 (40 MSA) (Cement Cum 5296.20 1083.13
2.6 bags/Cum, GGBS 2.6 bags/Cum)
(c) M-15 (80 MSA) (Cement Cum 5196.70 1083.13
2.5 bags/Cum, GGBS 2.5 bags/Cum)

CC 4A Section 3.1
Providing and laying in situ cement concrete of grade M-
20 of trap / granite / gneiss / quartzite / graded metal for
RCC works of gallery, sluice, spillway crest, spillway
down stream face, energy dissipating structures,
intake structures, training walls, piers, abutments,
slab etc. with Batching Plant and Transit mixer
including centering, shuttering ,scaffolding,
compacting, curing etc. complete with all lifts etc.
complete as directed.

(A) M-20 (20 MSA) (Cement 6.60 bags/Cum) Cum 5842.15 1083.13
(B) M-20 (40 MSA) (Cement 6.08 bags/Cum) Cum 5672.95 1083.13

28
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 4B Providing and laying in situ cement concrete of grade M- Section 3.1
20 With 50% Ground Granulated blast Furnance Slag
(GGBS),of trap / granite / gneiss / quartzite / graded metal
for RCC works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments, slab etc. with Batching Plant and Transit
mixer including centering, shuttering, scaffolding,
compacting, curing etc. complete with all lifts etc.
complete with all lifts etc. complete as directed.

(a) M-20 (20 MSA) (Cement Cum 5706.15 1083.13


3.3 bags/Cum, GGBS 3.3 bags/Cum)
(b) M-20 (40 MSA) (Cement Cum 5547.70 1083.13
3.04 bags/Cum, GGBS 3.04 bags/Cum)
CC 5A Providing and laying in situ cement concrete of grade M- Section 3.1
25 of trap / granite / gneiss / quartzite / graded metal for
RCC works of gallery, sluice, spillway crest, spillway
down stream face, energy dissipating structures,
intake structures, training walls, piers, abutments,
slab etc. with Batching Plant and Transit mixer
including centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts etc.
complete as directed.

(a) M-25 (20 MSA) (Cement 7.62 bags/Cum) Cum 6154.65 1083.13
CC 5B Providing and laying in situ cement concrete of grade M- Section 3.1
25 With 50% Ground Granulated blast Furnance Slag
(GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments, slab etc. with Batching Plant and Transit
mixer including centering, shuttering, scaffolding,
placing, compacting, curing with all lifts etc. complete as
directed.

(a) M-25 (20 MSA) (Cement Cum 5997.70 1083.13


3.81 bags/Cum, GGBS 3.81 bags/Cum)

Section B : Canal and Allied Works


CC 6A Providing and laying in situ M-15 (20 MSA)(28 days Section 3.1
cube compressive strength not less than 15N/sqmm)
grade cement concrete with clean, hard, graded
aggregates for canal lining for side and bed including
cost of all materials, machinery, labour, cleaning with
batching plant and transit mixer placing in position,
finishing with all slope of canal including centering,
scaffolding, formwork, compaction, curing, by cutting
grooves, filling with sealing compound and providing
porous plugs preparation of sub grade etc. complete
with all lifts etc. complete as directed.

a) For Bed Lining (Cement 5.64 bags/Cum) Cum 5401.00 706.02


b) i) For Side Lining with curing compound (Cement Cum 5774.90 706.02
5.64 bags/Cum)

29
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
b) ii) For Side Lining without curing compound i.e. by Cum 5556.50 685.93
curing with water (Cement 5.64 bags/Cum)
CC 6B Providing and laying in situ M-15 (20 MSA)With 50% Section 3.1
Ground Granulated blast Furnance Slag (GGBS),(28
days cube compressive strength not less than
15N/sqmm) grade cement concrete with clean, hard,
graded aggregates for canal lining for side and bed
including cost of all materials, machinery, labour,
cleaning with batching plant and transit mixer placing
in position, finishing with all slope of canal including
centering, scaffolding, formwork, compaction, curing, by
cutting grooves, filling with sealing compound and
providing porous plugs preparation of sub grade etc.
complete with all lifts etc. complete as directed.

a) For Bed Lining (Cement Cum 5276.10 706.02


2.82 bags/Cum, GGBS 2.82 bags/Cum)

b) i) For Side Lining with curing compound Cum 5650.00 706.02


(Cement 2.82 bags/Cum, GGBS 2.82 bags/Cum)

b) ii) For Side Lining without curing compound i.e. by Cum 5431.60 685.93
curing with water (Cement
2.82 bags/Cum, GGBS 2.82 bags/Cum)

CC 7A Providing and laying in situ mechanised lining in M-15 Section 3.1


(20 MSA)(28 days cube compressive strength not less
than 15N/sqmm) grade cement concrete with clean, hard,
graded aggregates for canal side and bed using
vibrating cylindrical type mechanical paver including
cost of all materials, machinery, labour, cleaning with
batching plant and transit mixer finishing with all slope of
canal including centering, scaffolding, formwork,
compaction, curing, by cutting grooves, filling with sealing
compound and providing porous plugs preparation of sub
grade etc. complete with all lifts as directed.

a) For Bed Lining (Cement 5.64 bags/Cum) Cum 5494.20 709.94


b) i) For Side Lining with curing compound (Cement Cum 5868.10 709.94
5.64 bags/Cum)
b) ii) For Side Lining without curing compound i.e. by Cum 5649.70 689.86
curing with water (Cement 5.64 bags/Cum)
CC 7B Providing and laying in situ mechanised lining in M-15 Section 3.1
(20 MSA),With 50% Ground Granulated blast Furnance
Slag (GGBS),(28 days cube compressive strength not
less than 15N/sqmm) grade cement concrete with clean,
hard, graded aggregates for canal side and bed using
vibrating cylindrical type mechanical paver including
cost of all materials, machinery, labour, cleaning with
batching plant and transit mixer finishing with all slope of
canal including centering, scaffolding, formwork,
compaction, curing, by cutting grooves, filling with sealing
compound and providing porous plugs preparation of sub
grade etc. complete with all lifts as directed.

30
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
a) For Bed Lining (Cement Cum 5363.10 709.94
2.82 bags/Cum, GGBS 2.82 bags/Cum)

b) i) For Side Lining with curing compound Cum 5743.20 709.94


(Cement 2.82 bags/Cum, GGBS 2.82 bags/Cum)

b) ii) For Side Lining without curing compound i.e. by Cum 5525.35 689.86
curing with water (Cement
2.82 bags/Cum, GGBS 2.82 bags/Cum)

CC 8 Providing & laying chip masonry back filling behind Section 3.2 Cum 2037.00 556.25
concrete lining in CM 1:8 including striking joints, curing,
centering, scaffolding etc. complete but excluding pointing
etc. complete as directed (35% mortar) (Cement 1.25
bags/Cum)
CC 9 Providing, laying, erecting and dismantling M.S. Section 3.3 Sqm 257.70 108.84
plates form work for side lining etc. complete as
Directed. (for steeper slopes only)

CC 10 Providing and laying polythene film of 031 properly Section 3.4


manufactured from 100% virgin granules confirming to I.S.
2508-1984 with 1.5 to 2.5 m. package in rolls etc.
complete as directed.
A) 200 microns Sqm 59.35 2.75
B) 400 microns Sqm 115.95 2.75
C) 600 microns Sqm 172.55 2.75
CC 11 Providing and laying 40 and 45 cm. thick UCR Section 3.2 Cum 2816.75 870.70
masonry in C.M. 1:5 for side lining of the canal including
raking joints, centering, scaffolding and curing etc.
complete excluding pointing with all lifts as directed (35%
mortar) (Cement 2.00 bags/Cum)

CC 12 Providing and laying cement plaster 6 mm thick in Section 3.5 Sqm 121.75 66.06
C.M. 1:3 single coat without neru finish to concrete
surface in all position including centering, scaffolding,
curing etc. complete as directed. (Cement 0.057
bags/Sqm)
Section C : Canal Structures
CC Providing and laying in situ cement concrete of grade Section 3.1
13A M-10 of trap/ granite / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, centering, shuttering,
compacting, curing, etc. complete with all lifts as directed.

(a) M-10 (20 MSA) (Cement 4.40 bags/Cum.) Cum 4528.55 937.58
(b) M-10 (40 MSA) (Cement 4.40 bags/Cum.) Cum 4528.55 937.58
(c) M-10 (80 MSA) (Cement 4.33 bags/Cum.) Cum 4456.25 937.58
CC Providing and laying in situ cement concrete of grade Section 3.1
13B M-10,With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap/ granite / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, centering, shuttering,
compacting, curing, etc. complete with all lifts as directed.

31
CC Section 3.1
13B

Rates for 2022-23 (Rate in Rs.)


Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
(a) M-10 (20 MSA) (Cement Cum 4437.90 937.58
2.2 bags/Cum, GGBS 2.2 bags/Cum)

(b) M-10 (40 MSA) (Cement Cum 4437.90 937.58


2.2 bags/Cum, GGBS 2.2 bags/Cum)

(c) M-10 (80 MSA) (Cement Cum 4367.05 937.58


2.165 bags/Cum, GGBS 2.165 bags/Cum)

CC Providing and laying in situ cement concrete of grade Section 3.1


14A M-15 of trap / granite / gneiss / quartzite / graded metal for
foundation and bedding by Batching Plant & Transit Mixer
including centering,shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as directed.

(a) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4844.40 937.58
(b) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4699.70 937.58
(c) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4590.70 937.58
CC Providing and laying in situ cement concrete of grade Section 3.1
14B M-15, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for foundation and bedding by Batching Plant &
Transit Mixer including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all lifts as
directed.

(a) M-15 (20 MSA) (Cement Cum 4728.20 937.58


2.82 bags/Cum, GGBS 2.82 bags/Cum)

(b) M-15 (40 MSA) (Cement Cum 4592.60 937.58


2.6 bags/Cum, GGBS 2.6 bags/Cum)

(c) M-15 (80 MSA) (Cement Cum 4487.90 937.58


2.5 bags/Cum, GGBS 2.5 bags/Cum)

CC Providing and laying in situ cement concrete of grade Section 3.1


15A M-15 of trap / granite / gneiss / quartzite / graded metal for
RCC works of retaining walls, piers, abutments, etc. with
Batching Plant and Transit mixer including
centering,shuttering, scaffolding, placing, compacting,
curing etc. complete with all lifts as directed.

(a) M-15 (20 MSA) (Cement 5.64 bags/Cum)


i) For Abutment, wing walls, returns, transition walls Cum 6047.20 1355.48

ii) For Piers Cum 6448.10 1413.53


(b) M-15 (40 MSA) (Cement 5.20 bags/Cum)
i) For Abutment, wing walls, returns, transition walls Cum 6145.30 1355.48

ii) For Piers Cum 6303.45 1413.53


(c) M-15 (80 MSA) (Cement 4.99 bags/Cum)
i) For Abutment, wing walls, returns, transition walls Cum 6041.50 1355.48

ii) For Piers Cum 6199.65 1413.53

32
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC Providing and laying in situ cement concrete of grade Section 3.1
15B M-15, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of retaining walls, piers, abutments,
etc. with Batching Plant and Transit mixer including
centering, shuttering, scaffolding, placing, compacting,
curing etc. complete with all lifts as directed.

(a) M-15 (20 MSA) (Cement


2.82 bags/Cum, GGBS 2.82 bags/Cum)

i) For Abutment, wing walls, returns, transition walls Cum 5931.05 1355.48

ii) For Piers Cum 6331.90 1413.53


(b) M-15 (40 MSA) (Cement
2.6 bags/Cum, GGBS 2.6 bags/Cum)

i) For Abutment, wing walls, returns, transition walls Cum 6038.20 1355.48
ii) For Piers Cum 6196.31 1413.53
(c) M-15 (80 MSA) (Cement
2.5 bags/Cum, GGBS 2.5 bags/Cum)

i) For Abutment, wing walls, returns, transition walls Cum 5938.70 1355.48
ii) For Piers Cum 6096.85 1413.53
CC Providing and laying in situ cement concrete of grade Section 3.1
16A M-20 of trap / granite / gneiss / quartzite / graded metal for
RCC works of abutment, wing walls, returns, transition
walls, piers, columns, beams and slabs, diaphragm walls,
road slabs trough (Box Culvert) trough for aqueduct,
wearing coat, etc. . with Batching Plant and Transit mixer
including centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as directed.

(a) M-20 (20 MSA) (Cement 6.60 bags/Cum)


i) For Abutment, wing walls, returns, transition walls Cum 6584.10 1355.48
ii) Piers Cum 6742.25 1413.53
iii) Columns Cum 8956.15 2226.17
iv) Beams and slabs Cum 9374.60 2181.52
v) Road Slab, kerb, super passage/slab culvert etc. Cum 9110.90 2096.68
vi) Trough resting on ground Cum 8374.80 1846.64
vii) Trough for aqueduct Cum 10137.90 2427.10
viii) Wearing Coat and other required concrete Cum 4652.00 758.98
(b) M-20 (40 MSA) (Cement 6.08 bags/Cum)
i) abutment/retaining walls/wing walls/Transition Cum 6414.95 1355.48
walls
ii) Pier Cum 6573.10 1413.53

33
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC Providing and laying in situ cement concrete of grade Section 3.1
16B M-20, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of abutment, wing walls, returns,
transition walls, piers, columns, beams and slabs,
diaphragm walls, road slabs trough (Box Culvert) trough
for aqueduct, wearing coat, etc. . with Batching Plant and
Transit mixer including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all lifts as
directed.

(a) M-20 (20 MSA) (Cement


3.3 bags/Cum, GGBS 3.3 bags/Cum)

i) For Abutment, wing walls, returns, transition walls Cum 6448.15 1355.48
ii) Piers Cum 6606.25 1413.53
iii) Columns Cum 8820.15 2226.17
iv) Beams and slabs Cum 9238.65 2181.52
v) Road Slab, kerb, super passage/slab culvert etc. Cum 8974.90 2096.68
vi) Trough resting on ground Cum 8238.81 1846.64
vii) Trough for aqueduct Cum 10001.95 2427.10
viii) Wearing Coat and other required concrete Cum 4516.00 758.98
(b) M-20 (40 MSA) (Cement
3.04 bags/Cum, GGBS 3.04 bags/Cum)

i) abutment/retaining walls/wing walls/Transition Cum 6289.70 1355.48


walls
ii) pier Cum 6447.85 1413.53
CC Providing and laying in situ cement concrete of grade Section 3.1
17A M-25 of trap / granite / gneiss / quartzite / graded metal for
RCC works of columns, beams and slabs, diaphragm
walls, Road slabs trough (Box Culvert) trough for
aqueduct, wearing coat, etc. with Batching Plant and
Transit mixer including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all lifts as
directed.
(a) M-25 (20 MSA) (Cement 7.62 bags/Cum)
i) Columns Cum 9825.90 2226.17
ii) Beams and slabs Cum 9687.15 2181.52
iii) Road Slab, kerb, super passage/slab culvert etc. Cum 9423.45 2096.68
iv) Trough resting on ground Cum 8646.20 1846.64
v) Trough for aqueduct Cum 10450.45 2427.10
vi) Wearing Coat Cum 4964.50 758.98
CC Providing and laying in situ cement concrete of grade Section 3.1
17B M-25, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of columns, beams and slabs,
diaphragm walls, Road slabs trough (Box Culvert) trough
for aqueduct, wearing coat, etc. with Batching Plant and
Transit mixer including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all lifts as
directed.

(A) M-25 (20 MSA) (Cement


3.81 bags/Cum, GGBS 3.81 bags/Cum)

34
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
i) Columns Cum 9668.95 2226.17
ii) Beams and slabs Cum 9530.15 2181.52
iii) Road Slab, kerb, super passage/slab culvert etc. Cum 9266.45 2096.68
iv) Trough resting on ground Cum 8489.25 1846.64
v) Trough for aqueduct Cum 10293.45 2427.10
vi) Wearing Coat Cum 4807.55 758.98
CC Providing and laying in situ cement concrete of grade Section 3.1
18A M-30 for trough of aqueduct etc. of trap / granite / gneiss /
quartzite / graded metal with Batching Plant and Transit
mixer including centering, shuttering, scaffolding
including placing, compacting, curing etc. complete with
all lifts as directed.
(a) M-30 (20 MSA) for trough of aqueduct (Cement 9.20 Cum 10854.45 2427.10
bags/Cum)

(b) M-30 (20 MSA) for slab (Cement 9.20 bags/Cum) Cum 10091.15 2181.52

CC Providing and laying in situ cement concrete of grade M- Section 3.1


18B 30, With 50% Ground Granulated blast Furnance Slag
(GGBS), for trough of aqueduct etc. of trap / granite /
gneiss / quartzite / graded metal with Batching Plant and
Transit mixer including centering, shuttering,
scaffolding including placing, compacting, curing etc.
complete with all lifts etc. complete with all lifts as
directed.

(a) M-30 (20 MSA) for trough of aqueduct Cum 10664.95 2427.10
(Cement 4.6 bags/Cum, GGBS 4.6 bags/Cum)

(b) M-30 (20 MSA) for slab Cum 9901.60 2181.52


(Cement 4.6 bags/Cum, GGBS 4.6 bags/Cum)

CC 19 Providing and laying expansion / construction joint Section 3.6


with 18 SWG copper plate and shalitex expansion
pad below and above the copper plate including sealing
the joint with shalitex sealing compound including 50 x 50
x 5 mm angle frame with stainless steel bolts etc as
directed. (For all slab thickness)

A) 60 Cm. wide copper plate Sqm 16651.85 494.58


B) 37.50 Cm. wide copper plate Sqm 19298.55 791.33
CC 20 Providing and laying expansion / construction joint Section 3.7 Sqm 1422.10 198.44
with shalitex super expansion pad (jute fiber) 12 mm
thick including sealing the joint with shalitex sealing
compound etc. complete as directed (For all slab
thickness).

CC 21 Providing and fixing G.I. sheet 24 gauge and 22.5 cm. Section 3.8 Rmt 179.95 37.00
wide for the construction joint in R.C.C. trough wall
including cutting 15 cm. overlap, riveting the joints and
fixing in position etc. complete as directed.

35
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 22 Providing and fixing in position TMT - FE - 500 bar Section 3.9 MT 75737.10 8818.51
reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams columns, canopies,
staircase, newels, chajjas, lintels pardis, copings, fins,
arches etc. as per detailed designs, drawings and
schedules. including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required complete as directed.

Centering Items
CC 23 Providing, erecting and laying steel shuttering Section 3.10
formwork and making surface suitable for concreting
including dismantling etc. complete as directed.

(a) for abutments, piers, wings, returns etc.complete Sqm 486.55 178.60

(b) For RCC Solid/Deck slab/Box Cells/ Trough of Sqm 555.15 178.60
Aqueduct etc.
(c ) For curved surface Sqm 583.85 214.32

CC 24 (a) Providing and erecting steel props centering up to 3.00 Section 3.11 Sqm 268.50 111.62
m height including bracing, strengthening and dismantling
etc. complete as directed.
(b) Rate for centering for every Additional 1.00 m height Sqm 96.55 55.81

U.C.R. Masonry
CC 25 Providing U.C.R. masonry in C.M. 1:5 in foundation upto Section 3.12
0.5 m above G.L. with lift upto 1.5 m. including striking
joints, curing etc. complete as directed.

A)Thickness of wall upto 1 m. (30% mortar) Cum 2624.55 498.16


B) Walls of water retaining structures thinner than 1.0 Cum 2620.45 368.93
m. and walls of structures thicker than 1.0 m. other than
dams and water retaining structures.(35% mortar).

C) For dams and water retaining structures (45% mortar) Cum 2867.65 368.93
.
CC 26 Providing U.C.R. masonry in C.M. 1:6 in foundation Section 3.12
upto plinth with lift upto 1.5 m. including striking joints,
curing etc. complete as directed.
(A) (30% mortar) Cum 2538.75 498.16
(B) (35% mortar) Cum 2553.80 403.36
(C) (45% mortar) Cum 2770.35 403.36
CC 27 Providing U.C.R. masonry in C.M. 1:5 in superstructure Section 3.12
with lift upto 1.5 m. including striking joints etc.complete
as directed.

A) Thickness of walls upto 1 m. (30% mortar) Cum 2649.45 523.07


B) Walls of water retaining structures thinner than 1.0 m. Cum 2638.90 387.38
and walls of structures thicker than 1.0 m. other than
dams and water retaining structures. (35% mortar).

C) For dams and water retaining structures (45% mortar) . Cum 2886.10 387.38

36
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 28 Providing khandki facing to the face of masonry with Section 3.13
pointing in C.M. 1:2 including finishing to the required
shape & slope with necessary centering, scaffolding,
curing etc. complete as directed. (It is assumed that the
Khandkis are of the size 20cm x 20cm. No mortar for
jointing is taken into account, only face pointing of joint is
considered).
A) with khandki facing on one side Sqm 2555.35 109.96
B) with khandki facing on both side. Sqm 5000.70 109.96
CC 29 Providing and laying dry stone rubble masonry Section 3.14 Cum 1253.05 288.00
excluding pointing etc. complete as directed.

CC 30 Providing pointing with cement mortar for stone Section 3.15


masonry including racking joints, centering, scaffolding,
curing etc. complete as directed.
(A) In Cement mortar 1:3 Sqm 53.45 37.60
(B) In Cement Mortar 1:2 Sqm 58.50 37.97
CC 31 Providing and constructing coarse rubble masonry II Section 3.16 Cum 5762.75 780.86
sort in C.M. 1:4.5 for super structure with lift upto 1.5m.
including striking joints, curing excluding cement pointing
etc. complete as directed. (30% mortar)

CC 32 Cutting rectangular grooves of size 10 cm. x 10 cm. in Section 3.17 Rmt 1339.50 1339.50
stone masonry including clearing pointing etc. to facilitate
smooth working of needles etc. complete as directed.

CC 33 Providing and laying rough dressed cut stone coping Section 3.18 Cum 6546.30 3008.16
23 cm. thick in C.M. 1:5 excluding cement pointing but
including watering with lift upto 1.5 m.etc. complete as
directed.
CC 34 Providing coalgrout U.C.R. masonry in C.M. 1:3 (43% Section 3.19 Cum 3451.50 392.71
mortar) proper packing rubble and of the required shape
and quality with the coalgrout at required pressure with lift
upto 1.5 m. including centering, scaffolding, watering etc.
complete as directed. (Excluding formwork and staging)

BRICK MASONRY
CC 35 Providing B.B. masonry with conventional I.S. type Section 3.20 Cum 5785.90 556.84
bricks for super structure including striking joints,
watering, centering, scaffolding with lift upto 1.5 m.,
including cost of material etc. complete as Directed.

CC 36 Providing B.B. masonry with conventional I.S. type Section 3.21 sqm 806.60 76.92
bricks in cement mortar 1:5 in super structure upto floor
level including mild steel reinforcement of 2 bars of 6 mm
dia. placed by every 3rd course properly bent, bounded at
ends,centering, scaffolding, watering etc. complete with all
lift. including cost of material etc complete as directed.

PIPE LAYING
CC Providing R.C.C .pipe of NP2 class conforming to IS458 Section 3.22
37A 2003 of following diameter including cost of all material
and labour required, inspection charges, transportation to
stores, transit insurance, loading, unloading and stacking
excluding GST levied by GOI and GOM in all respect etc.
complete as directed.
a) 1200 mm dia Rmt 5820.00 0.00
b) 1000 mm dia Rmt 3576.00 0.00
c) 900 mm dia Rmt 2938.00 0.00

37
CC Section 3.22
37A

Rates for 2022-23 (Rate in Rs.)


Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
d) 800 mm dia Rmt 2299.00 0.00
e) 600 mm dia Rmt 1532.00 0.00
f) 450 mm dia Rmt 1150.00 0.00
CC Laying and jointing R.C.C. pipe of NP2 class or IRC Section 3.23
37B standard in C.M. 1:2, proportion by volume including cost
of all materials (excluding pipes and collars), labour,
aligning pipes, batching and mixing mortar, packing joints
with hemp and mortar, finishing, curing etc. complete with
all lifts as directed.
a) 1200 mm dia Rmt 522.30 322.70
b) 1000 mm dia Rmt 390.05 241.52
c) 900 mm dia Rmt 375.25 241.52
d) 800 mm dia Rmt 360.30 241.52
e) 600 mm dia Rmt 276.30 200.93
f) 450 mm dia Rmt 213.95 160.33
CC Providing R.C.C .pipe of NP3 class conforming to IS458 Section 3.22
38A 2003 of following diameter including cost of all material
and labour required, inspection charges, transportation to
stores, transit insurance, loading, unloading and stacking
excluding GST levied by GOI and GOM in all respect etc.
complete as dirrected.
a) 1200 mm dia Rmt 9592.00 0.00
b) 900 mm dia Rmt 4471.00 0.00
CC Laying and jointing R.C.C. pipe of NP3 class or IRC Section 3.23
38B standard in C.M. 1:2, proportion by volume including cost
of all materials (excluding pipes and collars), labour,
aligning pipes, batching and mixing mortar, packing joints
with hemp and mortar, finishing, curing etc. complete with
all lifts as directed.
a) 1200 mm dia Rmt 619.10 419.51
b) 900 mm dia Rmt 447.70 313.98
CC 39 Laying and jointing R.C.C. pipe of P1 class of 900 mm Section 3.23 Rmt 447.70 313.98
dia or IRC standard in C.M. 1:2, proportion by volume
including cost of all materials (excluding pipes and
collars), labour, aligning pipes, batching and mixing
mortar, packing joints with hemp and mortar, finishing,
curing etc. complete with all lifts as directed.

CC 40 Providing and laying in situ cement concrete of grade Section 3.24 Cum 9682.15 2699.22
M-20 of trap / granite / gneiss / quartzite / graded metal for
Staunch wall with Batching Plant and Transit Mixer
including centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as directed.

CC 41 Providing and fixing RCC Boundary/Guard /Chainage Section 3.25 No 804.65 163.66
blocks of size 75 x 20 x 20 cm including excavation and
fixing in a block of 45 x 45 x 45 cm in M-15 Concrete with
oil painting of two coats, lettering etc. complete as
Directed. ( height of stone above GL 40 cm.)

CC 42 Providing and fixing RCC Km/half km/ submergence Section 3.26 No 953.80 241.16
boundary blocks of size 95 x 20 x 20 cm including
excavation and fixing in a block of 45 x 45 x 45 cm in M-
15 Concrete with oil painting of two coats, lettering etc.
complete as directed. (height of stone above GL 60 cm.)

38
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 43 Providing and fixing canal information board of Section 3.27 No 6401.05 2219.63
1.2x0.75 m prepared on 16 gauge M.S. sheet with angle
iron frame of size 35x35x3 mm with cross bracing of size
25x25x3 mm including painting with one coat of zinc
chromate storing primer and two coats each of
green/white back ground and back side grey store
enamelled bonded with red retro reflective sheet
Engineering grade, border/letters/numeral / arrows coated
with non pealable crystal clear protective transparent coat
retaining 100% reflection including two angle iron post of
size 50x50x5 mm of 3.65 m long inflated at bottom drilled
on top and painted in white and black bonds of 30 cm with
four numbers high strength of G.I. bolts and nuts of size
10 mm dia. and 20 mm long sheet and angle iron post in
one piece without joints including all taxes, conveying,
fixing in ground with cement concrete in M-15 block of
size 60x60x75 cm as directed.

CC 44 Providing and laying rubble soling below foundation in Section 3.28 Cum 1132.70 501.41
layers including filling with rubble chips, murum etc.
complete as directed.
CC 45 Back filling up to ground level behind the canal Section 3.29 Cum 55.60 3.00
structures etc. complete with suitable material of approved
quality in layers not exceeding 20 cm without disturbing
the structure etc. complete as directed.

CC 46 Providing and constructing contraction joints by Section 3.30 Rmt 2117.60 170.54
fixing 310 mm wide central bulb type approved quality
PVC water stop in two lines with 8 mm dia. Steel dowel
rods on either side at 1 m interval, forming 125*125 size
groove in between 2 water stops for filling asphalt, fixing
15 mm dia. two legged G.I. pipe with U-bend at bottom for
circulating steam at interval and forming 150 mm dia.
formed drain behind water seals including cost of all
materials, machinery, labour, filling asphalt in groove,
circulation of steam at intervals, vulcanizing water seal
joints etc. complete with all lifts as directed.

CC 47 Supplying, laying and joining Bituminous Geomembrane Section 3.31 sqm 1314.15 19.36
as hydraulic liner over canal having average thickness of
4 mm (minimum thickness 3.6 mm), minimum width of 5
m, minimum tensile strength of 18 kN/m and minimum
permissible elongation of 30 % including 200 mm overlap,
excavating trench of size 500 mm x 500 mm, steel
anchorage of 12 mm dia MS bar 1.5 m long of approved
shape at 0.75 m c/c. Bituminous Geomembrane Lining
which shall be laid on the properly prepared subgrade
including wastage, import duties & custom clearance
charges, transportation, supply at site, Loading /
unloading, labour charges and testing which shall confirm
to ASTM/I.S. standards and excluding dismantling of
concrete, earthwork preparation, dewatering, GST etc
complete as directed.

39
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-4

TUNNEL WORKS

ITEM NO. TN 1 TO TN 11
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-2023
SECTION 4:- TUNNEL WORKS
Rate for 2022-23
(Rate in Rs.)
Item No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
TN 01 Excavation of tunnel through adit / itself in all types
of rock by drilling and smooth control perimeter blasting,
mucking, disposing muck in muck yard, lighting,
ventilation inside tunnel Including dewatering
considering cross section of tunnel as D-shaped with Section 4.1 Cum 2430.30 811.96
initial lead of 1.5 Km (From average face to Dump yard
including length of Adit) etc. Complete.

TN 02 Excavation of tunnel through Shaft in all types of


rock by drilling and smooth control perimeter blasting,
mucking, disposing muck in muck yard, lighting,
ventilation inside tunnel Including dewatering Section 4.1 Cum 3630.25 813.30
considering cross section of tunnel as D-shaped with
initial lead of 1.5 Km (From average face to Dump yard)
etc. Complete.

TN 03 Excavation of Shaft in all types of rock by drilling and


smooth control perimeter blasting, mucking, disposing
muck in muck yard, lighting, ventilation inside tunnel
including dewatering with initial lead of 500 m (From top Section 4.1 Cum 3166.55 1092.89
of shaft to Dump yard) etc. Complete.

TN 04 A Providing and fixing steel rock bolts of 25 mm


diameter and 3.10 m length with resin bond cement
capsule anchorage through adit / itself including
drilling holes, inserting grout capsule, driving bolt, fixing
10 mm thick plate and nuts and tightening the same by
Section 4.2 No. 3040.90 247.51
torque wrench after hardening of cement grout, cost of
all materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
with all lifts.

TN 04 B Providing and fixing steel rock bolts of 25 mm


diameter and 3.10 m length with resin bond cement
capsule anchorage through shaft including drilling
holes, inserting grout capsule, driving bolt, fixing 10 mm
thick plate and nuts and tightening the same by torque Section 4.2 No. 3596.05 247.51
wrench after hardening of cement grout, cost of all
materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
with all lifts.
TN 05 A Providing and fixing anchor bar of 25 mm diameter
3.375 m length with resin bond cement capsule
anchorage through adit / itself including drilling holes,
inserting grout capsule, driving anchor, cost of all Section 4.3 No. 2730.00 210.30
materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
with all lifts as Directed .
TN 05 B Providing and fixing anchor bar of 25 mm diameter
3.375 m length with resin bond cement capsule
anchorage through shaft including drilling holes,
inserting grout capsule, driving anchor, cost of all
Section 4.3 No. 2908.35 210.30
materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
with all lifts as Directed .

40
Rate for 2022-23
(Rate in Rs.)
Item No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
TN 06 A Providing and fixing anchor bar of 32 mm diameter
4.32 m length with resin bond cement capsule
anchorage through adit/ itself including drilling holes,
inserting grout capsule, driving anchor, cost of all Section 4.3 No. 3790.85 210.30
materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
withall lifts as Directed .

TN 06 B Providing and fixing anchor bar of 32 mm diameter


4.32 m length with resin bond cement capsule
anchorage through shaft including drilling holes,
inserting grout capsule, driving anchor, cost of all Section 4.3 No. 3969.20 210.30
materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
with all lifts as Directed.
TN 07 A Providing, fabricating and fixing in position permanent
structural steel supports through adit / itself as per
details including cost of all materials, machinery,
labour, cutting, bending, welding, grinding, lighting, Section 4.4 MT 109519.55 ---
ventilation, drainage and all other ancillary operations
etc complete with all lifts.

TN 07 B Providing, fabricating and fixing in position permanent


structural steel supports through shaft as per details
including cost of all materials, machinery, labour,
cutting, bending, welding, grinding, lighting, ventilation, Section 4.4 MT 115010.60 ---
drainage and all other ancillary operations etc complete
with all lifts.

TN 08 A Providing, fabricating and placing in position


reinforcement steel for tunnel RCC works through
adit / itself including cleaning, straightening, cutting,
bending, hooking, lapping, welding joints wherever Section 4.5 MT 85015.85 ---
required tying with binding wire including cost of all
materials, machinery, labour, lighting, ventilation,
drainage etc. complete with all lifts.
TN 08 B Providing, fabricating and placing in position
reinforcement steel for tunnel RCC works through
shaft including cleaning, straightening, cutting,
bending, hooking, lapping, welding joints wherever Section 4.5 MT 94449.70 ---
required tying with binding wire including cost of all
materials, machinery, labour, lighting, ventilation,
drainage etc. complete with all lifts.

TN 09 A Providing and applying wet shotcrete (M-25 : 10MSA)


50 mm thick in two layers through adit / itself of tunnel
including admixtures, neccessary machinery , labours Section 4.6 &
,scaffolding, lighting, drainage, ventilation with sqm 516.10 29.99
Section 3
providing and all other ancillary operations etc.
complete with all lifts.
TN 09 B Providing and applying wet shotcrete (M-25 10MSA)
50 mm thick in two layers through shaft of tunnel
including admixtures, neccessary machinery , labours Section 4.6 &
,scaffolding, lighting, drainage, ventilation with sqm 969.35 29.99
Section 3
providing and all other ancillary operations etc.
complete with all lifts.

41
Rate for 2022-23
(Rate in Rs.)
Item No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
TN 10 A Providing and laying insitu vibrated M20 grade cement
concrete using 20 mm clean, hard, graded aggregates
for side and arch lining of tunnel through adit / itself
including cost of all materials, machinery, labour,
formwork, batching, mixing, conveying upto placing Section 4.7 &
Cum 8487.55 1463.74
point in agitator car, placing in position, laying, vibrating, Section 3
finishing, curing, ventilation, lighting, draining and all
other ancillary operations etc. complete with all lifts for
Tunnel.

TN 10 B Providing and laying insitu vibrated M20 grade cement


concrete using 20 mm clean, hard, graded aggregates
for side and arch lining of tunnel through shaft
including cost of all materials, machinery, labour,
formwork, batching, mixing, conveying upto placing Section 4.7 &
Cum 8858.90 1463.75
point in agitator car, placing in position, laying, vibrating, Section 3
finishing, curing, ventilation, lighting, draining and all
other ancillary operations etc. complete with all lifts for
Tunnel.

TN 11 A Providing and laying insitu vibrated M-20 grade


cement concrete using 20 mm clean, hard, graded
aggregates for Invert (Kerb and bed) lining of tunnel
through adit / itself including cost of all materials,
machinery, labours, formwork, batching, mixing, Section 4.7 &
Cum 6104.00 642.59
conveying upto placing point in agitator car, placing in Section 3
position, laying, vibrating, finishing, curing, ventilation,
lighting, draining and all other ancillary operations etc.
complete with all lifts for Tunnel.

TN 11 B Providing and laying insitu vibrated M-20 grade


cement concrete using 20 mm clean, hard, graded
aggregates for Invert (Kerb and bed) lining of tunnel
through shaft including cost of all materials,
machinery, labours, formwork, batching, mixing, Section 4.7 &
Cum 6338.55 642.59
conveying upto placing point in agitator car, placing in Section 3
position, laying, vibrating, finishing, curing, ventilation,
lighting, draining and all other ancillary operations etc.
complete with all lifts for Tunnel.

42
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-5

SURVEYING AND INVESTIGATION

ITEM NO. SI 1 TO SI 17
SECTION- 5

SURVEYING AND INVESTIGATION

co.oRDJNA TOR

~5-
(A.L. PAT HAK)
CHIEF ENGINEER(SP)
WATER.RES_OUR.CES DEPARLV1£NT,
Ai\lARAVATI .
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 5 :- SURVEYING AND INVESTIGATION
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 1
Double levelling using Auto level to connect
Geodetic Trignometrical survey, bench mark and
establishing permanent bench mark at Dam site at Section 5.1 Km. 1052.40 991.40
place along the canal alignment, submergence and
in command area etc. complete, as directed.
(Excluding cost of B.M. structure)
SI 2 Block contour survey of 10m x 10m grid (Not less
than 121 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
Section 5.2
design Software packages including contour plotting
and 5.3
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper, as directed.

(A) Total Station Ha. 774.90 598.42


(B) DGPS Ha. 271.70 141.93
SI 3 Block contour survey of 15 m x 15 m grid (Not less
than 64 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system Section
design Software packages including contour plotting 5.4 and 5.5
at specified interval and scale.The test print of the
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper,as directed.

(A) Total Station Ha. 521.65 402.85


(B) DGPS Ha. 182.90 95.55
SI 4 Block contour survey of 20m x 20m grid (Not less
than 36 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
Section
design Software packages including contour plotting
5.6 and 5.7
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper,as directed.

(A) Total Station Ha. 391.30 302.15

(B) DGPS Ha. 137.20 71.65

43
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 5 Block contour survey of 30m x 30m grid (Not less
than 25 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting Section 5.8
at specified interval and scale.The test print of the and 5.9
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper, as directed.

(A) Total Station Ha. 268.50 207.35

(B) DGPS Ha. 94.15 49.20


SI 6 Block contour survey of 60m x 30m grid (Not less
than 15 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
Section
design Software packages including contour plotting
5.10 and 5.11
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper,as directed.

(A) Total Station Ha. 138.10 106.65


(B) DGPS Ha. 48.40 25.30
SI 7 Block contour survey of 150m x 30m grid (Not less
than 5 raw data points distributed uniformly over a
Hector) for irrigation projects using digital state of art
Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system Section
design Software packages including contour plotting 5.12 and 5.13
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper,as directed.

(A) Total Station Ha. 61.40 47.40


(B) DGPS Ha. 21.50 11.25

44
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 8 Carrying out line survey with digital state of art
Total Station for fixing FRL / HFL including C/s
survey with levels at 20m interval/ survey for 'L'
section of alternative Dam site OR 'L' section of river
1Km u/s OR 1Km D/s of alternative Dam site etc
complete including station, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Soft wares compatible with canal irrigation system Section 5.14 Km. 767.25 592.50
design Soft wares packages including contour
plotting at specified interval and scale. The test print
of the drawing shall be approved by Engineer-in-
charge and the same shall be delivered in a CD
format as well as hard copy in six numbers including
one print on tracing paper as directed.

SI 9 Survey for main canal, branches, distributaries


with digital state of art Total Station on falling
contour including investigation of alternative line,
taking falling contour fixing canal line, taking 'L'
section and cross section on final line and
distributaries survey including transfer of entire data
to computer system in different georeferential layer/
themes using features of standard plotting Softwares
compatible with canal irrigation system design Section 5.15 Km. 920.70 711.00
Softwares packages including contour plotting at
specified interval and scale. Absolutely linear survey
for all types of canals (Length of survey for L-section
and cross sections to be measured separately for
payment) etc complete,as directed. (Excluding fixing
apex / chainage stones)

SI 10 Preparation of detailed construction plan for pipe


distribution network system including necessary
command survey, linear survey for pipe laying, chak Section
planning, designing of pipe network, and preparation 5.16 and 5.17
of estimates,as directed.

Ha.
A) Total Station 1059.30 612.64
CCA
Ha.
B) DGPS 556.10 156.15
CCA
SI 11 Providing permanent bench mark dressed stone
of basalt, granite or gniess of size 30cm X 30cm X
45cm at least 15Cm below the ground and
embedding it to a depth of 30cm in grade M-15 insitu
concrete of size 90cm X 90cm X 60cm deep over 1M
deep foundation concrete of grade M-10 including Section 5.18 No. 5666.20 477.58
excavation, concrete, providing and fixing dressed
stone and backfilling the pit up to ground level with
sand etc. complete,with all lifts as directed.

SI 12 Fixing precast RCC alignment blocks (Pillar) on


alternative dam site finally approved of size 900 x
175 x 100 mm at 90 M interval including fixing in
1:3:6 (600 x 450 x 450mm) cement concrete, Section 5.19 No. 561.95 47.43
excavation, backfilling and coloring etc.with all lifts as
directed.

45
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 13 Supplying labour for Double levelling to connect
Geodetic Trignometrical Survey Bench Mark and
establishing the Permanent Bench Mark at Dam site
at place along the canal alignment submergence and Section 5.20 Km. 1147.40 1147.40
in command area etc.as directed.(Excluding cost of
P.B.M. structure)

SI 14 Taking trial bore for detailed investigation with


NX diamond drill double tube in all sorts of strata
like soft murum, hard murum and boulders including
all materials such as casing pipes, accessories,
grease, steel boolsam and other such materials and
or as required including conveying such materials
and machinery to site of works, preserving the loose
Section 5.21
samples in glass/plastic jar and core samples serially
numbered at site of work and conveying the same to
the head quarter of concerned office and submission
of detailed bore log sheet etc complete,as directed.
(Excluding Core Box)

(A) Over Burdon (soil of all sorts, soft,murum,hard


Rmt. 2085.00 422.00
murum, boulders and soft rock)

(B) Hard Rock Rmt. 3880.00 492.00


SI 15 Providing core box of M.S.of size 1.25m x 0.35m x
0.15m for preserving core sample with all fixtures
and fastening handles including locking arrangement Section 5.22 No. 2731.20 0.00
etc. complete,as directed.

SI 16 Carrying out water intake test / permeability test


at any stage or depth by filling the bore hole with
water or air at specific pressure of specified limit as Section 5.23 Test 729.95 380.81
and where ,as directed.

SI 17 Excavation for taking trial pits on final alignment


of dam and canal at specified interval and in Nalla-
bed of size 2.00 x 2.00 x 2.50mtr. in length, breadth
and depth respectively or Various sizes including Section 5.24 Cum. 144.50 21.24
backfilling trial pits etc. complete,with all lifts as
Directed

46
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-6

HYDROMETEROLOGY

ITEM NO. HD 1 TO HD 7
SECTION -6

HYDROMETEOROLOGY

CO-ORDINATOR

'
1/

(S. . AR)
~
CHIEFE NEER
PLANNING AND DAM SAFETYY
NASHIK
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 6 :- HYDROMETEOROLOGY
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
HD 01 Standard Rain Gauge Station
(Measurement Clerk)
Providing person to take measurement at
every morning 8:30 am to SRG station, taking
Per
the entry in the register. Sending the reading Section 6.1 1627.85 1627.85
Month
daily to Sub-Dn by SMS & monthly progress
(reading) to Sub-Dn, including taking care of
instruments established on the station As
Directed.
HD 02 Autographic Rain Gauge (Measurement
Clerk)
Providing person to take measurement at
every morning 8:30 am of autographic rain
gauge station including changing graph at Per
8:30 am, taking reading in the register, also Section 6.2 3488.40 3488.40
Month
sending reading to Sub-Dn by SMS & monthly
progress (reading) sending to Sub-Dn, with
taking care of instruments established on the
station. As Directed.

HD 03
Full climatic station (Measurement Clerk)

Providing person to take reading from the


below mentioned scientific instruments
established in the F.C.S Station including
taking reading in the register as per
prescribed Proforma given by the Sub-Dn,
also sending to concern Sub-Division in the Per
Section 6.3 22325.05 22325.05
precribed Proforma time to time. As Directed. Month

Scientific instruments
1) ARG, 2) SRG, 3) Pan Evaporimeter, 4) Pan
Water Temperature, 5) Thermometer [Dry,
Wet, Minimum, Maximum], 6) Thermo
hygrograph, 7) Anemometer, 8) Wind Vane,
9) Sunshine Recorder.
HD 04
Gauge Discharge (Gauge Inspector)

Providing Gauge Inspector to take hourly


gauge measurements in the river in rainy &
Per
other season taking all reading in the register Section 6.4 22994.80 22994.80
Month
& sending to concern Sub-Division as per
instruction in the precribed proforma
including accidental insurance .As Directed.

47
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
HD 05
Gauge Discharge (Measurement Clerk)

Providing measurement Clerk to take


measurement by winch & Cradle with current
meter or by float method from required
compartment in the flood season, taking
measurements as per instruction given by Per
Section 6.5 22994.80 22994.80
concern Engineer, taking Water levels in four Month
times daily, changing paper of AWLR and
Calculating Velocity as per given area. Taking
all readings in the register, sending to
Concern Sub-Division as per instructions in
the prescribed proforma, including accidiental
insurance,As Directed.
HD 06
Gauge Discharge (Boat Driver)

Providing boat driver (He must be good


swimmer) to drive the boat for taking
measurements at G.D. Stations near
Per
compartment in the Steady position. After Section 6.6 22994.80 22994.80
Month
taking the measurement bringing back the
boat & concern persons in the boat safely,
Installing the boat in out of danger area etc.
complete, including accidiental insurance, As
Directed.
HD 07 Gauge Discharge (Boat Chowkidar)

Providing Boat Chowkidar (He must be good


swimmer) to take care & Security of boat.
When the Water Level of river increase or Per
Section 6.7 21272.05 21272.05
Month
decrease, he must tighten the boat at safe
place & taking care of boat in the night.
including accidiental insurance, As Directed.

48
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-7
VALUATION OF REHABILITATION WORKS

ITEM NO. VAL 1 TO VAL 31


SECTION ~7

VALUATION OF REHABfLfTATION "VORKS

•·

CO-ORDINATOR

(.-\~ 1.-\~
CHIEF ENGINEER (SP)
\VATER RESOURCES DEP..\RTi\'lENT
.-\MAR:\VATI
GOVERNMENT OF MAHARASHTRA
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 07:-VALUATION OF REHABILITATION WORKS
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item

1 2 3 4 5 6
VAL 1 Providing and constructing stone masonry in
mud mortar in foundation and plinth including As Directed by
scaffolding, finishing etc. complete. As directed Engineer-In-
by Engineer-In-Charge.. Charge.

(A) Up to Plinth Cum 1428.05 540.85


(B) Super structure Cum 1601.10 713.90
VAL 2 Providing and constructing U.C.R.masonry in
lime 1:6 mortar in foundation and plinth As Directed by
including scaffolding, finishing etc.complete. As Engineer-In- Cum 2468.90 540.80
directed by Engineer-In-Charge.. Charge

VAL 3 Providing second class B.B.masonry with


conventional/ I.S. type bricks in mud mortar
in super structures, including racking out joints, As Directed by
when plastering is to be done including Engineer-In-
scaffolding and watering etc. complete. As Charge
directed by Engineer-In-Charge..

(A) For Super structure Cum 5917.90 1074.60


(B) For foundation and Plinth Cum 5703.00 859.70
VAL 4 Providing and constructing arch like
B.B.Masonry slab roofing in lime mortor
including 'I' Section as (150 x 100 mm @ 0.90 As Directed by
mt.C/C) as a bottom support and tie rods with Engineer-In- Sqm 2858.70 1074.60
shuttering and scaffolding etc.complete.As Charge
directed by Engineer-In-Charge.

VAL 5 Providing 50 mm. thick mud plaster including


racking out joints, scaffolding all finishing As Directed by
etc.complete.As directed by Engineer-In-Charge. Engineer-In- Sqm 193.70 135.90
Charge

VAL 6 Providing & Constructing Kud Walls with


vertical posts (100 mm Dia), bamboos (25 mm As Directed by
Dia.) and tur/cotton/Paddy bushes Excluding Engineer-In- Sqm 327.85 117.85
mud plaster etc. complete. As directed by Charge
Engineer-In-Charge.
VAL 7 Providing 25 mm thick mud plaster to kud
As Directed by
walls including cow dung wash etc.complete. As
Engineer-In- Sqm 150.15 121.25
directed by Engineer-In-Charge.
Charge
VAL 8 Providing & Constructing Kud Walls with
clothing of grass/other vegetation with vertical
(100 mm Dia) posts and bamboos (25 mm Dia At As Directed by
450 mm c/c) excluding mud plaster etc.complete. Engineer-In- Sqm 155.55 23.85
As directed by Engineer-In-Charge. Charge

49
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item

1 2 3 4 5 6
VAL 9 Providing & constructing Kud walls including
mud plaster 25 mm thick on both sides with As Directed by
cow dung wash etc. complete.As directed by Engineer-In- Sqm 622.25 360.35
Engineer-In-Charge. Charge

VAL 10 Providing & constructing Kud walls, split


Bamboo knitted together and covered with 12 As Directed by
mm. thick mud plaster on both sides etc. Engineer-In- Sqm 475.05 241.35
complete. As directed by Engineer-In-Charge. Charge

VAL 11 Providing & constructing Kud roofing with


bamboos and balli rafter alongwith tur/cotton As Directed by
bushes excluding mud plater etc.complete. As Engineer-In- Sqm 602.35 242.85
directed by Engineer-In-Charge. Charge

VAL 12 Providing & Fixing non teak wood Dhaba


including mud flooring and mud plaster on non
As Directed by
teak planks, rested on non teak rafter at 1.5 x 2.5
Engineer-In- Sqm 5665.95 191.05
m. intervals, including mud flooring over the
Charge
planks etc.complete (Jungle wood Dhaba) As
directed by Engineer-In-Charge.
VAL 13 Providing & Fixing teak wood Dhaba
including mud flooring and mud plaster on
non teak planks, rested on non teak wood rafter As Directed by
1.5 x 2.5 m. intervals, including mud flooring over Engineer-In- Sqm 12254.10 191.00
the planks etc.complete (Vertical posts and Charge
beams are considered in Teak wood) As directed
by Engineer-In-Charge.

VAL 14 Providing & constructing split bamboo mesh


As Directed by
knitted together including all labour material
Engineer-In- Sqm 380.05 63.35
leads and lift etc.complete. As directed by
Charge
Engineer-In-Charge.
VAL 15 Providing & constructing mud boulder otta
As Directed by
(1mx1mx1m) with earthen Ranjan etc.complete.
Engineer-In- No. 1238.80 414.20
As directed by Engineer-In-Charge.
Charge
VAL 16 Providing & constructing mud Wall including
preparation of mud mortar including placing As Directed by
scaffolding, finishing etc.complete. As directed Engineer-In- Cum 2113.90 1279.20
by Engineer-In-Charge. Charge

VAL 17 Providing & fixing non teak doors/windows


40 mm. Thick ledged with 25 mm. Thick plain
planked shutters without ventilators/fan light/iron
bars including the frames of the sizes as per As Directed by
standard specification, iron fixtures and Engineer-In- Sqm 5415.20 1710.40
fastenings and finishing the wood work with Charge
oiling etc.complete .As directed by Engineer-In-
Charge.

50
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item

1 2 3 4 5 6
VAL 18 Providing and fixing non teak doors/window II
class fully pannelled without ventilators/fan
light/iron bars including the frames of the sizes
as per standard specification, Iron fixtures and As Directed by
fastenings and finishing the wood work with oil Engineer-In- Sqm 8188.95 3895.25
painting etc.complete. As directed by Engineer-In- Charge
Charge.

VAL 19 Providing & fixing non teak doors ledged and


braced with 20 mm thick, planked shutters As Directed by
including the frame without sill with all fixture and Engineer-In- Sqm 7975.70 3899.50
fastenings oil painting etc. complete. As directed Charge
by Engineer-In-Charge.

VAL 20 Providing & fixing Jungle wood door of frame


60 mm x 100 mm for second class door's and
window with/without ventilators fan light and As Directed by
clear storey windows including chamfering/ Engineer-In- Sqm 3340.85 384.15
rounding rebating and hold fast finishing with one Charge
coat of primer etc. complete. As directed by
Engineer-In-Charge.

VAL 21 Providing and fixing Country Teak wood


As Directed by
frame of size 60 mm x 100 mm with G.I. Sheet
Engineer-In- Sqm 3088.25 840.25
Shutter etc.complete. As directed by Engineer-In-
Charge
Charge.
VAL 22 Providing & fixing Country Teak Wood plank
ceiling 12 mm. Thick with planked on
underside, longuled and grooved including
As Directed by
scaffolding, fixtures with oiling and two coats of
Engineer-In- Sqm 2343.65 501.75
varnishing etc. complete. (excluding battens and
Charge
joists) As directed by Engineer-In-Charge.

VAL 23 Providing & fixing non teak wood plank


ceiling 12 mm. Thick with planked on
underside, longuled and grooved including As Directed by
scaffolding, fixtures with oiling and two coats of Engineer-In- Sqm 1308.65 522.45
varnishing etc. complete (Excluding battens and Charge
joists) As directed by Engineer-In-Charge.

VAL 24 Providing & fixing wooden shelf of country


teak wood plank 30 cm wide and 20 mm thick
As Directed by
with wooden brackets of 50 mm x 50 mm without
Engineer-In- Sqm 1069.75 197.75
fillets including all fixtures with oil painting etc.
Charge
complete. As directed by Engineer-In-Charge.

VAL 25 Providing and fixing eaves board (Projection)


of country teak wood plank 20 cm, x 20 mm.
thick plan decorative type including scaffolding & As Directed by
painting with 2 coats, etc.complete. As directed Engineer-In- Sqm 577.65 37.15
by Engineer-In-Charge. Charge

51
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item

1 2 3 4 5 6
VAL 26 Providing & fixing T.W.frame and shutter to
wall cupboard made of 25 mm. thick particle
board one face with approved colour laminated As Directed by
face borided with phenol formal desynthetic Engineer-In- Sqm 3727.55 1278.45
lipping, beading oxidised iron fixtures & oil primer Charge
coat etc. complete. As directed by Engineer-In-
Charge.

VAL 27 Providing & fixing xpm Jalli with teak wood/


non teak wood frame including fixing painting As Directed by
etc. complete. As directed by Engineer-In- Engineer-In-
Charge. Charge

i) Non teak wooden frame into wooden bar


Jalli. Sqm 2107.35 716.95

ii) N.T.Wooden frame & M.S.Bar Sqm 1277.55 412.85


iii) Country teak wooden frame with M.S.bar Sqm 1998.35 398.45
iv) xpm. Jalli with T.W. wooden frame (18
gauge) Sqm 1887.75 400.65

v) Providing and fixing xpm jalli (18 gauge)


with non teak wood frame including fixing Sqm 1166.95 415.05
oiling etc.complete.

VAL 28 Providing & fixing half round single country


tiled roofing over bamboo battens including As Directed by
nails, battens etc. complete. As directed by Engineer-In- Sqm 850.10 381.00
Engineer-In-Charge. Charge

VAL 29 Providing and fixing medium grade G.I. pipe (


As Directed by
50 mm. dia.) below C.G.I sheet roofing
Engineer-In- Rmt 574.60 52.20
etc.complete. As directed by Engineer-In-
Charge
Charge.
VAL 30 Providing & fixing M.S.angle of size 50 x 50 x 6
As Directed by
mm.etc complete. As directed by Engineer-In-
Engineer-In- Rmt 353.35 58.85
Charge.
Charge
VAL 31 Providing & fixing half round single country
tiled roofing over bamboo mats laid on half split
bamboo battens including all fastenings As Directed by
etc.complete. As directed by Engineer-In- Engineer-In- Sqm 961.80 355.40
Charge. Charge

52
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-8

FLOW MEASURING DEVICES

ITEM NO. FMD 1 TO FMD 4


SECTIO N -8

FLOW MEASURING DEVICES

CO-ORDINATOR

(DR~~)
CHIEF ENGINEER (WR)
WATER RESOURCES DEPARTMENT
NAGPUR
GOVERNMENT OF MAHARASHTRA, WATER RESOUCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 8:- FLOW MEASURING DEVICES
Rates for 2022-23
Item (Rates in Rs.)
Description of Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
FMD 1 Providing and fixing gauge plate of FRP sheet
very sturdy both sides, gelcoat finish composite
material, sandwich with M S strip by contact
moulding process, engraved moulded bandwidth
and figures with computerised gauge marking with
reflective radium pasting, spray lamination with Section 8.1 Sqm 26843.70 2149.20
polyurethane chemical for surface protection
including material reqd for fixing, nut bolts,
washers, Nylon rope, hanger, drilling machine etc.
complete as directed.
FMD 2 Providing, installing & erecting in correct line and
level, fibre glass reinforced plastics(FRP) " V
notch" of following sizes and discharge capacities,
for accurate measurement of water flowing through
open channel with prefabricated fibre glass lining
moulded engraved gauge marking ( in lit/sec and in
cms) including discharge table, capacity marking,
flow direction, sand treatment on the back side of "
Section 8.2
V" notch, testing, etc. complete as directed.
(Excluding base preparation i.e. CBL, canal
section and other concrete etc.)

FRP V notch having discharge capacity 15 lit/ sec


a of section 20 x 40 cms with upstream and No 13745.40 716.40
downstream channel
FRP V notch having discharge capacity 30 lit/ sec
b of section 25 x 50 cms with upstream and No 21232.85 895.50
downstream channel
FRP V notch having discharge capacity 45 lit/ sec
c of section 28 x 56 cms with upstream and No 24042.00 1074.60
downstream channel
FRP V notch having discharge capacity 60 lit/ sec
of section 30 x 60 cms with upstream and
d No 28766.10 1253.70
downstream channel

FRP V notch having discharge capacity 90 lit/ sec


e of section 35 x 70 cms with upstream and No 37211.05 1432.80
downstream channel

FRP V notch having discharge capacity 120 lit/ sec


f of section 42 x 84 cms with upstream and No 46152.90 1611.90
downstream channel

53
Rates for 2022-23
Item (Rates in Rs.)
Description of Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
FMD 3 Providing , installing & erecting in correct line and
level, fibre glass reinforced plastics(FRP) cut
throat flume ( CTF ) measuring devices on
calculated hump level for accurate measurement
of water flowing through open channel, with
prefabricated fibre glass lining moulded engraved
gauge marking ( in lit/sec and in cms.) including
discharge table, capacity marking, flow direction,
Section 8.3
sand treatment on the back side of flume, testing,
etc. complete as directed.
(Excluding CBL and hump preparation, canal
section and other concrete required for hump
,U/S and D/S slopes of hump etc.)

a Cut throat flume 10 x 90 cms -0.33 cusecs No 5274.20 1074.60


b Cut throat flume 10 x 90 cms 0.50 cusecs No 5922.60 1074.60
c Cut throat flume 20 x 90 cms -1.0 cusecs No 11377.25 1432.80
d Cut throat flume 20 x 90 cms -2.0 cusecs No 12643.80 1432.80
e Cut throat flume 20 x 90 cms -3.0 cusecs No 14086.10 1432.80
f Cut throat flume 20 x 90 cms -4.0 cusecs No 14158.80 1432.80
g Cut throat flume 40 x 180 cms -5.0 cusecs No 34424.75 2149.20
h Cut throat flume 40 x 180 cms -6.0 cusecs No 36164.00 2149.20
i Cut throat flume 40 x 180 cms 8.0 cusecs No 38751.60 2149.20
j Cut throat flume 40 x 180 cms -10.0 cusecs No 41381.65 2149.20
k Cut throat flume 40 x 180 cms 12.0 cusecs No 41599.80 2149.20
l Cut throat flume 40 x 180 cms 15.0 cusecs No 45478.20 2149.20
m Cut throat flume 40 x 180 cms -18.0 cusecs No 48144.60 2149.20
n Cut throat flume 40 x 180 cms 20.0. cusecs No 49617.20 2149.20
o Cut throat flume 100 x 270 cms -25 cusecs No 78615.60 2865.60
p Cut throat flume 100 x 270 cms -30 cusecs No 83736.30 2865.60
q Cut throat flume 100 x 270 cms -35 cusecs No 89996.30 2865.60
r Cut throat flume 100 x 270 cms 40 cusecs No 94371.60 2865.60
s Cut throat flume 100 x 270 cms -50 cusecs No 99765.00 2865.60
t Cut throat flume 100 x 270 cms 60 cusecs No 108612.60 2865.60
u Cut throat flume 100 x 270 cms -70 cusecs No 113569.70 2865.60
v Cut throat flume 100 x 270 cms 80 cusecs No 122732.40 2865.60

54
Rates for 2022-23
Item (Rates in Rs.)
Description of Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
FMD 4 Providing, installing & erecting in correct line and
level, fibre glass reinforced plastics(FRP) parshall
flume on calculated hump level of following sizes
and discharge capacities, for accurate
measurement of water flowing through open
channel with prefabricated fibre glass lining
moulded engraved gauge marking ( in lit/sec and in
cms) including discharge table, capacity marking,
Section 8.4
flow direction, sand treatment on the back side of
flume, testing, etc. complete as directed.
( Excluding CBL and hump preparation, canal
section and other concrete required for hump,
U/S and D/S slopes of hump etc.)

a Parshall flume -243.80 x 437 cms -100 cusecs No 290945.90 2865.60

b Parshall flume -243.80 x 437 cms -150 cusecs No 308253.25 2865.60

c Parshall flume -304.80 x 701 cms -200 cusecs No 553425.30 4298.40

d Parshall flume -304.80 x 701 cms -250 cusecs No 567084.55 4298.40

e Parshall flume -365.80 x 823 cms -300 cusecs No 579834.80 4298.40

f Parshall flume -365.80 x 823 cms -400 cusecs No 620024.70 4298.40

g Parshall flume -365.80 x 823 cms -500 cusecs No 1009028.20 4298.40

h Parshall flume -452.70 x 1189 cms -750 cusecs No 1090383.70 4298.40

i Parshall flume -610.00 x 1311 cms -1000 cusecs No 1426298.20 5731.20

j Parshall flume -610.00 x 1311 cms -1250 cusecs No 1503348.70 5731.20

k Parshall flume 762.00 x 1341 cms -1500 cusecs No 1538487.00 5731.20

55
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-9

MARKING BLUE LINE AND RED LINE

ITEM NO. BRL 1 TO BRL 7


SECTION -9

MARKING BLUE LINE AND RED LINE

CO-ORDINATOR

(H. ~
CHIEF ENGINEER (WR)
WATER RESOURCES DEPARTMENT
PUNE
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 9:- MARKING BLUE LINE AND RED LINE
Rate for 2022-23
(Rate in Rs.)
Sr.No. Description of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
BRL 01 Fixing control points by Differential
Global Position System (DGPS)
instrument at every One Km. along the both
side of river including collection of
Section 9.1 Km. 1521.25 460.71
necessary flood data etc. complete
including labour welfare cess, service tax,
labour insurance and all applicable taxes
etc. complete as directed.
BRL 02 Traverse Survey along river with cross
section at 100 m .c/c along river .The levels
on cross section shall be at every 30 m c/c
beyond past locally observed flood line,
using Differential Global Position System
(DGPS) instrument including labour,
transportation, using sounding by boat in
river water in wet condition and transfer of
entire data to computer system in different Section 9.2
geo referential layers/ themes using
features of standard plotting software
computable with design software package
including contour plotting at required interval
and at a scale and following deliverables
etc. all completeas directed.

A)For Rivers/Nalas in Dry condition Ha. 613.40 237.67


B)For River and Nalas with deep water and
Ha. 687.85 312.09
flowing condition
BRL 03 Delivering Contour map of 0.50 m.
contour interval by using standard
software & superimposing it on village map
with scale1:5000 showing Prohibited line(
Blue line) & Restricted line (Red line) along Section 9.3 Ha. 57.45 50.18
with mapping of structures & other details
etc all complete as directed.

56
Rate for 2022-23
(Rate in Rs.)
Sr.No. Description of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
BRL 04 Providing computerised detailed cross
section drawings in two copies at 100 m
interval with actual profile of river (levels at
every 30m. distance along cross section) on
A-3 size paper with scale 1cm = 15m or
1cm = 30m which is suitable as per site
condition showing 25 year return flood line
(Blue line) and 100 years return flood line
(Red line) computed by software analysis Cross-
and submission in the form of soft and hard Section 9.4 388.75 --
section
copy as directed by Engineer in charge. So
as to use the data of above Item No.BRL 01
to BRL 03 by HEC-RAS Software. including
submission of check print and getting
approval of Engineer in charge etc all
complete as directed.

BRL 05 Computation of Blue line ( 25 Year return


flood line ) and red line ( 100 year return
flood line ) by using HEC-RAS software
including estimation of flood getting
approval of competent authority for the
same giving all the precise necessary input
details into the software, viz. cross sectional Section 9.5 Km. 2914.40 --
and longitudinal features of the stream, flow
obstructions etc. including site validation &
recalculation to the satisfaction of Engineer
In charge etc all complete as directed.

BRL 06 Providing computerised detailed river


alignment with contours on A-1 size
paper with scale 1 cm equal to 15 m or 30m
whichever is suitable as per site condition.
(one sheet for one Km. length of river) with
contour at 0.50 m. interval including
marking 25 years return flood level (Blue
line) & 100 years return flood level (Red
line) line & showing locations of bridges, KT Section 9.6 Sheet 1174.05 --
Weirs & other permanent structures on
each drawing along and across the river as
directed by Engineer in Charge, including
providing one color check print & six hard
copies(color print) with one soft copy etc. all
complete as directed.

57
Rate for 2022-23
(Rate in Rs.)
Sr.No. Description of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
BRL 07 Marking of 25 year's flood levels (Blue
line) & 100 year's flood levels (Red line)
at interval not less than 100m & not more
than 500m on permanent structures like
Bridges, Temples & other permanent
structures along & across the river, Section 9.7 No. 625.45 102.38
including permanent coloured painting,
lettering on both the banks of river, after the
final approval of flood levels, etc. all
complete as directed.

58
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-10

LAND RECLAIMATION WORK AND SOIL SURVEY

ITEM NO. LR 1 TO LR 12
SECTION -10

LAND RECLAMATION WORK AND SOIL


SURVEY

CO-ORDINATOR

(1-1 .V~
CHIEF ENGINE ER (WR)
WATER RESOURCES DEPARTMENT
PUNE
GOVERNMENT OF MAHARASHTRA, WATER RESOUCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 10:- LAND RECLAMATION & SOIL SURVEY WORK
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed rate Labour
1 2 3 4 5 6
LR 1 Collecting and filling soil samples in plastic bag
of size (15X23cm) 200 gauge and cloth bag of size Per
(18X25 cm) with inside flap of 4 X 5 cm for address
Section 10.1 auger 99.86 67.65
tag and packing properly including cost of bags etc.
hole
complete as Directed.

LR 2 Taking well observations in the command area


including collecting data of well water level, taking
photos of wells for GPS Based Monitoring, with
Software developing, Maintenance of Web &
Producing reports,Syncronisation of reloads through
Internet. & Cloud storage ,Water samples, visual Section 10.2 No. 100.60 100.60
observation of crops and preparing data base
recording in well observation book collecting water
samples.etc complete.as directed.

LR 3 Taking auger bores of 10 cm.dia.with auger for


classifying strata including putting the excavated
stuff in cyclic order, dewatering for recuperating Section 10.3 Rmt 592.25 592.25
results etc. complete as Directed.( Auger karkoon
not engaged departmentally )
LR 4 Taking auger bores of 10 cm.dia.with auger for
classifying strata including putting the excavated
stuff in cyclic order, dewatering for recuperating Section 10.4 Rmt 468.25 468.25
results etc. complete as Directed. ( Auger karkoon
engaged departmentally )
LR 5 Measuring drain discharge in every season
including transporting and installing temporarily the
measuring device such as “V “notch on site with all Section 10.5 No. 372.10 372.10
Labour & material recording in well observation
book etc Complete as Directed.

LR 6 Collecting & filling water samples in plastic


bottles including cost of plastic bottles etc. complete Section 10.6 No 3.90 0
as Directed.

LR 7 Testing of soil sample obtained from auger as


per depth, doing weight of 100gm of soil sample
mix with distilled water in 1:2 proportion using 20
lit.for 100 samples, Testing Ec &pH of each sample Section 10.7 No. 42.15 37.21
filling result in prescribe forms cleaning of
equipments,measuring cylinder etc. complete as
Directed.
LR 8 Labour charges for removing grass, thorny
shurbs, Jungli shurb, Kubabul and alike grass
along and in the drain/canal making the ground clean Section 10.8 Sqm 14.90 14.90
by showel and phavaras etc. complete as Directed.

59
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed rate Labour
1 2 3 4 5 6
LR 9 Taking open pits, one open pit per sq.km.,
including refilling of open pit after taking down
all necessary morphological observation. Size of pit -
Length 2.5 m. x Width 1.20 m and Depth of open pit Section 10.9 No 880.00 880.00
up to 2.50 m. or up to hard strata if met
first.etc.complete as Directed.

LR 10 Carrying out infiltration tests at the location of


open pits in the command area etc.complete as Section 10.10 No. 372.10 372.10
Directed.
LR 11 Carrying out phase level mapping for
confirmation of morphological properties of soil
and their interconnection in field for various phases Section 10.11 sq.km. 930.20 930.20
such as texture, erosion, slope, salinity, rockiness,
stoniness etc.complete as Directed.

LR 12 Carrying out drying, pounding, sieving of soil


samples in laboratory including washing the sets of
soil samples after every test and discarding of tested Section 10.12 No. 17.20 17.20
soil samples at laboratory etc.complete as Directed.

60
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-11

MAINTENANCE & REPAIRS

ITEM NO. MR 1 TO MR 39
SECTION-11

MAINTENANCE AND REPAIRS INCLUDING


DRIP

CO-ORDINATOR

-~v.
( J. G. GAWALI)
CHIEF ENGINEER & CHIEF ADMINISTRATOR
. CAD,WRD,AURANGABAD .
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 11:- MAINTENANCE AND REPAIRS INCLUDING DRIP

Rates for 2022-2023


( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 1 Dismantling the Stone Masonry in cement mortar Section 11.1
including stacking the material with all lifts Cum 228.55 228.55
etc.complete as directed.
MR 2 Dismantling the old lime concrete or cement Section 11.2
concrete including stacking the material with all lifts Cum 275.35 275.35
etc.complete as directed.
MR 3 Dismantling R.C.C. works and removing the stuff to Section 11.3
a distance of 15 m and all lifts including stacking etc. Cum 413.05 413.05
complete as directed.
MR 4 Cleaning grass and removal of rubbish up to a Section 11.4
distance of 50 meters outside the periphery of the Sqm 4.20 4.20
area as directed.
MR 5 Cutting down trees including cutting trunks & Section 11.5
branches and stacking the material with all lift
including uprooting and refilling the pit with material
etc. complete as directed. (excluding extra material
required for refilling)
a above 30 cm to 60 cm girth No 268.65 212.09
b above 60 cm to 90 cm girth No 332.30 275.74
c above 90 cm to 1.5 m. girth No 586.80 530.24
d above 1.5 m. to 3.0 m. girth No 862.55 805.99
e above 3.0 m. to 4.5 m. girth No 1392.80 1336.24
MR 6 Numbering road and canal sites trees including Section 11.6
painting etc. Complete as directed. No 15.70 7.15

MR 7 Removing dry silt from the canal bed and Section 11.7
stacking as directed with 15 mtr. Lead and all lift etc. Cum 61.95 61.95
Complete as directed.
MR 8 Removing wet silt from canal bed with 15 mtr. Section 11.8
Lead and all lift including depositing the excavated Cum 91.55 91.55
stuff etc. Complete as directed.
MR 9 Removing old paint from steel and other surface Section 11.9
with flame, cleaning and making the surface even
including scaffolding etc. Complete as directed. Sqm 46.15 41.33

MR 10 Providing and applying Primer Red Oxide Paint in Section 11.10


two coats including surface preparation, chipping the
welding, cleaning spatters, dust etc. Complete as Sqm 271.65 139.52
directed.
MR 11 Providing and applying anticorrosive coal tar Section 11.11
black paint IS 290-1961 in two coats including
surface preparation, chipping the welding, cleaning Sqm 334.75 266.70
spatters, dust etc. Complete as directed.

MR 12 Providing and applying anticorrosive Coal Tar Section 11.12


Epoxy paint for upstream side in two coats including
surface preparation, chipping the welding, cleaning Sqm 338.45 183.45
spatters, dust etc. Complete as directed.

61
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 13 Providing and applying two coats of flat oil paint Section 11.13
of approved colour and shade to internal / external
plastered surfaces including scaffolding if necessary
Sqm 92.60 44.42
clearing and preparing surfaces excluding primer
paint etc. Complete as directed.

MR 14 Providing and applying two coats of flat oil paint Section 11.14
of approved colour to the old structural steel work
and iron work previously painted including scaffolding
if necessary clearing & preparing surface excluding Sqm 89.05 44.41
primer coat etc. Complete as directed.

MR 15 Providing and applying two coats of lead / zinc Section 11.15


base oil paint / bituminous paint of approved
colour and shade to wood work/fiber boards
previously painted including scaffolding if necessary, Sqm 118.35 57.32
preparing surface excluding primary coat etc.
complete as directed.
MR 16 Providing and applying coal tar in one coat on Section 11.16
previously painted wood work including preparing the Sqm 25.00 14.88
surface scaffolding etc. Complete as directed.
MR 17 Applying geru wash and white wash to canal road Section 11.17
side Km stones/Boundary stones / Ch. stones /
bottom of trees, etc. Complete as directed. No 65.70 53.00

MR 18 Removing M.S. needles from the K.T. Weir Section 11.18


opening before on set of the monsoon for Passing
the flood water through the K.T. Weir openings
including conveying the same up to the river banks, No 168.10 159.44
stacking the same as directed with all lifts etc.
complete as directed.
MR 19 Transportation of M.S.Needles from the river Section 11.19
bank to the store shed / safe place or from store
shed/safe place to river bank by Bullock cart
including loading unloading and stacking with all lifts No 49.40 49.40
etc. complete as directed. (lead half Km)

MR 20 Providing supplying and applying 1 coat of red Section 11.20


oxide to the steel structure as a primary coat
including cleaning, scrubbing for preparing the Sqm 188.95 117.06
surface to apply paint with all lift etc complete as
directed.

MR 21 Fixing of M.S. Needles in weir openings after offset Section 11.21


of the monsoon for storage of Water from post
monsoon river flow and making it water tight by using
wooden pegs, Dungry cloth & empty cement bags Needle 618.20 155.48
etc. with all lifts and including all material and labour
etc. complete as directed. (For 07 Nos)

62
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 22 Cleaning by redrilling the vertical porous drain Section 11.22
pipe including removing of leaching material, grout
material if any inside of the V.P.D. etc complete with
lifts etc. as directed. (Vertical upward drilling)

a From 0 to 5 m. meter 7264.65 1418.65


b From 5 to 10 m. meter 7991.10 1560.51
c From 10 to 15 m. meter 8717.60 1702.38
d From 15 to 20 m. meter 9080.80 1773.31
MR 23 Providing and applying single coat of epoxy Section 11.23
primer (4.42 sq m per kg) (resin : hardener, 2:1) on
old UCR / concrete surface etc. Complete as Sqm 570.60 107.46
directed.
MR 24 Providing & applying of Epoxy Mortar layers to Section 11.24
Monolith joint of Masonry Dam with all lift etc. kg 227.95 69.94
complete as directed.

MR 25 Providing and Fixing and errecting, welding 8 mm As Directed by


MS bar @200 mm c/c both ways for ferrocement Engineer-In-charge
walling with welded mesh of size 100x100x2.30 mm Sqm 1297.00 111.62
and chiken mesh 3 layers as directed.

MR 26 Providing and casting Ferrocement wall in CM 1:3 As Directed by


including curing etc complete as directed. Engineer-In-charge

A) For 30 mm thick wall Sqm 762.60 581.76


B) 40 mm thick Sqm 1006.70 774.90
C) 50 mm thick Sqm 1220.60 940.06
MR 27 Providing, erecting, testing and commissioning of Section 11.25
a Casagrande type Piezometer in a 100 mm
dia.cased drilled hole with all its required
accessories as follows as per IS -7356 part-I at
the dam site
A) Drilling perfectly vertical cased bore hole of 100
mm diameter for casagrande piezometer inclusive of
charges of transporting ,lowering and fixing of 50 mm
diameter M.S./G.I./P.V.C.casing pipe inside the
cased bore hole including all works pertaining to
drilling such as transportation,Installation and Rmt 1702.70 1702.70
removal of drilling machine etc. complete in all type
of collapsible strata consisting of soft soil,
clays,murum,gravel as per direction of Engineer- in-
charge upto 100 mtr depth below ground.

B) UPVC,(Schedule 40) pipe of 50 mm diameter for


casing of bore hole, ISI mark with required length Rmt 1265.35 281.15
and all required material complete.
C) 100 mm dia and 1.80 m deep well graded sand
filter( 2.36 to 4.75 mm screened ) around the Cum 4007.90 889.79
casagrande piezometer.
D) Rigid UPVC (Schedule 40) riser pipe of 20 mm
inner dia. ,(min wall thickness 2.87 mm ) with Rmt 409.50 90.56
required length and all its required accessories.

63
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
E) 37 mm dia,6 mm wall thickess and 60 cm long
porous tube piezometer with stopper and top adapter
made up of carborundum with porous tube fillter of No. 17696.15 4371.00
grain size 60 micron as specified in IS 7356 part-I.

F) 25 mm brass hexagonal pipe top cap. No. 79.20 20.01


G) Providing 100 mm dia and 0.60 m deep bentonite
clay plug above sand filter. No 817.80 210.60

H) 100 mm dia and required depth cement grouting


above sand filter. Cum 19277.85 4313.25

I) 50 mm dia and 1.25 m long G.I pipe,Heavy ,


(Schedule C) type for casing protective cover No. 885.20 196.91

J) Construction of cement concrete


platform/block/muffing of size 700x700x700mm
around the piezometer pipe below ground with cavity
around the pipe of 300x300x300 mm in cement
concrete in M15 including excavation ,centering ,
shutting arrangement of RCC cover ( frame Each 3112.70 696.03
300x300mm with lifting arrangement including laying
of angle iron frame of angle size as 50x50x6 mm to
be fixed /embedded on the top of chamber
complete.) cost of all materials and labour and curing
etc.complete.

MR 28 Providing electronic water level indicator for Section 11.26


taking water level reading in casagrande piezometer
with stainless steel probe connected with indelibly
graduated electric measurement cable having
graduation at 0.5 m interval & 200 m length (100 m No 35692.35 0.00
on spool with the device and 100 m as spare ) as per
IS 7356 (Part I) 2002

MR 29 Providing, erecting, testing and commissioning of Section 11.27


Twin Tube Piezometer with all its required
accessories as per IS 7356 part -II with all material,
labour and transportation at the sites etc complete.

A) Foundation or embankment type twin tube


piezometer tip assembly of 50 mm dia and 32 mm
height with all its accessories like metallic end plate, No. 3950.70 976.13
ring ,ceramic filter and screws etc complete.

B) Polypropelene tubing 8 mm O.D. 1.6 mm wall


thickness which can be fitted to the twin tube
Meter 134.55 33.70
piezometer tip assembly with all relevent accessories
like elbow, nuts etc complete.
C) Identification tag with nylon thread. Set 118.25 29.48
D) Brass compression connector between twin tube
tip assembly and tubing. No. 394.95 97.93

E) Brass End Plug No. 315.75 77.92


F) Twin tube piezometer manifold system in the
Terminal Well like main Pressure gauge, Valves,
No. 474009.70 117084.12
Pressure Pump Set etc.with all the required
accessories as per IS 7356 Part II.
G) Panel board with individual pressure gauges for
Set 513510.00 126841.22
six tips.

64
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 30 Providing accessories required for Repairs to Section 11.28
manifold system of twin tube piezometer as
below
A) Compression type T
No 237.60 58.97
B) Straight union for joint
No 158.45 38.96
C) Elbow brass fitting No. 197.50 48.44
D) Ferrule and nut No 39.05 9.48
E) Compression type Brass coupling for jointing
tubes End Plug No 394.95 97.93

F) End Plug
No 315.75 77.92
G) Gauge Plug No 7900.30 1951.21
H) Hand shut up valve
No 1974.80 487.54
I) Pressure Pump No. 118502.15 29271.29
J) Identification Tag Set 118.25 29.48
MR 31 Manufacturing, Supplying and Erection of sub Section 11.29
assemblies of conventional plumb bob as per IS
13073 (part I) : 2002
A) Manufacturing, supplying of table stand of size
600 x 700 mm & 1200 mm height.as per Job 43545.20 0.00
specifications given & drawing provided.
B) Manufacturing, supplying of Weight gatta. as per
specifications given & drawing provided. Job 37953.40 0.00

C) Manufacturing, supplying of fixing point anchoring


arrangement. as per specifications given & drawing Job 39857.15 0.00
provided.
D) Manufacturing, supplying oil tank & stand for tank
as per specifications given & drawing provided. Job 32479.95 0.00

E) Supply of S.S. wire ø 1.6 x 100 mtr long.


Job 9161.45 0.00
Complete job .
F) Manufacturing, supplying Box Cover of size 400 x
400 x 250 for Microscopes 2 Nos. as per Job 9279.85 0.00
specifications given & drawing provided.
G) Supply of Vernier microscope - 2 Nos as per
specifications given Job 28078.40 0.00

H) Erection and commissioning charges at site.


Complete job including material handling, labour Job 78056.80 78056.78
charges,
Total Rates for Manufacturing, Supplying and
Erection of sub assemblies of conventional plumb Set 278412.20 78056.78
bob.
MR 32 Manufacturing, Supplying sub assemblies of Section 11.30
Inverted plumb bob as per IS 13073 (part I) :
2002
A)Manufacturing, Supplying Stand for oil tank of
plumb bob as per specifications given & drawing Job 65436.70 0.00
provided.
B) Oil tank with cover as per specifications given &
Job 38547.40 0.00
drawing provided.
C) Copper/ SS float in oil tank Job 19749.90 0.00

65
MR 32 Section 11.30

Rates for 2022-2023


( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
D) Spider attachment as per specifications given &
drawing provided. Job 2261.05 0.00

E) Anchor rod as per specifications given & drawing


provided. Job 3807.50 0.00

F) Supply of S.S. wire ø 1.6 x 100 mtr long.


Job 9161.45 0.00
Complete job .
G) Manufacturing of Box Cover of size 400 x 400 x
250 for Microscopes 2 Nos. as per specifications Job 9279.85 0.00
given & drawing provided.
H) Supply of Vernier microscope - 2 Nos as per
Job 28078.40 0.00
specifications given
I) Erection and commissioning charges at site.
Complete job including material handling, labour Job 78056.80 78056.78
charges
Total Rates for Manufacturing, Supplying and
Erection of sub assemblies of inverted plumb bob. Set 254379.05 78056.78

MR 33 Drilling 52-57 mm dia grout holes by percusson As Directed by


drilling equipment through masonry / rock in stages Engineer-In-charge
as directed including cleaning and flushing the drilled
holes, conveyance of all materials and equipments
for all other ancillary etc complete. As Directed by
Engineer-In-charge

A) Dam Top Rmt 1505.35 232.16


B) Rate for Drilling 52-57 mm Dia hole for D/S of
Rmt 1655.90 255.38
Dam
C) Rate for Drilling 52-57 mm Dia hole for U/S of
Rmt 1731.15 266.99
Dam
D)Rate for Drilling 52-57 mm Dia hole for Gallery of
Rmt 1881.70 290.20
Dam
MR 34 Drilling 75 mm dia hole in masonry / rock by As Directed by
diamond drilling from foundation gallery floor at Engineer-In-charge
requred depth including flushing the holeincluding
conveying all machinery equipment & necessary Rmt 4226.70 1039.85
dewatering etc complete. As Directed by Engineer-In-
charge.

MR 35 Providing & injecting cementatious grout as per As Directed by


specification in the drilled holes at required pressure Engineer-In-charge
including supplying, conveying cement ,micro silica,
fly ash, admixtures (Accelerator, Binder,
Superplasticizer) , grouting machinery with packer
system etc complete. As Directed by Engineer-In-
charge.

A) Grouting for hole 6.00 m depth. (For Dam Top) Bag 1141.85 137.86
B) Rate for Grouting 6.00 m depth hole(For D/S of
Bag 1256.05 151.64
Dam)
C) Rate for Grouting 6.00 m depth hole (For U/S of
Bag 1313.15 158.54
Dam)
D) Rate for Grouting for hole 6.00 m depth (For
Bag 1427.30 172.32
Gallery of Dam)

66
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 36 Raking and cleaning of masonry joints on upstream As Directed by
face of dam for masonry joint filling to a depth of 5 Engineer-In-charge
cm including preparing of ‘T’ joint of masonry by
removing of existing loose portion of stone masonry
by breaking (using manual / mechanical means )
removing existing embedded M.S. bar, racking out
the masonry joints to required depth, cleaning with
air water jet under pressure for removing algae/ Sqm 745.00 332.92
fungi etc, complete as per specification including cost
of all materials, machinery, labour, scaffolding, hire
charges of cranes, insurance charges transportation
with all leads and lifts and any other incidental
charges as directed by the Project Manager. As
Directed by Engineer-In-charge.

MR 37 Pointing of masonry joints on upstream face dam As Directed by


with UV resistant and anti-shrink materials using Engineer-In-charge
crystalline technology(CT)/Polymer/Equivalent
Technology, using Poly Ceramic Cementitious i.e
NicGrout G 06 + 53 grade cement material of Dimple
Chemicals as per requirement to reduce the porosity
of concrete / Masonry structure and to increase the
strength of structure masonry joint filling to a depth of
5 cm, applying bond coat before repair material Kg 67.00 13.82
application and top coat after finishing, complete as
per specification including cost of all materials,
machinery, labour, scaffolding, hire charges of
cranes, insurance charges transportation with all
leads and lifts and any other incidental charges as
directed by Engineer-In-charge.

MR 38 Filling deeper cavities or loose material area inside As Directed by


the masonry joints which are beyond 5cm and upto Engineer-In-charge
30 cm using cementitious 1:3 (1 of OPC 53 grade
cement ,3 of fine sand) cement mortar mixed with
water proofing admixture (having 28th day
compressive strength of more than 7.5N/mm2)
inside the masonry joint upto 30 cm depth
(underneath the top 5cm depth meant for pointing),
using raking tools, etc complete as per specification
including cost of all materials, machinery, Curing, MT 30565.60 7107.16
labour,electricity, scaffolding, hanging platform,
pullys, hire charges of cranes, all relevant safety
equipments, insurance charges, transportation with
all leads and lifts and any other incidental charges as
directed by Engineer incharge. (Work will be
measured and paid based on Weight of cement used
in 1:3 cement sand mortar filling).

67
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT

COMMON SCHEDULE OF RATES FOR 2022-23

SECTION-12

LIFT IRRIGATION SCHEME AND PIPE


DISTRIBUTION NETWORK.

ITEM NO. LIPDN 1 to LIPDN 71


SECTION-12

LIFT IRRIGATION SCHEME AND PIPE


DISTRIBUTION NETWORK

CO-ORDINATOR

(RV~
CHIEF ENGINEER (WR)
WATER RESOURCES DEPARTMENT
(DI,~)
CHIEF ENGI NEER (WR)
WATER RESOURCES DEPARTMENT
PUNE NAGPUR
GOVERNMENT OF MAHARASHTRA,WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION-12 :- LIFT IRRIGATION SCHEME AND PIPE DISTRIBUTION NETWORK
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 1 Excavation for deep trenches for laying rising main in
Earth Soil of all types, sand, gravel and soft murum
including trimming to correct line, level and to specified
widths including removing the excavated material and
stacking or spreading the same upto a distance of 1 km
and all lifts as directed, preparing the bed for
foundation and necessary safety precautions , keep the Section 12.1 cum 148.35 20.46
trench undisturbed till pipe laying & fixing necessary
specials etc complete as per detailed specifications As
Directed.
(Payable measurements with vertical excavation)

LIPDN 2 Excavation for deep trenches for laying rising main in


Hard murum, soft bhisa, Hard man and boulder
including trimming to correct line and level and to
specified width, including removing the excavated
material and stacking or spreading the same upto a
distance of 1km and all lifts as directed, preparing the
bed for foundation and necessary safety precautions , Section 12.1 cum 174.95 26.72
keep the trench undisturbed till pipe laying & fixing
necessary specials etc complete as per detailed
specifications
(Payable measurements with vertical excavation).

LIPDN 3 Excavation for deep trenches for laying rising main in


Soft Rock by crow bar and shavel including trimming to
correct line and level and to specified width including
trimming and levelling the bed removing the excavated
material and stacking the same upto a distance of 1 km
and all lifts as directed and safety precautions to keep
Section 12.1 cum 180.30 30.88
the trench undisturbed till pipe laying & fixing necessary
specials etc complete as per detailed specifications.
(Payable measurements with vertical excavation).

LIPDN 4 Excavation for deep trenches for laying rising main in


Hard Rock of any toughness by breaker to correct line
and level and to specified width including trimming and
levelling the bed as directed, removing the excavated
material and sorting, stacking the same upto a distance
of 1 km and all lifts as directed, preparing the bed for
foundation and keep the trench undisturbed till pipe Section 12.2 cum 567.55 42.59
laying & fixing necessary specials etc complete as per
detailed specifications. As Directed.
(Payable measurements with vertical excavation).

LIPDN 5 Providing and laying Murum bedding using available


material from excavation in trenches with murum of
approved quality in layers not exceeding 150 mm to 200
mm, each layer shall be compacted by watering and Section 12.3 cum 230.30 148.03
ramming etc complete as directed.

LIPDN 6 Providing and laying Murum bedding using material


from borrow area (Private land/ Contractors own
material) in trenches with murum of approved quality in
layers not exceeding 150 mm to 200 mm, each layer Section 12.3 cum 314.65 148.03
shall be Compacted by watering and ramming etc
complete with lead upto 1 km and all lifts as directed.

68
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 7 Providing and laying sand bedding in trenches with
sand of approved quality including watering and Section 12.3 cum 1360.65 148.02
compaction etc complete as directed.
LIPDN 8 Backfilling the trenches using available material from
excavation in layers not exceeding 300 mm, each layer
shall be compacted by watering and ramming without
disturbing the pipe line with excavated stuff , including
breaking of clods of soil etc complete as directed. (The Section 12.4 cum 46.25 2.51
backfilling on the two sides of the pipeline should be
carried out simultaneously)

LIPDN 9 Providing & Erecting M.S. pipes made out of MS


plate conforming to IS 2062:1992 including
procurement of plates, gas cutting to required size,
rolling, tack welding, assembling in suitable lengths to
form pipes on automatic welding machine and
transportation upto 500 m.The welding Shall be
ERW/SAW using electrodes having weldmark E7018
(Low Hydrogen electrodes) and forming 'V' edge on
both ends of pipes, Including third party inspection
charges, lowering and laying to correct position on
prepared bedding or on pedastals or chairs, field
Section 12.5 Kg 113.35 9.89
hydraulic testing at specified test pressure as per IS
5822: 1994 sec 11, field welding to join pipes after
laying, Radiographic (5%) and ultrasonic (10%)
testing of welds including all equipments submitting
report, expert personnel required for testing, interpreting
and submitting report along with developed film where
applicable all incidental charges etc complete as per IS -
3589:2001 and as per specifications (No negative
tolerance in thickness is permissible).

LIPDN 10 Lowering, laying in position to correct line & level


including M.S. pipes with / without any outcoating on
prepared bedding or on pedaetals or chairs or upon
prepared formation including loading, unloading,
hoisting, marginal cutting wherever required,
assembling , and transportation upto 500 m etc.
completed as specified with all leads & lifts etc.
Section 12.6 kg 8.45 4.17
complete including tack welding, field hydraulic
testing at specified pressure and as per procedure
mentioned in section 11 of IS 5822: 1994. (item to be
used only in situations where pipes are already
procured ) For total quantity 7.5 rmt & 900 mm Dia. 6
mm thick).As Directed.

LIPDN 11 Providing and Erecting tapers made out of MS plate


conforming to IS 2062:1992 including procurement of
plates, gas cutting to required size and shape, rolling,
tack welding, full welding on either automatic welding
machine or manually and forming 'V' edge on both ends
for welding it to pipe, including fabrication & full welding
of stiffeners as per design requirements, third party
inspection charges, lowering & laying to correct position
etc, complete as per IS - 3589 and IS - 5504 as
applicable and as per detailed specifications. Cost of Section 12.7 kg 118.60 20.63
longitudinal welding and " V " edging required for
circumferencial welding required to connect MS special
to Rising main /delivery pipes is inclusive in the rate
however circumferencial welding for connecting the
M.S. special to Rising main shall be paid seperately on
running meter basis. (No negative Tolerance in
thickness is permissible).As Directed.

69
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 12 Providing and Erecting "Y" connection with Crotch
plate made out of MS plate conforming to IS 2062:1992
including procurement of plates, gas cutting to required
size and shape, rolling, tack welding, full welding on
either automatic welding machine or manually and
forming 'V' edge on all the three ends for welding it to
pipe, including fabrication and full welding of crotch
plate and stiffeners as per design requirements,third
party inspection charges ,lowering & laying to correct
position etc, complete as per IS - 3589 and IS - 5504 as
applicable as per detailed specifications. Cost of
welding of crotch plate is included in the rate. Cost of Section 12.7 Kg 137.25 23.68
longitudanal welding and " V " edging required for
circumferencial welding required to connect MS special
to Rising main /delivery pipe is inclusive in the rate
however circumferencial welding required for
connecting Y-piece to Rising main / manifold pipe shall
be paid seperately on running meter basis.As directed.
(No negative Tolerance in thickness is permissible).

LIPDN 13 I Providing and Erecting "Y" and "T" branches with


coller plate made out of MS plate conforming to IS
2062:1992 including procurement of plates, gas cutting
to required size and shape, rolling, tack welding, full
welding on either automatic welding machine or
manually and forming 'V' edge on both ends for welding
it to pipe, including fabrication & full welding of coller
plate and stiffeners as per design requirements, third
party inspection charges ,lowering & laying to correct
position etc, complete as per IS - 3589 and IS - 5504
as applicable as per detailed specifications. Cost of "V"
edging, machining and welding of collar plate in "Y" and Section 12.7 Kg 120.50 21.65
"T" connection is included in the rate. Cost of
longitudinal welding and "V" edging required for
circumferencial welding required to connect MS special
to Rising main / delivery pipes is inclusive in the rate
however circumferencial welding required to connect
Y/T to Rising main or manifold shall be paid separately
on running meter basis.As Directed. (No negative
Tolerance in thickness is permissible).

LIS&PDN 14 Providing and Erecting manhole covers made out of


MS plate conforming to IS 2062:1992 including
procurement of plates, gas cutting to required size and
shape, rolling, tack welding and full welding on either
automatic welding machine or manually and forming 'V'
edge on both ends, including fabrication and full
welding of stiffeners as per design requirements,
lowering & laying to correct position etc, third party
inspection charges complete as per IS - 3589 and IS
- 5504 as applicable and as per detailed specifications.
Cost of longitudinal welding and 'V' edging required for Section 12.7 kg 120.50 21.65
circumferencial welding required to connect MS special
to Rising main /delivery pipes is inclusive in the rate
however circumferencial welding required for
connecting man hole to Rising main shall be paid
separately on running meter basis. Cost of washers ,
nuts, bolts, etc. required for fixing manhole cover is
included in the rate.As directed. (No negative
Tolerance in thickness is permissible).

70
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 15 Providing and Erecting M S bends made out of MS
plate conforming to IS 2062:1992 including
procurement of plates, gas cutting to required size and
shape, rolling, tack welding, full welding on either
automatic welding machine or manually and forming 'V'
edge on both ends for welding it to pipe, including
fabrication & full welding of stiffeners as per design
requirements, lowering & laying to correct position,
third party inspection charges etc, complete as per
IS - 3589 and IS - 5504 as applicable as per detailed
Section 12.7 kg 120.50 21.65
specifications. Cost of longitudinal welding and " V "
edging required for circumferencial welding required to
connect MS special to Rising main /delivery pipes is
inclusive in the rate however circumferencial welding
required for connecting M.S. special to Rising Main
shall be paid separately on running meter basis. As
Directed..
(No negative Tolerance in thickness is permissible).

LIPDN 16 Providing and Erecting short pipes, cants made out of


MS plate conforming to IS 2062:1992 including
procurement of plates, gas cutting to required size and
shape, rolling, tack welding, full welding on either
automatic welding machine or manually and forming 'V'
edge on both ends for welding it to pipe, including
fabrication and full welding of stiffeners as per design
requirements, lowering & laying to correct position third
party inspection charges etc, complete as per IS - 3589
and IS - 5504 as applicable as per detailed
Section 12.7 kg 113.45 19.62
specifications. Cost of longitudinal welding and " V "
edging required for circumferencial welding required to
connect MS special to Rising main /delivery pipes is
inclusive in the rate however circumferencial welding
required for connecting M.S. special to Rising Main
shall be paid separately on running meter basis As
Directed..
(No negative Tolerance in thickness is permissible).

LIPDN 17 Radiographic testing of welded butt joints in Rising


main as per Procedure given in IS 4853:1982 including
cost of all materials, equipments & expert personnel
required for testing, developing, interpreting and
submitting report along with developed films, including Section 12.8 Rmt 1890.90 1129.00
all incidental charges, transportation to site and local
transportation on site etc. complete.As Directed.

LIPDN 18 Ultrasonic testing of field welded joints as per


Procedure laid down in IS 4260:1986 including actual
testing, interpreting and submitting test report in detail
including cost of all materials, equipments & expert
personnel required for testing, developing, interpreting Section 12.9 Rmt 442.70 264.00
and submitting report, including all incidental charges,
transportation to site and local transportation on site
etc. complete.As directed.

LIPDN 19 Cleaning the surface of M.S. pipe by Sand Blasting to


expose fresh metal surface ready for painting including
removal of all rust, oil, grease, etc. as per specification
including all material, labour and equipments etc Section 12.10 Sq. m. 92.40 13.77
complete.As Directed.

71
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 20 Providing & applying Liquid epoxy coating system to
the external surface of Rising Main Pipes as per
Annex-B of IS 3589:2001, with one coat of Zinc rich
epoxy primer (90 % zink (DFT 40 micron , coverage 9
Sqm / lit) and two coats of coal tar epoxy paint (DFT
120 X 2 micron coverage 5 Sqm / Lit / coat) including
Section 12.11 Sq. m. 671.10 406.99
cleaning the surface to the satisfaction of Engineer in
charge by sand blasting / scraping removing oil, grease,
other foreign materials including all necessary material ,
labour with all lifts etc. complete.As directed.

LIPDN 21 Providing & applying Liquid epoxy coating system to


the interior surface of Rising Main Pipes as per Annex
- B of IS 3589:2001,with one coat of Zinc rich epoxy
primer (90% zink ,DFT 40 micron , coverage 9 Sqm /
lit) and three coats of coal tar epoxy paint (DFT 120
X 3 micron coverage 5 Sqm/Lit/coat) including cleaning
the surface to the satisfaction of Engineer in charge by Section 12.12 Sq. m. 856.35 530.25
sand blasting /chemical cleaning / scraping
removing oil, grease, other foreign materials including
all necessary material, labour with all leads and lifts
etc. complete.As directed.

LIPDN 22 Providing and guniting 25 mm thick in CM 1 : 3


(cement consumption 15.94 kg/sqm) pnumatically
under pressure of 2.1 to 2.8 kg /Sq cm, with weld mesh
50 x 50 x 2.54 mm (13 gauge), after duly cleaning the
surface by wire brushing, degreasing etc., including
Section 12.13 Sq. m. 577.00 43.41
necessary admixtures (200 ml / bag of cement), curing,
rehandling the pipe from fabrication shop to guniting
place and from guniting place to laying location etc.
complete with all lifts As Directed..

LIPDN 23 Providing cement mortar lining of specified thickness


to inner surface of pipe in proportion 1:1.5 using
mechanical spinning machine, including all necessary
labour, material, plants and equipments, local handling Section 12.14
etc. complete as per procedure laid down in IS
3589:2001.As Directed.

1) For 9 mm thick mortar lining Sq.m. 333.80 83.00


2) For 12 mm thick mortar lining Sq.m. 417.40 83.00
LIPDN 24 Providing 'X' Ray Quality M.S. Welding in all positions
with required number of runs, for M.S. pipes internally
and / or externally including gauging wherever
necessary, fixing appurtenances and other accessories
in connection with pipe laying work as per specification,
using electrodes having weldmark E7018 (Low Section 12.15
hydrogen electrodes), including Surface preparation,
(i.e. Removal of scale, cleaning, etc.) including all
materials, labour, equipments, etc. complete.As
Directed.
A : Single 'V' Butt Joint
Butt Joint : Plate thickness
6 mm Rmt 416
8 mm Rmt 591
10 mm Rmt 851
12 mm Rmt 939
14 mm Rmt 1366
16 mm Rmt 1410
18 mm Rmt 1691
20 mm Rmt 1991
22 mm Rmt 2252
25 mm Rmt 2306
B : Fillet Type Joint
Fillet Weld Size
4 mm Rmt 175
5 mm Rmt 263
6 mm Rmt 359
8 mm Rmt 495
10 mm Rmt 758
12 mm Rmt 1074
14 mm Rmt 1415
16 mm Rmt 2020
72
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-2023
1 2 3 4 5
I. DUCTILE IRON (D.I.) PIPES (K-7)
LIPDN 25 Providing and supplying D.I. pipes (push on joints Section 12.16
pressure) pipes of D. I. of following class and diameters
confirming to the I.S. specification inclusive cost of jointing
materials (Rubber gasket of EPDM Quality) excluding GST
levied by GOI & GOM in all respect including Third party
inspection charges of TPI Agency approved by WRD including
Transit insurance, Railway Freight, Unloading from railway
wagon, Loading into Truck, Transportation to departmental
store, unloading, stacking etc. completed as directed. (IS
1536/2001 for pipes and IS 158/1969 and IS 12820/1989 or
latest edition/revision with amendments for Rubber
Gaskets).(IS:8329-2000 Latest Version) D.I. K-7

(IS:8329-2000 latest version)


1 100 mm Rmt 1391.00
2 150 mm Rmt 1968.00
3 200 mm Rmt 2537.00
4 250 mm Rmt 3340.00
5 300 mm Rmt 4283.00
6 350 mm Rmt 5291.00
7 400 mm Rmt 6442.00
8 450 mm Rmt 7598.00
9 500 mm Rmt 9052.00
10 600 mm Rmt 11873.00
11 700 mm Rmt 15962.00
12 750 mm Rmt 18121.00
13 800 mm Rmt 20311.00
14 900 mm Rmt 24968.00
15 1000 mm Rmt 29845.00
16 1100 mm Rmt 39395.00
17 1200 mm Rmt 45622.00
LIPDN 26 Lowering, laying and jointing in proper grade and Section 12.17
alignment D.I. pipes with cost of all jointing materials (rubber
packing, nut bolts, etc.) including cost of conveyance from
stores to site of works, all labours involved, etc. complete. Only
SBR rubber Gasket to be used as per IS 5382 and IS 12820
(for all class of pipes)
1 100 mm Rmt 52.00
2 150 mm Rmt 69.00
3 200 mm Rmt 80.00
4 250 mm Rmt 95.00
5 300 mm Rmt 180.00
6 350 mm Rmt 218.00
7 400 mm Rmt 392.00
8 450 mm Rmt 426.00
9 500 mm Rmt 449.00
10 600 mm Rmt 706.00
11 700 mm Rmt 854.00
12 750 mm Rmt 959.00
13 800 mm Rmt 1113.00
14 900 mm Rmt 1297.00
15 1000 mm Rmt 1553.00
16 1100 mm Rmt 1930.00
17 1200 mm Rmt 2658.00

73
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-2023
1 2 3 4 5
LIPDN 27 Providing and supplying ISI standard D. I. specials & Section 12.18
fitting with sealing rubber gasket of S.B.R, complete with cast
iron follower gland and M. S. nut bolts coated or otherwise
protected from rusting and suitable for D.I. pipes including cost
of labour, materials, and transportation to stores / site, loading
and unloading excluding GST levied by GOI & GOM in all
respect, as per IS-9523. For all types of specials, bends, tees
etc. complete
1 a) up to 300 mm dia. Kg 168.00
2 b) 350 mm & above dia. Kg 168.00
LIPDN 28 Hydraulic testing of D.I. pipe line to specified pressure Section 12.19
including cost of all materials and labour and water for testing
for specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type
pumps which should be able to provide specified test pressure
gauges and other necessary equipments, labour, operation
charges, etc. required for testing. The rate under this item shall
also include cost of retesting, if necessary and reinstating to
original position using water supplied by the contractor.

1 80 mm Km 7217.30
2 100 mm Km 7435.05
3 125 mm Km 7760.50
4 150 mm Km 8517.10
5 200 mm Km 9463.50
6 250 mm Km 10646.35
7 300 mm Km 12831.55
8 350 mm Km 15919.85
9 400 mm Km 19547.50
10 450 mm Km 23328.00
11 500 mm Km 27344.95
12 600 mm Km 32224.15
13 700 mm Km 38430.70
14 750 mm Km 41888.65
15 800 mm Km 45583.00
16 900 mm Km 53651.00
17 1000 mm Km 62725.00
18 1100 mm Km 72714.00
19 1200 mm Km 83649.00

74
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
II. POLYVINYL CHLORIDE (P.V.C.) PIPES
LIPDN 29 Providing and supplying in standard lengths ISI mark Section 12.20
rigid unplasticised PVC pipes suitable for potable water
with solvent cement joints including cost of couplers, as per
IS specification no. 4985 / 1988 excluding GST levied by
GOI and GOM in all respect, including transportation, freight
charges, inspection charges, loading, unloading,
conveyance to the departmental stores and stacking the
same in closed shed duly protected from sun rays and rains
including cost of jointing material i.e. solvent cement, etc.
complete (selffit type to be jointed with cement solvent).

a) Working Pressure 4 Kg./Sq.cm


1 63 mm Rmt 100.00
2 75mm Rmt 139.00
3 90mm Rmt 193.00
4 110 mm Rmt 280.00
5 125 mm Rmt 373.00
6 140 mm Rmt 460.00
7 160 mm Rmt 601.00
8 180 mm Rmt 745.00
9 200 mm Rmt 958.00
10 225 mm Rmt 1188.00
11 250 mm Rmt 1490.00
12 280 mm Rmt 1933.00
13 315 mm Rmt 2215.00
14 400 mm Rmt 5696.00
b) Working Pressure 6 Kg./Sq.cm
1 63 mm Rmt 134.00
2 75mm Rmt 191.00
3 90mm Rmt 280.00
4 110 mm Rmt 386.00
5 125 mm Rmt 544.00
6 140 mm Rmt 672.00
7 160 mm Rmt 869.00
8 180 mm Rmt 1064.00
9 200 mm Rmt 1348.00
10 225 mm Rmt 1777.00
11 250 mm Rmt 2220.00
12 280 mm Rmt 2791.00
13 315 mm Rmt 3492.00
14 400 mm Rmt 8360.00
c) Working Pressure 8 Kg./Sq.cm
1 63 mm Rmt 180.00
2 75mm Rmt 258.00
3 90mm Rmt 362.00
4 110 mm Rmt 534.00
5 125 mm Rmt 702.00
6 140 mm Rmt 878.00
7 160 mm Rmt 1162.00
8 180 mm Rmt 1396.00
9 200 mm Rmt 1772.00
10 225 mm Rmt 2305.00
11 250 mm Rmt 2880.00
12 280 mm Rmt 3618.00
13 315 mm Rmt 4535.00
14 400 mm Rmt 11785.00

75
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
d) Working Pressure 10 Kg./Sq.cm
1 63 mm Rmt 214.00
2 75mm Rmt 299.00
3 90mm Rmt 432.00
4 110 mm Rmt 655.00
5 125 mm Rmt 844.00
6 140 mm Rmt 1052.00
7 160 mm Rmt 1394.00
8 180 mm Rmt 1660.00
9 200 mm Rmt 2166.00
10 225 mm Rmt 2742.00
11 250 mm Rmt 3438.00
12 280 mm Rmt 4267.00
13 315 mm Rmt 5420.00
14 400 mm Rmt 13726.00
e) Working Pressure 12.5 Kg./Sq.cm
1 110 mm Rmt 972.00
2 125 mm Rmt 1273.00
3 140 mm Rmt 1571.00
4 160 mm Rmt 2060.00
5 200 mm Rmt 3292.00
6 250 mm Rmt 5265.00
7 315 mm Rmt 8387.00
8 400 mm Rmt 17707.00
LIPDN 30 Lowering, laying and jointing with P.V.C. pipes and Section 12.21
specials of following class and diameter including cost of
conveyance from stores to site of works including cost of all
labour, material, except cement solvent, rubber ring, as per
IS code, etc. complete (with cement solvent joint / ring fit
joint). (for all class of pipes)

1 63 mm Rmt 16.10
2 75mm Rmt 19.55
3 90mm Rmt 23.75
4 110 mm Rmt 28.60
5 125 mm Rmt 31.75
6 140 mm Rmt 34.05
7 160 mm Rmt 35.75
8 180 mm Rmt 48.85
9 200 mm Rmt 48.85
10 225 mm Rmt 57.25
11 250 mm Rmt 63.60
12 280 mm Rmt 70.70
13 315 mm Rmt 80.35
14 400 mm Rmt 99.65

76
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
LIPDN 31 Providing and supplying ISI mark P.V.C. pipes Section 12.22
fitting/specials including loading, unloading,
trasnporatation upto departmental store, stacking excluding
GST levied by GOI & GOM in all respect etc.complete.

i) up to 300 mm dia. Rmt 2 % of per


mtr. rate of
pipe
ii) above 300 mm dia. Rmt 5 % of per
mtr. rate of
pipe
LIPDN 32 Hydraulic testing of PVC pipe line to specified pressure Section 12.23
including cost of all materials and labour and water for
testing for specified length including cutting, placing end cap
making arrangement for filling safe water using reciprocating
type pumps which should be able to provide specified test
pressure gauges and other necessary equipments, labour,
operation charges, etc. required for testing. The rate under
this item shall also include cost of retesting, if necessary
and reinstating to original position.

1 63 mm Km 6373.50
2 75mm Km 7168.75
3 90mm Km 7321.45
4 110 mm Km 7558.15
5 125 mm Km 7760.50
6 140 mm Km 8356.20
7 160 mm Km 8687.50
8 180 mm Km 9056.60
9 200 mm Km 9463.50
10 225 mm Km 10025.35
11 250 mm Km 10646.35
12 280 mm Km 11469.50
13 315 mm Km 13303.45
14 400 mm Km 19547.50

77
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
III. P.V.C.-O PIPES
LIPDN 33 Providing and supplying in ISI mark rigid PVC-O class-500 Section
s/s pipes (push on joints) pressure pipes confirming to IS 12.24
specifications no 16647- 2017 inclusive cost of EPDM gasket
seals on joints including all statutory duties excluding GST levied
by Government of India and Government of Maharashtra in all
respect including third party inspection charges of agency
approved by WRD, transit insurance loading, unloading charges
conveyance to the departmental store / site and stacking the
same in closed shade duly protected from sunrays etc complete.

Note :-
Diameter wise overlapping lengths are respectively, 110mm-
2.92%, 160mm- 3.33%, 200mm- 3.75%, 250mm- 4.5%, 315mm-
5.42%, 400mm- 6.25%
a) Class - 500 PN - 12.5
i) 110 mm Rmt 755.00
ii) 160 mm Rmt 1245.00
iii) 200 mm Rmt 1632.00
iv) 250 mm Rmt 2255.00
v) 315 mm Rmt 3036.00
vi) 400 mm Rmt 4578.00
b) Class - 500 PN - 16
i) 110 mm Rmt 829.00
ii) 160 mm Rmt 1389.00
iii) 200 mm Rmt 1841.00
iv) 250 mm Rmt 2401.00
v) 315 mm Rmt 3269.00
vi) 400 mm Rmt 4936.00
c) Class - 500 PN - 25
i) 110 mm Rmt 1001.00
ii) 160 mm Rmt 1456.00
iii) 200 mm Rmt 1981.00
iv) 250 mm Rmt 2738.00
v) 315 mm Rmt 4461.00
vi) 400 mm Rmt 6604.00
LIPDN 34 Lowering, laying and jointing with P.V.C.-O pipes and Section
specials of following class and diameter including cost of 12.25
conveyance from stores to site of works including cost of all
labour, material, except cement solvent, rubber ring, as per IS
code, for all class of pipe, etc. complete (with cement solvent
joint / ring fit joint).

i) 110 mm Rmt 52.00


ii) 160 mm Rmt 65.00
iii) 200 mm Rmt 81.00
iv) 250 mm Rmt 96.00
v) 315 mm Rmt 118.00
vi) 400 mm Rmt 130.00

78
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 35 Providing and supplying ISI mark P.V.C.-O pipes fitting / Section
specials including loading, unloading, trasnporatation upto 12.26
departmental store, stacking excluding GST levied by GOI &
GOM in all respect etc.complete.

i) up to 300 mm dia. Rmt 2 % of per mtr.


rate of pipe

ii) above 300 mm dia. Rmt 5 % of per mtr.


rate of pipe

LIPDN 36 Hydraulic testing of PVC-O pipe line to specified pressure Section


including cost of all materials and labour and water for testing for 12.27
specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type pumps
which should be able to provide specified test pressure gauges
and other necessary equipments, labour, operation charges, etc.
required for testing. The rate under this item shall also include
cost of retesting, if necessary and reinstating to original
position.(for all class of pipe)

i) 110 mm Km 7558.15
ii) 160 mm Km 8687.50
iii) 200 mm Km 9463.50
iv) 250 mm Km 10646.35
v) 315 mm Km 13303.45
vi) 400 mm Km 19547.50

79
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
IV. PRE-STRESSED CEMENT CONCRETE PIPES (PSC)
LIPDN 37 Providing and supplying ISI standard Pre-stressed Section
Cement concrete pipes of following class and diameter 12.28
including cost of all meterial and labour required, cost,
inspection charges, transportaion to stores, unloading and
stacking excluding GST levied by GOI & GOM in all respect
etc. complete as per IS-784-2001.
i) Factory test pressure
a) Site test pressure + 01N/mm 2, For working pressure upto 1
N/mm 2
b) Site test pressure + 02N/mm 2, For working pressure upto 1
N/mm 2

ii) Site test pressure - 1.5 times working pressure pertaining


to the section or 1.1 times static pressure, whichever is more
(such pressure is to be control within 25% of pumphead incase
of pumping main)
iii) Working pressure - The maximum sustained internal
pressure excluding surge to which each portion of pipeline may
be subjected when installed.
Note : One rubber ring should be supplied with each pipe,
cost included in rates below.
a) Factory Test Pressure 4 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4033.00
4 500 mm Rmt 4184.00
5 600 mm Rmt 5369.00
6 700 mm Rmt 6068.00
7 800 mm Rmt 7466.00
8 900 mm Rmt 9140.00
9 1000 mm Rmt 10325.00
10 1100 mm Rmt 11834.00
11 1200 mm Rmt 14209.00
12 1300 mm Rmt 18157.00
13 1400 mm Rmt 19334.00
14 1500 mm Rmt 20749.00
15 1600 mm Rmt 22344.00
16 1700 mm Rmt 24476.00
17 1800 mm Rmt 26482.00
18 1900 mm Rmt 35886.00
19 2000 mm Rmt 37600.00
b) Factory Test Pressure 6 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4033.00
4 500 mm Rmt 4184.00
5 600 mm Rmt 5369.00
6 700 mm Rmt 6068.00
7 800 mm Rmt 7466.00
8 900 mm Rmt 9184.00
9 1000 mm Rmt 10499.00

80
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
10 1100 mm Rmt 12127.00
11 1200 mm Rmt 14536.00
12 1300 mm Rmt 18503.00
13 1400 mm Rmt 19759.00
14 1500 mm Rmt 21209.00
15 1600 mm Rmt 22897.00
16 1700 mm Rmt 25150.00
17 1800 mm Rmt 27202.00
18 1900 mm Rmt 36688.00
19 2000 mm Rmt 38489.00
c) Factory Test Pressure 8 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4033.00
4 500 mm Rmt 4184.00
5 600 mm Rmt 5369.00
6 700 mm Rmt 6090.00
7 800 mm Rmt 7596.00
8 900 mm Rmt 9428.00
9 1000 mm Rmt 10814.00
10 1100 mm Rmt 12457.00
11 1200 mm Rmt 14975.00
12 1300 mm Rmt 19099.00
13 1400 mm Rmt 20340.00
14 1500 mm Rmt 21929.00
15 1600 mm Rmt 23702.00
16 1700 mm Rmt 26058.00
17 1800 mm Rmt 28661.00
18 1900 mm Rmt 37872.00
19 2000 mm Rmt 39810.00
d) Factory Test Pressure 10 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4033.00
4 500 mm Rmt 4184.00
5 600 mm Rmt 5418.00
6 700 mm Rmt 6252.00
7 800 mm Rmt 7834.00
8 900 mm Rmt 9704.00
9 1000 mm Rmt 11219.00
10 1100 mm Rmt 12874.00
11 1200 mm Rmt 15337.00
12 1300 mm Rmt 19571.00
13 1400 mm Rmt 21072.00
14 1500 mm Rmt 22730.00
15 1600 mm Rmt 24932.00
16 1700 mm Rmt 27493.00
17 1800 mm Rmt 30050.00
18 1900 mm Rmt 39112.00
19 2000 mm Rmt 41189.00
e) Factory Test Pressure 12 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4051.00

81
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
4 500 mm Rmt 4225.00
5 600 mm Rmt 5558.00
6 700 mm Rmt 6490.00
7 800 mm Rmt 8052.00
8 900 mm Rmt 9958.00
9 1000 mm Rmt 11509.00
10 1100 mm Rmt 13302.00
11 1200 mm Rmt 15938.00
12 1300 mm Rmt 20117.00
13 1400 mm Rmt 21718.00
14 1500 mm Rmt 23376.00
15 1600 mm Rmt 25375.00
16 1700 mm Rmt 27881.00
17 1800 mm Rmt 31363.00
18 1900 mm Rmt 41461.00
19 2000 mm Rmt 43762.00
f) Factory Test Pressure 14 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3899.00
3 450 mm Rmt 4136.00
4 500 mm Rmt 4314.00
5 600 mm Rmt 5765.00
6 700 mm Rmt 6715.00
7 800 mm Rmt 8304.00
8 900 mm Rmt 10272.00
9 1000 mm Rmt 11880.00
10 1100 mm Rmt 13746.00
11 1200 mm Rmt 16433.00
12 1300 mm Rmt 20686.00
13 1400 mm Rmt 22800.00
14 1500 mm Rmt 25270.00
15 1600 mm Rmt 27510.00
16 1700 mm Rmt 30448.00
17 1800 mm Rmt 33311.00
18 1900 mm Rmt 42440.00
19 2000 mm Rmt 45023.00
g) Factory Test Pressure 16 kg/Sqcm
1 350 mm Rmt 3628.00
2 400 mm Rmt 3934.00
3 450 mm Rmt 4222.00
4 500 mm Rmt 4686.00
5 600 mm Rmt 5879.00
6 700 mm Rmt 6877.00
7 800 mm Rmt 8578.00
8 900 mm Rmt 11384.00
9 1000 mm Rmt 12812.00
10 1100 mm Rmt 15377.00
11 1200 mm Rmt 17749.00
12 1300 mm Rmt 22212.00
13 1400 mm Rmt 23863.00
14 1500 mm Rmt 26784.00
15 1600 mm Rmt 30043.00
16 1700 mm Rmt 33300.00
17 1800 mm Rmt 36556.00

82
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
18 1900 mm Rmt 45125.00
19 2000 mm Rmt 48845.00
h) Factory Test Pressure 18 kg/Sqcm
1 350 mm Rmt 3685.00
2 400 mm Rmt 4007.00
3 450 mm Rmt 4306.00
4 500 mm Rmt 4831.00
5 600 mm Rmt 6089.00
6 700 mm Rmt 7520.00
7 800 mm Rmt 9385.00
8 900 mm Rmt 11869.00
9 1000 mm Rmt 13948.00
10 1100 mm Rmt 16096.00
11 1200 mm Rmt 18604.00
12 1300 mm Rmt 22763.00
13 1400 mm Rmt 28277.00
14 1500 mm Rmt 31883.00
15 1600 mm Rmt 35938.00
16 1700 mm Rmt 39988.00
17 1800 mm Rmt 44040.00
i) Factory Test Pressure 20 kg/Sqcm
1 350 mm Rmt 3743.00
2 400 mm Rmt 4075.00
3 450 mm Rmt 4400.00
4 500 mm Rmt 4981.00
5 600 mm Rmt 6305.00
6 700 mm Rmt 8330.00
7 800 mm Rmt 11084.00
8 900 mm Rmt 13102.00
9 1000 mm Rmt 15761.00
10 1100 mm Rmt 18736.00
11 1200 mm Rmt 23562.00
12 1300 mm Rmt 25925.00
13 1400 mm Rmt 30287.00
14 1500 mm Rmt 34334.00
15 1600 mm Rmt 38400.00
16 1700 mm Rmt 42463.00
17 1800 mm Rmt 46529.00
LIPDN 38 Lowering, laying and jointing in proper grade and Section
alignment Pre-Stressed Cement Concrete Pipes with 12.29
rubber ring joints including cost of conveyance from stores to
site of works, all labour involved, etc. complete but excluding
cost of rubber rings (for all class of pipes)

1 350 mm Rmt 83.35


2 400 mm Rmt 124.55
3 450 mm Rmt 143.70
4 500 mm Rmt 170.60
5 600 mm Rmt 231.20
6 700 mm Rmt 260.00
7 800 mm Rmt 279.15
8 900 mm Rmt 304.55

83
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
9 1000 mm Rmt 401.80
10 1100 mm Rmt 571.35
11 1200 mm Rmt 585.70
12 1300 mm Rmt 685.75
13 1400 mm Rmt 685.75
14 1500 mm Rmt 800.05
15 1600 mm Rmt 869.20
16 1700 mm Rmt 907.45
17 1800 mm Rmt 1147.05
18 1900 mm Rmt 1176.15
19 2000 mm Rmt 1267.95
LIPDN 39 Providing and supplying ISI standard specials & fitting Section
suitable for P. S. C. pipes including cost of labour, materials, 12.30
and transportation to stores / site, loading and unloading
excluding GST levied by GOI & GOM in all respect, complete.

350 mm & above dia. Kg 168.00


LIPDN 40 Hydraulic testing of Pre-Stressed Cement Concrete Pipes Section
with rubber ring joints to specified pressure including cost of all 12.31
materials and labour and water for testing for the length upto 1
km. using reciprocating type pumps which should be able to
provide specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for
testing. The rate under this item shall also include cost of
retesting, if necessary.
1 350 mm Km 15919.85
2 400 mm Km 19547.50
3 450 mm Km 23328.00
4 500 mm Km 27344.95
5 600 mm Km 32224.15
6 700 mm Km 38430.70
7 800 mm Km 45583.00
8 900 mm Km 53651.00
9 1000 mm Km 62725.00
10 1100 mm Km 72714.00
11 1200 mm Km 83649.00
12 1300 mm Km 95530.00
13 1400 mm Km 108357.00
14 1500 mm Km 125902.00
15 1600 mm Km 142052.00
16 1700 mm Km 157716.00
17 1800 mm Km 174326.00
18 1900 mm Km 191881.00
19 2000 mm Km 210381.00

84
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
V. BAR WRAPPED STEEL CYLINDER PIPES (BWSC)
LIPDN 41 Providing and supplying Bar Wrapped steel cylinder pipes, Section
conforming to IS-15155-2002 (suitable for overlaping steel 12.32
welded joint or butt welded steel joints) of following class and
diameter including cost of all material and labour required,
inspection charges, transportation to stores, transit insurance,
loading, unloding and stacking excluding GST levied by GOI &
GOM in all respect, etc. complete.

i) Factory test pressure


a) Site test pressure + 01N/mm2, For working pressure upto 1
N/mm2
b) Site test pressure + 02N/mm2, For working pressure upto 1
N/mm2
ii) Site test pressure - 1.5 times working pressure pertaining
to the section or 1.1 times static pressure, which ever is more
(such pressure is to be control within 25% of pumphead incase
of pumping main)
iii) Working pressure - The maximum sustained internal
pressure excluding surge to which each portion of pipeline may
be subjected when installed.
Note : 1) Class mentioned below represents the working
pressure of pipe. 2) For external coating at site to the
joints, necessary polythene wrap ping for pouring cement
slurry shall also be given free with each pipe.

a) Factory Test Pressure 4 kg/Sqcm


i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 22811.00
xiii) 1200 mm Rmt 25430.00
xiv) 1300 mm Rmt 29077.00
xv) 1400 mm Rmt 31574.00
xvi) 1500 mm Rmt 35327.00
xvii) 1600 mm Rmt 37708.00
xviii) 1700 mm Rmt 40092.00
xix) 1800 mm Rmt 42468.00
b) Factory Test Pressure 6 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00

85
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 37536.00
xvii) 1600 mm Rmt 39974.00
xviii) 1700 mm Rmt 43421.00
xix) 1800 mm Rmt 46262.00
c) Factory Test Pressure 8 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 37536.00
xvii) 1600 mm Rmt 39974.00
xviii) 1700 mm Rmt 43421.00
xix) 1800 mm Rmt 46262.00
d) Factory Test Pressure 10 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 37536.00
xvii) 1600 mm Rmt 39974.00
xviii) 1700 mm Rmt 43421.00
xix) 1800 mm Rmt 46262.00

86
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
e) Factory Test Pressure 12 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11840.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 17686.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 38116.00
xvii) 1600 mm Rmt 41736.00
xviii) 1700 mm Rmt 46198.00
xix) 1800 mm Rmt 51222.00
f) Factory Test Pressure 14 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 6164.00
vii) 600 mm Rmt 7812.00
viii) 700 mm Rmt 10666.00
ix) 800 mm Rmt 13060.00
x) 900 mm Rmt 15618.00
xi) 1000 mm Rmt 19528.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27780.00
xiv) 1300 mm Rmt 32454.00
xv) 1400 mm Rmt 38129.00
xvi) 1500 mm Rmt 42350.00
xvii) 1600 mm Rmt 46777.00
xviii) 1700 mm Rmt 52355.00
xix) 1800 mm Rmt 57187.00
g) Factory Test Pressure 16 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5724.00
vi) 500 mm Rmt 6644.00
vii) 600 mm Rmt 8443.00
viii) 700 mm Rmt 11621.00
ix) 800 mm Rmt 14267.00
x) 900 mm Rmt 17106.00
xi) 1000 mm Rmt 21559.00
xii) 1100 mm Rmt 26288.00
xiii) 1200 mm Rmt 30461.00

87
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
xiv) 1300 mm Rmt 35827.00
xv) 1400 mm Rmt 41911.00
xvi) 1500 mm Rmt 46786.00
xvii) 1600 mm Rmt 51583.00
xviii) 1700 mm Rmt 58268.00
xix) 1800 mm Rmt 64740.00
h) Factory Test Pressure 18 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4987.00
v) 450 mm Rmt 5918.00
vi) 500 mm Rmt 6857.00
vii) 600 mm Rmt 8790.00
viii) 700 mm Rmt 12100.00
ix) 800 mm Rmt 14886.00
x) 900 mm Rmt 17833.00
xi) 1000 mm Rmt 22562.00
xii) 1100 mm Rmt 27396.00
xiii) 1200 mm Rmt 31811.00
xiv) 1300 mm Rmt 37308.00
xv) 1400 mm Rmt 44076.00
xvi) 1500 mm Rmt 48779.00
xvii) 1600 mm Rmt 54844.00
xviii) 1700 mm Rmt 61751.00
xix) 1800 mm Rmt 68162.00
e) Factory Test Pressure 20 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4469.00
iv) 400 mm Rmt 5285.00
v) 450 mm Rmt 6281.00
vi) 500 mm Rmt 7337.00
vii) 600 mm Rmt 9421.00
viii) 700 mm Rmt 13056.00
ix) 800 mm Rmt 16360.00
x) 900 mm Rmt 19415.00
xi) 1000 mm Rmt 24829.00
xii) 1100 mm Rmt 29888.00
xiii) 1200 mm Rmt 34644.00
xiv) 1300 mm Rmt 40669.00
xv) 1400 mm Rmt 48366.00
xvi) 1500 mm Rmt 54449.00
xvii) 1600 mm Rmt 60323.00
xviii) 1700 mm Rmt 68267.00
xix) 1800 mm Rmt 75510.00

88
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 42 Lowering, laying and jointing in proper grade and Section
alignment Bar wrapped steel cylinder pipes with couplings 12.33
& gasket including cost of conveyance from stores to site of
works, all labour involved, etc. complete (for all class of pipes)

i) 250 mm Rmt 325.25


ii) 300 mm Rmt 337.95
iii) 350 mm Rmt 349.45
iv) 400 mm Rmt 397.30
v) 450 mm Rmt 408.85
vi) 500 mm Rmt 486.50
vii) 600 mm Rmt 538.20
viii) 700 mm Rmt 643.80
ix) 800 mm Rmt 744.70
x) 900 mm Rmt 817.60
xi) 1000 mm Rmt 908.25
xii) 1100 mm Rmt 997.60
xiii) 1200 mm Rmt 1099.85
xiv) 1300 mm Rmt 1220.10
xv) 1400 mm Rmt 1296.80
xvi) 1500 mm Rmt 1445.95
xvii) 1600 mm Rmt 1479.95
xviii) 1700 mm Rmt 1667.30
xix) 1800 mm Rmt 1701.30
LIPDN 43 Providing and supplying ISI mark Bar wrapped steel Section
cylinder pipes fitting/specials including loading, unloading, 12.34
trasnporatation upto departmental store, stacking excluding
GST levied by GOI & GOM in all respect etc.complete.

i) 250 mm dia. To 1800mm kg 144.00

LIPDN 44 Hydraulic testing of Bar wrapped steel cylinder pipes to Section


specified pressure including cost of all materials and labour 12.35
and water for testing for the length upto 1 km. using
reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for
testing. The rate under this item shall also include cost of
retesting, if necessary.
1 250 mm Km 10646.35
2 300 mm Km 12831.55
3 350 mm Km 15919.85
4 400 mm Km 19547.50
5 450 mm Km 23328.00
6 500 mm Km 27344.95
7 600 mm Km 32224.15
8 700 mm Km 38430.70
9 800 mm Km 45583.00
10 900 mm Km 53651.00
11 1000 mm Km 62725.00
12 1100 mm Km 72714.00
13 1200 mm Km 83649.00
14 1300 mm Km 95530.00
15 1400 mm Km 108357.00
16 1500 mm Km 125902.00
17 1600 mm Km 142052.00
18 1700 mm Km 157716.00
19 1800 mm Km 174326.00

89
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
VI. GLASS FIBRE REINFORCED PLASTIC PIPES (GRP)
LIPDN 45 Providing and supplying Glass fibre reinforced plastic Section
(GRP) pipes confirming to IS 14402 with double bell REKA 12.36
GRP coupling EPDM rubber gaskets for sealing of following
pressure diameter and stiffness class including cost of all
material and labour required, insurance, transportation to store,
unloading and stacking excluding GST levied by GOI & GOM in
all respect etc. complete.
A. Class (SN) 2500 (124 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 2990.00
ii) 350 mm Rmt 3457.00
iii) 400 mm Rmt 3806.00
iv) 450 mm Rmt 4281.00
v) 500 mm Rmt 4844.00
vi) 600 mm Rmt 6149.00
vii) 700 mm Rmt 7628.00
viii) 800 mm Rmt 9437.00
ix) 900 mm Rmt 11521.00
x) 1000 mm Rmt 13665.00
xi) 1100 mm Rmt 16637.00
xii) 1200 mm Rmt 19399.00
xiii) 1300 mm Rmt 21951.00
xiv) 1400 mm Rmt 25383.00
xv) 1500 mm Rmt 28842.00
xvi) 1600 mm Rmt 33603.00
xvii) 1700 mm Rmt 40219.00
xviii) 1800 mm Rmt 43884.00
xix) 1900 mm Rmt 49057.00
xx) 2000 mm Rmt 53029.00
xxi) 2100 mm Rmt 59297.00
xxii) 2200 mm Rmt 63656.00
xxiii) 2300 mm Rmt 68785.00
xiv) 2400 mm Rmt 73520.00
xxv) 2500 mm Rmt 80010.00
xxvi) 2600 mm Rmt 86751.00
xxvii) 2700 mm Rmt 92590.00
xxviii) 2800 mm Rmt 99363.00
xxix) 2900 mm Rmt 106367.00
xxx) 3000 mm Rmt 113357.00
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 3104.00
ii) 350 mm Rmt 3546.00
iii) 400 mm Rmt 3985.00
iv) 450 mm Rmt 4423.00
v) 500 mm Rmt 4934.00
vi) 600 mm Rmt 6404.00
vii) 700 mm Rmt 8004.00
viii) 800 mm Rmt 9819.00
ix) 900 mm Rmt 11981.00
x) 1000 mm Rmt 14263.00
xi) 1100 mm Rmt 17295.00
xii) 1200 mm Rmt 20059.00
xiii) 1300 mm Rmt 22944.00
xiv) 1400 mm Rmt 26276.00
xv) 1500 mm Rmt 29987.00
xvi) 1600 mm Rmt 35011.00
xvii) 1700 mm Rmt 41851.00
xviii) 1800 mm Rmt 45578.00
xix) 1900 mm Rmt 51030.00
xx) 2000 mm Rmt 55221.00
xxi) 2100 mm Rmt 61617.00
xxii) 2200 mm Rmt 66431.00
xxiii) 2300 mm Rmt 71573.00
xiv) 2400 mm Rmt 76437.00
xxv) 2500 mm Rmt 84719.00
xxvi) 2600 mm Rmt 91078.00
xxvii) 2700 mm Rmt 97568.00
xxviii) 2800 mm Rmt 104427.00
xxix) 2900 mm Rmt 112081.00
xxx) 3000 mm Rmt 119749.00

90
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 3203.00
ii) 350 mm Rmt 3720.00
iii) 400 mm Rmt 4147.00
iv) 450 mm Rmt 4702.00
v) 500 mm Rmt 4934.00
vi) 600 mm Rmt 6789.00
vii) 700 mm Rmt 8496.00
viii) 800 mm Rmt 10634.00
ix) 900 mm Rmt 12961.00
x) 1000 mm Rmt 15388.00
xi) 1100 mm Rmt 18608.00
xii) 1200 mm Rmt 21639.00
xiii) 1300 mm Rmt 24989.00
xiv) 1400 mm Rmt 28743.00
xv) 1500 mm Rmt 32637.00
xvi) 1600 mm Rmt 38128.00
xvii) 1700 mm Rmt 45743.00
xviii) 1800 mm Rmt 50004.00
xix) 1900 mm Rmt 55604.00
xx) 2000 mm Rmt 60302.00
xxi) 2100 mm Rmt 67154.00
xxii) 2200 mm Rmt 72231.00
xxiii) 2300 mm Rmt 77974.00
xiv) 2400 mm Rmt 84105.00
xxv) 2500 mm Rmt 96179.00
xxvi) 2600 mm Rmt 104306.00
xxvii) 2700 mm Rmt 111726.00
xxviii) 2800 mm Rmt 119946.00
xxix) 2900 mm Rmt 128377.00
xxx) 3000 mm Rmt 136781.00
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3392.00
ii) 350 mm Rmt 3914.00
iii) 400 mm Rmt 4360.00
iv) 450 mm Rmt 5228.00
v) 500 mm Rmt 4934.00
vi) 600 mm Rmt 7306.00
vii) 700 mm Rmt 9075.00
viii) 800 mm Rmt 11284.00
ix) 900 mm Rmt 13847.00
x) 1000 mm Rmt 16523.00
xi) 1100 mm Rmt 20294.00
xii) 1200 mm Rmt 23674.00
xiii) 1300 mm Rmt 26817.00
xiv) 1400 mm Rmt 30902.00
xv) 1500 mm Rmt 35333.00
xvi) 1600 mm Rmt 41032.00
xvii) 1700 mm Rmt 49266.00
xviii) 1800 mm Rmt 54055.00
xix) 1900 mm Rmt 59839.00
xx) 2000 mm Rmt 65089.00
xxi) 2100 mm Rmt 72560.00
xxii) 2200 mm Rmt 78279.00
xxiii) 2300 mm Rmt 87079.00
xiv) 2400 mm Rmt 94425.00
xxv) 2500 mm Rmt 127648.00
xxvi) 2600 mm Rmt 137384.00
xxvii) 2700 mm Rmt 147131.00
xxviii) 2800 mm Rmt 158015.00
xxix) 2900 mm Rmt 173389.00
xxx) 3000 mm Rmt 178797.00

91
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3531.00
ii) 350 mm Rmt 4078.00
iii) 400 mm Rmt 4537.00
iv) 450 mm Rmt 5228.00
v) 500 mm Rmt 6009.00
vi) 600 mm Rmt 7852.00
vii) 700 mm Rmt 9772.00
viii) 800 mm Rmt 12231.00
ix) 900 mm Rmt 15119.00
x) 1000 mm Rmt 17952.00
xi) 1100 mm Rmt 22054.00
xii) 1200 mm Rmt 25601.00
xiii) 1300 mm Rmt 29537.00
xiv) 1400 mm Rmt 33827.00
xv) 1500 mm Rmt 38417.00
xvi) 1600 mm Rmt 44585.00
xvii) 1700 mm Rmt 54344.00
xviii) 1800 mm Rmt 59353.00
xix) 1900 mm Rmt 66299.00
xx) 2000 mm Rmt 72198.00
xxi) 2100 mm Rmt 82844.00
xxii) 2200 mm Rmt 89630.00
xxiii) 2300 mm Rmt 96707.00
xiv) 2400 mm Rmt 103256.00
B. Class (SN) 5000 (248 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 3204.00
ii) 350 mm Rmt 3759.00
iii) 400 mm Rmt 4224.00
iv) 450 mm Rmt 4816.00
v) 500 mm Rmt 5390.00
vi) 600 mm Rmt 6936.00
vii) 700 mm Rmt 8663.00
viii) 800 mm Rmt 10771.00
ix) 900 mm Rmt 13306.00
x) 1000 mm Rmt 15834.00
xi) 1100 mm Rmt 19223.00
xii) 1200 mm Rmt 22544.00
xiii) 1300 mm Rmt 25820.00
xiv) 1400 mm Rmt 29503.00
xv) 1500 mm Rmt 33714.00
xvi) 1600 mm Rmt 39200.00
xvii) 1700 mm Rmt 47043.00
xviii) 1800 mm Rmt 51558.00
xix) 1900 mm Rmt 57410.00
xx) 2000 mm Rmt 62484.00
xxi) 2100 mm Rmt 69546.00
xxii) 2200 mm Rmt 75074.00
xxiii) 2300 mm Rmt 83294.00
xiv) 2400 mm Rmt 90002.00
xxv) 2500 mm Rmt 96970.00
xxvi) 2600 mm Rmt 104161.00
xxvii) 2700 mm Rmt 112005.00
xxviii) 2800 mm Rmt 119721.00
xxix) 2900 mm Rmt 128466.00
xxx) 3000 mm Rmt 137254.00

92
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 3254.00
ii) 350 mm Rmt 3823.00
iii) 400 mm Rmt 4224.00
iv) 450 mm Rmt 4816.00
v) 500 mm Rmt 5548.00
vi) 600 mm Rmt 7088.00
vii) 700 mm Rmt 8888.00
viii) 800 mm Rmt 11033.00
ix) 900 mm Rmt 13632.00
x) 1000 mm Rmt 16193.00
xi) 1100 mm Rmt 19835.00
xii) 1200 mm Rmt 23067.00
xiii) 1300 mm Rmt 26510.00
xiv) 1400 mm Rmt 30248.00
xv) 1500 mm Rmt 34503.00
xvi) 1600 mm Rmt 40170.00
xvii) 1700 mm Rmt 48196.00
xviii) 1800 mm Rmt 52807.00
xix) 1900 mm Rmt 58847.00
xx) 2000 mm Rmt 64158.00
xxi) 2100 mm Rmt 71350.00
xxii) 2200 mm Rmt 77142.00
xxiii) 2300 mm Rmt 85550.00
xiv) 2400 mm Rmt 92094.00
xxv) 2500 mm Rmt 99467.00
xxvi) 2600 mm Rmt 107524.00
xxvii) 2700 mm Rmt 115235.00
xxviii) 2800 mm Rmt 123387.00
xxix) 2900 mm Rmt 132271.00
xxx) 3000 mm Rmt 141200.00
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 3372.00
ii) 350 mm Rmt 3952.00
iii) 400 mm Rmt 4447.00
iv) 450 mm Rmt 5062.00
v) 500 mm Rmt 5792.00
vi) 600 mm Rmt 7869.00
vii) 700 mm Rmt 9322.00
viii) 800 mm Rmt 12047.00
ix) 900 mm Rmt 14255.00
x) 1000 mm Rmt 17017.00
xi) 1100 mm Rmt 22299.00
xii) 1200 mm Rmt 25913.00
xiii) 1300 mm Rmt 29066.00
xiv) 1400 mm Rmt 32617.00
xv) 1500 mm Rmt 37483.00
xvi) 1600 mm Rmt 42218.00
xvii) 1700 mm Rmt 50898.00
xviii) 1800 mm Rmt 55401.00
xix) 1900 mm Rmt 60394.00
xx) 2000 mm Rmt 72468.00
xxi) 2100 mm Rmt 76610.00
xxii) 2200 mm Rmt 82844.00
xxiii) 2300 mm Rmt 93511.00
xiv) 2400 mm Rmt 100626.00
xxv) 2500 mm Rmt 105379.00
xxvi) 2600 mm Rmt 113779.00
xxvii) 2700 mm Rmt 121815.00
xxviii) 2800 mm Rmt 128232.00
xxix) 2900 mm Rmt 138096.00
xxx) 3000 mm Rmt 146645.00

93
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3468.00
ii) 350 mm Rmt 4114.00
iii) 400 mm Rmt 4548.00
iv) 450 mm Rmt 5266.00
v) 500 mm Rmt 6013.00
vi) 600 mm Rmt 7941.00
vii) 700 mm Rmt 9890.00
viii) 800 mm Rmt 12181.00
ix) 900 mm Rmt 15275.00
x) 1000 mm Rmt 17976.00
xi) 1100 mm Rmt 22299.00
xii) 1200 mm Rmt 25913.00
xiii) 1300 mm Rmt 29699.00
xiv) 1400 mm Rmt 34076.00
xv) 1500 mm Rmt 38687.00
xvi) 1600 mm Rmt 43420.00
xvii) 1700 mm Rmt 53867.00
xviii) 1800 mm Rmt 57944.00
xix) 1900 mm Rmt 64394.00
xx) 2000 mm Rmt 78156.00
xxi) 2100 mm Rmt 83760.00
xxii) 2200 mm Rmt 90046.00
xxiii) 2300 mm Rmt 102918.00
xiv) 2400 mm Rmt 108680.00
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3593.00
ii) 350 mm Rmt 4276.00
iii) 400 mm Rmt 4781.00
iv) 450 mm Rmt 5520.00
v) 500 mm Rmt 6300.00
vi) 600 mm Rmt 8229.00
vii) 700 mm Rmt 10407.00
viii) 800 mm Rmt 12998.00
ix) 900 mm Rmt 16089.00
x) 1000 mm Rmt 19195.00
xi) 1100 mm Rmt 23550.00
xii) 1200 mm Rmt 27594.00
xiii) 1300 mm Rmt 31357.00
xiv) 1400 mm Rmt 36235.00
xv) 1500 mm Rmt 41196.00
xvi) 1600 mm Rmt 46403.00
xvii) 1700 mm Rmt 56000.00
xviii) 1800 mm Rmt 60537.00
xix) 1900 mm Rmt 70425.00
xx) 2000 mm Rmt 81727.00
xxi) 2100 mm Rmt 89485.00
xxii) 2200 mm Rmt 93749.00
xxiii) 2300 mm Rmt 107130.00
xiv) 2400 mm Rmt 117053.00

94
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
LIPDN 46 Lowering, laying and jointing in proper grade and alignment Section
Glass fibre reinforced plastic (GRP) pipes with couplings & 12.37
gasket including cost of conveyance from stores to site of
works, all labour involved, etc. complete (for all class of pipes)

i) 300 mm Rmt 227.00


ii) 350 mm Rmt 227.00
iii) 400 mm Rmt 227.00
iv) 450 mm Rmt 227.00
v) 500 mm Rmt 227.00
vi) 600 mm Rmt 243.00
vii) 700 mm Rmt 243.00
viii) 800 mm Rmt 283.00
ix) 900 mm Rmt 353.00
x) 1000 mm Rmt 353.00
xi) 1100 mm Rmt 381.00
xii) 1200 mm Rmt 383.00
xiii) 1300 mm Rmt 422.00
xiv) 1400 mm Rmt 446.00
xv) 1500 mm Rmt 547.00
xvi) 1600 mm Rmt 550.00
xvii) 1700 mm Rmt 604.00
xviii) 1800 mm Rmt 644.00
xix) 1900 mm Rmt 643.00
xx) 2000 mm Rmt 659.00
xxi) 2100 mm Rmt 745.00
xxii) 2200 mm Rmt 804.00
xxiii) 2300 mm Rmt 961.00
xiv) 2400 mm Rmt 976.00
xxv) 2500 mm Rmt 1097.00
xxvi) 2600 mm Rmt 1097.00
xxvii) 2700 mm Rmt 1097.00
xxviii) 2800 mm Rmt 1097.00
xxix) 2900 mm Rmt 1097.00
xxx) 3000 mm Rmt 1097.00
LIPDN 47 Providing and supplying ISI mark Glass fibre reinforced Section
plastic pipes (GRP) fitting/specials including loading, 12.38
unloading, transportation upto departmental store, stacking
excluding GST levied by GOI & GOM in all respect
etc.complete.
i) 90 DRG Bend with one coupling One Bend 7 times x Pipe
Per Mtr Price
ii) 60 DRG Bend with one coupling One Bend 5 times x Pipe
Per Mtr Price
iii) 45 DRG Bend with one coupling One Bend 4 times x Pipe
Per Mtr Price
iv) 30 DRG Bend with one coupling One Bend 3 times x Pipe
Per Mtr Price
v) 22.5 DRG Bend with one coupling One Bend 2.5 times x
Pipe Per Mtr
Price
vi) 11.25 DRG Bend with one coupling One Bend 2 times x Pipe
Per Mtr Price
vii) GRP Equal Tee One Tee 5 times x Pipe
Per Mtr Price
viii) Flange Tail Piece (Length 0.65 m) One 4 times x Pipe
Flange Per Mtr Price
ix) Lamination joint (Butt strap joint) One joint 1.5 times x
Pipe Per Mtr
Price
x) GRP Double bell coupling One 1.5 times x
coupling Pipe Per Mtr
Price

95
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
LIPDN 48 Hydraulic testing of Glass fibre reinforced plastic (GRP) Section
pipes to specified pressure including cost of all materials and 12.39
labour and water for testing for the length upto 1 km. using
reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for testing.
The rate under this item shall also include cost of retesting, if
necessary.
1 300 mm Km 12831.55
2 350 mm Km 15919.85
3 400 mm Km 19547.50
4 450 mm Km 23328.00
5 500 mm Km 27344.95
6 600 mm Km 32224.15
7 700 mm Km 38430.70
8 800 mm Km 45583.00
9 900 mm Km 53651.00
10 1000 mm Km 62725.00
11 1100 mm Km 72714.00
12 1200 mm Km 83649.00
13 1300 mm Km 95530.00
14 1400 mm Km 108357.00
15 1500 mm Km 125902.00
16 1600 mm Km 142052.00
17 1700 mm Km 157716.00
18 1800 mm Km 174326.00
19 1900 mm Km 191881.00
20 2000 mm Km 210381.00
21 2100 mm Km 229828.00
22 2200 mm Km 250909.00
23 2300 mm Km 272247.00
24 2400 mm Km 294530.00
25 2500 mm Km 317760.00
26 2600 mm Km 341935.00
27 2700 mm Km 367056.00
28 2800 mm Km 393122.00
29 2900 mm Km 420134.00
30 3000 mm Km 448092.00

96
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
VII. H.D.P.E. PIPES
LIPDN 49 Providing and supplying in standard lengths Polyethelene Section
Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with 12.40
nesessary jointing material like mechanical connector i.e. thread /
insert joint / quick release coupler joint / compression fitting joint
or flanged joint excluding coupler/specials, including
transportation and freight charges, inspection charges, loading /
unloading charges, conveyance to the departmental stores &
stacking the same in closed shade duly protecting from sunrays &
rains, excluding GST levied by GOI & GOM in all respect etc.
complete.

Note:- H.D.P.E. Pipes shall be as per latest IS Specifications.

a) PE-100 : 3 Kg/Sq.cm
1 630 mm Rmt 6411.00
2 710 mm Rmt 8118.00
3 800 mm Rmt 10327.00
4 900 mm Rmt 12361.00
5 1000 mm Rmt 15218.00
6 1200 mm Rmt 19348.00
b) PE-100 : 4 Kg/Sq.cm
1 75 mm Rmt 122.00
2 90 mm Rmt 169.00
3 110 mm Rmt 248.00
4 125 mm Rmt 299.00
5 140 mm Rmt 377.00
6 160 mm Rmt 492.00
7 180 mm Rmt 622.00
8 200 mm Rmt 763.00
9 225 mm Rmt 971.00
10 250 mm Rmt 1190.00
11 280 mm Rmt 1490.00
12 315 mm Rmt 1890.00
13 355 mm Rmt 2393.00
14 400 mm Rmt 3039.00
15 450 mm Rmt 3832.00
16 500 mm Rmt 4715.00
17 560 mm Rmt 5909.00
18 630 mm Rmt 7465.00
19 710 mm Rmt 9520.00
20 800 mm Rmt 11198.00
21 900 mm Rmt 15227.00
22 1000 mm Rmt 18776.00
23 1200 mm Rmt 27059.00

97
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
c) PE-100 : 5 Kg/Sq.cm
1 75 mm Rmt 151.00
2 90 mm Rmt 209.00
3 110 mm Rmt 310.00
4 125 mm Rmt 374.00
5 140 mm Rmt 468.00
6 160 mm Rmt 614.00
7 180 mm Rmt 780.00
8 200 mm Rmt 955.00
9 225 mm Rmt 1213.00
10 250 mm Rmt 1501.00
11 280 mm Rmt 1870.00
12 315 mm Rmt 2372.00
13 355 mm Rmt 3006.00
14 400 mm Rmt 3798.00
15 450 mm Rmt 4785.00
16 500 mm Rmt 5930.00
17 560 mm Rmt 7442.00
18 630 mm Rmt 9404.00
19 710 mm Rmt 11906.00
20 800 mm Rmt 15144.00
21 900 mm Rmt 19192.00
22 1000 mm Rmt 23662.00
23 1200 mm Rmt 34040.00
d) PE-100 : 6 Kg/Sq.cm
1 75 mm Rmt 177.00
2 90 mm Rmt 252.00
3 110 mm Rmt 381.00
4 125 mm Rmt 460.00
5 140 mm Rmt 577.00
6 160 mm Rmt 756.00
7 180 mm Rmt 950.00
8 200 mm Rmt 1177.00
9 225 mm Rmt 1488.00
10 250 mm Rmt 1834.00
11 280 mm Rmt 2290.00
12 315 mm Rmt 2888.00
13 355 mm Rmt 3667.00
14 400 mm Rmt 4664.00
15 450 mm Rmt 4588.00
16 500 mm Rmt 7272.00
17 560 mm Rmt 9101.00
18 630 mm Rmt 11497.00
19 710 mm Rmt 14639.00
20 800 mm Rmt 18533.00
21 900 mm Rmt 23477.00
22 1000 mm Rmt 29006.00
23 1200 mm Rmt 41716.00
e) PE-100 : 8 Kg/Sq.cm
1 75 mm Rmt 219.00
2 90 mm Rmt 307.00
3 110 mm Rmt 462.00
4 125 mm Rmt 560.00
5 140 mm Rmt 704.00
6 160 mm Rmt 924.00
7 180 mm Rmt 1159.00
8 200 mm Rmt 1431.00
9 225 mm Rmt 1811.00
10 250 mm Rmt 2227.00
11 280 mm Rmt 2800.00
12 315 mm Rmt 3548.00

98
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
13 355 mm Rmt 4490.00
14 400 mm Rmt 5713.00
15 450 mm Rmt 7217.00
16 500 mm Rmt 8923.00
17 560 mm Rmt 11171.00
18 630 mm Rmt 14125.00
19 710 mm Rmt 17996.00
20 800 mm Rmt 22838.00
21 900 mm Rmt 28911.00
22 1000 mm Rmt 35698.00
23 1200 mm Rmt 51354.00
f) PE-100 : 10 Kg/Sq.cm
1 75 mm Rmt 266.00
2 90 mm Rmt 381.00
3 110 mm Rmt 561.00
4 125 mm Rmt 683.00
5 140 mm Rmt 856.00
6 160 mm Rmt 1122.00
7 180 mm Rmt 1420.00
8 200 mm Rmt 1747.00
9 225 mm Rmt 2219.00
10 250 mm Rmt 2726.00
11 280 mm Rmt 3424.00
12 315 mm Rmt 4332.00
13 355 mm Rmt 5493.00
14 400 mm Rmt 6998.00
15 450 mm Rmt 8798.00
16 500 mm Rmt 10871.00
17 560 mm Rmt 13623.00
18 630 mm Rmt 17254.00
19 710 mm Rmt 21882.00
20 800 mm Rmt 27821.00
21 900 mm Rmt 35170.00
22 1000 mm Rmt 43457.00
23 1200 mm Rmt 62534.00
g) PE-100 : 12.5 Kg/Sq.cm
1 75 mm Rmt 320.00
2 90 mm Rmt 455.00
3 110 mm Rmt 679.00
4 125 mm Rmt 832.00
5 140 mm Rmt 1044.00
6 160 mm Rmt 1361.00
7 180 mm Rmt 1715.00
8 200 mm Rmt 2116.00
9 225 mm Rmt 2684.00
10 250 mm Rmt 3314.00

99
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
11 280 mm Rmt 4153.00
12 315 mm Rmt 5255.00
13 355 mm Rmt 6660.00
14 400 mm Rmt 8454.00
15 450 mm Rmt 10657.00
16 500 mm Rmt 13174.00
17 560 mm Rmt 16500.00
18 630 mm Rmt 20887.00
19 710 mm Rmt 26548.00
20 800 mm Rmt 33702.00
21 900 mm Rmt 42649.00
22 1000 mm Rmt 52598.00
23 1200 mm Rmt 75742.00
h) PE-100 : 16 Kg/Sq.cm
1 75 mm Rmt 379.00
2 90 mm Rmt 542.00
3 110 mm Rmt 813.00
4 125 mm Rmt 988.00
5 140 mm Rmt 1242.00
6 160 mm Rmt 1618.00
7 180 mm Rmt 2044.00
8 200 mm Rmt 2530.00
9 225 mm Rmt 3193.00
10 250 mm Rmt 3945.00
11 280 mm Rmt 4954.00
12 315 mm Rmt 6255.00
13 355 mm Rmt 7958.00
14 400 mm Rmt 10099.00
15 450 mm Rmt 12718.00
16 500 mm Rmt 15715.00
17 560 mm Rmt 19710.00
18 630 mm Rmt 24921.00
19 710 mm Rmt 31656.00
20 800 mm Rmt 40187.00
21 900 mm Rmt 50851.00
22 1000 mm Rmt 62815.00
LIPDN 50 Lowering, Laying and Jointing H. D. P. E pipes in proper Section
position including all specials by compression fitting/electrofusion 12.41
and butt fusion jointing procedure as per relevent IS Code
complete with all materials for jointing procedure like
Electrofusion machine, Electric heater/butt fusion welding
machine with hydraulic jack, top loading clamp etc. and all
labours as directed by engineer in charge as per IS-7634 Part II
For all classes.

1 75 mm Rmt 58.00
2 90 mm Rmt 66.00
3 110 mm Rmt 72.00
4 125 mm Rmt 84.00
5 140 mm Rmt 97.00
6 160 mm Rmt 108.00
7 180 mm Rmt 114.00
8 200 mm Rmt 133.00
9 225 mm Rmt 166.00
10 250 mm Rmt 181.00
11 280 mm Rmt 222.00
12 315 mm Rmt 264.00
13 355 mm Rmt 305.00
14 400 mm Rmt 322.00
15 450 mm Rmt 338.00
16 500 mm Rmt 395.00
17 560 mm Rmt 414.00
18 630 mm Rmt 547.00
19 710 mm Rmt 570.00
20 800 mm Rmt 713.00
21 900 mm Rmt 950.00
22 1000 mm Rmt 988.00
23 1200 mm Rmt 1056.00

100
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 51 Providing and supplying ISI mark H. D. P. E pipes Section
fitting/specials including loading, unloading, trasnporatation 12.42
upto departmental store, stacking excluding GST levied by GOI &
GOM in all respect etc.complete.
75 mm & above dia. Rmt 2 % of per
mtr. rate of
pipe
LIPDN 52 Hydraulic testing of H. D. P. E. pipe line to specified pressure Section
including cost of all materials and labour and water for testing for 12.43
specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type pumps
which should be able to provide specified test pressure gauges
and other necessary equipments, labour, operation charges, etc.
required for testing. The rate under this item shall also include
cost of retesting, if necessary and reinstating to original position.

1 75 mm Km 7168.75
2 90 mm Km 7321.45
3 110 mm Km 7558.15
4 125 mm Km 7760.50
5 140 mm Km 8356.20
6 160 mm Km 8687.50
7 180 mm Km 9056.60
8 200 mm Km 9463.50
9 225 mm Km 10025.35
10 250 mm Km 10646.35
11 280 mm Km 11469.50
12 315 mm Km 13303.45
13 355 mm Km 16098.40
14 400 mm Km 19547.50
15 450 mm Km 23328.00
16 500 mm Km 27344.95
17 560 mm Km 30494.95
18 630 mm Km 33986.80
19 710 mm Km 39103.40
20 800 mm Km 45583.00
21 900 mm Km 53651.00
22 1000 mm Km 62725.00
23 1200 mm Km 83649.00

101
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
VIII. PRE-STRESSED CONCRETE CYLINDER PIPES (PCCP)

LIPDN 53 Providing and supplying Prestressed Concrete Cylinder Section


Pipes suitable for sliding ovrelap weld joint or confined rubber 12.44
ring joint with necessary rubber ring of following class and
diameter including cost of transportation, inspection charges to
store, transit insurance, unloading and stacking excluding GST
levied by GOI & GOM in all respect etc. complete.
i) Factory test pressure
a) Site test pressure + 01N/mm2, For working pressure upto 1
N/mm2
b) Site test pressure + 02N/mm2, For working pressure upto 1
N/mm2
ii) Site test pressure - 1.5 times working pressure pertaining
to the section or 1.1 times static pressure, which ever is more
(such pressure is to be control within 25% of pumphead incase
of pumping main)
iii) Working pressure - The maximum sustained internal
pressure excluding surge to which each portion of pipeline may
be subjected when installed. As per IS 784:2001
a) Factory Test Pressure 4 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6947.00
v) 600 mm Rmt 8022.00
vi) 700 mm Rmt 9942.00
vii) 800 mm Rmt 11334.00
viii) 900 mm Rmt 13045.00
ix) 1000 mm Rmt 15712.00
x) 1100 mm Rmt 17035.00
xi) 1200 mm Rmt 19541.00
xii) 1300 mm Rmt 23548.00
xiii) 1400 mm Rmt 25406.00
xiv) 1500 mm Rmt 27416.00
xv) 1600 mm Rmt 33143.00
xvi) 1700 mm Rmt 39737.00
xvii) 1800 mm Rmt 42092.00
xviii) 1900 mm Rmt 60503.00
xix) 2000 mm Rmt 64758.00
xx) 2100 mm Rmt 67664.00
xxi) 2200 mm Rmt 70717.00
b) Factory Test Pressure 5.5 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6947.00
v) 600 mm Rmt 8022.00
vi) 700 mm Rmt 9942.00
vii) 800 mm Rmt 11334.00
viii) 900 mm Rmt 13156.00
ix) 1000 mm Rmt 15964.00
x) 1100 mm Rmt 17312.00
xi) 1200 mm Rmt 19838.00
xii) 1300 mm Rmt 23927.00
xiii) 1400 mm Rmt 25871.00
xiv) 1500 mm Rmt 27918.00
xv) 1600 mm Rmt 33673.00
xvi) 1700 mm Rmt 40302.00
xvii) 1800 mm Rmt 42664.00
xviii) 1900 mm Rmt 61304.00
xix) 2000 mm Rmt 65681.00
xx) 2100 mm Rmt 68983.00
xxi) 2200 mm Rmt 72173.00

102
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
c) Factory Test Pressure 7 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6947.00
v) 600 mm Rmt 8022.00
vi) 700 mm Rmt 9998.00
vii) 800 mm Rmt 11498.00
viii) 900 mm Rmt 13340.00
ix) 1000 mm Rmt 16172.00
x) 1100 mm Rmt 17542.00
xi) 1200 mm Rmt 20140.00
xii) 1300 mm Rmt 24306.00
xiii) 1400 mm Rmt 26279.00
xiv) 1500 mm Rmt 28418.00
xv) 1600 mm Rmt 34274.00
xvi) 1700 mm Rmt 40358.00
xvii) 1800 mm Rmt 42716.00
xviii) 1900 mm Rmt 62099.00
xix) 2000 mm Rmt 66604.00
xx) 2100 mm Rmt 69691.00
xxi) 2200 mm Rmt 73730.00
d) Factory Test Pressure 8.5 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6947.00
v) 600 mm Rmt 8068.00
vi) 700 mm Rmt 10088.00
vii) 800 mm Rmt 11632.00
viii) 900 mm Rmt 13528.00
ix) 1000 mm Rmt 16381.00
x) 1100 mm Rmt 17815.00
xi) 1200 mm Rmt 20488.00
xii) 1300 mm Rmt 24685.00
xiii) 1400 mm Rmt 26747.00
xiv) 1500 mm Rmt 28979.00
xv) 1600 mm Rmt 34874.00
xvi) 1700 mm Rmt 41004.00
xvii) 1800 mm Rmt 43363.00
xviii) 1900 mm Rmt 62900.00
xix) 2000 mm Rmt 68330.00
xx) 2100 mm Rmt 71474.00
xxi) 2200 mm Rmt 74868.00
e) Factory Test Pressure 10 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6965.00
v) 600 mm Rmt 8140.00
vi) 700 mm Rmt 10206.00
vii) 800 mm Rmt 11765.00
viii) 900 mm Rmt 13716.00
ix) 1000 mm Rmt 16631.00
x) 1100 mm Rmt 18088.00
xi) 1200 mm Rmt 20785.00
xii) 1300 mm Rmt 25066.00
xiii) 1400 mm Rmt 27210.00
xiv) 1500 mm Rmt 29474.00
xv) 1600 mm Rmt 35474.00
xvi) 1700 mm Rmt 41674.00
xvii) 1800 mm Rmt 44032.00
xviii) 1900 mm Rmt 64518.00
xix) 2000 mm Rmt 69253.00
xx) 2100 mm Rmt 72716.00
xxi) 2200 mm Rmt 76144.00

103
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
f) Factory Test Pressure 11.5 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6503.00
iv) 500 mm Rmt 7027.00
v) 600 mm Rmt 8209.00
vi) 700 mm Rmt 10325.00
vii) 800 mm Rmt 11914.00
viii) 900 mm Rmt 13903.00
ix) 1000 mm Rmt 16840.00
x) 1100 mm Rmt 18365.00
xi) 1200 mm Rmt 21133.00
xii) 1300 mm Rmt 25496.00
xiii) 1400 mm Rmt 27618.00
xiv) 1500 mm Rmt 29976.00
xv) 1600 mm Rmt 36080.00
xvi) 1700 mm Rmt 42341.00
xvii) 1800 mm Rmt 44701.00
xviii) 1900 mm Rmt 65518.00
xix) 2000 mm Rmt 70304.00
xx) 2100 mm Rmt 75143.00
g) Factory Test Pressure 13 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5976.00
iii) 450 mm Rmt 6559.00
iv) 500 mm Rmt 7068.00
v) 600 mm Rmt 8281.00
vi) 700 mm Rmt 10445.00
vii) 800 mm Rmt 12065.00
viii) 900 mm Rmt 14052.00
ix) 1000 mm Rmt 17089.00
x) 1100 mm Rmt 18685.00
xi) 1200 mm Rmt 21482.00
xii) 1300 mm Rmt 25932.00
xiii) 1400 mm Rmt 28086.00
xiv) 1500 mm Rmt 31096.00
xv) 1600 mm Rmt 37334.00
xvi) 1700 mm Rmt 43007.00
xvii) 1800 mm Rmt 45349.00
xviii) 1900 mm Rmt 66396.00
xix) 2000 mm Rmt 71354.00
xx) 2100 mm Rmt 76490.00
h) Factory Test Pressure 14.5 kg/Sqcm
i) 350 mm Rmt 5461.00
ii) 400 mm Rmt 6026.00
iii) 450 mm Rmt 6596.00
iv) 500 mm Rmt 7129.00
v) 600 mm Rmt 8376.00
vi) 700 mm Rmt 10564.00
vii) 800 mm Rmt 12232.00
viii) 900 mm Rmt 14201.00
ix) 1000 mm Rmt 17298.00
x) 1100 mm Rmt 18958.00
xi) 1200 mm Rmt 21832.00
xii) 1300 mm Rmt 26260.00
xiii) 1400 mm Rmt 29111.00
xiv) 1500 mm Rmt 31681.00
xv) 1600 mm Rmt 37961.00
xvi) 1700 mm Rmt 44668.00
xvii) 1800 mm Rmt 47028.00
xviii) 1900 mm Rmt 68336.00
xix) 2000 mm Rmt 74024.00
xx) 2100 mm Rmt 77846.00

104
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
i) Factory Test Pressure 17 kg/Sqcm
i) 350 mm Rmt 5507.00
ii) 400 mm Rmt 6078.00
iii) 450 mm Rmt 6672.00
iv) 500 mm Rmt 7212.00
v) 600 mm Rmt 8495.00
vi) 700 mm Rmt 10740.00
vii) 800 mm Rmt 12466.00
viii) 900 mm Rmt 14615.00
ix) 1000 mm Rmt 17716.00
x) 1100 mm Rmt 19417.00
xi) 1200 mm Rmt 22379.00
xii) 1300 mm Rmt 27493.00
xiii) 1400 mm Rmt 30535.00
xiv) 1500 mm Rmt 33205.00
xv) 1600 mm Rmt 39109.00
xvi) 1700 mm Rmt 45414.00
xvii) 1800 mm Rmt 47772.00
xviii) 1900 mm Rmt 70541.00
xix) 2000 mm Rmt 76086.00
xx) 2100 mm Rmt 80922.00
j) Factory Test Pressure 18.5 kg/Sqcm
i) 350 mm Rmt 5537.00
ii) 400 mm Rmt 6112.00
iii) 450 mm Rmt 6727.00
iv) 500 mm Rmt 7272.00
v) 600 mm Rmt 8590.00
vi) 700 mm Rmt 10861.00
vii) 800 mm Rmt 12634.00
viii) 900 mm Rmt 14803.00
ix) 1000 mm Rmt 17965.00
x) 1100 mm Rmt 19738.00
xi) 1200 mm Rmt 23267.00
xii) 1300 mm Rmt 28483.00
xiii) 1400 mm Rmt 31078.00
xiv) 1500 mm Rmt 33886.00
xv) 1600 mm Rmt 41174.00
xvi) 1700 mm Rmt 45592.00
xvii) 1800 mm Rmt 47950.00
xviii) 1900 mm Rmt 72599.00
xix) 2000 mm Rmt 77989.00
xx) 2100 mm Rmt 83184.00

105
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
k) Factory Test Pressure 20 kg/Sqcm
i) 350 mm Rmt 5567.00
ii) 400 mm Rmt 6145.00
iii) 450 mm Rmt 6764.00
iv) 500 mm Rmt 7334.00
v) 600 mm Rmt 8662.00
vi) 700 mm Rmt 10979.00
vii) 800 mm Rmt 12802.00
viii) 900 mm Rmt 14988.00
ix) 1000 mm Rmt 18174.00
x) 1100 mm Rmt 20455.00
xi) 1200 mm Rmt 24028.00
xii) 1300 mm Rmt 28906.00
xiii) 1400 mm Rmt 31625.00
xiv) 1500 mm Rmt 35910.00
xv) 1600 mm Rmt 41994.00
xvi) 1700 mm Rmt 46478.00
xvii) 1800 mm Rmt 48836.00
xviii) 1900 mm Rmt 73580.00
xix) 2000 mm Rmt 80154.00
xx) 2100 mm Rmt 85362.00
l) Factory Test Pressure 21.5 kg/Sqcm
i) 350 mm Rmt 5599.00
ii) 400 mm Rmt 6197.00
iii) 450 mm Rmt 6821.00
iv) 500 mm Rmt 7394.00
v) 600 mm Rmt 8734.00
vi) 700 mm Rmt 11098.00
vii) 800 mm Rmt 12934.00
viii) 900 mm Rmt 15215.00
ix) 1000 mm Rmt 18822.00
x) 1100 mm Rmt 20813.00
xi) 1200 mm Rmt 24416.00
xii) 1300 mm Rmt 29416.00
xiii) 1400 mm Rmt 34134.00
xiv) 1500 mm Rmt 36998.00
xv) 1600 mm Rmt 44292.00
xvi) 1700 mm Rmt 48738.00
xvii) 1800 mm Rmt 51583.00
xviii) 1900 mm Rmt 76093.00
xix) 2000 mm Rmt 82552.00

106
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
m) Factory Test Pressure 23 kg/Sqcm
i) 350 mm Rmt 5614.00
ii) 400 mm Rmt 6230.00
iii) 450 mm Rmt 6858.00
iv) 500 mm Rmt 7456.00
v) 600 mm Rmt 8828.00
vi) 700 mm Rmt 11216.00
vii) 800 mm Rmt 13102.00
viii) 900 mm Rmt 15402.00
ix) 1000 mm Rmt 19151.00
x) 1100 mm Rmt 21169.00
xi) 1200 mm Rmt 25073.00
xii) 1300 mm Rmt 31968.00
xiii) 1400 mm Rmt 35172.00
xiv) 1500 mm Rmt 38950.00
xv) 1600 mm Rmt 45482.00
xvi) 1700 mm Rmt 53527.00
xvii) 1800 mm Rmt 59112.00
xviii) 1900 mm Rmt 78406.00
xix) 2000 mm Rmt 82817.00
n) Factory Test Pressure 24.5 kg/Sqcm
i) 350 mm Rmt 5644.00
ii) 400 mm Rmt 6265.00
iii) 450 mm Rmt 6914.00
iv) 500 mm Rmt 7496.00
v) 600 mm Rmt 8900.00
vi) 700 mm Rmt 11336.00
vii) 800 mm Rmt 13268.00
viii) 900 mm Rmt 15990.00
ix) 1000 mm Rmt 19410.00
x) 1100 mm Rmt 21527.00
xi) 1200 mm Rmt 27121.00
xii) 1300 mm Rmt 32476.00
xiii) 1400 mm Rmt 35851.00
xiv) 1500 mm Rmt 40202.00
xv) 1600 mm Rmt 47051.00
xvi) 1700 mm Rmt 54778.00
xvii) 1800 mm Rmt 61092.00

107
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 54 Lowering, Laying and Jointing in proper grade and Section
alignment Prestressed Concrete Cylinder Pipes (PCCP) 12.45
with welding & mortor coating joints including cost of
conveyance from stores to site of works, loading, unloading,
hoisting, all labour involved,etc.complete but excluding cost of
rubber rings (For all class of pipes)
i) 350 mm Rmt 349.45
ii) 400 mm Rmt 397.30
iii) 450 mm Rmt 408.85
iv) 500 mm Rmt 486.50
v) 600 mm Rmt 538.20
vi) 700 mm Rmt 643.80
vii) 800 mm Rmt 744.70
viii) 900 mm Rmt 817.60
ix) 1000 mm Rmt 908.25
x) 1100 mm Rmt 997.60
xi) 1200 mm Rmt 1099.85
xii) 1300 mm Rmt 1220.10
xiii) 1400 mm Rmt 1296.80
xiv) 1500 mm Rmt 1431.20
xv) 1600 mm Rmt 1479.95
xvi) 1700 mm Rmt 1667.30
xvii) 1800 mm Rmt 1701.30
xviii) 1900 mm Rmt 1734.60
xix) 2000 mm Rmt 1986.50
xx) 2100 mm Rmt 2019.40
xxi) 2200 mm Rmt 2052.35
LIPDN 55 Providing and supplying ISI standard specials & fitting Section
suitable for P. C. C. pipes including cost of labour ,materials, 12.46
and transportation to stores / site, loading and unloading
excluding GST levied by GOI & GOM in all respect etc.
complete.
i) 350 mm & above dia. kg 144.00
LIPDN 56 Hydraulic testing of Prestressed Concrete Cylinder Pipes Section
with rubber ring joints to specified pressure including cost of all 12.47
materials and labour and water for testing for the length upto 1
km. using reciprocating type pumps which should be able to
provide specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for testing.
The rate under this item shall also include cost of retesting, if
necessary.
i) 350 mm Km 15919.85
ii) 400 mm Km 19547.50
iii) 450 mm Km 23328.00
iv) 500 mm Km 27344.95
v) 600 mm Km 32224.15
vi) 700 mm Km 38430.70
vii) 800 mm Km 45583.00
viii) 900 mm Km 53651.00
ix) 1000 mm Km 62725.00
x) 1100 mm Km 72714.00
xi) 1200 mm Km 83649.00
xii) 1300 mm Km 95530.00
xiii) 1400 mm Km 108357.00
xiv) 1500 mm Km 125902.00
xv) 1600 mm Km 142052.00
xvi) 1700 mm Km 157716.00
xvii) 1800 mm Km 174326.00
xviii) 1900 mm Km 191881.00
xix) 2000 mm Km 210381.00
xx) 2100 mm Km 229828.00
xxi) 2200 mm Km 250909.00

108
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
1 2 3 4 5 6

Providing, supplying & erecting of approved make CI


D/F reflux valves (non-return valves ) of following dia
with technical specifications as below
i. Design, manfacturing & testing standard IS 5312 Part Section
LIPDN 57
1 Including transportation, inspection, unloding, loading, 12.48
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
I (1984)

a) Without by pass arrangement -PN -1


1 100 mm 7727.00 1497 9224
2 150 mm 15321.00 1497 16818
3 200 mm 21982.00 1497 23479
4 250 mm 28644.00 6112 34756
5 300 mm 46630.00 6112 52742
6 350 mm 69279.00 6112 75391
7 400 mm 90596.00 6112 96708
8 450 mm 119907.00 11611 131518
9 500 mm 146553.00 11611 158164
10 600 mm 213168.00 11611 224779
b) With by pass arrangement - PN-1
1 100 mm 8192.00 1497 9689
2 150 mm 16241.00 1497 17738
3 200 mm 23302.00 1497 24799
4 250 mm 30364.00 6112 36476
5 300 mm 49429.00 6112 55541
6 350 mm 73436.00 6112 79548
7 400 mm 96032.00 6112 102144
8 450 mm 127101.00 11611 138712
9 500 mm 155346.00 11611 166957
10 600 mm 225958.00 11611 237569
c) Without by pass arrangement - PN -1.6
1 100 mm 8655.00 1497 10152
2 150 mm 17160.00 1497 18657
3 200 mm 24621.00 1497 26118
4 250 mm 32082.00 6112 38194
5 300 mm 52227.00 6112 58339
6 350 mm 77594.00 6112 83706
7 400 mm 101468.00 6112 107580
8 450 mm 134295.00 11611 145906
9 500 mm 164139.00 11611 175750
10 600 mm 238748.00 11611 250359
d) With by pass arrangement - PN-1.6
1 100 mm 9174.00 1497 10671
2 150 mm 18189.00 1497 19686
3 200 mm 26098.00 1497 27595
4 250 mm 34007.00 6112 40119
5 300 mm 55360.00 6112 61472
6 350 mm 82248.00 6112 88360
7 400 mm 107556.00 6112 113668
8 450 mm 142353.00 11611 153964
9 500 mm 173988.00 11611 185599
10 600 mm 253073.00 11611 264684

109
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of approved make


multi door CI D/F reflux valves (non-return valves ) of
following dia with technical specifications as below
i. Design, manfacturing & testing standard IS 5312 Part Section
LIPDN 58
2 Including transportation, inspection, unloding, loading, 12.49
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
II (1984)

a) Without by pass arrangement -PN -1


1 700 mm 351282.00 21224 372506
2 750 mm 388587.00 21224 409811
3 800 mm 404130.00 21224 425354
4 900 mm 544022.00 21224 565246
5 1000 mm 637282.00 24203 661485
6 1100 mm 808261.00 24203 832464
7 1200 mm 994782.00 24203 1018985
b) With by pass arrangement -PN -1
1 700 mm 372359.00 21224 393583
2 750 mm 411902.00 21224 433126
3 800 mm 428378.00 21224 449602
4 900 mm 576663.00 21224 597887
5 1000 mm 675520.00 24203 699723
6 1100 mm 856756.00 24203 880959
7 1200 mm 1054469.00 24203 1078672
c) Without by pass arrangement -PN -1.6
1 700 mm 393437.00 21224 414661
2 750 mm 435217.00 21224 456441
3 800 mm 452626.00 21224 473850
4 900 mm 609304.00 21224 630528
5 1000 mm 713756.00 24203 737959
6 1100 mm 905252.00 24203 929455
7 1200 mm 1114156.00 24203 1138359
d) With by pass arrangement -PN -1.6
1 700 mm 417042.00 21224 438266
2 750 mm 461331.00 21224 482555
3 800 mm 479784.00 21224 501008
4 900 mm 645862.00 21224 667086
5 1000 mm 756582.00 24203 780785
6 1100 mm 959567.00 24203 983770
7 1200 mm 1181006.00 24203 1205209

110
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of approved make DI


or SGI D/F reflux valves (non-return valves ) of
following dia with technical specifications as below
i. Design, manfacturing & testing standard IS 5312 Part Section
LIPDN 59
1 Including transportation, inspection, unloding, loading, 12.50
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
I (1984)

a) Without by pass arrangement -PN -1


1 100 mm 9350.00 1497 10847
2 150 mm 18539.00 1497 20036
3 200 mm 26599.00 1497 28096
4 250 mm 34660.00 6112 40772
5 300 mm 56423.00 6112 62535
6 350 mm 83829.00 6112 89941
7 400 mm 109622.00 6112 115734
8 450 mm 145087.00 11611 156698
9 500 mm 177328.00 11611 188939
10 600 mm 257933.00 11611 269544
b) With by pass arrangement - PN-1
1 100 mm 9911.00 1497 11408
2 150 mm 19651.00 1497 21148
3 200 mm 28196.00 1497 29693
4 250 mm 36739.00 6112 42851
5 300 mm 59808.00 6112 65920
6 350 mm 88858.00 6112 94970
7 400 mm 116199.00 6112 122311
8 450 mm 153793.00 11611 165404
9 500 mm 187968.00 11611 199579
10 600 mm 273409.00 11611 285020
c) Without by pass arrangement - PN -1.6
1 100 mm 10472.00 1497 11969
2 150 mm 20764.00 1497 22261
3 200 mm 29791.00 1497 31288
4 250 mm 38819.00 6112 44931
5 300 mm 63193.00 6112 69305
6 350 mm 93888.00 6112 100000
7 400 mm 122776.00 6112 128888
8 450 mm 162497.00 11611 174108
9 500 mm 198608.00 11611 210219
10 600 mm 288885.00 11611 300496
d) With by pass arrangement - PN-1.6
1 100 mm 11100.00 1497 12597
2 150 mm 22010.00 1497 23507
3 200 mm 31579.00 1497 33076
4 250 mm 41148.00 6112 47260
5 300 mm 66985.00 6112 73097
6 350 mm 99521.00 6112 105633
7 400 mm 130142.00 6112 136254
8 450 mm 172247.00 11611 183858
9 500 mm 210525.00 11611 222136
10 600 mm 306218.00 11611 317829

111
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of approved make


multi door DI D/F reflux valves (non-return valves ) of
following dia with technical specifications as below
i. Design, manfacturing & testing standard IS 5312 Part Section
LIPDN 60
2 Including transportation, inspection, unloding, loading, 12.51
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
II (1984)

a) Without by pass arrangement -PN -1


1 700 mm 425052.00 21224 446276
2 750 mm 470191.00 21224 491415
3 800 mm 488998.00 21224 510222
4 900 mm 658266.00 21224 679490
5 1000 mm 771112.00 24203 795315
6 1100 mm 977995.00 24203 1002198
7 1200 mm 1203686.00 24203 1227889
b) With by pass arrangement -PN -1
1 700 mm 450555.00 21224 471779
2 750 mm 498402.00 21224 519626
3 800 mm 518338.00 21224 539562
4 900 mm 697762.00 21224 718986
5 1000 mm 817378.00 24203 841581
6 1100 mm 1036675.00 24203 1060878
7 1200 mm 1275907.00 24203 1300110
c) Without by pass arrangement -PN -1.6
1 700 mm 476057.00 21224 497281
2 750 mm 526613.00 21224 547837
3 800 mm 547678.00 21224 568902
4 900 mm 737258.00 21224 758482
5 1000 mm 863645.00 24203 887848
6 1100 mm 1095354.00 24203 1119557
7 1200 mm 1348129.00 24203 1372332
d) With by pass arrangement -PN -1.6
1 700 mm 504621.00 21224 525845
2 750 mm 558209.00 21224 579433
3 800 mm 580538.00 21224 601762
4 900 mm 781493.00 21224 802717
5 1000 mm 915464.00 24203 939667
6 1100 mm 1161076.00 24203 1185279
7 1200 mm 1429016.00 24203 1453219

112
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of approved make


CS D/F reflux valves (non-return valves ) of following
dia with technical specifications as below
i. Design, manfacturing & testing standard IS 5312 Part Section
LIPDN 61
1 Including transportation, inspection, unloding, loading, 12.52
stacking excluding GST levied by GOI & GOM in all
respect etc. complete. Reflux valves as per I.S.5312 Part
I (1984)

a) Without by pass arrangement -PN -1


1 100 mm 10432.00 1497 11929
2 150 mm 20684.00 1497 22181
3 200 mm 29676.00 1497 31173
4 250 mm 38670.00 6112 44782
5 300 mm 62951.00 6112 69063
6 350 mm 93527.00 6112 99639
7 400 mm 122305.00 6112 128417
8 450 mm 161874.00 11611 173485
9 500 mm 197847.00 11611 209458
10 600 mm 287777.00 11611 299388
b) With by pass arrangement - PN-1
1 100 mm 11058.00 1497 12555
2 150 mm 21925.00 1497 23422
3 200 mm 31457.00 1497 32954
4 250 mm 40990.00 6112 47102
5 300 mm 66728.00 6112 72840
6 350 mm 99139.00 6112 105251
7 400 mm 129644.00 6112 135756
8 450 mm 171586.00 11611 183197
9 500 mm 209717.00 11611 221328
10 600 mm 305043.00 11611 316654
c) Without by pass arrangement - PN -1.6
1 100 mm 11683.00 1497 13180
2 150 mm 23166.00 1497 24663
3 200 mm 33238.00 1497 34735
4 250 mm 43311.00 6112 49423
5 300 mm 70506.00 6112 76618
6 350 mm 104750.00 6112 110862
7 400 mm 136981.00 6112 143093
8 450 mm 181299.00 11611 192910
9 500 mm 221588.00 11611 233199
10 600 mm 322309.00 11611 333920
d) With by pass arrangement - PN-1.6
1 100 mm 12385.00 1497 13882
2 150 mm 24556.00 1497 26053
3 200 mm 35232.00 1497 36729
4 250 mm 45909.00 6112 52021
5 300 mm 74735.00 6112 80847
6 350 mm 111036.00 6112 117148
7 400 mm 145200.00 6112 151312
8 450 mm 192177.00 11611 203788
9 500 mm 234883.00 11611 246494
10 600 mm 341648.00 11611 353259

113
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of approved make


multi door CS D/F reflux valves (non-return valves ) of
following dia with technical specifications as below
i. Design, manfacturing & testing standard IS 5312 Part Section
LIPDN 62
2 Including transportation, inspection, unloding, loading, 12.53
stacking excluding GST levied by GOI & GOM in all
respect etc. complete.Reflux valves as per I.S.5312 Part
II (1984)

a) Without by pass arrangement -PN -1


1 700 mm 474232.00 21224 495456
2 750 mm 524593.00 21224 545817
3 800 mm 545576.00 21224 566800
4 900 mm 734430.00 21224 755654
5 1000 mm 860332.00 24203 884535
6 1100 mm 1091151.00 24203 1115354
7 1200 mm 1342956.00 24203 1367159
b) With by pass arrangement -PN -1
1 700 mm 502685.00 21224 523909
2 750 mm 556068.00 21224 577292
3 800 mm 578310.00 21224 599534
4 900 mm 778494.00 21224 799718
5 1000 mm 911951.00 24203 936154
6 1100 mm 1156621.00 24203 1180824
7 1200 mm 1423533.00 24203 1447736
c) Without by pass arrangement -PN -1.6
1 700 mm 531139.00 21224 552363
2 750 mm 587544.00 21224 608768
3 800 mm 611045.00 21224 632269
4 900 mm 822560.00 21224 843784
5 1000 mm 963571.00 24203 987774
6 1100 mm 1222090.00 24203 1246293
7 1200 mm 1504111.00 24203 1528314
d) With by pass arrangement -PN -1.6
1 700 mm 563008.00 21224 584232
2 750 mm 622795.00 21224 644019
3 800 mm 647708.00 21224 668932
4 900 mm 871914.00 21224 893138
5 1000 mm 1021385.00 24203 1045588
6 1100 mm 1295415.00 24203 1319618
7 1200 mm 1594358.00 24203 1618561

114
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of CI double flange


sluice valve confirming for IS-14846 including worm
gear arrangements as per test pressure stainless steel Section
LIPDN 63
spindle, caps Including transportation, inspection, 12.54
unloding, loading, stacking excluding GST levied by GOI
& GOM in all respect etc. complete.

a) Sluice valves - PN -1 without by pass arrangement


1 100 mm 9016.00 1497 10513
2 150 mm 13212.00 1497 14709
3 200 mm 21450.00 1497 22947
4 250 mm 34195.00 6112 40307
5 300 mm 46630.00 6112 52742
6 350 mm 60620.00 6112 66732
7 400 mm 79893.00 6112 86005
8 450 mm 100411.00 11611 112022
9 500 mm 116576.00 11611 128187
10 600 mm 203619.00 11611 215230
11 700 mm 321749.00 21224 342973
12 750 mm 376152.00 21224 397376
13 800 mm 463973.00 21224 485197
14 900 mm 612413.00 21224 633637
15 1000 mm 691685.00 24203 715888
16 1100 mm 816032.00 24203 840235
17 1200 mm 1002554.00 24203 1026757
b) Sluice valve - PN - 1.6
without by pass arrangement
1 100 mm 9466.00 1497 10963
2 150 mm 13872.00 1497 15369
3 200 mm 22523.00 1497 24020
4 250 mm 35905.00 6112 42017
5 300 mm 48962.00 6112 55074
6 350 mm 63650.00 6112 69762
7 400 mm 83888.00 6112 90000
8 450 mm 105432.00 11611 117043
9 500 mm 122405.00 11611 134016
10 600 mm 213800.00 11611 225411
11 700 mm 337838.00 21224 359062
12 750 mm 394960.00 21224 416184
13 800 mm 487171.00 21224 508395
14 900 mm 643033.00 21224 664257
15 1000 mm 726269.00 24203 750472
16 1100 mm 856834.00 24203 881037
17 1200 mm 1052682.00 24203 1076885

115
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of double flange


Ductile Iron non-rising spindle soft seated Resilient
seated sluice Valves in accordance with BS 5163/ EN
1074-1&2 of PN-10 / 16 rated, with Body and bonnet of
Ductile Iron confirming to EN1563/ GGG40 Wedge fully
encapsulated high quality WRAS or DVGW approved
EPDM rubber (approved for drinking water), Replaceble
Wedge nut of Brass, Shaft of Stainless Steel EN1.4105,
Stem seals min. 4 nos. of NBR, Internal fasteners of
Stainless Steel A2. Body & Bonnet coated inside & Section
LIPDN 64
outside with electrostatically applied epoxy powder 12.55
coated blue colour RAL 5017 (suitable for drinking water)
to DIN 30677-2 & GSK guidelines with a coating
thickness of min. 250 microns. Valves should be full bore
& 100% tight shut-off. Flange drilling as per IS 1538
raised face. Gate valve shall be compatible for buried
applications without valve chamber. Manual operation by
Handwheel. Operating torque shall be less than that
mentioned in EN 1171. Testing shall be as per BS 5163 /
EN 12266-1&2 / IS 14846.

a) Sluice valves - PN -1 without by pass arrangement


1 100 mm 10908.00 1497 12405
2 150 mm 15986.00 1497 17483
3 200 mm 25954.00 1497 27451
4 250 mm 41376.00 6112 47488
5 300 mm 56423.00 6112 62535
6 350 mm 73350.00 6112 79462
7 400 mm 96672.00 6112 102784
8 450 mm 121497.00 11611 133108
9 500 mm 141057.00 11611 152668
10 600 mm 246380.00 11611 257991
11 700 mm 389318.00 21224 410542
12 750 mm 455144.00 21224 476368
13 800 mm 561407.00 21224 582631
14 900 mm 741020.00 21224 762244
15 1000 mm 836938.00 24203 861141
16 1100 mm 987400.00 24203 1011603
17 1200 mm 1213090.00 24203 1237293
b) Sluice valve - PN - 1.6
without by pass arrangement
1 100 mm 11454.00 1497 12951
2 150 mm 16785.00 1497 18282
3 200 mm 27252.00 1497 28749
4 250 mm 43445.00 6112 49557
5 300 mm 59244.00 6112 65356
6 350 mm 77017.00 6112 83129
7 400 mm 101505.00 6112 107617
8 450 mm 127572.00 11611 139183
9 500 mm 148110.00 11611 159721
10 600 mm 258699.00 11611 270310
11 700 mm 408783.00 21224 430007
12 750 mm 477901.00 21224 499125
13 800 mm 589477.00 21224 610701
14 900 mm 778070.00 21224 799294
15 1000 mm 878785.00 24203 902988
16 1100 mm 1036769.00 24203 1060972
17 1200 mm 1273745.00 24203 1297948

116
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of double flanged


short body pattern type manually operated C.I.
Butterfly Valve confirming in to IS-13095-1991,
Synthetic rubber faced ring secured on disc by retaining Section
LIPDN 65
ring with stainless steel screw stub shaft of stainless 12.56
steel riding in teflon bearing including transportation,
inspection, unloding, loading, stacking excluding GST
levied by GOI & GOM in all respect etc. complete.

a) Butterfly valves - PN -1
1 100 mm 7460.00 1497 8957
2 150 mm 10259.00 1497 11756
3 200 mm 13678.00 1497 15175
4 250 mm 18652.00 6112 24764
5 300 mm 29533.00 6112 35645
6 350 mm 37460.00 6112 43572
7 400 mm 44455.00 6112 50567
8 450 mm 49429.00 11611 61040
9 500 mm 65749.00 11611 77360
10 600 mm 108339.00 11611 119950
11 700 mm 153569.00 21224 174793
12 750 mm 158543.00 21224 179767
13 800 mm 185123.00 21224 206347
14 900 mm 211391.00 21224 232615
15 1000 mm 311335.00 24203 335538
16 1100 mm 354392.00 24203 378595
17 1200 mm 454180.00 24203 478383
b) Butterfly valves - PN -1.6
1 100 mm 7834.00 1497 9331
2 150 mm 10771.00 1497 12268
3 200 mm 14362.00 1497 15859
4 250 mm 19584.00 6112 25696
5 300 mm 31009.00 6112 37121
6 350 mm 39333.00 6112 45445
7 400 mm 46678.00 6112 52790
8 450 mm 51900.00 11611 63511
9 500 mm 69036.00 11611 80647
10 600 mm 113755.00 11611 125366
11 700 mm 161248.00 21224 182472
12 750 mm 166470.00 21224 187694
13 800 mm 194379.00 21224 215603
14 900 mm 221961.00 21224 243185
15 1000 mm 326903.00 24203 351106
16 1100 mm 372111.00 24203 396314
17 1200 mm 476889.00 24203 501092

117
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of Ductile Iron Double


Flanged Double Eccentric Butterfly Valves in
accordance with EN 593 /BS 5155 /IS 13095 /API 609
with Body & disc of Ductile Iron confirming to EN1563/
GGG40 / IS 1865 Gr. 400/12, Body seat of PTFE seated
with Stainless Steel backed , disk seat of S.S. AISI
304/316 , Shaft of S.S. AISI 420(Dry Shaft Design , (to
ensure 100% drop tight shut off as per EN Std suitable
for drinking water application), Internal fasteners of
Stainless Steel Body & disc coated inside & outside with Section
LIPDN 66
electrostatically applied epoxy powder coated blue colour 12.57
(suitable for drinking water) to DIN 30677-2 & GSK
guidelines with a coating thickness of min. 250 microns.
Valves should be 100% tight shut-off. Leakages not
allowed. Flange drilling as per IS 1538/ IS 9523/ ASME
B 16.5 / EN1092-2 raised face. Testing as per EN 12266-
1&2. Features required for Butterfly valves will be
suitable to water work application for continuous
operation up to 70 degree Celsius as per above general
specification or otherwise the standard BS 5155/ EN593

a) Butterfly valves - PN -1
1 100 mm 9028.00 1497 10525
2 150 mm 12413.00 1497 13910
3 200 mm 16551.00 1497 18048
4 250 mm 22569.00 6112 28681
5 300 mm 35734.00 6112 41846
6 350 mm 45326.00 6112 51438
7 400 mm 53789.00 6112 59901
8 450 mm 59808.00 11611 71419
9 500 mm 79556.00 11611 91167
10 600 mm 131089.00 11611 142700
11 700 mm 185819.00 21224 207043
12 750 mm 191837.00 21224 213061
13 800 mm 223998.00 21224 245222
14 900 mm 255783.00 21224 277007
15 1000 mm 376716.00 24203 400919
16 1100 mm 428813.00 24203 453016
17 1200 mm 549559.00 24203 573762
b) Butterfly valves - PN -1.6
1 100 mm 9479.00 1497 10976
2 150 mm 13034.00 1497 14531
3 200 mm 17378.00 1497 18875
4 250 mm 23698.00 6112 29810
5 300 mm 37522.00 6112 43634
6 350 mm 47593.00 6112 53705
7 400 mm 56479.00 6112 62591
8 450 mm 62799.00 11611 74410
9 500 mm 83534.00 11611 95145
10 600 mm 137643.00 11611 149254
11 700 mm 195110.00 21224 216334
12 750 mm 201429.00 21224 222653
13 800 mm 235198.00 21224 256422
14 900 mm 268573.00 21224 289797
15 1000 mm 395552.00 24203 419755
16 1100 mm 450254.00 24203 474457
17 1200 mm 577036.00 24203 601239

118
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

Providing, supplying & erecting of Air Valves


confirming IS-14845-2000 and standard specifications
double orifice type combined with isolating sluice valve,
mounted in horizontal position and operated by wheel
gearing, small orifice elastic ball resting on a gun metal Section
LIPDN 67
orifice nipple, large orifice vulcanite ball seating on 12.58
moulded seat ring, inlet face and drilled, including
transportation, inspection, unloding, loading, stacking
excluding GST levied by GOI & GOM in all respect etc.
complete.
Double Ball Flanged
a)
Type - PN -1.0
1 100 mm 9300.00 316 9616
2 150 mm 16947.00 424 17371
3 200 mm 28503.00 466 28969
Double Ball Flanged
b)
Type - PN -1.6
1 100 mm 14217.00 316 14533
2 150 mm 20030.00 424 20454
3 200 mm 33686.00 466 34152
Providing, supplying & erecting of Kinetic Double
Orifice type Air Valves confirming to IS 14845 & as per
standard specifications combined with screw down
isolating valve, small orifice elastic ball resting on a gun
Section
LIPDN 68 metal orifice nipple, large orifice vulcanite ball seating on
12.59
moulded seat ring, inlet face and drilled, including
transportation, inspection, unloding, loading, stacking
excluding GST levied by GOI & GOM in all respect etc.
complete.
Kinetic Air Valve Flanged
a)
Type P-1
2 50 mm 9665.00 256 9921
3 80 mm 11338.00 282 11620
4 100 mm 12360.00 316 12676
5 150 mm 17285.00 424 17709
6 200 mm 26950.00 466 27416
Kinetic Air Valve Flanged
b)
Type P-1.6
2 50 mm 12080.00 256 12336
3 80 mm 14171.00 282 14453
4 100 mm 15450.00 316 15766
5 150 mm 21605.00 424 22029
6 200 mm 33686.00 466 34152

119
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

LIPDN 69 Electric Valve Actuator for non rising spindle type

sluice valve, PN 1 & PN 1.6 rating

Providing, erecting electric Valve actuators totally


enclosed, weather-proof and dust proof construction with
IP-67, protection class suitable for installation in any
position without lubrication, leakage or other operational
difficulty with special grease filled gear box and hand
wheel for emergency manual operation which will
automatically disengage on restoration of power to motor
and with 10 watt single phase space heater and
continuous local mechanical position indicator and
individually replaceable counter gear assembly and with
two torque and four limit switches with S.S. flap and
Section
operated with gear driven cams and of rating 250 Volt, 5
12.60
Amp, AC/DC, torque switch dial and with TEFC squirrel
cage induction motor working on 440 Volts +/- 10%, 3
phase, 50 Hz AC of intermittent duty rating S-2,
insulation class "F" and temp rise restricted to class "B"
with IP - 67 protection class suitable for DOL starting and
with three thermostat and 30% over load margin. The
torque rating of reduction gear box shall be at least 1.5
times max. torque required for opening and closing of
valve with integral starter controls having four limit
switches 1 for OPEN, 1 for CLOSE & 2 Nos. for
intermediate positions for interlocking etc complete.

1 150 mm 72042
2 200 mm 74863
3 250 mm 79565
4 300 mm 84825
5 350 mm 87045
6 400 mm 89266
7 450 mm 93003
8 500 mm 101165
9 600 mm 113408
10 700 mm 118012
11 750 mm 120232
12 800 mm 123272
13 900 mm 133667
14 1000 mm 141260

120
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

LIPDN 70 Dismantling Joints

Providing, erecting and commissioning M.S. Dismantling


joint as per requirement and Department's approved
drawing and specifications, including machining and
rubber rings and suitable for working pressure with
Section
required flanges of suitable size with nut bolts etc
12.61
complete. The joint should have through long bolts so
that during normal working pressure there should be no
sliding movement of sliding flanges. L.O.F. ( length over
flange ) should not be less than 75% of dia.

PN 1.0
1 100 mm 4314.00 87 4401
2 150 mm 7189.00 144 7333
3 200 mm 9038.00 181 9219
4 250 mm 12734.00 254 12988
5 300 mm 15404.00 308 15712
6 350 mm 21567.00 432 21999
7 400 mm 28756.00 575 29331
8 450 mm 34506.00 690 35196
9 500 mm 41079.00 822 41901
10 600 mm 50528.00 1011 51539
11 700 mm 64494.00 1290 65784
12 750 mm 79282.00 1586 80868
13 800 mm 87293.00 1746 89039
14 900 mm 95304.00 1906 97210
15 1000 mm 124675.00 2493 127168
16 1100 mm 161441.00 3229 164670
17 1200 mm 198001.00 3960 201961
PN 1.6
1 100 mm 4573.00 91 4664
2 150 mm 7620.00 152 7772
3 200 mm 9580.00 192 9772
4 250 mm 13498.00 270 13768
5 300 mm 16329.00 327 16656
6 350 mm 22860.00 457 23317
7 400 mm 30481.00 609 31090
8 450 mm 36577.00 731 37308
9 500 mm 43544.00 871 44415
10 600 mm 53559.00 1071 54630
11 700 mm 68364.00 1368 69732
12 750 mm 84040.00 1681 85721
13 800 mm 92531.00 1851 94382
14 900 mm 101022.00 2020 103042
15 1000 mm 132156.00 2644 134800
16 1100 mm 171127.00 3423 174550
17 1200 mm 209882.00 4198 214080

121
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.

LIPDN 71 Metallic Expansion Joints

Providing, erecting and commissioning M.S. fabricated


Metallic Expansion joint as per requirement and
Department's approved drawing and specifications,
including machining and rubber rings and suitable for
working pressure with required flanges of suitable size Section
with nut bolts etc complete. The joint should have 12.62
through long bolts so that during normal working
pressure there should be no sliding movement of sliding
flanges. L.O.F. ( length over flange ) should not be less
than 75% of dia.
PN 1.0
1 100 mm 6984.00 139 7123
2 150 mm 11296.00 226 11522
3 200 mm 15199.00 304 15503
4 250 mm 19718.00 395 20113
5 300 mm 24237.00 484 24721
6 350 mm 33069.00 661 33730
7 400 mm 41079.00 822 41901
8 450 mm 44776.00 895 45671
9 500 mm 51349.00 1027 52376
10 600 mm 88731.00 1774 90505
11 700 mm 103930.00 2079 106009
12 800 mm 117487.00 2350 119837
13 900 mm 129194.00 2584 131778
14 1000 mm 198001.00 3960 201961
15 1100 mm 205396.00 4108 209504
16 1200 mm 234768.00 4695 239463
PN 1.6
1 100 mm 7402.00 148 7550
2 150 mm 11975.00 240 12215
3 200 mm 16111.00 322 16433
4 250 mm 20901.00 418 21319
5 300 mm 25691.00 514 26205
6 350 mm 35053.00 701 35754
7 400 mm 43544.00 871 44415
8 450 mm 47463.00 949 48412
9 500 mm 54430.00 1088 55518
10 600 mm 94054.00 1881 95935
11 700 mm 110167.00 2203 112370
12 800 mm 124535.00 2491 127026
13 900 mm 136945.00 2739 139684
14 1000 mm 209882.00 4198 214080
15 1100 mm 217719.00 4354 222073
16 1200 mm 248853.00 4977 253830

122
PDN CSR 2022-23 PIPE FITTINGS/SPECIALS ABSTRACT

S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Reinforced Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Plastic (G.R.P) (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes Pipes (P.C.C)
Pipes Pipes

1 2 3 4 5 6 7 8 9 10
1 75 mm & above dia. 2 % of per mtr.
rate of pipe

2 up to 300 mm dia. 168 /kg 2 % of per mtr. 2 % of per mtr. rate


rate of pipe of pipe

3 above 300 mm dia. 5 % of per mtr. 5 % of per mtr. rate


rate of pipe of pipe

4 350mm & above dia 168/ kg 168 /kg 144 / kg


5 250mm dia to 1800 mm dia 144 /kg

6 90 DRG Bend One 7 times x Pipe


with one coupling Bend Per Mtr Price

7 60 DRG Bend One 5 times x Pipe


with one coupling Bend Per Mtr Price

8 45 DRG Bend One 4 times x Pipe


with one coupling Bend Per Mtr Price

9 30 DRG Bend One 3 times x Pipe


with one coupling Bend Per Mtr Price

10 22.5 DRG Bend One 2.5 times x Pipe


with one coupling Bend Per Mtr Price

11 11.25 DRG Bend One 2 times x Pipe


with one coupling Bend Per Mtr Price

12 GRP Equal Tee One Tee 5 times x Pipe


Per Mtr Price

123
S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Reinforced Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Plastic (G.R.P) (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes Pipes (P.C.C)
Pipes Pipes

13 Flange Tail Piece One 4 times x Pipe


(Length 0.65 m) Flange Per Mtr Price

14 Lamination joint One joint 1.5 times x Pipe


(Butt strap joint) Per Mtr Price

15 GRP Double bell One 1.5 times x Pipe


coupling coupling Per Mtr Price

124
Hydraulic testing of All types of pipe line to specified pressure including cost of all materials and
labour and water for testing for specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type pumps which should be able to provide
specified test pressure gauges and other necessary equipments, labour, operation charges, etc.
required for testing. The rate under this item shall also include cost of retesting, if necessary and
reinstating to original position.

Sr No. Dia of pipe Unit Rate for 2022-23 (Rate in Rs.)

1 2 3 4
1 63 mm km 6373.50
2 75 mm km 7168.75
3 80 mm km 7217.30
4 90 mm km 7321.45
5 100 mm km 7435.05
6 110 mm km 7558.15
7 125 mm km 7760.50
8 140 mm km 8356.20
9 150 mm km 8517.10
10 160 mm km 8687.50
11 180 mm km 9056.60
12 200 mm km 9463.50
13 225 mm km 10025.35
14 250 mm km 10646.35
15 280 mm km 11469.50
16 300 mm km 12831.55
17 315 mm km 13303.45
18 350 mm km 15919.85
19 355 mm km 16098.40
20 400 mm km 19547.50
21 450 mm km 23328.00
22 500 mm km 27344.95
23 560 mm km 30494.95
24 600 mm km 32224.15
25 630 mm km 33986.80
26 700 mm km 38430.70
27 710 mm km 39103.40
28 750 mm km 41888.65
29 800 mm km 45583.00
30 900 mm km 53651.00
31 1000 mm km 62725.00
32 1100 mm km 72714.00
33 1200 mm km 83649.00

125
Sr No. Dia of pipe Unit Rate for 2022-23 (Rate in Rs.)

1 2 3 4
34 1300 mm km 95530.00
35 1400 mm km 108357.00
36 1500 mm km 125902.00
37 1600 mm km 142052.00
38 1700 mm km 157716.00
39 1800 mm km 174326.00
40 1900 mm km 191881.00
41 2000 mm km 210381.00
42 2100 mm km 229828.00
43 2200 mm km 250909.00
44 2300 mm km 272247.00
45 2400 mm km 294530.00
46 2500 mm km 317760.00
47 2600 mm km 341935.00
48 2700 mm km 367056.00
49 2800 mm km 393122.00
50 2900 mm km 420134.00
51 3000 mm km 448092.00

126
ANNEXURE-2
GOVERNMENT RESOLUTION FOR REFERENCE
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö
¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ) †×¬Ö×−ÖµÖ´Ö 1996 ŸÖÃÖê“Ö ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü
×−ÖµÖ´Ö 1998 †ÓŸÖÖÔŸÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö
ú¸üÖ¾ÖµÖÖ“Öß úÖµÖÔ¯Ö¬¤üŸÖß ×−ÖÛ¿“ÖŸÖ ú¸üÖê²ÖÖ²ÖŸÖ

´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö
ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö,
¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ Îú´ÖÖӍú : ²ÖßÃÖß‹ 2009/¯ÖÏ.Îú. 108/úִ֐ÖÖ¸ü 7-†
´ÖÓ¡ÖÖ»ÖµÖ, ´ÖÓã²Ö‡Ô- 32.
פü−ÖÖӍú 17 •Öã−Ö 2010

¾ÖÖ“ÖÖ - †) ×−ÖµÖ´Ö ¾Ö †×¬Ö×−ÖµÖ´Ö


1) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996
2) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996
3) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998
4) ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) ×−ÖµÖ´Ö 2007
פü.5.2.2007
²Ö) ¿ÖÖÃÖ−Ö×−֝ÖÔµÖ ¾Ö ¯Ö׸ü¯Ö¡Öúê
1) ¿ÖÖÃÖ−Ö †×¬ÖÃÖæ“Ö−ÖÖ, Îú´ÖÖӍú ‹´Ö‹ÃÖÃÖß 1097/ÃÖ߆ָü 775/úִ֐ÖÖ¸ü-2,
פü−ÖÖӍú 26 •Öæ−Ö,1997
2) ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ Îú. ‹´Ö‹ÃÖÃÖß 1097/ÃÖ߆ָü 442/úִ֐ÖÖ¸ü 10, פü. 21 ´Öê,1999
3) ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ, ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö, Îú. ²ÖßÃÖß‹ 12007/¯ÖÏ.Îú.775/
úִ֐ÖÖ¸ü-7, פü−ÖÖӍú 4 †ÖòÖÙü, 2007
4) ¿ÖÖÃÖ−Ö †×¬ÖÃÖæ“Ö−ÖÖ, ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö, Îú. ²ÖßÃÖß‹ 12007/ ¯ÖÏ.Îú.-
778/ úִ֐ÖÖ¸ü-7, פü−ÖÖӍú 4 †ÖòÖÙü, 2007 ¾Ö ¿Ö㬤ü߯֡֍ú5 †ÖòÖÙ, 2008ü
5) ¿ÖÖÃÖ−Ö †×¬ÖÃÖæ“Ö−ÖÖ, ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö, Îú. ²ÖßÃÖß‹ 2008/ ¯ÖÏ.Îú.-
907/úִ֐ÖÖ¸ü-7, פü−ÖÖӍú 16 ‹×¯ÖÏ»Ö, 2008 .
6) ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú Îú´ÖÖӍú : ²ÖßÃÖß‹ 2007/¯ÖÏ.Îú. 788/úִ֐ÖÖ¸ü 7-†,
פü−ÖÖӍú 26 †ÖòŒ™üÖê²Ö¸ü, 2009
7) ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú Îú´ÖÖӍú : ‡´ÖÖ¸üŸÖ 2009/¯ÖÏ.Îú. 119/úִ֐ÖÖ¸ü 7-†, פü−ÖÖӍú 1 ×›üÃÖë²Ö¸ü, 2009
8) ÃÖ×“Ö¾Ö (úִ֐ÖÖ¸ü)µÖÖÓ−Öß −ÖÖê¤ÓüÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓÃÖ×»Ö×Æü»Öê»Öê †.¿ÖÖ.¯Ö¡Ö ÎÓú. †ÃÖӍúÖ 2009 ¯ÖÏ.ÎÓú.62
úÖ´Ö 7 † פü. 14 •Öã−Ö 2010

¯ÖÏßÖÖ¾Ö−ÖÖ :-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996 ¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ †×¬Ö×−ÖµÖ´Ö 1996 Æêü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖӬ֍úÖ´Ö ´Ö•Öæ¸üÖÓ−ÖÖ, •Öê ¸üÖ•µÖ ¿ÖÖÃÖ−ÖÖ−Öê ÖךüûŸÖ êú»Ö껵ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ
»ÖÖ³ÖÖ£Öá ´ÆüÖæ−Ö −ÖÖëפüŸÖ —ÖÖ»Öê»Öê ׍Óú¾ÖÖ •µÖÖ úִ֐ÖÖ¸üÖÓ“Öß »ÖÖ£ÖÖ£Öá ´ÆüÖã−Ö −ÖÖë¤üÖß ú¸üµÖÖŸÖ µÖêÖÖ¸ü †ÖÆêü †¿ÖÖ
úִ֐ÖÖ¸üÖÓ“Öê ú»µÖÖÖ ú¸üµÖÖ“µÖÖ ˆ§êü¿ÖÖ−Öê ¯ÖÖ¸üßŸÖ êú»Öê»Öê †ÖÆêüŸÖ. ÃÖ¤ü¸ü úÖµÖªÖ“Öß ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖÖŸÖ
†Ó´Ö»Ö²Ö•Ö־֝Öß ú¸üµÖÖ“µÖÖ ¥üÛ™üü−Öê ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 2007
ŸÖµÖÖ¸ü ú¸üµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. †×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü פü.26.6.1997 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸ü ¯ÖÖÓ“Ö
¿ÖÖÃ֍úßµÖ ÃÖ¤üõÖÖÓ“Öê ´ÖÓ›üôû ãÖÖ¯Ö−Ö ú¸üµÖÖŸÖ †Ö»Öê»Öê †ÖÆêü. µÖÖ †×¬Ö×−ÖµÖ´ÖÖӟ֐ÖÔŸÖ ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ“Öß
ŸÖÃÖê“Ö ²ÖÖӬ֍úÖ´ÖÖ“Öê ´Ö㻵ÖÖÓӍú−Ö ú¸üµÖÖ“Öß ŸÖ¯Ö¿Ö߻־ÖÖ¸ü úÖµÖÔ¯Ö¬¤üŸÖß ŸÖµÖÖ¸ü ú¸üµÖÖÃÖÖšüß ´ÖÓÓסִÖÓÓ›üôûÖ−Öê פü−ÖÖӍú
12/05/2010 ¸üÖê•Öß ŸÖŸ¾ÖŸÖ: ´ÖÖ−µÖŸÖÖ ‘ÖꝵÖÖŸÖ †Ö»Öß, ŸµÖÖ −ÖãÃÖÖ¸ ´ÖÖ. ´Ö㏵ÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß−Öê
×−ÖÛ¿“ÖŸÖ êú»Öê»Öß úÖµÖÔ¯Ö¬¤üŸÖß ¯Öãלü»Ö¯ÖÏ´Ö֝Öê †ÖÆêü.

¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ:-

‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ †×¬Ö×−ÖµÖ´Ö
27/1996) †Ö×Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ
†×¬Ö×−ÖµÖ´Ö 28/1996) (ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö ) Æêü úÖµÖ¤êü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖӬ֍úÖ´Ö ´Ö•Öæ¸üÖÓ“µÖÖ ú»µÖ֝֍úÖ¸üß ˆ«êü¿µÖÖ−Öê •ÖÃÖê úß,†Ö¸üÖꐵÖ, ÃÖã¸üÖÖ †Ö×Ö ú»µÖÖÖ ‡ŸµÖÖ¤üß µÖÖê•Ö−ÖÖ
²ÖÖӬ֍úÖ´Ö Öê¡ÖÖŸÖ úÖ´Ö ú¸üÖÖ·µÖÖ úִ֐ÖÖ¸üÖ−Ó ÖÖ ¯Öã¸ü׾֝µÖÖ²ÖÖ²ÖŸÖ“µÖÖ ŸÖ¸üŸÖã¤üß ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ †ÖÆêüŸÖ. êÓ¦ü
¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998 †Ó´Ö»ÖÖŸÖ †ÖÖ»Öê»Öê †ÖÆêüŸÖ. ´Ö㏵Ö
†×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−ÖÖ−Öê ²ÖßÃÖß‹ 32003/ÃÖ߆ָü 146/ úִ֐ÖÖ¸ü 7 פü.5.2.2007
†−¾ÖµÖê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) ×−ÖµÖ´Ö 2007 ŸÖµÖÖ¸ü êú»Öê»Öê
†ÖÆêüŸÖ. ŸÖÃÖê“Ö ×¤ü.18.9.2007 “µÖÖ šü¸üÖ¾ÖÖ−ÖãÃÖÖ¸ü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö •Ö´ÖÖ ú¸üµÖÖÃÖÖšüß ÖÖŸÖê Îú´ÖÖӍú
004220110000153 ²Öэú †Öò±ú ‡Ó×›üµÖÖ µÖê£Öê ˆ‘Ö›üµÖÖŸÖ †Ö»ÖÖ †ÖÆêü.

2. ´ÖãµÖ †×¬Ö×−ÖµÖ´Ö ¾Ö ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖã¤üß ¯Ö׸üÛ¿Ö™ü 1 ´Ö¬µÖê −Ö´Öã¤ü êú»Ö껵ÖÖ †ÖÆêüŸÖ.

3. Ö֕֐Öß Øú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´ÖÖ“µÖÖ ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ ÃÖÓ¤ü³ÖÖÔŸÖ •Öê ×¾Ö³ÖÖÖ ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ †Ö¸ü֏֛ü¶ÖÃÖ
´ÖÖ−µÖŸÖÖ ¤êüµÖÖÃÖ ÃÖÖ´Ö †ÖÆêüŸÖ, •ÖÃÖê úß (1) ´ÖÆüÖ−֐ָü ¯ÖÖ׻֍úÖ,−֐ָü¯ÖÖ׻֍úÖ ¯ÖÏ¿ÖÖÃÖ−Ö †Ö×Ö −֐ָü ׾֍úÖÃÖ ×¾Ö³Ö֐Ö
(ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−֍ú ÃÖÓãÖÖÓ“µÖÖ ²ÖÖ²ÖŸÖߟÖ). (2) וֻÆüÖ¯Ö׸üÂÖ¤ü, ÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ †Ö×Ö ÖÏÖ´Ö ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ (ÃÖ¾ÖÔ ÖÏÖ´Ö
¯ÖÓ“ÖÖµÖŸÖß). (3) ˆªÖêÖ ×¾Ö³ÖÖÖ (‹´Ö.†ÖµÖ.›üß.ÃÖß. †Ö×Ö ×¾ÖúÖÃÖ †ÖµÖ㌟Ö, ‹ÃÖ‡Ô—Öê›ü) †Ö×Ö ÃÖ¾ÖÔ ¸üÖ•µÖ /ëú¦ü
¿ÖÖÃÖ−ÖÖ“Öê ×¾Ö³ÖÖÖ •µÖÖ´Ö¬µÖê ²ÖÖӬ֍úÖ´Ö “ÖÖ»Öæ †ÖÆêü ¾Ö ŸµÖÖŸÖ úִ֐ÖÖ¸ü ×−ÖµÖãŒŸÖ êú»Öê †ÖÆêüŸÖ, ŸµÖÖÓ−ÖÖ ŸµÖÖÓ“µÖÖ ×¾Ö³Ö֐ÖßµÖ
¯ÖÏ´ÖãÖÖÓ−Öß ŸÖÖŸÖ›üß−Öê ÃÖæ“Ö−ÖÖ ªÖ¾µÖÖ.

(1). ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö ú¸üŸÖÖ−ÖÖ, ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ ‹æÖ
´Ö㻵ÖÖ−ÖãÃÖÖ¸ü(•Ö´Öß−Öß“Öß Øú´ÖŸÖ ¾ÖÖôæû−Ö )ŸÖÃÖê“Ö ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖãÖÖ¯Ö−Öê−Öê úִ֐ÖÖ¸üÖÓ−ÖÖ Øú¾ÖÖ ŸµÖÖÓ“µÖÖ −Öֻ֟֐ÖÖÓ−ÖÖ
úִ֐ÖÖ¸üÖÓÃÖÖšüß −ÖãúÃÖÖ−Ö ³Ö¸ü¯ÖÖ‡Ô †×¬Ö×−ÖµÖ´Ö 1923 ´Ö¬Öᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü úÖêÖŸµÖÖÆüß ¯ÖύúÖ¸ü“Öß ³Ö¸ü¯ÖÖ‡Ô ×¤ü»Öê»Öß
†ÃÖê»Ö ŸÖß ¸üŒú´Ö ¾ÖÖôæû−Ö ˆ¾ÖÔ¸üßŸÖ ²ÖÖӬ֍úÖ´Ö ´Ö㻵ÖÖ¾Ö¸ü 1 % ˆ¯Öú¸ ¾ÖÃÖã»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ÆüÖ ˆ¯Öú¸ü Ö֕֐Öß
ŸÖÃÖê“Ö ¿ÖÖÃ֍úßµÖ ²ÖÖӬ֍úÖ´ÖÖ¾Ö¸ü ¤êü×Ö»Ö ¾ÖÃÖæ»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.

(2). ²ÖÖӬ֍úÖ´ÖÖ“Öß †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü׾֝µÖÖ²ÖÖ²ÖŸÖ −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−ÖÖ ´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾Öê ×−֐ÖÔ×´ÖŸÖ
ú¸üµÖÖÃÖÖšüß ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. ¾Ö −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−Öß µÖÖ²ÖÖ²ÖŸÖßŸÖ Ã¾ÖŸÖÓ¡Ö†Ö¤êü¿Ö ×−֐ÖÔ×´ÖŸÖ ú¸üÖ¾ÖêŸÖ.
†¿ÖÖ ¯ÖύúÖ¸êü ×−ÖÛ¿“ÖŸÖ êú»Ö껵ÖÖ ´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾ÖÖÓ“ÖÖ †Ö×Ö ŸµÖÖ ´Ö¬µÖê ¾ÖêôûÖê¾Öêôßü êú»Ö껵ÖÖ ÃÖã¬ÖÖ¸üÖÖÓ“ÖÖ †Ö¬ÖÖ¸ü
²ÖÖӬ֍úÖ´ÖÖ“Öê †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü×¾ÖŸÖÖ−ÖÖ ‘µÖÖ¾ÖÖ.

(3) −ÖÖë¤ü¾ÖÆüß šêü¾ÖÖê ¾Ö ´ÖÖ×Ã֍ú ×¾Ö¾Ö¸üÖ ¯Öãœüᯙ ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öã¾Öá †¬µÖÖ, ´ÖÆüÖ¸üÖÂ™Ò ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ ú»µÖÖÖ ´ÖÓ›üô, ´ÖãÓ²Ö‡Ô (¯Ö׸ü׿Ö™ü 2 ¯ÖÏ´Ö֝Öê)µÖÖÓ“µÖÖ ú›êü ¯ÖÖšü¾ÖÖ¾Öê. •ÖêÖêú¹ý−Ö µÖÖÓ−ÖÖ •Ö´ÖÖ
êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê“ÖÖ ŸÖÃÖê“Ö ²ÖэúêŸÖ/úÖêÂÖ֐ÖÖ¸üÖŸÖ •Ö´ÖÖ —ÖÖ»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ (¯Ö׸ü׿Ö™ü 3 ¯ÖÏ´Ö֝Öê)
ŸÖÖôû´Öêôû ‘ÖêÖê ¿ÖŒµÖ ÆüÖê‡Ô»Ö. ŸÖÃÖê“Ö ˆ¯Öú¸ü¾ÖÃÖã»Öß“µÖÖ −ÖÖë¤üß šêü¾ÖµÖÖÃÖÖšüß −ÖÖê¤ü¾ÖÊÖ ¾Ö ´ÖÖ×Ã֍ú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
šêü¾ÖµÖÖ²ÖÖ²ÖŸÖ ×¤ü.1.12.2009 ¯Ö׸ü¯Ö¡ÖúÖ´Ö‘µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ ÃÖã“Ö−ÖÖÓ“ÖêÆüß ¯ÖÖ»Ö−Ö ú¸üÖ¾Öêü.

(4) ‡´ÖÖ¸üŸÖ ¾Ö ‡üŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ¸êü ¾Ö ŸµÖÖÃÖÓ¤ü³ÖÖÔŸÖᯙ ˆ¯Öú¸ü •Ö´ÖÖ ú¸üÖÖ·µÖÖ ×¾Ö³Ö֐Ö/ãÖÖ×−֍ú
þָüÖ•µÖ ÃÖÓãÖÖ/¯ÖÏÖ׬֍ú¸üÖ µÖÖÓ−Öß ŸµÖÖÓ“Öê µÖÖÃÖÓ¤ü³ÖÖÔŸÖß»Ö ×¾Ö¾Ö¸üÖ¯Ö¡Öê ¾Ö ¾ÖÖÙÂ֍ú †Æü¾ÖÖ»Ö ¯Ö׸ü׿Öšü 4 ¯ÖÏ´Ö֝Öê ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ¯ÖÏŸµÖêú ¯Öãלü»Ö†Ö٣֍ú ¾ÖÂÖÖÔ“µÖÖ 15 ´Öê ¯Öæ¾Öá ÃÖÖ¤ü¸ü ú¸üÖ¾ÖêŸÖ. Æêü
¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ¯Ö¡Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖÓ“µÖÖ †ÖŸÖ ´ÖÓ›üôû ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ †Ö¸ü֏֛üµÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ·µÖÖ ¾Ö
ˆ¯Öú¸ü ÖÖêôûÖ ú¸üÖÖ·µÖÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ׬֍ú¸üÖÖÃÖ ÃÖ¤ü¸ü ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖÃÖÖšüß —ÖÖ»Ö껵ÖÖ Ö“ÖÖÔ“ÖÖ ( •Ö´ÖÖ -
— ÖÖ»Öê»ÖÖ ˆ¯ÖúÖ¸üÖ“µÖÖ 1 ™üŒúÖ¯ÖêÖÖü †×¬Öú −ÖÖÆüß) ¯Ö¸üŸÖÖ¾ÖÖ ú¸üß»Ö.

4. ÃÖÖ¾ÖÔ•Ö×−֍ú ²ÖÖӬ֍úÖ´Ö, •Ö»ÖÃÖÓ¯Ö¤üÖ ¾Ö ¾Ö−Ö ×¾Ö³ÖÖÖ ŸÖÃÖê“Ö ×•Ö»ÆüÖ ¯Ö׸üÂÖ¤ü µÖÖÓ“µÖÖ«üÖ¸êü êú»Öß •Ö֝ÖÖ¸üß •Öß úÖ´Öê
"‡´ÖÖ¸üŸÖ ¾Ö ²ÖÖӬ֍úÖ´ÖÖ“µÖÖ ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ †¿ÖÖ úÖ´ÖÖÓÃÖÖšüß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖ“Öê Óú¡ÖÖ™ü ‘ÖêÖÖ·µÖÖ
ÓúÓ¡ÖÖ™ü¤üÖ¸ü/†×³Öú¸üÖ µÖÖÓ“µÖÖ ¤êüµÖúÖŸÖæ−Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×¾Ö×ÆüŸÖ ¤ü¸üÖ−Öê ¾ÖÃÖæ»Ö
ú¸üµÖÖŸÖ µÖÖ¾ÖÖ." ÃÖ¤ü¸ü •Ö²ÖÖ²Ö¤üÖ¸üß ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐ÖÖ“Öß †ÃÖê»Ö ŸÖÃÖê“Ö •Öß ¤êüµÖêú úÖêÂÖ֐ÖÖ¸üÖŸÖ ÃÖÖ¤ü¸ü ÆüÖêŸÖᯙ †¿ÖÖ
¤êüµÖúÖŸÖ ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ·µÖÖ−Öê "‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü" µÖÖ“Öß
¾ÖÃÖæ»Öß ¤ü¿ÖÔ¾ÖÖ¾Öß ¾Ö ŸµÖÖ−ÖãÃÖÖ¸ü úÖêÂÖ֐ÖÖ¸üÖ−Öê ÃÖ¤ü¸ü ¾ÖÃÖæ»Öß ú¸üÖ¾Öß.

5. ÃÖ¾ÖÔ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ−ÖÖ ¾Ö ÃÖ¾ÖÔ ¿ÖÖÃ֍úßµÖ †×³ÖúŸµÖÖÕ−ÖÖ ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ µÖÖ¾ÖêŸÖ úß, µÖÖ
ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 †Ö×Ö ëú¦ü¿ÖÖÃÖ−ÖÖ“µÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö
1998 “µÖÖ ×−ÖµÖ´Ö 3 −ÖãÃÖÖ¸ü ×−֐ÖÔ×´ÖŸÖ êú»Ö껵ÖÖ ×¤ü.26.9.1996 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸üü 1 ™üŒúÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
ŸµÖÖÓ−Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖß−Öê פü.1.7.2010 ¯ÖÖÃÖæ−Ö −Ö “ÖãúŸÖÖ •Ö´ÖÖ
ú¸üÖ¾Öß.

6. •Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Öê ‘‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996’ “µÖÖ ú»Ö´Ö 2 (1) (›üß) †−ÖãÂÖӐÖÖ−Öê ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ ¾Ö •µÖÖ“Öê úÖ´Ö ‘ÖꝵÖÖÃÖÖšüß“ÖÖ ú¸üÖ¸ü
פü−ÖÖӍú 01 •Öã»Öê 2010 ¾ÖÖ ŸÖ¤Ëü−ÖÓŸÖ¸ü ú¸üµÖÖŸÖ µÖê‡Ô»Ö †¿ÖÖ ÃÖ¾ÖÔ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖÓ−ÖÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖ »Ö֐Öæ
¸üÖÆüß»Ö.

7. ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐ÖÖÓ¿Öß ×¾Ö“ÖÖ¸ü×¾Ö×−Ö´ÖµÖ ú¹ý−Ö ˆ¯Öú¸ü ¾ÖÃÖæ»Öß´Ö¬µÖê ÃÖãÃÖæ¡ÖŸÖÖ µÖꝵÖÖÃÖÖšüß ¯ÖÏŸµÖêú
¯Öύú¸üÖÖÃÖ µÖã×−֍ Îú´ÖÖӍú ¤êüµÖÖ²ÖÖ²ÖŸÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Ö פü.26.10.2009 †−¾ÖµÖê ÃÖ×¾Ößָü ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ
†Ö»Öê»Öê †ÖÆêüŸÖ. ŸµÖÖ−ÖãÃÖÖ¸ü ÃÖ¤ü¸ü µÖã×−֍ú Îú´ÖÖӍúÖ“Öß ¯Ö¬¤üŸÖ ™ü¯µÖÖ™ü¯µÖÖ−Öê ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐Ö֍ú›æü−Ö ¸üÖ²Ö׾֝µÖÖŸÖ µÖÖ¾Öß
¾Ö ¯ÖÏ£Ö´Ö ™ü¯¯µÖÖŸÖ −֐ָü ׾֍úÖÃÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ´ÖÆüÖ−֐ָü¯ÖÖ׻֍úÖ, −֐ָü¯ÖÖ׻֍úÖ, ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−֍ú
ÃÖÓãÖÖ ¾Ö ¯ÖÏÖ׬֍ú¸üÖê ‡ŸµÖÖ¤üß ŸÖÃÖê“Ö ÖéÆü×−Ö´ÖÖÔÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ÃÖ¾ÖÔ ÃÖÓãÖÖ/¯ÖÏÖ׬֍ú¸üÖ µÖÖÓ−ÖÖ ¯ÖÏ£Ö´Ö
™ü¯¯µÖÖŸÖ »Ö֐Öæ ¸üÖÆüß»Ö, ŸÖÃÖê“Ö ¯Öãœüᯙ ™ü¯¯µÖÖÓÃÖÖšüß úִ֐ÖÖ¸ü ×¾Ö³Ö֐Ö֍ú›æü−Ö Ã¾ÖŸÖӡ֯֝Öê ÃÖæ“Ö−ÖÖ ¤êüµÖÖŸÖ µÖêŸÖß»Ö.
8. ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ ÆüÖ ´Ö㏵ÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß“µÖÖ ²ÖîšüúßŸÖ —ÖÖ»Ö껵ÖÖ “Ö“Ö쓵ÖÖ
†−ÖãÂÖӐÖÖ−Öê ¾Ö ÃÖ¤ü¸ü ²ÖîšüúßÃÖ ˆ¯ÖÛÃ£ÖŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³Ö֐ÖÖÓ“µÖÖ ¯ÖϬÖÖ−Ö ÃÖד־Ö/ÃÖד־ÖÖÓ“µÖÖ ÃÖÆü´ÖŸÖß−Öê
×−֐ÖÔ×´ÖŸÖ ú¸üµÖÖŸÖ µÖêŸÖ †ÖÆêü.

´ÖÆüÖ¸üÖ™ÒüÖ“Öê ¸üÖ•µÖ¯ÖÖ»Ö µÖÖÓ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü ¾Ö −ÖÖÓ¾ÖÖ−Öê,

(ú×¾ÖŸÖÖ Ö㯟ÖÖ )
ÃÖד־Ö,úִ֐ÖÖ¸ü

¯ÖÏŸÖ-
´ÖÖ.¸üÖ•µÖ¯ÖÖ»Ö µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´Ö㏵ִÖÓ¡Öß µÖÖÓ“Öê ¯ÖϬÖÖ−Ö ÃÖד־Ö,
´ÖÖ.ˆ¯Ö´Ö㏵ִÖÓ¡Öß µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´ÖÓ¡Öß (úִ֐ÖÖ¸ü) µÖÖÓ“Öê Ö֕֐Öß ÃÖד־Ö,
´ÖÖ.¸üÖ•µÖ´ÖÓ¡Öß (úִ֐ÖÖ¸ü) µÖÖÓ“Öê Ö֕֐Öß ÃÖד־Ö,
´ÖãµÖ ÃÖד־Ö, ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö,
†¯Ö¸ü ´ÖãµÖ ÃÖ×“Ö¾Ö / ¯ÖϬÖÖ−Ö ÃÖ×“Ö¾Ö / ÃÖ×“Ö¾Ö ÃÖ¾ÖÔ ´ÖÓ¡ÖÖ»ÖµÖß−Ö ×¾Ö³Ö֐Ö, ´ÖÓ¡ÖÖ»ÖµÖ,´ÖãÓ²Ö‡Ô.
(´ÖÓ¡ÖÖ»ÖµÖß−Ö ÃÖ¾ÖÔ ×¾Ö³Ö֐ÖÖӍú›æü−Ö ÆüÖ ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÖ¾ÖÔ•Ö×−֍ú
ˆ¯ÖÎú´ÖÖÓ“µÖÖ ×−Ö¤ü¿ÖÔ−ÖÖÃÖ †ÖÖµÖÖŸÖ µÖÖ¾ÖÖ.)
´ÖãµÖ †×³ÖµÖÓŸÖÖ, ÃÖÖ¾ÖÔ•Ö×−֍ú ²ÖÖӬ֍úÖ´Ö ×¾Ö³Ö֐Ö,
´ÖãµÖ †×³ÖµÖÓŸÖÖ, •Ö»ÖÃÖÓ¯Ö¤üÖ ×¾Ö³Ö֐Ö,
ÃÖ¾ÖÔ ×¾Ö³Ö֐ÖßµÖ †ÖµÖ㌟Ö,
úִ֐ÖÖ¸ü †ÖµÖ㌟Ö, ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ, ´ÖãÓ²Ö‡Ô.
ÃÖ¾ÖÔ ×•Ö»ÆüÖ׬֍úÖ¸üß,
ÃÖ¾ÖÔ ´ÖãµÖ úÖµÖԍúÖ¸üß †×¬ÖúÖ¸üß, וֻÆüÖ ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ ´ÖÆüÖ−֐ָü¯ÖÖ׻֍úÖ †ÖµÖ㌟Ö,
ÃÖ¾ÖÔ Ö™ü׾֍úÖÃÖ †×¬ÖúÖ¸üß, ¯ÖÓ“ÖÖµÖŸÖ ÃÖ×´ÖŸÖß,
ÃÖ¾ÖÔ ´Ö㏵ÖÖ׬֍úÖ¸üß, −֐ָü ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ −ÖÖë¤üÖß †×¬ÖúÖ¸üß,
úÖ †×¬ÖúÖ¸üß (¯ÖÏ¿ÖÖÃÖ−Ö-2) ˆªÖêÖ,‰ú•ÖÖÔ ¾Ö úִ֐ÖÖ¸ü ×¾Ö³ÖÖÖ µÖÖÓ−ÖÖ ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−֝ÖÔµÖ ¾Öê²ÖÃÖÖ‡Ô™ü¾Ö¸ü
™ü֍úµÖÖ“µÖÖ ×¾Ö−ÖÓŸÖßÃÖÆü †ÖÏê×ÂÖŸÖ./×−Ö¾Ö›ü−ÖßÖß.
¯Ö׸ü׿Ö™ü -1
´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾Öê.
×−ÖµÖ´Ö ¾Ö †×¬Ö×−ÖµÖ´Ö
1) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996
2) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996
3) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998
4) ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) ×−ÖµÖ´Ö 2007
פü.5.2.2007
´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß ¾Ö ŸµÖÖ“µÖÖ †Ó´Ö»Ö²Ö•Ö־֝Öß²ÖÖ²ÖŸÖ ´Ö֐ÖÔ¤ü¿Öԍú ŸÖŸ¾Öê.

1. ‘‘‡´ÖÖ¸üŸÖ ؍ú¾ÖÖ ‡ŸÖ¸ü ²Ö֬֍úÖ´Ö ü úÖ´Ö’’ “Öß ¾µÖ֏µÖÖ (ú»Ö´Ö 2 (d) ) ´Ö¬µÖê פü»Öê»Öß †ÖÆêü.
²ÖÖӬ֍úÖ´Ö, ±êú¸ü±úÖ¸ü, ¤ãü¹ýßÖß,¤êüÖ³ÖÖ»Ö, ؍ú¾ÖÖ ¯ÖÖ›æü−Ö ™ü֍úÖê ‡ŸµÖÖ¤üß ‡´ÖÖ¸üŸÖ, ¸üßÖê,´Ö֐ÖÔ, ¸êü»¾Öê,
™ÒüÖ´Ö¾Öê•Ö,‹†¸ü ×±ú»›üÃÖË, ¯ÖÖšü²ÖÓ¬ÖÖ¸êü, •Ö»Ö×−ÖÃÃÖÖ¸üÖ,²ÖÓ¬ÖÖ¸üÖ ¾Ö −Öê¾ÆüߐÖê¿Ö−Ö úÖ´Ö, ¯Öã¸ü ×−ÖµÖӡ֝ÖÖ“Öê
úÖ´Ö (¾ÖÖ¤üôûÖ´Öãôêû •Ö»Ö×−ÖÃÃÖÖ¸üÖÖ“µÖÖ úÖ´ÖÖÃÖÆüߟÖ), ŸÖê»Ö ¾Ö ¾ÖÖµÖã“Öß •ÖÖê›üÖß ™ü֍úÖê, ×¾ÖªãŸÖ
»ÖÖ‡Ô−ÃÖ, ¾ÖÖµÖ¸ü»ÖêÃÖ, ¸êü›ü߆Öê, ™êü×»Ö¾Æüß•Ö−Ö, ™êü×»Ö±úÖê−Ö, ™êü׻֐ÖÏÖ±ú, †Ö×Ö ÃÖ´Öã¦üÖ¯ÖÖ¸ü ¤üôûÖ¾ÖôûÖ,
¬Ö¸üÖê, úÖ»Ö¾Öê,•Ö»ÖÖ¿ÖµÖê,•Ö»Ö¯ÖϾÖÖÆü, ²ÖÖêÖ¤êü, ¯Öã»Ö, ÃÖêŸÖã, ÃÖêŸÖã¯ÖϝÖÖ»Ö, ¯ÖÖ‡Ô¯Ö»ÖÖ‡Ô−Ö, ™üÖò¾ÖÃÖÔ, ãú»ÖߐÖ
™üÖò¾Ö¸üÃÖÔ, ¯ÖÖ¸êüÂÖÖ ™üÖò¾ÖÃÖÔ †Ö×Ö µÖÖ ¯ÖύúÖ¸ü“Öê ‡ŸÖ¸ü úÖ´Öê ÃÖ´Öã×“ÖŸÖ ¿ÖÖÃÖ−Ö †×¬ÖÃÖã“Ö−Öê«üÖ¸êü »Ö֐Ö㠍ú¹ý
¿ÖúŸÖê ¯Ö¸ÓüŸÖæ úÖ¸üÖÖ−Öê †×¬Ö×−ÖµÖ´Ö, 1948 ؍ú¾ÖÖ ÖÖÖ †×¬Ö×−ÖµÖ´Ö, 1952 “µÖÖ ŸÖ¸üŸÖæ¤üß •µÖÖ
†ÖãÖÖ¯Ö−ÖêÃÖ »Ö֐Öã ÆüÖêŸÖÖŸÖ ŸµÖÖÓ−ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß »Ö֐Öã
ÆüÖêÖÖ¸ü −ÖÖÆüߟÖ.
2. úÖêÖŸµÖÖÆüß ×¤ü¾Ö¿Öß 10 ؍ú¾ÖÖ ŸµÖÖ¯ÖêÖÖ •ÖÖÃŸÖ úִ֐ÖÖ¸ü úÖ´ÖÖ¾Ö¸ü šêü¾Ö»Öê †¿ÖÖ ÃÖ¾ÖÔ †ÖãÖÖ¯Ö−ÖÖ−ÖÖ
ÆüÖ úÖµÖ¤üÖ »Ö֐Öã ÆüÖêŸÖÖê. ‘‘†ÖãÖÖ¯Ö−ÖÖ’’ ´ÆüÖ•Öê ú»Ö´Ö 2 (•Öê) úÖêÖŸÖßÆüß †ÖãÖÖ¯Ö−ÖÖ •Öß
¿ÖÖÃÖ−ÖÖ“µÖÖ ×−ÖµÖӡ֝ÖÖŸÖ †ÖÆêü. úÖêÖŸµÖÖÆüß ×−֐ִ֓µÖÖ ×−ÖµÖӡ֝Ö֏ÖÖ»Öß †ÖÆêü ؍ú¾ÖÖ ¾µÖ¾ÖÃÖÖµÖ
ÃÖÓãÖꓵÖÖ ×−ֵ֡֝Ö֏ÖÖ»Öß †ÖÆêü †Ö×Ö ¾ÖîµÖŒŸÖߍú ؍ú¾ÖÖ †ÃÖÖêÃÖß‹¿Ö−Ö Øú¾ÖÖ ‡ŸÖ¸ü ¾ÖîµÖŒŸÖߍú
ÃÖÓãÖÖÓ“µÖÖ †ÓŸÖÖÔŸÖ •Öê ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ×−ÖµÖãŒŸÖ ú¸üŸÖÖŸÖ †Ö×Ö •µÖÖŸÖ Óú¡ÖÖ™ü¤üÖ¸üÖÓ“ÖÖ ÃÖ´ÖÖ¾Öê¿Ö
ÆüÖêŸÖÖê ¯Ö¸ÓüŸÖæ ¾µÖŒŸÖߐ֟Ö׸üŸµÖÖ •Öê †ÃÖê úִ֐ÖÖ¸ü ŸµÖÖÓ“Öê þ֟Ö:“Öê ‘Ö¸ü ²ÖÖӬ֝µÖ֍ú¸üߟÖÖ ¹ý¯ÖµÖê 10 »Ö֏Ö
¯ÖµÖÔŸÖ ¯ÖêÖÖ •ÖÖßÖ
−ÖÃÖê»Ö ŸÖê ŸµÖÖÓ−ÖÖ †ÖãÖÖ¯Ö−Öê“Öß ¾µÖ֏µÖÖ »Ö֐Öã ÆüÖêÖÖ¸ü −ÖÖÆüß.

3. ‘‘ ´Öֻ֍ú ’’ “Öß ¾µÖ֏µÖÖ ú»Ö´Ö 2 (i) ´Ö¬µÖê ‡Ã™üÖ²»Öß¿Ö´Öë™ü ÃÖÓ²ÖÓ¬ÖÖŸÖ −Ö´Öã¤ü êú»Öê»Öß †ÖÆêü.
ŸµÖÖŸÖ ÖÖ»Öᯙ ¯ÖÏ´Ö֝Öê †ÓŸÖ³ÖÖÔ¾Ö ÆüÖêŸÖÖê :-
i) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úÖ´Ö Ã£ÖÖ×−֍ú ÃÖÓãÖÖÓŸÖ±ìú ؍ú¾ÖÖ ‡ŸÖ¸ü †ÖãÖÖ¯Ö−Öê´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ
µÖêŸÖ †ÃÖ»µÖÖÃÖ ¾Ö •µÖÖŸÖ ¯ÖÏÖ׬֍úÖ¸üß −Öê´Öã−Ö ×¤ü»Öê»ÖÖ −ÖÃÖ»µÖÖÃÖ †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ×¾Ö³Ö֐ÖÖ“ÖÖ
¯ÖÏ´ÖãÖ.
ii) •Öê£Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´ÖÖ“Öê úÖ´Ö Ã£ÖÖ×−֍ú ¯ÖÏÖ׬֍ú¸üÖÖ´ÖÖ±ÔúŸÖ ü ؍ú¾ÖÖ ‡ŸÖ¸ü
†ÖãÖÖ¯Ö−ÖÖ´ÖÖ±ÔúŸÖ, £Öê™ü Óú¡ÖÖ™ü¤üÖ¸üÖ ×¿Ö¾ÖÖµÖ ú¸üµÖÖŸÖ µÖêŸÖê †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ŸµÖÖ ¯ÖÏÖ׬֍úÖ¸üÖÖ“ÖÖ
؍ú¾ÖÖ †ÖãÖÖ¯Ö−Öê“ÖÖ ´ÖãµÖ úÖµÖԍúÖ¸üß †×¬ÖúÖ¸üß,
iii) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü Óú¡ÖÖ™ü¤üÖ¸üÖ´ÖÖ±ÔúŸÖ ؍ú¾ÖÖ ´Öֻ֍úÖ´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ µÖêŸÖê
†¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ Óú¡ÖÖ™ü¤üÖ¸ü
4. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 ¾Ö ×−ÖµÖ´Ö 4 (3) −ÖãÃÖÖ¸ü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‹ÃÖ†Öê −ÖÓ.2899,
פü−ÖÖӍú 26.3.1996 †−¾ÖµÖê ײֻÖÖŸÖæ−Ö 1 % ˆ¯Öú¸ü ú¯ÖÖŸÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ ×−֐ÖÔ×´ÖŸÖ êú»Ö껵ÖÖ
†×¬ÖÃÖã“Ö−ÖꓵÖÖ †−ÖãÂÖӐÖÖ−Öê ú¯ÖÖŸÖ êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Öê“ÖÖ ¬Ö−Ö֍úÂÖÔ ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖ֝֍úÖ¸üß ´ÖÓ›üôû, ´ÖãÓ²Ö‡Ô µÖÖÓ“ÖÖ ÖÖŸÖê Îú´ÖÖӍú
004220110000153 ²Öэú †Öò±ú ‡Ó×›üµÖÖ ´ÖãÓ²Ö‡Ô µÖÖ ²Öэêú“µÖÖ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿Ö֏ÖêŸÖ
ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ “Ö»Ö−ÖÖ«üÖ¸êü •Ö´ÖÖ ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.
5. ˆ¯Öú¸ü ×−ÖµÖ´ÖÖ“µÖÖ ×−ÖµÖ´Ö, 4 (4) †−ÖãÃÖÖ¸ü •Öê£Öê ²ÖÖӬ֍úÖ´Ö֍ú¸üߟÖÖ Ã£ÖÖ×−֍ú ÃÖÓãÖê“Öß ´ÖÓ•Öæ¸üß
†Ö¾Ö¿µÖú †ÖÆêü. ŸÖê£Öê †¿ÖÖ ´ÖÓ•Öæ¸üߍú¸üߟÖÖ ¯ÖÏÖ¯ŸÖ —ÖÖ»Ö껵ÖÖ ¯ÖÏŸµÖêú †•ÖÖÔ ÃÖÖê²ÖŸÖ ´ÖÓ›üôûÖ“µÖÖ −ÖÖÓ¾Öê
ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß“ÖÖ ¸êüÖÖÓ׍úŸÖ ¬Ö−Ö֍úÂÖÔ (‹úÖ ¾ÖÂÖÖÔ“µÖÖ ²ÖÓ֬֍úÖ´ÖÖ“µÖÖ †Ó¤üÖ•ÖßŸÖ Ö“ÖÖÔ“µÖÖ 1 %
¸üŒú´Öê ‹¾ÖœüÖ)ÃÖ¤ü¸ü ãÖÖ×−֍ú ÃÖÓãÖêÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.
6. ¯Öãœêü ×−ÖµÖ´Ö 5 −ÖãÃÖÖ¸ü ¿ÖÖÃÖ׍úµÖ úÖµÖÖÔ»ÖµÖ/ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´Ö/ãÖÖ×−֍ú ÃÖÓãÖÖ“µÖÖ ²ÖÖ²ÖŸÖߟÖ
¾ÖÃÖæ»Öß †×¬ÖúÖ-µÖÖÓ−Öê ×−ÖµÖ´Ö 4 †ÓŸÖÖÔŸÖ •Ö´ÖÖ êú»Öê»ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö “Ö»Ö−ÖÖ«üÖ¸êü ¯ÖÏŸµÖÖ Ö“ÖÔ
—ÖÖ»Öê»Öß ¸üŒú´Ö •Öß 1 % ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃ֝ÖÖ¸ü ŸÖê¾Öœüß ú´Öß ú¹ý−Ö ˆ¾ÖÔ¸üßŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
•Ö´ÖÖ ú¸êü»Ö.
7. ×−ÖµÖ´Ö 5 (3) −ÖãÃÖÖ¸ü •Ö´ÖÖ êú»Öê»Öß ¸üŒú´Ö ´ÖÓ›üôû֍ú›êü 30 פü¾ÖÃÖÖÓŸÖ •Ö´ÖÖ ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.

8. úÖêÖŸµÖÖÆüß ²ÖÖӬ֍úÖ´Ö †ÖãÖÖ¯Ö−Öê−Öê ؍ú¾ÖÖ ²ÖÖӬ֍úÖ´Ö ´Öֻ֍úÖ−Öê ؍ú¾ÖÖ ˆ¯Öú¸ü ¾ÖÃÖã»Öß †×¬ÖúÖ-µÖÖ−Öê
؍ú¾ÖÖ Ã£ÖÖ×−֍ú ÃÖÓãÖê−Öê ؍ú¾ÖÖ ¿ÖÖÃ֍úßµÖ úÖµÖÖÔ»ÖµÖÖ−Öê ؍ú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´ÖÖ−Öê ؍ú¾ÖÖ »ÖÖ³ÖÖ£Öá
úִ֐ÖÖ¸üÖ−Öê ´ÆüÖ•Öê“Ö •Öê úÖêÖß ú»µÖÖÖ ´ÖÓ›üôû ×−Ö¬Öß´Ö¬µÖê ˆ¯Öú¸ü †£Ö¾ÖÖ »ÖÖ³ÖÖ£Öá −ÖÖë¤üÖß ¿Ö㻍ú
µÖÖ“ÖÖ ³Ö¸üÖÖ ú¸üÖÖ¸ü †ÃÖŸÖᯙ ŸÖê ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖ“µÖÖ ²Öэú †Öò±ú ‡Ó×›üµÖÖ
´Ö¬Öᯙ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿Ö֏ÖêŸÖ ú¸üµÖ֍ú׸üŸÖÖ ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ
“Ö»Ö−ÖÖ«üÖ¸êü ÃÖ¤ü¸ü ³Ö¸üÖÖ ú¸üŸÖß»Ö. µÖÖ “Ö»Ö−ÖÖ“Öß 4 ¯ÖÏŸÖßŸÖ ×¾Ö³Ö֐֝Öß †ÃÖæ−Ö 2 ¯ÖÏŸÖß ²Öэú
þ֟Ö:ú›êü šê¾Öæ−Ö ˆ¾ÖÔ׸üŸÖ 2 ¯ÖÏŸÖß ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ ¾µÖŒŸÖßÃÖ (¸êü×´Ö™ü¸üú›êü) ¤êüµÖÖŸÖ µÖê‡Ô»Ö. ÃÖ¤ü¸ü
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê 1 ¯ÖÏŸÖ ÃÖ×“Ö¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ
¯ÖÖšü¾ÖÖ¾ÖµÖÖ“Öß †ÖÆêü. ¤ü¸ü ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öæ¾Öá ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ
¸üú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ×¾Ö»Ö껵ÖÖ ´ÖÖ×Ã֍ú ŸÖŒŸµÖÖŸÖ •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ˆ¯Öú¸ü ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê
ú»µÖÖÖ ´ÖÓ›üôû֍ú›êü ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öß †ÖÆêü. ŸÖÃÖê“Ö •ÖÖê›ü¯Ö¡Ö-4 ´Ö¬µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ
ŸÖŒŸµÖÖŸÖ ¿ÖÖÃ֍úßµÖ ×¾Ö³Ö֐Ö, ãÖÖ×−֍ú ÃÖÓãÖÖ ¾Ö ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´Ö µÖÖÓ−Öß ¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
ú»µÖÖÖ ´ÖÓ›üôû֍ú›êü ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê †ÖÆêü. †Ö¸ü֏֛üÖ ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖ ¯ÖÏÖ׬֍úÖ-µÖÖ−Öê ¤êüÖß»Ö
ˆ¯Ö¸üÖêŒŸÖ ¯ÖÏ´Ö֝Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü ú»µÖÖÖ ´ÖÓ›üôû֍ú›êü “Ö»Ö−ÖÖ«üÖ¸êü ³Ö¸üÖÖ
ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ŸÖÃÖê“Ö ŸµÖÖ²ÖÖ²ÖŸÖ“ÖÖ ´ÖÖ×Ã֍ú †Æü¾ÖÖ»Ö •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ¾Ö ¾ÖÖÙÂ֍ú
×¾Ö¾Ö¸üÖÖ¯ÖÖê™üß •ÖÖê›ü¯Ö¡Ö-5 ´Ö¬µÖê ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. “Ö»Ö−ÖÖ“Öß ˆ¾ÖÔ׸üŸÖ ¯ÖÏŸÖ
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê þ֟Ö:ú›êü šêü¾Öæ−Ö ¸üú´ÖꓵÖÖ ‡ŸÖ¸ü ŸÖ¯Ö׿ֻÖÖÃÖÆü ´ÖÓ›üôûÖ−Öê ŸÖ¯ÖÖÃ֝Öߍú׸üŸÖÖ
´ÖÖאֻ֟µÖÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÃÖê»Ö.
9. ˆ¯Öú¸ü ŸÖÃÖê“Ö »ÖÖ³ÖÖ£Öá −ÖÖê¤ÓüÖß ¿Ö㻍ú ²Öэêú“µÖÖ •µÖÖ ¿Ö֏Öê´Ö¬µÖê •Ö´ÖÖ ÆüÖêŸÖ †ÃÖê»Ö ŸÖß ¿Ö֏ÖÖ ¤ü¸ü´ÖÆüÖ
²Öэú †Öò±ú ‡Ó×›üµÖÖ µÖÖÓ“µÖÖ ´ÖãÓ²Ö‡Ô µÖê£Öᯙ ŸÖÖ›ü¤êü¾Ö ¿Ö֏ÖêŸÖ “Ö»Ö−ÖÖ“µÖÖ ˆ¾ÖÔ¸üßŸÖ ¯ÖÏŸÖß ‹úס֟֯֝Öê ÃÖÖ¤ü¸ü
ú¸êü»Ö. •ÖêÖêú¹ý−Ö ²Öэú †Öò±ú ‡Ó×›üµÖÖ, ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ †Ö¯ÖÖ¯ÖÃÖÖŸÖ •Ö´ÖÖ ˆ¯Öú¸ü ¾Ö »ÖÖ³ÖÖ£Öá
−ÖÖë¤üÖß ¿Ö㻍úÖ“ÖÖ ŸÖÖôû´Öêôû ‘Öֻ֝Öê ¿ÖŒµÖ ÆüÖê‡Ô»Ö.
10.ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 6 (1) −ÖãÃÖÖ¸ü ¯ÖÏŸµÖêú ´Öֻ֍ú ²ÖÖӬ֍úÖ´ÖÖ“Öê úÖ´Ö ÃÖã¹ý
—ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖŸÖ Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸ü»µÖÖ −ÖÓŸÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-
µÖÖÃÖ ¯ÖÏ¯Ö¡Ö 1 ´Ö¬µÖê ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸êü»Ö (¯ÖÏŸÖ •ÖÖê›ü»Öß †ÖÆêü.)
11.×−ÖµÖ´Ö 7 −ÖãÃÖÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ŸµÖÖÓ−ÖÖ ±úÖò´ÖÔ 1 ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü 6
´Ö×Æü−µÖÖ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖ»Ö껵ÖÖ úÖ»ÖÖ¾Ö¬ÖßŸÖ ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ²ÖÖ²ÖŸÖ“Öê †Ö¤êü¿Ö ¯ÖÖ¸üߟÖ
ú¸êü»Ö.•Ö¸ü ŸÖÖê ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ“µÖÖ ²ÖÖ²ÖŸÖßŸÖ ÃÖ´ÖÖ¬ÖÖ−Öß †ÃÖê»Ö ŸÖ¸ü

12. µÖã×−֍ú úÖê›ü −ÖÓ. :- i) ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖ ¿ÖÖÃ֍úßµÖ/×−Ö´Ö ¿ÖÖÃ֍úßµÖ ˆ¯ÖÎú´Ö µÖÖÓ−Öß
²ÖÖӬ֍úÖ´ÖÖÃÖ ¯Ö¸ü¾ÖÖ−֐Öß ¤êüµÖÖ“µÖÖ ¯ÖÏŸµÖêú ¯Öύú¸üÖÖÃÖ ÆüÖ µÖã×−֍ú Îú´ÖÖӍú ªÖ¾ÖÖ. †ÖםÖ
ÆüÖ Îú´ÖÖӍú ²ÖÖӬ֍úÖ´Ö ÃÖã¹ý ú¸üµÖÖ“µÖÖ ¯ÖÏ´Ö֝֯֡ÖÖ´Ö¬µÖê −Ö´Öæ¤ü ú¸üÖ¾ÖÖ. ´ÖÆüÖ¸üÖ™Òü ¾Ö ‡ŸÖ¸ü
²ÖÖӬ֍úÖ´Ö ˆ¯Öú¸üÖ ÃÖÓ²ÖÓ¬Öß“ÖÖ ÆüÖ µÖã×−֍ú úÖê›ü −ÖÃÖê»Ö ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö ÃÖã¹ý ú¸üµÖÖ“Öê ¯ÖÏ´Ö֝֯֡Ö
†¯ÖæÖÔ †ÃÖ»µÖÖ“Öê ´ÖÖ−֝µÖÖŸÖ µÖÖ¾Öê. ÆüÖ µÖã×−֍ú úÖê›ü Îú´ÖÖӍú ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“µÖÖ
µÖã×−֍ú úÖê›ü“µÖÖ ¬ÖŸÖá¾Ö¸ü †ÃÖê»Ö.

ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“ÖÖ µÖã×−֍ú úÖê›ü −ÖÓÓ. ÆüÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú
פü.26.10.2009 †−¾ÖµÖê ×−Ö¬ÖÖÔ׸üŸÖ êú»µÖÖ−ÖãÃÖÖ¸ü †ÃÖê»Ö.

13. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö, ¾Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü •Ö¸ü ¯ÖãŸÖÔŸÖÖ êú»Öß −ÖÖÆüß ŸÖ¸ü
ÖÖ»Öᯙ ¯ÖÏ´Ö֝Öê úÖ¸ü¾ÖÖ‡Ô“Öß ŸÖ¸üŸÖæ¤ü ú¸üµÖÖŸÖ †Ö»Öê»Öß †ÖÆêü :-

ˆ¯Öú¸ü ˆ×¿Ö¸üÖ ³Ö¸ü»µÖÖÃÖ ú»Ö´Ö 8 −ÖãÃÖÖ¸ü ¾µÖÖ•Ö


úÖêÖŸÖÖÆüß ´Öֻ֍ú ú»Ö´Ö 3 −ÖãÃÖÖ¸ü ×¾ÖÆüßŸÖ êú»Ö껵ÖÖ ¾ÖêôêûŸÖ ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü
ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ †ÃÖê ´Öֻ֍ú ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê¾Ö¸ü ¯ÖÏןִÖÆüÖ Øú¾ÖÖ •µÖÖ ŸÖÖ¸üÖê¯ÖÖÃÖæ−Ö
ˆ¯Öú¸ü ³Ö¸üµÖÖÃÖ ¯ÖÖ¡Ö †ÖÆêüŸÖ †¿ÖÖ ŸÖÖ¸üÖê¯ÖÖÃÖæ−Ö 2 % ¾µÖÖ•Ö ³Ö¸üÖ¾Öê »Ö֐Öê»Ö.
×¾ÖÆüßŸÖ ¾ÖêôêûŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ú»Ö´Ö 9 ¯ÖÏ´Ö֝Öê ¤Óü›ü :- ú»Ö´Ö 3 −ÖãÃÖÖ¸ü
×¾ÖÆüßŸÖ ¾ÖêôêûŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ú»Ö´Ö 5 −ÖãÃÖÖ¸ü ×−Ö¬ÖÖÔ¸üÖ êú»µÖÖ¯ÖÏ´Ö֝Öê −Ö ³Ö¸ü»µÖÖÃÖ ÃÖÓ²ÖÓ׬֟Ö
†×¬ÖúÖ¸üß µÖÖêµÖ ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ´Öֻ֍úÖ×¾Ö¹ý¬¤Ëü ¤Óü›üÖ“Öß ¸üŒú´Ö •Öß ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê¯ÖêÖÖ •ÖÖßÖ
¸üÆü֝ÖÖ¸ü −ÖÖÆüß ‹¾Öœüß ³Ö¸üµÖÖ“Öß ×¿ÖÖÖ ´Öֻ֍úÖÃÖ ¤êüŸÖÖ µÖê‡Ô»Ö.
ŸÖ£ÖÖׯÖ, †¿Öß ×¿ÖÖÖ ¤êüµÖÖ¯Öã¾Öá †¿ÖÖ ´Öֻ֍úÖÓ−ÖÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ´ÖÖÓ›üµÖÖ“Öß µÖÖêµÖ ŸÖß
ÃÖÓ¬Öß ¤êüÖê †Ö¾Ö¿µÖú †ÖÆêü. •Ö¸ü ´Öֻ֍úÖ−Öê µÖÖêµÖ ¾Ö ¯Öã¸êü¿ÖÖ úÖ¸üÖÖ´Öãôêû ¤Óü›üÖ“Öß ¸üŒú´Ö ³Ö¸ü»Öß −ÖÖÆüß.
†ÃÖê ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ׬֍úÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ´Öֻ֍úÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü †ÖúÖ¸ü»ÖÖ •Ö֝ÖÖ¸ü −ÖÖÆüß.
†×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 10 −ÖãÃÖÖ¸ü ¸üŒú´Öê“Öß ¾ÖÃÖæ»Öß ú¸üµÖÖ²ÖÖ²ÖŸÖ:- ÆüµÖÖ úÖµÖªÖ
†ÓŸÖÖÔŸÖ ¾µÖÖ•Ö Øú¾ÖÖ ¤Óü›üÖ“Öß úÖêÖŸÖßÆüß ¸üŒú´Ö ¾ÖÃÖæ»Ö ú¸üµÖÖ²ÖÖ²ÖŸÖ £Öú²Ö֍úß“Öß ¸üŒú´Ö »Öò›ü
¸êü¾Æüß−µÖ㓵ÖÖ ¯Ö¬¤ËüŸÖß−ÖãÃÖÖ¸ü ¾ÖÃÖæ»Ö ú¸üŸÖÖ µÖê‡Ô»Ö.

¤Óü›ü:- 1) ú»Ö´Ö 12 −ÖãÃÖÖ¸ü •ÖÖê úÖêÖß úÖµÖªÖ“µÖÖ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü •Ö֝Öã−Ö²Öã•Öæ−Ö ×¾Ö¾Ö¸üÖ¯Ö¡Ö


ÃÖÖ¤ü¸ü ú¸üÖÖ¸ü −ÖÖÆüß Øú¾ÖÖ ÖÖê™êü ×¾Ö¾Ö¸üÖ¯Ö¡Ö ÃÖÖ¤ü¸ü êú»µÖÖÃÖ †¿ÖÖÓ−ÖÖ 6 ´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß ×¿ÖÖÖ Øú¾ÖÖ
¤Óü›ü •ÖÖê 1000 ¹ý¯ÖµÖÖ¯ÖµÖÔŸÖ †ÃÖê»Ö ؍ú¾ÖÖ ¤üÖê−Æüß“Öß ŸÖ¸üŸÖæ¤ü ú¸üµÖÖŸÖ †Ö»Öê»Öß †ÖÆêü.
1) •ÖÖê úÖêÖß ÆêüŸÖã¯Öã¸üïָü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸üµÖÖÃÖ ™üÖôûÖ™üÖôû ú¸üŸÖÖê †¿ÖÖÓ−ÖÖ 6
´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß îú¤ü †£Ö¾ÖÖ ¤Óü›ü †£Ö¾ÖÖ ¤üÖê−Æüß ÆüÖê‰ú ¿ÖúŸÖê.
2) úÖêÖŸÖêÆüß −µÖÖµÖÖ»ÖµÖ †¿ÖÖ Öã−ÆüµÖÖÓ“Öê ¤üÖ»Ö ‘ÖêÖÖ¸ü −ÖÖÆüß •ÖÖê ¯ÖµÖÔŸÖ êú¦ü ¿ÖÖÃÖ−ÖÖ“µÖÖ ¯ÖÏÖ׬֍úÖ-
µÖÖÓ−Öê ŸÖÎúÖ¸ü êú»Öê»Öß −ÖÃÖê»Ö.

¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö ؍ú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö ؍ú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´Öֻ֍úÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²Ö֍úß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖꐵÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´Öֻ֍úÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »Ö־֝µÖÖ¯Öã¾Öá ´Öֻ֍úÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖꝵÖ֍ú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´Ö֐֝Öß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •Ö֝ÖÖ¸ü −ÖÖÆüß.
3) •ÖÖê úÖêÖß ÆêüŸÖã¯Öã¸üïָü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸üµÖÖÃÖ ™üÖôûÖ™üÖôû ú¸üŸÖÖê †¿ÖÖÓ−ÖÖ 6
´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß îú¤ü †£Ö¾ÖÖ ¤Óü›ü †£Ö¾ÖÖ ¤üÖê−Æüß ÆüÖê‰ú ¿ÖúŸÖê.
4) úÖêÖŸÖêÆüß −µÖÖµÖÖ»ÖµÖ †¿ÖÖ Öã−ÆüµÖÖÓ“Öê ¤üÖ»Ö ‘ÖêÖÖ¸ü −ÖÖÆüß •ÖÖê ¯ÖµÖÔŸÖ êú¦ü ¿ÖÖÃÖ−ÖÖ“µÖÖ ¯ÖÏÖ׬֍úÖ-
µÖÖÓ−Öê ŸÖÎúÖ¸ü êú»Öê»Öß −ÖÃÖê»Ö.

¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö ؍ú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö ؍ú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´Öֻ֍úÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²Ö֍úß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖꐵÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´Öֻ֍úÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »Ö־֝µÖÖ¯Öã¾Öá ´Öֻ֍úÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖꝵÖ֍ú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´Öֻ֍úÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´Ö֐֝Öß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •Ö֝ÖÖ¸ü −ÖÖÆüß.
•ÖÖê›ü¯Ö¡Ö - 1 “Öê ¯Ö׸ü׿Ö™ü
¯ÖÏ¯Ö¡Ö 1 (×−ÖµÖ´Ö 7)
−ÖÖë¤üÖß Îú.
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü
(¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996 †ÓŸÖÖÔŸÖ
−ÖÖë¤üÖß ¯ÖÏÖ׬֍úÖ¸üß
1) †ÖãÖÖ¯Ö−Öê“Öê −ÖÖÓ¾Ö :-
2) ¯Ö¢ÖÖ
3) úÖ´ÖÖ“Öê −ÖÖÓ¾Ö/þֹý¯Ö
4) ×−ÖµÖãŒŸÖ êú»Öê»Öê úִ֐ÖÖ¸ü ÃÖӏµÖÖ
5) úÖ´Ö ÃÖã¹ý¾ÖÖŸÖ —ÖÖ»µÖÖ“Öß úÖ´ÖÖ“Öê †Ó¤üÖ•Öê úÖ»ÖÖ¾Ö¬Öß
ŸÖÖ¸üߏÖ/´Ö×Æü−ÖÖ/¾ÖÂÖÔ ´Ö×Æü−Öê / ¾ÖÂÖÔ
6) ²ÖÖӬ֍úÖ´ÖÖ“Öê ˆ¯Öú¸ü
†Ó¤üÖ•ÖßŸÖ ´Öã»µÖ ³Ö¸üµÖÖ²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ.
™ü¯¯Öê ´Öã»µÖ ¸üŒú´Ö, “Ö»Ö−Ö Îú.¾Ö †ÖÏß´Ö - ‹
פü−ÖÖӍú ¾Ö•ÖÖ¾Ö™ü - †
†ÓŸÖß´Ö - ‹±ú
¯ÖÆüß»Öê ¾ÖÂÖÔ
¤ãüÃÖ¸êü ¾ÖÂÖÔ
ןÖÃÖ¸êü ¾ÖÂÖÔ
“ÖÖî£Öê ¾ÖÂÖÔ
‹ãúÖ
---------------------------------------------------------------------------------------------------
´Öֻ֍úÖ“Öß Ã¾Öցָüß
´Öֻ֍úÖ“Öê −ÖÖÓ¾Ö
פü−ÖÖӍú
×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓ−Öê ³Ö¸üÖ¾ÖµÖÖ“Öê
7.¯ÖãÖÔŸ¾ÖÖ“Öß ŸÖÖ¸üßÖ 8. †Ó×ŸÖ´Ö ´Ö㻵Ö
9) ×−Ö¬ÖÖÔ¸üÖÖ“Öß ŸÖÖ¸üßÖ 10) ×−Ö¬ÖÖÔ¸üßŸÖ ¸üŒú´Ö
11) †×¯Ö»ÖÖ“Öß ŸÖÖ¸üßÖ †ÃÖ»µÖÖÃÖ 12) †×¯Ö»ÖÖÃÖÓ²ÖÓ¬Öß“µÖÖ †Ö¤êü¿ÖÖ“Öß ŸÖÖ¸üߏÖ
13) †×¯Ö»ÖÖ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü 14) ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ´ÖÓ›üôûÖŸÖ •Ö´ÖÖ êú»µÖÖ“Öß
¸üŒú´Ö ŸÖÖ¸üߏÖ
15) ÆüßÖÖÓŸÖ¸üßŸÖ ¸üŒú´Ö - “Ö»Ö−Ö Îú. ¾Ö פü−ÖÖӍú
þÖցָüß
Ææü¤ü¤ËüÖ
¯Ö׸ü׿Ö™ü- 2
ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ׾֝ÖÖ¸üÖ ´ÖÖ×Ã֍ú ŸÖŒŸÖÖ

†.Îú. Óú¡ÖÖ™ü¤üÖ¸üÖ“Öê ÃÖã¯Öã¤Ôü ײֻÖÖ¯ÖÖê™üß ×²Ö»Öê ú¯ÖÖŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ´ÖÓ›üôûÖŸÖ


−ÖÖ¾Ö ¾Ö ¯Ö¢ÖÖ ú¸üµÖÖŸÖ ¤êüµÖÖŸÖ ¤êüµÖÖŸÖ ú¸üµÖÖŸÖ •Ö´ÖÖ êú»µÖÖ²ÖÖ²ÖŸÖ“ÖÖ ŸÖ¯Ö׿ֻÖ
†Ö»Ö껵ÖÖ †Ö»Öê»Öß †Ö»Ö껵ÖÖ †Ö»Ö껵ÖÖ
úÖ´ÖÖ“ÖÖ ‹ãúÖ ŸÖÖ¸üÖÖ ˆ¯Öú¸üÖ“Öß
ŸÖ¯Ö×¿Ö»Ö ¸üŒú´Ö ¸üŒú´Ö
ŸÖÖ¸üßÖ “Ö»Ö−Ö ¸üŒú´Ö
Îú´ÖÖӍú
1. 2. 3. 4. 5. 6. 7. 8. 9.
¯Ö׸ü׿Ö™ü-ü 3
¿ÖÖÃÖ׍úµÖ ×¾Ö³Ö֐Ö/ãÖÖ×−֍ú ÃÖÓãÖÖ/ÃÖÖ¾ÖÔ•Ö×−֍ú ˆ¯ÖÎú´ÖÖŸÖ±ìú ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê ¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ
ÃÖ−Ö 200 ú¸üߟÖÖ
×¾Ö³Ö֐ÖÖ“Öê −ÖÖÓ¾Ö :-
†ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ“Öê −ÖÖÓ¾Ö ¾Ö Ææü¤ü¤ËüÖ :-
−ÖÖë¤üÖß Îú´ÖÖӍú :-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖӬ֍úÖ´Ö úִ֐ÖÖ¸ü †×¬Ö×−ÖµÖ´Ö †ÓŸÖÖÔŸÖ
†ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ“ÖÖ ÃÖÓ¤ü³ÖÔ Îú´ÖÖӍú

†.Îú. •µÖÖ¾ÖÂÖá úÖ´Ö ÃÖã¹ý •µÖÖ ¾ÖÂÖÖÔŸÖ ×¤ü»Ö껵ÖÖ ú¯ÖÖŸÖ ³Ö¸üÖ


ú¸üµÖÖŸÖ †Ö»Öê ŸµÖÖ Óú¡ÖÖ™ü¤üÖ¸üÖÓ−ÖÖ ‹ãúÖ ú¸üµÖÖŸÖ ú¸üµÖÖŸÖ
¾ÖÂÖÖÔŸÖ ¤êüµÖÖŸÖ úÖ´ÖÖ“Öê ײֻÖê ײֻÖÖ“Öß †Ö»Ö껵ÖÖ †Ö»Ö껵ÖÖ
†Ö»Ö껵ÖÖ úÖ´ÖÖ“Öß †¤üÖ ú¸üµÖÖŸÖ ¸üŒú´Ö ˆ¯Öú¸üÖ“Öß ˆ¯Öú¸üÖ“Öß
ÃÖӏµÖÖ †Ö»Öß ¸üŒú´Ö ¸üŒú´Ö
ŸµÖÖ²ÖÖ²ÖŸÖ
úÖ´ÖÖ“µÖÖ
úÖ´ÖÖ“Öß
ÃÖӏµÖÖ
1. 2. 3. 4. 5. 6.
¯Ö׸ü׿Ö™ü-ü 4
†Ö¸ü֏֛êü ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖ ¯ÖÏÖ׬֍úÖ-µÖÖӍú›æü−Ö ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê ¾ÖÖÙÂ֍ú ×¾Ö¾Ö¸üÖ
ÃÖ−Ö 2000- ú¸üߟÖÖ

úÖµÖÖÔ»ÖµÖÖ“Öê −ÖÖÓ¾Ö ¾Ö †Ö¸ü֏֛üÖ ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖÓ ¯ÖÏÖ׬֍úÖ-µÖÖÓ“ÖÖ Ææü¤ü¤ËüÖ :-

ÃÖÓ¤ü³ÖÔ Îú´ÖÖӍú
†.Îú †Ö٣֍ú ¾ÖÂÖÖÔŸÖ •Ö´ÖÖ ³Ö¸üÖÖ ÃÖ¾ÖÔ 12 •Ö´ÖÖ ú¸üµÖÖŸÖ ´ÖÓ›üôûÖŸÖ±ìú
´ÖÓ•Öæ¸ü ú¸üµÖÖŸÖ êú»Ö껵ÖÖ êú»Ö껵ÖÖ ´Ö×Æü−µÖÖ“Öê †Ö»Ö껵ÖÖ †Ö¸ü֏֛êü ´ÖÓ•Öæ¸ü
†Ö»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ˆ¯Öú¸üÖ“Öß ´ÖÖ×Ã֍ú ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß ú¸üµÖÖŸÖ
†Ö¸ü֏֛üµÖÖ“Öß ¸üŒú´Ö ¸üŒú´Ö ×¾Ö¾Ö¸üÖ¯Ö¡Ö —ÖÖ»Öê»ÖÖ ¯ÖÏŸµÖÖ †Ö»Ö껵ÖÖ
ÃÖӏµÖÖ ¹ý¯ÖµÖê ¹ý¯ÖµÖê ÃÖÖ¤ü¸ü êú»Öê Ö“ÖÔ †×¬ÖúÖ-µÖÖÓ−ÖÖ
†ÖÆêüŸÖ úÖµÖ (1 % ¯ÖêÖ ˆ¯Öú¸
†Ö×Ö ³Ö¸üÖÖ •ÖÖÃŸÖ ÖÖêôûÖ
êú»Ö껵ÖÖ −ÖÃÖ»Öê»ÖÖ) ú¸üµÖÖÃÖÖšüß
ˆ¯Öú¸üÖ“Öß Ö“ÖÔ ú¸üµÖÖŸÖ
¸üŒú´Öê“ÖÖ †Ö»Ö껵ÖÖ
´Öêôû ²ÖÃÖ»ÖÖ ¸üŒú´Öê“Öß
úÖµÖ ú¸üµÖÖŸÖ
†Ö»Ö껵ÖÖ
¯Ö¸ü߯ÖãŸÖá
²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ
(´ÖÓ›üôû֍ú¸üߟÖÖ
1. 2. 3. 4. 5. 6. 7.
जलसंपदा विभागाने प्रवििर्षी दरसूचीिर
आधारीि भाििाढ वनदे शांक प्रवसध्द करणेबाबि

महाराष्ट्र शासन
जलसंपदा विभाग
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
मंत्रालय, मंबई - 400 032.
िारीख: 22 मे, 2017
प्रस्िािना:-

राज्यािील विविध पाटबंधारे विकास महामंडळाकडील सधारीि प्रशाकीय मान्यिा प्रस्िाि,


ससचनक्षमिा, ससवचि क्षेत्र यांची िपासणी करण्याकवरिा डॉ.माधिराि वचिळे ,जलिज्ञ िथा माजी सवचि,
केंद्रीय जलसंसाधन मंत्रालय,निी वदल्ली यांच्या अध्यक्षिेखाली विशेर्ष चौकशी सवमिी वनयक्ि करण्याि आली
होिी. या सवमिीने तयांचा अहिाल वद.1-3-2014 रोजी शासनास सादर केला. सवमिीच्या अहिालाि एकूण
42 सधारणा प्रस्िाविि करण्याि आल्या आहेि. सदर सवमिीच्या अहिालािरील कायणपालन अहिालाि सदर
सधारणा ितिि: मान्य करण्याि आल्या आहेि.

एखाद्या प्रकल्पाच्या बांधकामाचा कालािधी मोठा असिो िेव्हा भाििाढीमळे प्रकल्पाच्या खचाि
होणारी िाढ ही अवनिायण ि अपवरहायण असिे. तयामळे दीर्णकाळ चालि असलेल्या प्रकल्पािील सकमििाढीचे
विश्लेर्षण करिांना प्रथमि: भाििाढीमळे झालेली सकमििाढ वनविि करुन िी अपवरहायण म्हणून िेगळी
काढली पावहजे. सधारीि प्रकल्प अहिाल ियार करिाना सविस्िर पवरगणना कूनन भाििाढीमळे प्रकल्प
खचाि होणारी िाढ काढण्याि येिे. िथापी, सधारीि प्रकल्प अहिालाच्या िपासणीच्या प्रतयेक टप्पप्पयािर
भाििाढीमळे होणारी प्रकल्प खचािील िाढीच्या सविस्िर पवरगणनेची आकडे िारी िपासणी शक्य होि नाही.
यासाठी भाििाढीमळे होणारी सकमििाढ स्स्िकारिाना सधारीि प्रशासकीय मान्यिा दे णाऱ्या प्रावधकरणास
पडिाळणीसाठी सटसटीि, सलभ ि िकणसंगि कायणपध्दिी विकवसि करणे गरजेचे ठरिे. ससचन विर्षयक
विशेर्ष चौकशी सवमिीच्या अहिालािील प्रस्िाविि 42 सधारणांमध्ये सधारणा क्र.18 पढीलप्रमाणे आहे.

“जलसंपदा विभागाने प्रिीिर्षी दरसूचीिर आधावरि भाििाढ वनदे शांक प्रवसध्द करािा”.

केंवद्रय बांधकाम विभागाच्या धिीिर असे वनदे शांक ठरविण्यासाठी मख्य अवभयंिा (जसं) ि सह सवचि यांच्या
अध्यक्षिेखाली अधीक्षक अवभयंिा, जायकिाडी प्रकल्प मंडळ औरंगाबाद आवण अधीक्षक अवभयंिा, महाराष्ट्र
कृष्ट्णा खोरे विकास महामंडळ हे सदस्य सवचि असलेली सवमिी गवठि करण्याि आली होिी.

राज्यािील मोठे ,मध्यम ि लर्ू प्रकल्पांच्या विविध कामांच्या 6 वनविदांचा (मोठ्या प्रकल्पािील मािी
धरण, द्वारयक्ि उतसारी भागाची कामे, मध्यम प्रकल्पाचे मािी धरणाचे काम, उपसा ससचन योजनेची कामे,
लपा प्रकल्पांच्या धरणाचे काम, अस्िरीकरणासह कालव्यांची कामे आवण मोठ्या प्रकल्पािील बॅरेजेसची
कामे) अभ्यास कूनन िसेच दरम्यानच्या कालािधीि केंद्रीय जलआयोगाने एवप्रल 2016 मध्ये जलसंपदा
प्रकल्पाच्या अंदाजपत्रक ियार करणेसाठीच्या प्रवसध्द केलेल्या मसूदा मागणदशणक सूचनाचा अभ्यास कूनन
सवमिीने आपला अहिाल सादर केला.
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

सवमिीच्या प्रमख वशफारशी खालीलप्रमाणे.

1) जलसंपदा विभागासाठी भाििाढ वनदे शांक पवरगवणि करिाना प्रकल्प सकमिीिर पवरणाम
करणाऱ्या र्टकांचे पढील प्रमाणे अवधमान (Weightage) वनविि करणेि यािे.

All Commodities :- 35 %

Cement :- 18 %

Steel :- 12 %

Fuel :- 10 %

Labour :- 25 %

2अ) वसमेंट, स्टील ि All Commodities साठी केंद्र शासनाचे Office of the Economic Advisor
Ministry of Commerce and Industries यांनी मवहना वनहाय प्रवसध्द केलेले Indices विचाराि
घ्यािेि. (http://eaindustry.nic.in)

2ब) इंधनासाठी Indian Oil यांनी मंबईसाठी प्रवसध्द केलेले दर विचाराि र्ेणेि यािेि.
(http://www.iocl.com)

2क) लेबर Indices साठी लेबर ब्यरोने प्रवसध्द केलेले Consumer Price Index for Industrial
workers विचाराि र्ेणेि यािेि. (http://labourbureau.nic.in) यासाठी मंबई, नागपूर , नावशक,
पणे, सोलापूर साठीच्या Indices ची सरासरी विचाराि र्ेणेि यािी.

(3) अथणसंकल्पाि िर्षासाठीची करप्रणाली वनविि होि असिे. तयामळे दरिर्षीचा भाििाढ वनदे शांक
पवरगवणि करिाना एवप्रल मवहन्यािील वनदे शांक विचाराि घ्यािेि.

सवमिीने उपरोक्ि गृहीिकािर आधारीि ससचन प्रकल्पासाठीचे सन 2000 पासनचे िार्षर्षक वनदेशांक
पवरगवणि कूनन शासनास सादर केले.

सवमिीचा अहिाल स्स्िकृि कूनन शासनाने ससचन प्रकल्पांचे भाििाढ वनदे शांकाबाबि पढील प्रमाणे वनणणय
र्ेिला आहे.

शासन वनणणय-

1) ससचन प्रकल्पांना सधारीि प्रशासवकय मान्यिा दे िाना भाििाढीमळे दशणविण्याि आलेल्या


सकमिीिाढीची व्यिहायणिा िपासणे साठी पवरवशष्ट्ठ 1 मधील भाििाढ वनदे शांकाचा िापर करािा.

2) एखाद्या िर्षी जलसंपदा विभागाची दरसूची प्रवसध्द न झाल्यास दरसूचीिील बाबीचे दर िदथणपणे
िाढििाना सदर वनदे शांकािील िाढ विचाराि घ्यािी.

पृष्ट्ठ 4 पैकी 2
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

3) दरिर्षीचे भाििाढ वनदे शांक एवप्रल मवहन्याचे प्रसावरि होणाऱ्या वनदे शांकाचे आधारािर प्रवसध्द
करािेि.

सदर शासन वनणणय महाराष्ट्र शासनाच्या www.maharashtra.gov.in या संकेिस्थळािर


उपलब्ध करण्याि आला असून तयाचा संकेिाक 201705261504066127 असा आहे. हा आदे श
वडजीटल स्िाक्षरीने साक्षांवकि करुन काढण्याि येि आहे.
महाराष्ट्राचे राज्यपाल यांच्या आदे शानसार ि नािाने.
Digitally signed by Rajendra Baburao Kshirsagar

Rajendra Baburao DN: c=IN, o=Government Of Maharashtra, ou=Water


Resources, postalCode=400032, st=Maharashtra,
2.5.4.20=0d5a1f5709281445b9117f5316c6c720edc1a56

Kshirsagar ac9bda2e00ed1169efc12f9e9, cn=Rajendra Baburao


Kshirsagar
Date: 2017.05.26 15:08:14 +05'30'

(रा. बा. क्षीरसागर)


अिर सवचि, महाराष्ट्र शासन
प्रि-
1) मा.राज्यपालांचे सवचि
2) मा.मख्यमंत्री यांचे प्रधान सवचि
3) सिण मंत्री/राज्यमंत्री यांचे खाजगी सवचि
4) सिण मंत्रालयीन विभागाचे अप्पपर मख्य सवचि/प्रधान सवचि/सवचि,मंत्रालय,मंबई
5) सवचि, मख्य सवचि कायालय,मंत्रालय,मंबई.
6) सवचि, महाराष्ट्र विधानमंडळ सवचिालय,विधानभिन,मंबई.
7) सवचि, संसवदय कायण विभाग,मंत्रालय,मंबई
8) महासंचालक, मावहिी ि जनसंपकण महासंचालनालय,मंबई
9) अप्पपर मख्य सवचि(वनयोजन),मंत्रालय,मंबई.
10) अप्पपर मख्य सवचि (वित्त), मंत्रालय,मंबई
11) अप्पपर मख्य सवचि (कृर्षी ि पणन),मंत्रालय,मंबई
12) अप्पपर मख्य सवचि (महसूल),मंत्रालय,मंबई
13) प्रधान सवचि (जलसंपदा),मंत्रालय,मंबई.
14) सवचि (जलसंपदा,लाक्षेवि),मंत्रालय,मंबई.
15) सवचि (जलसंपदा, प्रकल्प समन्िय),मंत्रालय,मंबई.
16) प्रधान सवचि (जलसंधारण, रो.ह.यो.),मंत्रालय,मंबई.
17) प्रधान सवचि (पाणी परिठा ि स्िच्छिा),मंत्रालय,मंबई.
18) प्रधान सवचि (िने),मंत्रालय,मंबई.
19) प्रधान सवचि (ग्रामविकास),मंत्रालय,मंबई.
20) सवचि (मदि ि पनिणसन),मंत्रालय,मंबई.
21) महासंचालक,महाराष्ट्र अवभयांवत्रकी संशोधन संस्था,नावशक.
22) सिण कायणकारी संचालक, पाटबंधारे विकास महामंडळे ,ठाणे,पणे,नागपूर,औरंगाबाद,जळगांि
23) सिण मख्य अवभयंिा ि सहसवचि/सहसवचि,जलसंपदा विभाग,मंत्रालय, मंबई -32
24) वनिड नस्िी, लपा-2, जलसंपदा विभाग, मंत्रालय,मंबई.६

पृष्ट्ठ 4 पैकी 3
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2

पवरवशष्ट्ट -1

ससचन प्रकल्पासाठीचे िर्षणवनहाय भाििाढ वनदे शांक


(आधारभूि िर्षण-2000)

अ.क्र. िर्षण दरसूची भाििाढ वनदे शांक


1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37
9 2008 167.31
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23

पृष्ट्ठ 4 पैकी 4
HETRTTHA
tadowrpy.w@maharashtrajgov i

ATE.

T.341 1TS)
37 tay

T i )FTYTEETTUET.

You might also like