WRD CSR 2022-23 Abstract
WRD CSR 2022-23 Abstract
8 EW 8 Compaction of bankwork
15 EW 15 C.O.T. filling - material from borrow areas (Private land- contractors own material)
16 EW 16 Hearting embankment from borrow areas (Private land- contractors own material)
17 EW 17 Casing embankment from borrow areas (Private land- contractors own material)
19 EW 19 CNS material lining to canals - borrow area (Private land- contractors own material)
20A EW 20A Providing and constructing 150 mm thick unscreened sand layer
20B EW 20B Providing and constructing Quarry Spalls
21 EW 21 Providing and constructing 300 mm thick dry rubble stone pitching layer
22 EW 22 Providing and constructing 450 mm thick dry rubble stone pitching
23 EW 23 Dry rubble rock-toe
24 EW 24 Longitudinal and Cross graded filter drains
25 EW 25 Vetical or inclined graded filter media
26 EW 26 Dewatering by pumping out water collected with 10 to 19 HP Diesel & Electrical pumps
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23
SECTION-03- Concrete Works including Centering, Masonry & RCC Pipes (CC 1 to CC 47) 26 to 39
Cement concrete M-15(20 MSA) for Mechanical Paver Canal Lining (With 50 % GGBS)
CC 7B
A)Bed lining B)Side lining i)curing compound ii)curing with water
Canal Structures
U.S.R.Masonary
72 CC 46 Providing and constructing contraction joints by fixing 310 mm wide PVC water stop
CC 47 Supplying, laying and joining Bituminous Geomembrane (BGM) as hydraulic liner over canal
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23
SECTION-04- Tunnel Works (Item TN 1 to TN 11 ) 40 to 42
78 TN 6A Anchor bar of 32 mm diameter with resin bond cement capsule anchorage(Through adit )
TN 6B Anchor bar of 32 mm diameter with resin bond cement capsule anchorage (Through Shaft )
79 TN 7A Permanent structural steel supports (Through adit )
TN 7B Permanent structural steel supports (Through Shaft )
80 TN 8A Reinforcement steel for tunnel RCC works (Through adit )
TN 8B Reinforcement steel for tunnel RCC works (Through Shaft )
81 TN 9A M-30 plain Wet Shotcrete 50 mm thick (Through adit )
TN 9B M-30 plain Wet Shotcrete 50 mm thick (Through Shaft )
82 TN 10A Cement concrete M-20 for side and arch lining (Through adit )
TN 10B Cement concrete M-20 for side and arch lining (Through Shaft )
83 TN 11A Cement concrete M-20 for Invert (Kerb and bed) lining (Through adit )
TN 11B Cement concrete M-20 for Invert (Kerb and bed) lining (Through Shaft )
SECTION-05 Surveying & Investigation (Item SI 1 to SI 17) 43 to 46
115 VAL 8 Kud walls with clothing of grass / other vegetation with vertical posts and bamboos
117 VAL 10 Kud walls, split Bamboo knitted together and covered with 12 mm. thick mud plaster
143 BRL 1 Fixing control points by DGPS every One Km. along the both side of river .
144 BRL 2 Traverse Survey along river with cross section at 100 m .c/c
145 BRL 3 Delivering Contour map of 0.50 m. contour interval
146 BRL 4 Providing computerised detailed C/S drawings at 100 m interval with profile of river
147 BRL 5 Computation of Blue line and red line by using HEC-RAS software
148 BRL 6 Providing computerised detailed river alignment with contours
149 BRL 7 Marking of blue line& Red line on permanent structures like Bridges
SECTION-10 Land reclaimation Work & Soil Survey (Item LR 1 to LR 12) 59 to 60
178 MR 17 Applying geru wash and white wash to canal road side Km stones/Boundary stones
MR 33 Drilling 52-57 mm dia grout holes by percusson drilling equipment through masonry / rock.(A to D )
MR 34 Drilling 75 mm dia hole in masonry / rock by diamond drilling from foundation gallery
MR 35 Providing & injecting cementatious grout as per specification in the drilled holes.
Additional items MR 36 Racking and cleaning of masonary joints on upstrem face of dam.
MR 37 pointing of masonary joint on upstream face of dam with UV resinstance and anti shrink materials.
MR 38 filling deeper cavities or loose material area inside the masonary joints.
SECTION-12-Lift Iirrigation Scheme & Pipe Distribution Network ( LIPDN 1 to LIPDN 71 ) 68 to 126
194 LIPDN 1 Excavation for deep trenches for laying rising main in Earth Soil
195 LIPDN 2 Excavation for deep trenches for laying rising main in Hard Murum
196 LIPDN 3 Excavation for deep trenches for laying rising main in Soft Rock
197 LIPDN 4 Excavation for deep trenches for laying rising main in Hard Rock by blasting
198 LIPDN 5 Murum bedding in trenches from available material
199 LIPDN 6 Murum bedding in trenches from borrow (Private land Contractors own material)
200 LIPDN 7 Providing and filling sand in trenches
201 LIPDN 8 Backfilling the trenches
202 LIPDN 9 Providing and Erecting , lowering and laying M.S. pipes
203 LIPDN 10 Lowering, laying M.S. pipes
204 LIPDN 11 Providing and Erecting tapers made out of MS plate
205 LIPDN 12 Providing and Erecting "Y" connection
206 LIPDN 13 Providing and Erecting "Y" and "T" branches
207 LIPDN 14 Providing and Erecting manhole covers
208 LIPDN 15 Providing and Erecting M S bends
209 LIPDN 16 Providing and Erecting short pipes, cants
210 LIPDN 17 Radiographic testing of welded butt joints in Rising main
211 LIPDN 18 Ultrasonic testing of field welded joints
212 LIPDN 19 Cleaning the surface of rising main pipe by Sand Blasting
213 LIPDN 20 Liquid epoxy coating system to the external surface of Rising Main Pipes
214 LIPDN 21 Liquid epoxy coating system to the interior surface of Rising Main Pipes
215 LIPDN 22 External 25 mm thick cement mortar coating in CM 1 : 3
216 LIPDN 23 Inner cement mortar in CM 1:1.5
217 LIPDN 24 Providing 'X' Ray Quality M.S. Welding for M.S. pipes
D.I.Pipe
218 LIPDN 25 Providing and supplying D.I. Pipes
219 LIPDN 26 Lowering, laying and jointing in proper grade and alignment D.I. Pipes
220 LIPDN 27 Providing and supplying ISI standard D. I. specials & fitting
221 LIPDN 28 Hydraulic testing of D.I. pipe line
P.V.C.Pipe
222 LIPDN 29 Providing and supplying P.V.C.Pipe
223 LIPDN 30 Lowering, laying and jointing in proper grade and alignment P.V.C.Pipe
224 LIPDN 31 Providing and supplying ISI standard P.V.C. specials & fitting
225 LIPDN 32 Hydraulic testing of P.V.C.Pipe line
P.V.C.O.Pipe
226 LIPDN 33 Providing and supplying P.V.C.O. Pipes
227 LIPDN 34 Lowering, laying and jointing in proper grade and alignment P.V.C.O. Pipes
228 LIPDN 35 Providing and supplying ISI standardP.V.C.O. specials & fitting
229 LIPDN 36 Hydraulic testing of P.V.C.O. pipe line
Item no. as Item no. as
per WRD-CSR per WRD-CSR Brief Description of Item Page No.
2021-22 2022-23
P.S.C.Pipe
230 LIPDN 37 Providing and supplying P.S.C. Pipes
231 LIPDN 38 Lowering, laying and jointing in proper grade and alignment P.S.C. Pipes
232 LIPDN 39 Providing and supplying ISI standard P.S.C. specials & fitting
233 LIPDN 40 Hydraulic testing ofP.S.C. pipe line
B.W.S.C.Pipe
234 LIPDN 41 Providing and supplying B.W.S.C. Pipes
235 LIPDN 42 Lowering, laying and jointing in proper grade and alignmentB.W.S.C. Pipes
236 LIPDN 43 Providing and supplying ISI standard B.W.S.C.specials & fitting
237 LIPDN 44 Hydraulic testing of B.W.S.C.pipe line
G.R.P.Pipe
238 LIPDN 45 Providing and supplying G.R.P. Pipes
239 LIPDN 46 Lowering, laying and jointing in proper grade and alignment G.R.P. Pipes
240 LIPDN 47 Providing and supplying ISI standard G.R.P. specials & fitting
241 LIPDN 48 Hydraulic testing of G.R.P. pipe line
H.D.P.E.Pipe
243 LIPDN 50 Lowering, laying and jointing in proper grade and alignment H.D.P.E. Pipes
244 LIPDN 51 Providing and supplying ISI standard H.D.P.E. specials & fitting
P.C.C. Pipe
247 LIPDN 54 Lowering, laying and jointing in proper grade and alignment P.C.C. Pipes
248 LIPDN 55 Providing and supplying ISI standard P.C.C. specials & fitting
Valves
250 LIPDN 57 Providing, supplying & erecting of approved make CI D/F reflux valves 100 to 600 mm
251 LIPDN 58 Providing, supplying & erecting of multi door CI D/F reflux valves 700 to 1200 mm
252 LIPDN 59 Providing, supplying & erecting of approved make DI or SGI D/F reflux valves
253 LIPDN 60 Providing, supplying & erecting of approved make multi door DI D/F reflux valves
254 LIPDN 61 Providing, supplying & erecting of approved make CS D/F reflux valves
255 LIPDN 62 Providing, supplying & erecting of approved make multi door CS D/F reflux valves
256 LIPDN 63 Providing, supplying & erecting of CI double flange sluice valve
257 LIPDN 64 P. S. & E. double flange Ductile Iron non-rising spindle soft seated Resilient seated sluice Valves
258 LIPDN 65 P. S. & E.of double flanged short body pattern type manually operated C.I. Butterfly Valve
259 LIPDN 66 P. S. & E. of Ductile Iron Double Flanged Double Eccentric Butterfly Valves
260 LIPDN 67 Providing, supplying & erecting of Air Valves - double orifice type
261 LIPDN 68 Providing, supplying & erecting of Kinetic Double Orifice type Air Valves
262 LIPDN 69 Electric Valve Actuator for non rising spindle type sluice valve, PN 1 & PN 1.6 rating
SECTION-1
सामाईक दरसूची सन २०२२-२३ ही ददनाांक 01/06/2022 पासून अांमलात येईल. सदर दरसूची
सन २०२२-२३ मध्ये खालील प्रमुख बाबींचा समावेश करण्यात आला आहे .
1)र्स्तू र् सेर्ा कर :-
सामाईक दरसूची सन 2022-23 मधील सवव बाां धकाम सादहतयाांचे दर, सवव यांत्र सामग्रीचे दर
तसेच सवव बाबींचे दर हे वस्तु व सेवाकर दवरहीत (without GST) आहे त. अांदाजपत्रके मांजुर
करणा-या सक्षम अदधकारी याांनी Government of India, Ministry of finance (Dept. of
revenue) याांचे मार्फवत वेळोवेळी अद्ययावत प्रदसद्ध करण्यात येणा-या notifications
(Government of India, Ministry of Finance (Department of Revenue),
Notification No.15/2021-Central Tax (Rate), New Delhi, Dt.18th November,
2021) मधील प्रचदलत दराप्रमाणे वस्तु व सेवा कराच्या दराांची अांदाजपत्रकाांमध्ये गोषवा-या
(recapitulation sheet) मध्ये तरतूद करण्यात यावी.
2) स्र्ाटमत्र् शुल्क:-
वाळू, दगड, खडी, तसेच मातीकामाच्या बाबींसाठी लागणारे मुरूम, माती या गौण खदनजाांचे
स्वादमतव शुल्क या बाबीच्या दरामध्ये तसेच तयाचा वापर करून केलेल्या दरपृथ:करणात
अांतर्ूवत नाहीत. महसूल व वनदवर्ागाच्या वेळोवेळीच्या अदधसूचनेनस
ु ार गौणखदनज कदरताचे
स्वादमतव शुल्क अांदाजपत्रकाच्या गोषवाऱ्यामध्ये स्वतांत्रपणे घेण्यात यावे. मुरुम, खडी, दगड व
वाळू या गौण खदनजाांच्या स्वादमतव शुल्कावरील अदधर्ाराबाबत अांदाजपत्रके तयार करताांना
महाराष्ट्र शासन, उद्योग, उजा व कामगार मांत्रालय, मुांबई याांचेकडील पदरपत्रक दवचारात घ्यावे.
1
महाराष्ट्र शासन, जलसंपदा विभाग
(उदाहरण :- वाळूच्या दललावाचा दर रु. 900 प्रदत घमी. वाळूच्या दरात अदतदरक्त घ्यावयाची
वाढ =900.00-७४४.५०=१५५.५० प्रदतघमी.)
4) कृ टिम र्ाळू (Artificial / Crushed Sand):-
4.1 ज्या कामाांमध्ये कृ त्रीम वाळू वापरणे प्रस्तादवत आहे , अशा कामाांची अांदाजपत्रके तयार
करताना तयामध्ये कृ त्रीम वाळू वापरासाठी रु.१७७०.२० प्रति घमी असा दर घेण्याि यावा
म्हणजेच दरपृथ:करण करिाना हा दर (रु.१७७०.२०प्रतिघमी) व अ क्र ३ मधील नैसर्गिक
वाळू चा दर (रु.९८०.९० प्रति घमी) यामधील फरक (रु.७८९.३० प्रतिघमी) तवचाराि घेण्याि
यावा.
4.2 कृ दत्रम वाळूसाठी आवचयक असणारी वहन अांतराची तरतूद ही कामाच्या दठकाणापासून
जवळच्या उपलब्ध क्रशर (CRUSHER) पासून दवचारात घेण्यात यावी.
5) मजुराांच्या सुटर्धा :-
शासन दनणवय क्रमाांक.दडएसआर-1090/सीआर-6453/पीएलएन-3, दद.14.07.1993 नुसार
मजुराांच्या सुदवधाांसाठी दरसूचीतील प्रतयेक बाबीमध्ये 1% तरतूद करण्यात आली आहे .
6) कामिार कल्याण उपकर :-
उद्योग व उजा दवर्ागाचे शासन दनणवय क्रमाांक बीसीए-2009/सीआर-108/लेबर 7-अ,
दद.17/06/2010 नुसार कामगार कल्याण उपकरासाठीची १ %ची तरतूद सामाईक दरसूचीतील
बाबीमध्ये दर दनश्चचत करताना दवचारात घेतलेली नाही. अांदाजपत्रक तयार करताना प्रतयेक
बाबीच्या दरपृथ:करणामध्ये कामगार कल्याण उपकराची 1 टक्के इतकी तरतूद करण्यात यावी.
7) टर्मा :-
दवत्त दवर्ागाचा शासन दनणवय क्रमाांक दवमासां-1008/प्र.क्र.28/98/शा.हमी, दद.19/08/1998
नुसार कामाच्या ककमतीच्या 1% ची दवमा कदरताची तरतूद सामाईक दरसूचीतील बाबीमध्ये दर
दनश्चचत करताना दवचारात घेतलेली नाही. अांदाजपत्रक तयार करताना दवमा कदरताची 1 टक्के
इतकी तरतूद अांदाजपत्रकाच्या गोषवाऱ्यात करण्यात यावी. कांत्राटदाराने प्रतयक्ष र्रल्यानुसार
दवमा शुल्काची प्रदतपूती १% च्या मयादे त करावेत.
8) मजुराांचे दर :- सन २०२२-२३ या वषाची सामाईक दरसूची तयार करताांना मजुराांचे दर हे
महाराष्ट्र शासन, जलसांपदा दवर्ाग, शासन दनणव य क्र.सांकीणव 2014/(289/14)/लपा-2,
मांत्रालय, मुांबई दद. 22.05.2017 नुसार व कामगार उपायुक्त, कायालयाकडू न प्राप्त पत्र
जा.क्र./काउआ/१९९४ तदनाांक ०२/०२/२०२२ नुसार मजुराांचे दर दनश्चचत करणेत आलेले
आहे त.
9) बाांधकाम साटित्याचे दर:-
9.1.लोह: दरसूची तयार करताना M.S./HYSD/TMT स्टीलचे round bar, structural steel,
MS plates इतयादी साठी दद.06/01/2022 रोजीचे जॉइन्ट प्लॅन्ट कदमटीने मुांबई साठी
दनश्चचत केलेले दर (GST दवरदहत) दवचारात घेतलेले आहे त. (उदा. JPC प्रमाणे PIG IRON
2
महाराष्ट्र शासन, जलसंपदा विभाग
3
महाराष्ट्र शासन, जलसंपदा विभाग
4
महाराष्ट्र शासन, जलसंपदा विभाग
5
महाराष्ट्र शासन, जलसंपदा विभाग
6
महाराष्ट्र शासन, जलसंपदा विभाग
पररशशष्ट्ट-1
स िंचन प्रकल्पा ाठीचे वर्षसनहाय भाववाढ सनर्दे शािंक
1 2000 100.00
2 2001 108.51
3 2002 110.77
4 2003 117.51
5 2004 128.07
6 2005 135.03
7 2006 142.37
8 2007 153.37 आधारर्ूत वषव
9 2008 167.31 2000
10 2009 168.99
11 2010 186.68
12 2011 202.56
13 2012 219.69
14 2013 233.78
15 2014 243.62
16 2015 243.40
17 2016 247.23
18 2017 240.77
19 2018 258.11 आधारर्ूत वषव
20 2019 273.94 2011
21 2020 277.36
22 2021 299.88
23 2022 326.88
7
GOVERNMENT OF MAHARASHTRA
8
सामाईक सामाईक
जलसंपदा
दरसूची सन दरसूची सन
िवभाग, सामाईक
अ. . सािह एकक 2022-23 ा 2022-23 साठी
दरसूची सन
दरासाठीचा ािवत दर
2021-22 चा दर
गुणांक
47 Nut Bolts Kg 63.25 1.096 69.30
48 Nut Bolts & Washer Kg 98.30 1.096 107.75
49 Nylon Rope Kg 278.30 1.096 305.00
50 Oil Paint Litre 228.80 1.096 250.75
51 Ordinary Detonator No. 6.80 1.096 7.45
52 Oxygen Cum. 49.20 1.096 53.90
P.V.C. Water Stopper, 310 mm wide
53 Rmt. 215.35 1.096 236.00
central bulb type
54 Painting Brush 4" No. 99.25 1.096 108.80
55 Pickaxe No. 148.90 1.096 163.20
56 Pin Header of Standard size No. 32.75 1.096 35.90
57 Plum bob No. 99.25 1.096 108.80
58 Polyethylene Film 200 Gauge Kg. 237.50 1.096 260.30
59 Primer Litre 146.30 1.096 160.35
60 Red Oxide Litre 128.30 1.096 140.60
61 Rust Cleaner Litre 327.50 1.096 358.95
62 Safety Helmet No. 248.20 1.096 272.05
63 Safety Shoes Pair 1433.65 1.096 1571.30
64 Sand blast gun nozzle hour 3.15 1.096 3.45
Shalitex Super Expansion Pad - 12
65 Sqm 617.10 1.096 676.35
mm thick
66 Spinning belt Hour 30.90 1.096 33.85
67 Spirit Level - 150 mm. No. 118.75 1.096 130.15
68 Steel MT As per Table no.5
69 Stone (Excluding Royalty Charges) Cum 377.35 1.096 413.60
Stone Chips (Excluding Royalty
70 Cum 228.20 1.096 250.10
Charges)
71 Super Plasticizer Kg 96.95 1.096 106.25
72 Tower Bolt Iron 200 mm No. 69.05 1.096 75.70
73 Tower Bolt Iron 250 mm No. 79.85 1.096 87.50
74 Tripod for chain pully block Day 206.10 1.096 225.90
75 Turpentine Litre 69.05 1.096 75.70
76 Water 1000 Litres 37.90 1.096 41.55
77 Water Proofing Compound Kg 52.90 1.096 58.00
78 Welding Cable 600 AMP Rmt. 747.50 1.096 819.25
79 Welding holder hour 8.05 1.096 8.80
80 White Glass No. 4.85 1.096 5.30
81 Wire Brush No. 79.85 1.096 87.50
82 Wire Mesh 50 X 50 - 13 Gauge Sqm 198.60 1.096 217.65
83 Zink Base Oil Paint Litre 290.80 1.096 318.70
84 Zink Rich Epoxy Primer Litre 264.65 1.096 290.05
9
TABLE "2"
जलसंपदा िवभाग, सामाईक दरसूची सन 2022-23 साठी मजुरांचे ािवत दर
सामाईक
जलसंपदा दरसूची सन सामाईक दरसूची सन
िवभाग, सामाईक 2022-23 2022-23 साठी
अ. . मजूर एकक
दरसूची सन ा ािवत दर
2021-22 चा दर दरासाठीचा
गु णां क
1 2 3 4 5 6
1 Bar Bender Day 597.00 614
2 Bhisti Day 597.00 614
3 CAD Operator / Civil Engg. Assistant Day 751.00 1.053 791
4 Carpenter Day 597.00 614
5 Civil Engineer Day 1215.00 1.053 1279
6 Electrician Day 639.00 1.053 673
7 Fitter Day 597.00 614
8 Fitter for Shuttering / Pipe fitter Day 597.00 614
9 Foreman Day 597.00 614
10 Gas Cutter Day 597.00 614
11 Grinder Day 597.00 614
12 Gauge Inspector Day 597.00 614
13 Mason Day 597.00 614
14 Mazdoor (Heavy) Day 597.00 614
15 Mazdoor (Light) Day 551.00 568
16 Measurement Clerk Day 597.00 614
17 Mechanic / Operator Day 597.00 614
18 Mistri / Mukadam Day 597.00 614
19 Painter Day 597.00 614
20 Semiskilled Mazdoor Day 597.00 614
21 Skilled Mazdoor Day 597.00 614
22 Surveyor Day 837.00 1.053 881
23 Tile Turner Day 597.00 614
24 Tracer / Laminator Day 714.00 1.053 752
25 Unskilled Mazdoor / Helper Day 551.00 568
26 Welder Day 597.00 614
10
TABLE "3"
"सामाईक दरसूची सन 2022-23 साठी यं वापर दराचा तपशील
जलसंपदा िवभाग,
जलसंपदा िवभाग, सामाईक सामाईक दरसूची सन
अ. . यं ाचे नाव एकक दरसूची सन 2021-22 साठीचे 2022-23 साठी ािवत
दर
Total POL Total POL
1 2 3 4 5 6 7
1 Ace hydralic mobile crane 12.5 T Hour 709.00 312.00 720.00 296.00
Air compressor 105 CFM
2 Hour
(Electric) 433.00 161.00 445.00 196.00
3 Air compressor 280 CFM Hour 955.00 713.00 967.00 725.00
4 Air compressor 400 CFM (Diesel) Hour 1174.00 975.00 1239.00 1035.00
5 Batching plant 25 Cum/Hour Hour 1712.00 --- 1758.93 ---
6 Bending Machine Day 238.00 97.60 254.72 104.46
7 Compressor 510 CFM Hour 1012.00 812.00 1127.00 945.00
8 Concrete mixer 10/7 cft Hour 195.00 --- 208.62 ---
9 Concrete mixer 100 ltr capacity Hour 454.00 --- 485.77 ---
10 Diesel pump 3 HP Hour 177.00 --- 181.00 ---
11 Diesel pump 5 HP Hour 272.00 98.00 212.00 82.00
12 Diesel pump 10 HP Hour 272.00 98.00 295.00 163.00
13 Diesel pump 20 HP Hour 302.00 120.00 352.00 217.00
14 Dozer (Beml BD 80) Hour 3446 1581 3605.00 1673.00
15 Dozer 300 hp /Dozer CAT D 8 K Hour 4196.00 2729.00 4401.00 2900.00
16 DRR 8 to 10 Tons Hour 575.00 292.00 593.00 297.00
17 Escort Mobile crane 3 T Hour 608.00 312.00 537.00 237.00
18 Excavator -0.3 Cum Hour 866.00 474.00 909.00 495.00
19 Excavator -0.6 Cum Hour 1355.00 853.00 1419.00 890.00
20 Excavator -0.9 Cum Hour 1767.00 1137.00 2037.00 1285.00
21 Explosive Van Hour --- --- 851.00 457.00
22 Generating set41-60 KVA Hour 659.00 559.00 693.00 593.00
23 Grinding Machine Hour 25.00 --- 25.00 ---
24 Guniting equipment Hour 219.00 --- 227.00 ---
25 Hydra crane Capacity 09 T Hour 608.00 312.00 631.00 296.00
26 Hydra crane Capacity 11 T Hour 709.00 312.00 720.00 296.00
27 Hydra crane Capacity 12 T Hour 709.00 312.00 720.00 296.00
28 Hydra crane Capacity 14 T Hour 709.00 312.00 785.00 296.00
29 Hydra crane Capacity 15 T Hour 709.00 312.00 785.00 296.00
30 Hydra crane Capacity 20 T Hour 1082.00 621.60 1187.00 593.00
31 Hydra crane Capacity 25 T Hour 1601.00 975.00 1688.00 1035.00
32 Jack Hammer Day 40.00 --- 41.43 ---
33 JCB JS 3C /(Tata Hitachi TH86) Hour 1393.00 744.00 1497.00 791.00
34 L & T Sismopactor TT 900 Hour 1892.00 877.00 1973.00 932.00
35 Mobile Crane 12.5 T 709.00 312.00 720.00 296.00
36 Needle Vibrator Hour 158.00 --- 169.04 ---
11
जलसंपदा िवभाग,
जलसंपदा िवभाग, सामाईक सामाईक दरसूची सन
अ. . यं ाचे नाव एकक दरसूची सन 2021-22 साठीचे 2022-23 साठी ािवत
दर
37 Passanger wintch Hour 575.00 --- 586.00 ---
38 Pug machine for cutting Hour 16.00 4.33 18.27 4.95
39 Sand blasting equipment Hour 119.00 --- 123.00 ---
40 Scraper Euclid B-FDT model Hour 2924.00 2002.00 OUT DATED
41 Spinning Machine Hour 164.00 117.00 170.00 121.00
42 Tata Hitachi Ex 100 Hour --- --- 1253.00 652.00
Tata Hitachi EX 200 With
43 Hour
Breaker & slope compactor 1983.00 1116.00 2154.00 1243.00
44 TATA Truck 10 T Hour --- --- 1112.00 571.00
45 Tata Wheel loader 3036 Hour 2074.00 1116.00 2178.00 1186.00
46 Tipper Hour 1039.00 559.00 1104.00 571.00
47 Tipper mounting Drilling Jumbo Hour 853.00 --- 883.00 ---
48 Water tanker 10 T Hour 816.00 326.00 853.00 347.00
49 Water tanker 7.5 T Hour 561.00 244.00 574.00 247.00
50 Welding Transformer Hour 100.00 98.66 104.47 103.07
12
TABLE "4"
"सामाईक दरसूची सन 2022-23 साठी फ बोगदा कामासाठी वापरले ा अित र यं वापर
दराचा तपशील
Total POL
1 2 3 6 7
1 Tata Hitachi (EX-100) Hour 1563.00 979.00
2 Dozer (D 80 A12/BD 80) Hour 4507.00 2231.00
Double Crabe EOT crane (13.5 mt+13.5
3 Hour 4623.00 3277.00
mt)
13
TABLE "5"
जलसंपदा िवभाग, सामाईक दरसूची सन 2022-23 साठी ीलचे ािवत दर
Rate of Item with GST are as per Joint Plant Committee as on 06 JAN 2022 vide letter dated 02/02/2022
1 2 3 3
1 PIG IRON 57820 49000
2 BILLETS 100 MM 53940 45712
3 BLOOME 150X150 MM 56330 47737
4 PENCIL INGOTS 52510 44500
5 WIRE RODS 6 MM 66910 56703
6 WIRE RODS 8 MM 66320 56203
7 ROUNDS 12 MM 65380 55407
8 ROUNDS 16 MM 65260 55305
9 ROUNDS 25 MM 65260 55305
10 TMT 10 MM 62010 52551
11 TMT 12 MM 61530 52144
12 TMT 25 MM 61100 51780
13 ANGLES 50X50X6 MM 62460 52932
14 ANGLES 75X75X6 MM 61240 51898
15 JOISTS 125X70 MM 62660 53102
16 JOISTS 200X100 MM 62420 52898
17 CHANNELS 75X40 MM 62940 53339
18 CHANNELS 150X75 MM 64340 54525
19 PLATES 6 MM 78270 66331
20 PLATES 10 MM 78430 66466
21 PLATES 12 MM 78390 66432
22 PLATES 25 MM 77340 65542
23 H. R. COILS 2.00 MM 79380 67271
24 H. R. COILS 2.50 MM 78330 66381
25 H. R. COILS 3.15 MM 77840 65966
26 C. R. COILS 0.63 MM 83910 71110
27 C. R. COILS 1.00 MM 83380 70661
28 G. P. SHEETS 0.40 MM 94290 79907
29 G. P. SHEETS 0.63 MM 92680 78542
30 G. C. SHEETS 0. 40 MM 94870 80398
31 G. C. SHEETS 0. 63 MM 92510 78398
32 MELTING SCRAP H M S - I 43910 37212
33 MELTING SCRAP H M S - II 43790 37110
34 SPONGE IRON (COAL BASED) 39240 33254
14
GOVERNMENT OF MAHARASHTRA
( s. Aw AR)
~ U H M. I
~.
Lead Charges Statement for 2022-23 (Excluding Loading and Unloading Charges)
Statement I
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per Trip
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including (Rs)
(4 Rs 94.14 / (10 % of Truck Charges & Overhead
Km/Litre) Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)
1 2 3 4 5 6 7 8 9 10 11 12
col 6 + col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 94.14 col 6 X 0.10 Rs 2030/day col 9 x 0.20 col 9 + col 10 col 11 / col 3
7 + col 8
0.50 15.00 48.00 54.00 13.50 1270.89 127.09 2030.00 3427.98 685.60 4113.58 85.70
1.00 16.00 35.56 77.12 19.28 1815.02 181.50 2030.00 4026.52 805.30 4831.82 135.88
1.50 16.50 28.39 91.17 22.79 2145.45 214.55 2030.00 4390.00 878.00 5268.00 185.56
2.00 17.00 23.86 101.44 25.36 2387.39 238.74 2030.00 4656.13 931.23 5587.36 234.17
2.50 17.25 20.52 108.60 27.15 2555.90 255.59 2030.00 4841.49 968.30 5809.79 283.13
3.00 17.50 18.06 114.36 28.59 2691.46 269.15 2030.00 4990.61 998.12 5988.73 331.60
3.50 17.75 16.18 119.26 29.82 2807.25 280.73 2030.00 5117.98 1023.60 6141.58 379.58
4.00 18.00 14.69 123.52 30.88 2907.04 290.70 2030.00 5227.74 1045.55 6273.29 427.04
4.50 18.25 13.49 127.41 31.85 2998.36 299.84 2030.00 5328.20 1065.64 6393.84 473.97
5.00 18.50 12.49 130.90 32.73 3081.20 308.12 2030.00 5419.32 1083.86 6503.18 520.67
5.50 18.50 11.52 132.72 33.18 3123.57 312.36 2030.00 5465.93 1093.19 6559.12 569.37
6.00 18.75 10.81 135.72 33.93 3194.17 319.42 2030.00 5543.59 1108.72 6652.31 615.38
6.50 18.85 10.13 137.69 34.42 3240.30 324.03 2030.00 5594.33 1118.87 6713.20 662.70
7.00 19.00 9.56 139.84 34.96 3291.13 329.11 2030.00 5650.24 1130.05 6780.29 709.24
7.50 19.15 9.06 141.90 35.48 3340.09 334.01 2030.00 5704.10 1140.82 6844.92 755.51
8.00 19.30 8.61 143.76 35.94 3383.39 338.34 2030.00 5751.73 1150.35 6902.08 801.64
8.50 19.45 8.21 145.57 36.39 3425.75 342.58 2030.00 5798.33 1159.67 6958.00 847.50
9.00 19.60 7.86 147.48 36.87 3470.94 347.09 2030.00 5848.03 1169.61 7017.64 892.83
9.50 19.80 7.55 149.45 37.36 3517.07 351.71 2030.00 5898.78 1179.76 7078.54 937.55
10.00 20.00 7.27 151.40 37.85 3563.20 356.32 2030.00 5949.52 1189.90 7139.42 982.04
15
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per Trip
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including (Rs)
(4 Rs 94.14 / (10 % of Truck Charges & Overhead
Km/Litre) Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)
1 2 3 4 5 6 7 8 9 10 11 12
col 6 + col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 94.14 col 6 X 0.10 Rs 2030/day col 9 x 0.20 col 9 + col 10 col 11 / col 3
7 + col 8
11.00 21.00 6.97 159.34 39.84 3750.54 375.05 2030.00 6155.59 1231.12 7386.71 1059.79
12.00 22.00 6.72 167.28 41.82 3936.93 393.69 2030.00 6360.62 1272.12 7632.74 1135.82
13.00 23.00 6.50 175.00 43.75 4118.63 411.86 2030.00 6560.49 1312.10 7872.59 1211.17
14.00 24.00 6.32 182.96 45.74 4305.96 430.60 2030.00 6766.56 1353.31 8119.87 1284.79
15.00 25.00 6.15 190.50 47.63 4483.89 448.39 2030.00 6962.28 1392.46 8354.74 1358.49
20.00 25.00 4.71 194.40 48.60 4575.20 457.52 2030.00 7062.72 1412.54 8475.26 1799.42
25.00 25.00 3.81 196.50 49.13 4625.10 462.51 2030.00 7117.61 1423.52 8541.13 2241.77
30.00 30.00 3.81 234.60 58.65 5521.31 552.13 2030.00 8103.44 1620.69 9724.13 2552.27
35.00 30.00 3.29 236.30 59.08 5561.79 556.18 2030.00 8147.97 1629.59 9777.56 2971.90
40.00 30.00 2.89 237.20 59.30 5582.50 558.25 2030.00 8170.75 1634.15 9804.90 3392.70
45.00 30.00 2.58 238.20 59.55 5606.04 560.60 2030.00 8196.64 1639.33 9835.97 3812.39
50.00 30.00 2.33 239.00 59.75 5624.87 562.49 2030.00 8217.36 1643.47 9860.83 4232.12
60.00 35.00 2.27 278.40 69.60 6552.14 655.21 2030.00 9237.35 1847.47 11084.82 4883.18
70.00 35.00 1.95 279.00 69.75 6566.27 656.63 2030.00 9252.90 1850.58 11103.48 5694.09
80.00 35.00 1.71 279.60 69.90 6580.39 658.04 2030.00 9268.43 1853.69 11122.12 6504.16
90.00 35.00 1.53 281.40 70.35 6622.75 662.28 2030.00 9315.03 1863.01 11178.04 7305.91
100.00 35.00 1.38 282.00 70.50 6636.87 663.69 2030.00 9330.56 1866.11 11196.67 8113.53
16
Lead in Av Speed No of Trips Km Done Qty of Cost of diesel Cost of Hire Total Cost Add 20 % Cost Cost per Trip
Km In Km/Hr Diesel (Rate = Mobile Oil Charges of (Rs) Overhead Including (Rs)
(4 Rs 94.14 / (10 % of Truck Charges & Overhead
Km/Litre) Litre) Cost of (Rs) Contractors Charges &
(Rs) Diesel) Profit (Rs) Contractors
( Rs ) Profit (Rs)
1 2 3 4 5 6 7 8 9 10 11 12
col 6 + col
L S N=8/((2 x L/S)+0.1) (2 x NL)+6 Col 4/4 Col 5 X 94.14 col 6 X 0.10 Rs 2030/day col 9 x 0.20 col 9 + col 10 col 11 / col 3
7 + col 8
125.00 40.00 1.26 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 9847.82
150.00 40.00 1.05 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 11817.38
175.00 40.00 0.90 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 13786.94
200.00 40.00 0.79 322.00 80.50 7578.27 757.83 2030.00 10366.10 2073.22 12439.32 15745.97
250.00 40.00 0.63 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 19695.63
300.00 40.00 0.53 324.00 81.00 7625.34 762.53 2030.00 10417.87 2083.57 12501.44 23587.62
350.00 40.00 0.45 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 27573.89
400.00 40.00 0.40 326.00 81.50 7672.41 767.24 2030.00 10469.65 2093.93 12563.58 31408.95
450.00 40.00 0.35 321.00 80.25 7554.74 755.47 2030.00 10340.21 2068.04 12408.25 35452.14
500.00 40.00 0.32 326.00 81.50 7672.41 767.24 2030.00 10469.65 2093.93 12563.58 39261.19
Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3) The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval, 100 km to 200 km are with 25 km
interval and 200 km to 500 km are with 50 km interval. The transportation charges for intermediate Km within the range shall be worked out by lineraly
interpolating between rates of lower and upper values in the range.
4) For calculating additional lead charges, difference of lead charges i.e (lead charges - lead charges considered in basic rate analysis) shall be considered.)
17
Lead Charges Statement for 2022-23 (Excluding Loading and Unloading Charges)
Statement II
Cost of
Lead in Km Trip Lead Charges in Rs / Unit
( Rs)
Carrying
capacity of 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
0.50 85.70 18.23 14.90 14.28 12.24 8.57 9.52 17.14
1.00 135.88 28.91 23.63 22.65 19.41 13.59 15.10 27.18
1.50 185.56 39.48 32.27 30.93 26.51 18.56 20.62 37.11
2.00 234.17 49.82 40.73 39.03 33.45 23.42 26.02 46.83
2.50 283.13 60.24 49.24 47.19 40.45 28.31 31.46 56.63
3.00 331.60 70.55 57.67 55.27 47.37 33.16 36.84 66.32
3.50 379.58 80.76 66.01 63.26 54.23 37.96 42.18 75.92
4.00 427.04 90.86 74.27 71.17 61.01 42.70 47.45 85.41
4.50 473.97 100.84 82.43 79.00 67.71 47.40 52.66 94.79
5.00 520.67 110.78 90.55 86.78 74.38 52.07 57.85 104.13
5.50 569.37 121.14 99.02 94.90 81.34 56.94 63.26 113.87
6.00 615.38 130.93 107.02 102.56 87.91 61.54 68.38 123.08
6.50 662.70 141.00 115.25 110.45 94.67 66.27 73.63 132.54
7.00 709.24 150.90 123.35 118.21 101.32 70.92 78.80 141.85
7.50 755.51 160.75 131.39 125.92 107.93 75.55 83.95 151.10
18
Cost of
Lead in Km Trip Lead Charges in Rs / Unit
( Rs)
Carrying
capacity of 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
8.00 801.64 170.56 139.42 133.61 114.52 80.16 89.07 160.33
8.50 847.50 180.32 147.39 141.25 121.07 84.75 94.17 169.50
9.00 892.83 189.96 155.27 148.81 127.55 89.28 99.20 178.57
9.50 937.55 199.48 163.05 156.26 133.94 93.76 104.17 187.51
10.00 982.04 208.94 170.79 163.67 140.29 98.20 109.12 196.41
11.00 1059.79 225.49 184.31 176.63 151.40 105.98 117.75 211.96
12.00 1135.82 241.66 197.53 189.30 162.26 113.58 126.20 227.16
13.00 1211.17 257.70 210.64 201.86 173.02 121.12 134.57 242.23
14.00 1284.79 273.36 223.44 214.13 183.54 128.48 142.75 256.96
15.00 1358.49 289.04 236.26 226.42 194.07 135.85 150.94 271.70
20.00 1799.42 382.86 312.94 299.90 257.06 179.94 199.94 359.88
25.00 2241.77 476.97 389.87 373.63 320.25 224.18 249.09 448.35
30.00 2552.27 543.04 443.87 425.38 364.61 255.23 283.59 510.45
35.00 2971.90 632.32 516.85 495.32 424.56 297.19 330.21 594.38
40.00 3392.70 721.85 590.03 565.45 484.67 339.27 376.97 678.54
45.00 3812.39 811.15 663.02 635.40 544.63 381.24 423.60 762.48
50.00 4232.12 900.45 736.02 705.35 604.59 423.21 470.24 846.42
60.00 4883.18 1038.97 849.25 813.86 697.60 488.32 542.58 976.64
70.00 5694.09 1211.51 990.28 949.02 813.44 569.41 632.68 1138.82
80.00 6504.16 1383.86 1131.16 1084.03 929.17 650.42 722.68 1300.83
19
Cost of
Lead in Km Trip Lead Charges in Rs / Unit
( Rs)
Carrying
capacity of 4.70 m3 5.75 m3 6.00 m3 7.00 m3 10.00 MT 9000 Litre 5000 Nos.
Truck
Unit for
Trip Cum Cum Cum Cum MT 1000 Litre 1000 Nos.
Rate
90.00 7305.91 1554.45 1270.59 1217.65 1043.70 730.59 811.77 1461.18
100.00 8113.53 1726.28 1411.05 1352.26 1159.08 811.35 901.50 1622.71
125.00 9847.82 2095.28 1712.66 1641.30 1406.83 984.78 1094.20 1969.56
150.00 11817.38 2514.34 2055.20 1969.56 1688.20 1181.74 1313.04 2363.48
175.00 13786.94 2933.39 2397.73 2297.82 1969.56 1378.69 1531.88 2757.39
200.00 15745.97 3350.21 2738.43 2624.33 2249.42 1574.60 1749.55 3149.19
250.00 19695.63 4190.56 3425.33 3282.61 2813.66 1969.56 2188.40 3939.13
300.00 23587.62 5018.64 4102.19 3931.27 3369.66 2358.76 2620.85 4717.52
350.00 27573.89 5866.79 4795.46 4595.65 3939.13 2757.39 3063.77 5514.78
400.00 31408.95 6682.76 5462.43 5234.83 4486.99 3140.90 3489.88 6281.79
450.00 35452.14 7543.01 6165.59 5908.69 5064.59 3545.21 3939.13 7090.43
500.00 39261.19 8353.44 6828.03 6543.53 5608.74 3926.12 4362.35 7852.24
Note :
1) For calculation of carrying capacity, a tipper of 10 Tonne capacity is considered.
2) For loading and unloading of material on site, 6 minutes of ideal time i.e 0.1 hr is considered for working out No.of Trips.
3) The transportation charges beyond 15 km to 50 km are with 5 km interval, 50 km to 100 km are with 10 km interval, 100 km to 200
km are with 25 km interval and 200 km to 500 km are with 50 km interval.The transportation charges for intermediate Km within
the range shall be worked out by lineraly interpolating between rates of lower and upper values in the range.
4) For calculating additional lead charges, difference of lead charges i.e (lead charges - lead charges considered in basic rate analysis)
shall be considered.)
20
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION-2
ITEM NO. EW 1 to EW 26
SECTION -2
(S. ~ WAR)
CHIEF ENGINEER (CIVIL)
HYDROELECTRICAL PROJECT
AND QUALITY CONTROL,
PONE
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 2:- EXCAVATION & EMBANKMENT
21
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 6 Excavation in hard rock of all toughness by breaker
including boulders above 0.6 m dia.(0.113Cum)
minimising damage to side slopes of excavation and
placing the excavated rock neatly in approved dump
Section 2.1 Cum. 629.65 42.60
area including cost of all materials, machinery, labour,
levelling bed etc., complete with lead upto 1 km and all
lifts as directed .
22
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 12 Providing cut off trench filling using selected
impervious soil from approved borrow areas
(Government acquired land) including cost of all
materials, machinery,labour, all other operations such
as collection of soil, spreading soil in layer of specified
thickness, sorting out, breaking clods, levelling,
sectioning edges / sides, watering, compacting each Section 2.2 Cum. 164.90 2.76
layer to density control of not less than 95 % of Proctor
density using vibratory compactor including cost of
water etc. complete with lead upto1 km for water and
all lifts as directed.
23
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 17 Providing casing embankment using selected
pervious material from approved borrow areas
(Private land- contractor's own material) in layers
including cost of all materials, machinery, labour, all
other operations such as collection of soil, spreading
soil in layer of specified thickness, sorting out, breaking
clods, levelling, sectioning edges / sides, watering,
Section 2.2 Cum. 227.35 3.44
compacting each layer to density control of not less
than 95 % of Proctor density using vibratory compactor
including cost of water etc., complete with lead upto1
km for water and all lifts as directed.
24
Rate for 2022-23
(Rate in Rs.)
Item No. Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
EW 22 Providing and constructing 450 mm thick dry rubble
stone pitching with pin headers at 2 per sqm using
stones and stone chips from approved source including
cost of all materials, labour,hand,machinary ,packing / Section 2.3 Sqm. 378.70 44.10
wedging stone chips, finishing etc.complete with lead
up to 1 km and all lifts as directed.
25
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 3
ITEM NO. CC 1 TO CC 47
CONSUMPTION OF MATERIAL CONSIDERED IN RATE ANALYSIS
Item Item in brief Cement Coarse Fine
No. In bags Aggregate Aggregate
CC1A CC M-10 (20 MSA) 4.4 0.94 0.47
CC M-10 (40 MSA) 4.4 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
CC2A CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
CC3A CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.90 0.45
CC4A CC M-20 (20 MSA) 6.60 0.90 0.45
CC M-20 (40 MSA) 6.08 0.89 0.45
CC5A CC M-25 (20 MSA) 7.62 0.90 0.45
CC6A CC M-15 (20 MSA) for Bed lining per Cum 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
CC7A CC M-15 (20 MSA) Mechanized lining for bed lining 5.64 0.90 0.45
B) for side lining with curing compound 5.64 0.90 0.45
B) for side lining without curing compound 5.64 0.90 0.45
CC8A Chip Masonry behind concrete lining 1.25 1.24 0.35
(Rubble)
CC11 UCR Masonry in CM 1:5 for side lining 2.00 1.24 0.35
(Rubble)
CC12 Cement Plaster 6 mm thick in CM 1:3 0.057 0.006
CC13 CC M-10 (20 MSA) 4.40 0.94 0.47
CC M-10 (40 MSA) 4.40 0.94 0.47
CC M-10 (80 MSA) 4.33 0.94 0.47
CC14 CC M-15 (20 MSA) 5.64 0.90 0.45
CC M-15 (40 MSA) 5.20 0.89 0.45
CC M-15 (80 MSA) 4.99 0.89 0.45
CC15 CC M-15 (20 MSA) for abutment, pier 5.64 0.90 0.45
CC M-15 (40 MSA) for abutment, pier 5.20 0.89 0.45
CC M-15 (80 MSA) for abutment, pier 4.99 0.90 0.45
CC16 CC M-20 (20 MSA) for abutment, wing wall, returns, 6.60 0.90 0.45
transition walls, piers, columns, beams & Slabs, road
slab, kerb, super passage/slab culvert, trough
resting on ground, trough for aqueduct, wearing coat
& other concrete
CC M-20 (40 MSA) for abutment, retaining walls, 6.08 0.89 0.45
piers
CC17 CC M-25 (20 MSA) for column, beams and slabs, 7.62 0.90 0.45
road slab, kerb, super passage/slab culvert, trough
resting on ground, trough aqueduct, wearing coat
CC18 CC M-30 (20 MSA) for trough aqueduct, slab 9.20 0.85 0.425
CC25,CC27 UCR Masonry in CM 1:5 for foundation and super 1.71 1.15 0.30
structure (30% mortar) (Rubble)
(35% mortar) 2.00 1.1 0.35
(Rubble)
(45% mortar) 2.57 1.00 0.45
(Rubble)
CC28 UCR Masonry in CM 1:6 for foundation (30% mortar) 1.43 1.15 0.30
(Rubble)
(35% mortar) 1.67 1.1 0.35
(Rubble)
(45% mortar) 2.14 1.00 0.45
(Rubble)
CC30 Cement Pointing in CM 1:3 0.0295 0.003
Cement Pointing in CM 1:2 0.0449 0.003
CC35 B.B. Masonry in CM 1:5 1.77 480 0.31
(Bricks)
26
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 3:- CONCRETE WORK INCLUDING CENTERING, UCR MASONRY,
BRICK MASONRY AND R.C.C. PIPES
Dam and Allied Works
(a) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4357.85 758.98
(b) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4213.15 758.98
(c) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4104.15 758.98
CC 2B Providing and laying in situ cement concrete of grade Section 3.1
M-15 With 50% Ground Granulated blast Furnance
Slag (GGBS),of trap / granite / gneiss / quartzite / graded
metal for foundation and bedding with Batching Plant and
Transit Mixer including placing, compacting, curing etc.
complete with all lifts as directed.
(a) M-15 (20 MSA) (Cement 2.82 bags/Cum, GGBS Cum 4241.65 758.98
2.82 bags/Cum)
(b) M-15 (40 MSA) (Cement 2.6 bags/Cum, GGBS 2.6 Cum 4106.05 758.98
bags/Cum)
(c) M-15 (80 MSA) (Cement 2.5 bags/Cum, GGBS 2.5 Cum 4001.35 758.98
bags/Cum)
27
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
Sub and Super Structure
CC 3A Providing and laying in situ cement concrete of grade M- Section 3.1
15 of trap / granite / gneiss / quartzite / graded metal for
PCC with or without surface reinforcement/ RCC
concreting requiring heavy or special type of
shuttering for works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments etc. with Batching Plant and Transit mixer
with centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts etc.
complete as directed.
(a) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 5548.00 1083.13
(b) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 5403.30 1083.13
(c) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 5299.50 1083.13
CC 3B Providing and laying in situ cement concrete of grade M- Section 3.1
15 With 50% Ground Granulated blast Furnance Slag
(GGBS),of trap / granite / gneiss / quartzite / graded metal
for PCC with or without surface reinforcement/RCC
concreting requiring heavy or special type of
shuttering for works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments etc. with Batching Plant and Transit mixer
with centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts etc.
complete as directed.
CC 4A Section 3.1
Providing and laying in situ cement concrete of grade M-
20 of trap / granite / gneiss / quartzite / graded metal for
RCC works of gallery, sluice, spillway crest, spillway
down stream face, energy dissipating structures,
intake structures, training walls, piers, abutments,
slab etc. with Batching Plant and Transit mixer
including centering, shuttering ,scaffolding,
compacting, curing etc. complete with all lifts etc.
complete as directed.
(A) M-20 (20 MSA) (Cement 6.60 bags/Cum) Cum 5842.15 1083.13
(B) M-20 (40 MSA) (Cement 6.08 bags/Cum) Cum 5672.95 1083.13
28
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 4B Providing and laying in situ cement concrete of grade M- Section 3.1
20 With 50% Ground Granulated blast Furnance Slag
(GGBS),of trap / granite / gneiss / quartzite / graded metal
for RCC works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments, slab etc. with Batching Plant and Transit
mixer including centering, shuttering, scaffolding,
compacting, curing etc. complete with all lifts etc.
complete with all lifts etc. complete as directed.
(a) M-25 (20 MSA) (Cement 7.62 bags/Cum) Cum 6154.65 1083.13
CC 5B Providing and laying in situ cement concrete of grade M- Section 3.1
25 With 50% Ground Granulated blast Furnance Slag
(GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of gallery, sluice, spillway crest,
spillway down stream face, energy dissipating
structures, intake structures, training walls, piers,
abutments, slab etc. with Batching Plant and Transit
mixer including centering, shuttering, scaffolding,
placing, compacting, curing with all lifts etc. complete as
directed.
29
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
b) ii) For Side Lining without curing compound i.e. by Cum 5556.50 685.93
curing with water (Cement 5.64 bags/Cum)
CC 6B Providing and laying in situ M-15 (20 MSA)With 50% Section 3.1
Ground Granulated blast Furnance Slag (GGBS),(28
days cube compressive strength not less than
15N/sqmm) grade cement concrete with clean, hard,
graded aggregates for canal lining for side and bed
including cost of all materials, machinery, labour,
cleaning with batching plant and transit mixer placing
in position, finishing with all slope of canal including
centering, scaffolding, formwork, compaction, curing, by
cutting grooves, filling with sealing compound and
providing porous plugs preparation of sub grade etc.
complete with all lifts etc. complete as directed.
b) ii) For Side Lining without curing compound i.e. by Cum 5431.60 685.93
curing with water (Cement
2.82 bags/Cum, GGBS 2.82 bags/Cum)
30
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
a) For Bed Lining (Cement Cum 5363.10 709.94
2.82 bags/Cum, GGBS 2.82 bags/Cum)
b) ii) For Side Lining without curing compound i.e. by Cum 5525.35 689.86
curing with water (Cement
2.82 bags/Cum, GGBS 2.82 bags/Cum)
CC 8 Providing & laying chip masonry back filling behind Section 3.2 Cum 2037.00 556.25
concrete lining in CM 1:8 including striking joints, curing,
centering, scaffolding etc. complete but excluding pointing
etc. complete as directed (35% mortar) (Cement 1.25
bags/Cum)
CC 9 Providing, laying, erecting and dismantling M.S. Section 3.3 Sqm 257.70 108.84
plates form work for side lining etc. complete as
Directed. (for steeper slopes only)
CC 12 Providing and laying cement plaster 6 mm thick in Section 3.5 Sqm 121.75 66.06
C.M. 1:3 single coat without neru finish to concrete
surface in all position including centering, scaffolding,
curing etc. complete as directed. (Cement 0.057
bags/Sqm)
Section C : Canal Structures
CC Providing and laying in situ cement concrete of grade Section 3.1
13A M-10 of trap/ granite / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, centering, shuttering,
compacting, curing, etc. complete with all lifts as directed.
(a) M-10 (20 MSA) (Cement 4.40 bags/Cum.) Cum 4528.55 937.58
(b) M-10 (40 MSA) (Cement 4.40 bags/Cum.) Cum 4528.55 937.58
(c) M-10 (80 MSA) (Cement 4.33 bags/Cum.) Cum 4456.25 937.58
CC Providing and laying in situ cement concrete of grade Section 3.1
13B M-10,With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap/ granite / quartzite / graded metal for
foundation and bedding with Batching Plant and Transit
Mixer including placing, centering, shuttering,
compacting, curing, etc. complete with all lifts as directed.
31
CC Section 3.1
13B
(a) M-15 (20 MSA) (Cement 5.64 bags/Cum) Cum 4844.40 937.58
(b) M-15 (40 MSA) (Cement 5.20 bags/Cum) Cum 4699.70 937.58
(c) M-15 (80 MSA) (Cement 4.99 bags/Cum) Cum 4590.70 937.58
CC Providing and laying in situ cement concrete of grade Section 3.1
14B M-15, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for foundation and bedding by Batching Plant &
Transit Mixer including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all lifts as
directed.
32
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC Providing and laying in situ cement concrete of grade Section 3.1
15B M-15, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of retaining walls, piers, abutments,
etc. with Batching Plant and Transit mixer including
centering, shuttering, scaffolding, placing, compacting,
curing etc. complete with all lifts as directed.
i) For Abutment, wing walls, returns, transition walls Cum 5931.05 1355.48
i) For Abutment, wing walls, returns, transition walls Cum 6038.20 1355.48
ii) For Piers Cum 6196.31 1413.53
(c) M-15 (80 MSA) (Cement
2.5 bags/Cum, GGBS 2.5 bags/Cum)
i) For Abutment, wing walls, returns, transition walls Cum 5938.70 1355.48
ii) For Piers Cum 6096.85 1413.53
CC Providing and laying in situ cement concrete of grade Section 3.1
16A M-20 of trap / granite / gneiss / quartzite / graded metal for
RCC works of abutment, wing walls, returns, transition
walls, piers, columns, beams and slabs, diaphragm walls,
road slabs trough (Box Culvert) trough for aqueduct,
wearing coat, etc. . with Batching Plant and Transit mixer
including centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as directed.
33
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC Providing and laying in situ cement concrete of grade Section 3.1
16B M-20, With 50% Ground Granulated blast Furnance
Slag (GGBS), of trap / granite / gneiss / quartzite / graded
metal for RCC works of abutment, wing walls, returns,
transition walls, piers, columns, beams and slabs,
diaphragm walls, road slabs trough (Box Culvert) trough
for aqueduct, wearing coat, etc. . with Batching Plant and
Transit mixer including centering, shuttering, scaffolding,
placing, compacting, curing etc. complete with all lifts as
directed.
i) For Abutment, wing walls, returns, transition walls Cum 6448.15 1355.48
ii) Piers Cum 6606.25 1413.53
iii) Columns Cum 8820.15 2226.17
iv) Beams and slabs Cum 9238.65 2181.52
v) Road Slab, kerb, super passage/slab culvert etc. Cum 8974.90 2096.68
vi) Trough resting on ground Cum 8238.81 1846.64
vii) Trough for aqueduct Cum 10001.95 2427.10
viii) Wearing Coat and other required concrete Cum 4516.00 758.98
(b) M-20 (40 MSA) (Cement
3.04 bags/Cum, GGBS 3.04 bags/Cum)
34
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
i) Columns Cum 9668.95 2226.17
ii) Beams and slabs Cum 9530.15 2181.52
iii) Road Slab, kerb, super passage/slab culvert etc. Cum 9266.45 2096.68
iv) Trough resting on ground Cum 8489.25 1846.64
v) Trough for aqueduct Cum 10293.45 2427.10
vi) Wearing Coat Cum 4807.55 758.98
CC Providing and laying in situ cement concrete of grade Section 3.1
18A M-30 for trough of aqueduct etc. of trap / granite / gneiss /
quartzite / graded metal with Batching Plant and Transit
mixer including centering, shuttering, scaffolding
including placing, compacting, curing etc. complete with
all lifts as directed.
(a) M-30 (20 MSA) for trough of aqueduct (Cement 9.20 Cum 10854.45 2427.10
bags/Cum)
(b) M-30 (20 MSA) for slab (Cement 9.20 bags/Cum) Cum 10091.15 2181.52
(a) M-30 (20 MSA) for trough of aqueduct Cum 10664.95 2427.10
(Cement 4.6 bags/Cum, GGBS 4.6 bags/Cum)
CC 21 Providing and fixing G.I. sheet 24 gauge and 22.5 cm. Section 3.8 Rmt 179.95 37.00
wide for the construction joint in R.C.C. trough wall
including cutting 15 cm. overlap, riveting the joints and
fixing in position etc. complete as directed.
35
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 22 Providing and fixing in position TMT - FE - 500 bar Section 3.9 MT 75737.10 8818.51
reinforcement of various diameters for R.C.C. pile caps,
footings, foundations, slabs, beams columns, canopies,
staircase, newels, chajjas, lintels pardis, copings, fins,
arches etc. as per detailed designs, drawings and
schedules. including cutting, bending, hooking the bars,
binding with wires or tack welding and supporting as
required complete as directed.
Centering Items
CC 23 Providing, erecting and laying steel shuttering Section 3.10
formwork and making surface suitable for concreting
including dismantling etc. complete as directed.
(a) for abutments, piers, wings, returns etc.complete Sqm 486.55 178.60
(b) For RCC Solid/Deck slab/Box Cells/ Trough of Sqm 555.15 178.60
Aqueduct etc.
(c ) For curved surface Sqm 583.85 214.32
CC 24 (a) Providing and erecting steel props centering up to 3.00 Section 3.11 Sqm 268.50 111.62
m height including bracing, strengthening and dismantling
etc. complete as directed.
(b) Rate for centering for every Additional 1.00 m height Sqm 96.55 55.81
U.C.R. Masonry
CC 25 Providing U.C.R. masonry in C.M. 1:5 in foundation upto Section 3.12
0.5 m above G.L. with lift upto 1.5 m. including striking
joints, curing etc. complete as directed.
C) For dams and water retaining structures (45% mortar) Cum 2867.65 368.93
.
CC 26 Providing U.C.R. masonry in C.M. 1:6 in foundation Section 3.12
upto plinth with lift upto 1.5 m. including striking joints,
curing etc. complete as directed.
(A) (30% mortar) Cum 2538.75 498.16
(B) (35% mortar) Cum 2553.80 403.36
(C) (45% mortar) Cum 2770.35 403.36
CC 27 Providing U.C.R. masonry in C.M. 1:5 in superstructure Section 3.12
with lift upto 1.5 m. including striking joints etc.complete
as directed.
C) For dams and water retaining structures (45% mortar) . Cum 2886.10 387.38
36
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 28 Providing khandki facing to the face of masonry with Section 3.13
pointing in C.M. 1:2 including finishing to the required
shape & slope with necessary centering, scaffolding,
curing etc. complete as directed. (It is assumed that the
Khandkis are of the size 20cm x 20cm. No mortar for
jointing is taken into account, only face pointing of joint is
considered).
A) with khandki facing on one side Sqm 2555.35 109.96
B) with khandki facing on both side. Sqm 5000.70 109.96
CC 29 Providing and laying dry stone rubble masonry Section 3.14 Cum 1253.05 288.00
excluding pointing etc. complete as directed.
CC 32 Cutting rectangular grooves of size 10 cm. x 10 cm. in Section 3.17 Rmt 1339.50 1339.50
stone masonry including clearing pointing etc. to facilitate
smooth working of needles etc. complete as directed.
CC 33 Providing and laying rough dressed cut stone coping Section 3.18 Cum 6546.30 3008.16
23 cm. thick in C.M. 1:5 excluding cement pointing but
including watering with lift upto 1.5 m.etc. complete as
directed.
CC 34 Providing coalgrout U.C.R. masonry in C.M. 1:3 (43% Section 3.19 Cum 3451.50 392.71
mortar) proper packing rubble and of the required shape
and quality with the coalgrout at required pressure with lift
upto 1.5 m. including centering, scaffolding, watering etc.
complete as directed. (Excluding formwork and staging)
BRICK MASONRY
CC 35 Providing B.B. masonry with conventional I.S. type Section 3.20 Cum 5785.90 556.84
bricks for super structure including striking joints,
watering, centering, scaffolding with lift upto 1.5 m.,
including cost of material etc. complete as Directed.
CC 36 Providing B.B. masonry with conventional I.S. type Section 3.21 sqm 806.60 76.92
bricks in cement mortar 1:5 in super structure upto floor
level including mild steel reinforcement of 2 bars of 6 mm
dia. placed by every 3rd course properly bent, bounded at
ends,centering, scaffolding, watering etc. complete with all
lift. including cost of material etc complete as directed.
PIPE LAYING
CC Providing R.C.C .pipe of NP2 class conforming to IS458 Section 3.22
37A 2003 of following diameter including cost of all material
and labour required, inspection charges, transportation to
stores, transit insurance, loading, unloading and stacking
excluding GST levied by GOI and GOM in all respect etc.
complete as directed.
a) 1200 mm dia Rmt 5820.00 0.00
b) 1000 mm dia Rmt 3576.00 0.00
c) 900 mm dia Rmt 2938.00 0.00
37
CC Section 3.22
37A
CC 40 Providing and laying in situ cement concrete of grade Section 3.24 Cum 9682.15 2699.22
M-20 of trap / granite / gneiss / quartzite / graded metal for
Staunch wall with Batching Plant and Transit Mixer
including centering, shuttering, scaffolding, placing,
compacting, curing etc. complete with all lifts as directed.
CC 41 Providing and fixing RCC Boundary/Guard /Chainage Section 3.25 No 804.65 163.66
blocks of size 75 x 20 x 20 cm including excavation and
fixing in a block of 45 x 45 x 45 cm in M-15 Concrete with
oil painting of two coats, lettering etc. complete as
Directed. ( height of stone above GL 40 cm.)
CC 42 Providing and fixing RCC Km/half km/ submergence Section 3.26 No 953.80 241.16
boundary blocks of size 95 x 20 x 20 cm including
excavation and fixing in a block of 45 x 45 x 45 cm in M-
15 Concrete with oil painting of two coats, lettering etc.
complete as directed. (height of stone above GL 60 cm.)
38
Rates for 2022-23 (Rate in Rs.)
Item
Description Specifications Unit
No. completed
Labour
Item
1 2 3 4 5 6
CC 43 Providing and fixing canal information board of Section 3.27 No 6401.05 2219.63
1.2x0.75 m prepared on 16 gauge M.S. sheet with angle
iron frame of size 35x35x3 mm with cross bracing of size
25x25x3 mm including painting with one coat of zinc
chromate storing primer and two coats each of
green/white back ground and back side grey store
enamelled bonded with red retro reflective sheet
Engineering grade, border/letters/numeral / arrows coated
with non pealable crystal clear protective transparent coat
retaining 100% reflection including two angle iron post of
size 50x50x5 mm of 3.65 m long inflated at bottom drilled
on top and painted in white and black bonds of 30 cm with
four numbers high strength of G.I. bolts and nuts of size
10 mm dia. and 20 mm long sheet and angle iron post in
one piece without joints including all taxes, conveying,
fixing in ground with cement concrete in M-15 block of
size 60x60x75 cm as directed.
CC 44 Providing and laying rubble soling below foundation in Section 3.28 Cum 1132.70 501.41
layers including filling with rubble chips, murum etc.
complete as directed.
CC 45 Back filling up to ground level behind the canal Section 3.29 Cum 55.60 3.00
structures etc. complete with suitable material of approved
quality in layers not exceeding 20 cm without disturbing
the structure etc. complete as directed.
CC 46 Providing and constructing contraction joints by Section 3.30 Rmt 2117.60 170.54
fixing 310 mm wide central bulb type approved quality
PVC water stop in two lines with 8 mm dia. Steel dowel
rods on either side at 1 m interval, forming 125*125 size
groove in between 2 water stops for filling asphalt, fixing
15 mm dia. two legged G.I. pipe with U-bend at bottom for
circulating steam at interval and forming 150 mm dia.
formed drain behind water seals including cost of all
materials, machinery, labour, filling asphalt in groove,
circulation of steam at intervals, vulcanizing water seal
joints etc. complete with all lifts as directed.
CC 47 Supplying, laying and joining Bituminous Geomembrane Section 3.31 sqm 1314.15 19.36
as hydraulic liner over canal having average thickness of
4 mm (minimum thickness 3.6 mm), minimum width of 5
m, minimum tensile strength of 18 kN/m and minimum
permissible elongation of 30 % including 200 mm overlap,
excavating trench of size 500 mm x 500 mm, steel
anchorage of 12 mm dia MS bar 1.5 m long of approved
shape at 0.75 m c/c. Bituminous Geomembrane Lining
which shall be laid on the properly prepared subgrade
including wastage, import duties & custom clearance
charges, transportation, supply at site, Loading /
unloading, labour charges and testing which shall confirm
to ASTM/I.S. standards and excluding dismantling of
concrete, earthwork preparation, dewatering, GST etc
complete as directed.
39
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-4
TUNNEL WORKS
ITEM NO. TN 1 TO TN 11
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-2023
SECTION 4:- TUNNEL WORKS
Rate for 2022-23
(Rate in Rs.)
Item No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
TN 01 Excavation of tunnel through adit / itself in all types
of rock by drilling and smooth control perimeter blasting,
mucking, disposing muck in muck yard, lighting,
ventilation inside tunnel Including dewatering
considering cross section of tunnel as D-shaped with Section 4.1 Cum 2430.30 811.96
initial lead of 1.5 Km (From average face to Dump yard
including length of Adit) etc. Complete.
40
Rate for 2022-23
(Rate in Rs.)
Item No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
TN 06 A Providing and fixing anchor bar of 32 mm diameter
4.32 m length with resin bond cement capsule
anchorage through adit/ itself including drilling holes,
inserting grout capsule, driving anchor, cost of all Section 4.3 No. 3790.85 210.30
materials, machinery, labour, ventilation, lighting,
drainage and other ancillary operations etc complete
withall lifts as Directed .
41
Rate for 2022-23
(Rate in Rs.)
Item No. Description of Item Specifications Unit
Completed
Labour
Item
1 2 3 4 5 6
TN 10 A Providing and laying insitu vibrated M20 grade cement
concrete using 20 mm clean, hard, graded aggregates
for side and arch lining of tunnel through adit / itself
including cost of all materials, machinery, labour,
formwork, batching, mixing, conveying upto placing Section 4.7 &
Cum 8487.55 1463.74
point in agitator car, placing in position, laying, vibrating, Section 3
finishing, curing, ventilation, lighting, draining and all
other ancillary operations etc. complete with all lifts for
Tunnel.
42
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-5
ITEM NO. SI 1 TO SI 17
SECTION- 5
co.oRDJNA TOR
~5-
(A.L. PAT HAK)
CHIEF ENGINEER(SP)
WATER.RES_OUR.CES DEPARLV1£NT,
Ai\lARAVATI .
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 5 :- SURVEYING AND INVESTIGATION
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 1
Double levelling using Auto level to connect
Geodetic Trignometrical survey, bench mark and
establishing permanent bench mark at Dam site at Section 5.1 Km. 1052.40 991.40
place along the canal alignment, submergence and
in command area etc. complete, as directed.
(Excluding cost of B.M. structure)
SI 2 Block contour survey of 10m x 10m grid (Not less
than 121 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
Section 5.2
design Software packages including contour plotting
and 5.3
at specified interval and scale. The test print of the
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper, as directed.
43
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 5 Block contour survey of 30m x 30m grid (Not less
than 25 raw data points distributed uniformly over a
Hectare) for irrigation projects using digital state of
art Total Station / DGPS, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Softwares compatible with canal irrigation system
design Software packages including contour plotting Section 5.8
at specified interval and scale.The test print of the and 5.9
drawing shall be approved by Engineer-in-charge
and the same shall be delivered in a CD format as
well as hard copy in six numbers including one print
on tracing paper, as directed.
44
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 8 Carrying out line survey with digital state of art
Total Station for fixing FRL / HFL including C/s
survey with levels at 20m interval/ survey for 'L'
section of alternative Dam site OR 'L' section of river
1Km u/s OR 1Km D/s of alternative Dam site etc
complete including station, including transfer of entire
data to computer system in different georeferential
layer / themes using features of standard plotting
Soft wares compatible with canal irrigation system Section 5.14 Km. 767.25 592.50
design Soft wares packages including contour
plotting at specified interval and scale. The test print
of the drawing shall be approved by Engineer-in-
charge and the same shall be delivered in a CD
format as well as hard copy in six numbers including
one print on tracing paper as directed.
Ha.
A) Total Station 1059.30 612.64
CCA
Ha.
B) DGPS 556.10 156.15
CCA
SI 11 Providing permanent bench mark dressed stone
of basalt, granite or gniess of size 30cm X 30cm X
45cm at least 15Cm below the ground and
embedding it to a depth of 30cm in grade M-15 insitu
concrete of size 90cm X 90cm X 60cm deep over 1M
deep foundation concrete of grade M-10 including Section 5.18 No. 5666.20 477.58
excavation, concrete, providing and fixing dressed
stone and backfilling the pit up to ground level with
sand etc. complete,with all lifts as directed.
45
Rate for 2022-23
( Rate in Rs.)
Item No. Discription of Item Specifications Unit
Completd
Labour rate
Item
1 2 3 4 5 6
SI 13 Supplying labour for Double levelling to connect
Geodetic Trignometrical Survey Bench Mark and
establishing the Permanent Bench Mark at Dam site
at place along the canal alignment submergence and Section 5.20 Km. 1147.40 1147.40
in command area etc.as directed.(Excluding cost of
P.B.M. structure)
46
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-6
HYDROMETEROLOGY
ITEM NO. HD 1 TO HD 7
SECTION -6
HYDROMETEOROLOGY
CO-ORDINATOR
'
1/
~·
(S. . AR)
~
CHIEFE NEER
PLANNING AND DAM SAFETYY
NASHIK
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 6 :- HYDROMETEOROLOGY
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
HD 01 Standard Rain Gauge Station
(Measurement Clerk)
Providing person to take measurement at
every morning 8:30 am to SRG station, taking
Per
the entry in the register. Sending the reading Section 6.1 1627.85 1627.85
Month
daily to Sub-Dn by SMS & monthly progress
(reading) to Sub-Dn, including taking care of
instruments established on the station As
Directed.
HD 02 Autographic Rain Gauge (Measurement
Clerk)
Providing person to take measurement at
every morning 8:30 am of autographic rain
gauge station including changing graph at Per
8:30 am, taking reading in the register, also Section 6.2 3488.40 3488.40
Month
sending reading to Sub-Dn by SMS & monthly
progress (reading) sending to Sub-Dn, with
taking care of instruments established on the
station. As Directed.
HD 03
Full climatic station (Measurement Clerk)
Scientific instruments
1) ARG, 2) SRG, 3) Pan Evaporimeter, 4) Pan
Water Temperature, 5) Thermometer [Dry,
Wet, Minimum, Maximum], 6) Thermo
hygrograph, 7) Anemometer, 8) Wind Vane,
9) Sunshine Recorder.
HD 04
Gauge Discharge (Gauge Inspector)
47
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed
Labour
Item
1 2 3 4 5 6
HD 05
Gauge Discharge (Measurement Clerk)
48
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-7
VALUATION OF REHABILITATION WORKS
•·
CO-ORDINATOR
(.-\~ 1.-\~
CHIEF ENGINEER (SP)
\VATER RESOURCES DEP..\RTi\'lENT
.-\MAR:\VATI
GOVERNMENT OF MAHARASHTRA
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 07:-VALUATION OF REHABILITATION WORKS
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
VAL 1 Providing and constructing stone masonry in
mud mortar in foundation and plinth including As Directed by
scaffolding, finishing etc. complete. As directed Engineer-In-
by Engineer-In-Charge.. Charge.
49
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
VAL 9 Providing & constructing Kud walls including
mud plaster 25 mm thick on both sides with As Directed by
cow dung wash etc. complete.As directed by Engineer-In- Sqm 622.25 360.35
Engineer-In-Charge. Charge
50
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
VAL 18 Providing and fixing non teak doors/window II
class fully pannelled without ventilators/fan
light/iron bars including the frames of the sizes
as per standard specification, Iron fixtures and As Directed by
fastenings and finishing the wood work with oil Engineer-In- Sqm 8188.95 3895.25
painting etc.complete. As directed by Engineer-In- Charge
Charge.
51
Rate for 2022-23 (Rate
in Rs.)
Item
Description Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
VAL 26 Providing & fixing T.W.frame and shutter to
wall cupboard made of 25 mm. thick particle
board one face with approved colour laminated As Directed by
face borided with phenol formal desynthetic Engineer-In- Sqm 3727.55 1278.45
lipping, beading oxidised iron fixtures & oil primer Charge
coat etc. complete. As directed by Engineer-In-
Charge.
52
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-8
CO-ORDINATOR
(DR~~)
CHIEF ENGINEER (WR)
WATER RESOURCES DEPARTMENT
NAGPUR
GOVERNMENT OF MAHARASHTRA, WATER RESOUCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 8:- FLOW MEASURING DEVICES
Rates for 2022-23
Item (Rates in Rs.)
Description of Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
FMD 1 Providing and fixing gauge plate of FRP sheet
very sturdy both sides, gelcoat finish composite
material, sandwich with M S strip by contact
moulding process, engraved moulded bandwidth
and figures with computerised gauge marking with
reflective radium pasting, spray lamination with Section 8.1 Sqm 26843.70 2149.20
polyurethane chemical for surface protection
including material reqd for fixing, nut bolts,
washers, Nylon rope, hanger, drilling machine etc.
complete as directed.
FMD 2 Providing, installing & erecting in correct line and
level, fibre glass reinforced plastics(FRP) " V
notch" of following sizes and discharge capacities,
for accurate measurement of water flowing through
open channel with prefabricated fibre glass lining
moulded engraved gauge marking ( in lit/sec and in
cms) including discharge table, capacity marking,
flow direction, sand treatment on the back side of "
Section 8.2
V" notch, testing, etc. complete as directed.
(Excluding base preparation i.e. CBL, canal
section and other concrete etc.)
53
Rates for 2022-23
Item (Rates in Rs.)
Description of Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
FMD 3 Providing , installing & erecting in correct line and
level, fibre glass reinforced plastics(FRP) cut
throat flume ( CTF ) measuring devices on
calculated hump level for accurate measurement
of water flowing through open channel, with
prefabricated fibre glass lining moulded engraved
gauge marking ( in lit/sec and in cms.) including
discharge table, capacity marking, flow direction,
Section 8.3
sand treatment on the back side of flume, testing,
etc. complete as directed.
(Excluding CBL and hump preparation, canal
section and other concrete required for hump
,U/S and D/S slopes of hump etc.)
54
Rates for 2022-23
Item (Rates in Rs.)
Description of Item Specifications Unit
No. Completed
Labour
Item
1 2 3 4 5 6
FMD 4 Providing, installing & erecting in correct line and
level, fibre glass reinforced plastics(FRP) parshall
flume on calculated hump level of following sizes
and discharge capacities, for accurate
measurement of water flowing through open
channel with prefabricated fibre glass lining
moulded engraved gauge marking ( in lit/sec and in
cms) including discharge table, capacity marking,
Section 8.4
flow direction, sand treatment on the back side of
flume, testing, etc. complete as directed.
( Excluding CBL and hump preparation, canal
section and other concrete required for hump,
U/S and D/S slopes of hump etc.)
55
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-9
CO-ORDINATOR
(H. ~
CHIEF ENGINEER (WR)
WATER RESOURCES DEPARTMENT
PUNE
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT.
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 9:- MARKING BLUE LINE AND RED LINE
Rate for 2022-23
(Rate in Rs.)
Sr.No. Description of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
BRL 01 Fixing control points by Differential
Global Position System (DGPS)
instrument at every One Km. along the both
side of river including collection of
Section 9.1 Km. 1521.25 460.71
necessary flood data etc. complete
including labour welfare cess, service tax,
labour insurance and all applicable taxes
etc. complete as directed.
BRL 02 Traverse Survey along river with cross
section at 100 m .c/c along river .The levels
on cross section shall be at every 30 m c/c
beyond past locally observed flood line,
using Differential Global Position System
(DGPS) instrument including labour,
transportation, using sounding by boat in
river water in wet condition and transfer of
entire data to computer system in different Section 9.2
geo referential layers/ themes using
features of standard plotting software
computable with design software package
including contour plotting at required interval
and at a scale and following deliverables
etc. all completeas directed.
56
Rate for 2022-23
(Rate in Rs.)
Sr.No. Description of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
BRL 04 Providing computerised detailed cross
section drawings in two copies at 100 m
interval with actual profile of river (levels at
every 30m. distance along cross section) on
A-3 size paper with scale 1cm = 15m or
1cm = 30m which is suitable as per site
condition showing 25 year return flood line
(Blue line) and 100 years return flood line
(Red line) computed by software analysis Cross-
and submission in the form of soft and hard Section 9.4 388.75 --
section
copy as directed by Engineer in charge. So
as to use the data of above Item No.BRL 01
to BRL 03 by HEC-RAS Software. including
submission of check print and getting
approval of Engineer in charge etc all
complete as directed.
57
Rate for 2022-23
(Rate in Rs.)
Sr.No. Description of Item Specifications Unit
Completed Labour
Item
1 2 3 4 5 6
BRL 07 Marking of 25 year's flood levels (Blue
line) & 100 year's flood levels (Red line)
at interval not less than 100m & not more
than 500m on permanent structures like
Bridges, Temples & other permanent
structures along & across the river, Section 9.7 No. 625.45 102.38
including permanent coloured painting,
lettering on both the banks of river, after the
final approval of flood levels, etc. all
complete as directed.
58
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-10
ITEM NO. LR 1 TO LR 12
SECTION -10
CO-ORDINATOR
(1-1 .V~
CHIEF ENGINE ER (WR)
WATER RESOURCES DEPARTMENT
PUNE
GOVERNMENT OF MAHARASHTRA, WATER RESOUCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 10:- LAND RECLAMATION & SOIL SURVEY WORK
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed rate Labour
1 2 3 4 5 6
LR 1 Collecting and filling soil samples in plastic bag
of size (15X23cm) 200 gauge and cloth bag of size Per
(18X25 cm) with inside flap of 4 X 5 cm for address
Section 10.1 auger 99.86 67.65
tag and packing properly including cost of bags etc.
hole
complete as Directed.
59
Rate for 2022-23
Item (Rate in Rs.)
Discription of Item Specifications Unit
No.
Completed rate Labour
1 2 3 4 5 6
LR 9 Taking open pits, one open pit per sq.km.,
including refilling of open pit after taking down
all necessary morphological observation. Size of pit -
Length 2.5 m. x Width 1.20 m and Depth of open pit Section 10.9 No 880.00 880.00
up to 2.50 m. or up to hard strata if met
first.etc.complete as Directed.
60
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-11
ITEM NO. MR 1 TO MR 39
SECTION-11
CO-ORDINATOR
-~v.
( J. G. GAWALI)
CHIEF ENGINEER & CHIEF ADMINISTRATOR
. CAD,WRD,AURANGABAD .
GOVERNMENT OF MAHARASHTRA, WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION 11:- MAINTENANCE AND REPAIRS INCLUDING DRIP
MR 7 Removing dry silt from the canal bed and Section 11.7
stacking as directed with 15 mtr. Lead and all lift etc. Cum 61.95 61.95
Complete as directed.
MR 8 Removing wet silt from canal bed with 15 mtr. Section 11.8
Lead and all lift including depositing the excavated Cum 91.55 91.55
stuff etc. Complete as directed.
MR 9 Removing old paint from steel and other surface Section 11.9
with flame, cleaning and making the surface even
including scaffolding etc. Complete as directed. Sqm 46.15 41.33
61
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 13 Providing and applying two coats of flat oil paint Section 11.13
of approved colour and shade to internal / external
plastered surfaces including scaffolding if necessary
Sqm 92.60 44.42
clearing and preparing surfaces excluding primer
paint etc. Complete as directed.
MR 14 Providing and applying two coats of flat oil paint Section 11.14
of approved colour to the old structural steel work
and iron work previously painted including scaffolding
if necessary clearing & preparing surface excluding Sqm 89.05 44.41
primer coat etc. Complete as directed.
62
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 22 Cleaning by redrilling the vertical porous drain Section 11.22
pipe including removing of leaching material, grout
material if any inside of the V.P.D. etc complete with
lifts etc. as directed. (Vertical upward drilling)
63
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
E) 37 mm dia,6 mm wall thickess and 60 cm long
porous tube piezometer with stopper and top adapter
made up of carborundum with porous tube fillter of No. 17696.15 4371.00
grain size 60 micron as specified in IS 7356 part-I.
64
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 30 Providing accessories required for Repairs to Section 11.28
manifold system of twin tube piezometer as
below
A) Compression type T
No 237.60 58.97
B) Straight union for joint
No 158.45 38.96
C) Elbow brass fitting No. 197.50 48.44
D) Ferrule and nut No 39.05 9.48
E) Compression type Brass coupling for jointing
tubes End Plug No 394.95 97.93
F) End Plug
No 315.75 77.92
G) Gauge Plug No 7900.30 1951.21
H) Hand shut up valve
No 1974.80 487.54
I) Pressure Pump No. 118502.15 29271.29
J) Identification Tag Set 118.25 29.48
MR 31 Manufacturing, Supplying and Erection of sub Section 11.29
assemblies of conventional plumb bob as per IS
13073 (part I) : 2002
A) Manufacturing, supplying of table stand of size
600 x 700 mm & 1200 mm height.as per Job 43545.20 0.00
specifications given & drawing provided.
B) Manufacturing, supplying of Weight gatta. as per
specifications given & drawing provided. Job 37953.40 0.00
65
MR 32 Section 11.30
A) Grouting for hole 6.00 m depth. (For Dam Top) Bag 1141.85 137.86
B) Rate for Grouting 6.00 m depth hole(For D/S of
Bag 1256.05 151.64
Dam)
C) Rate for Grouting 6.00 m depth hole (For U/S of
Bag 1313.15 158.54
Dam)
D) Rate for Grouting for hole 6.00 m depth (For
Bag 1427.30 172.32
Gallery of Dam)
66
Rates for 2022-2023
( Rate in Rs.)
Item. No. Description of item Specification Unit
Completed
Labour
item
1 2 3 4 5 6
MR 36 Raking and cleaning of masonry joints on upstream As Directed by
face of dam for masonry joint filling to a depth of 5 Engineer-In-charge
cm including preparing of ‘T’ joint of masonry by
removing of existing loose portion of stone masonry
by breaking (using manual / mechanical means )
removing existing embedded M.S. bar, racking out
the masonry joints to required depth, cleaning with
air water jet under pressure for removing algae/ Sqm 745.00 332.92
fungi etc, complete as per specification including cost
of all materials, machinery, labour, scaffolding, hire
charges of cranes, insurance charges transportation
with all leads and lifts and any other incidental
charges as directed by the Project Manager. As
Directed by Engineer-In-charge.
67
GOVERNMENT OF MAHARASHTRA
WATER RESOURCES DEPARTMENT
SECTION-12
CO-ORDINATOR
(RV~
CHIEF ENGINEER (WR)
WATER RESOURCES DEPARTMENT
(DI,~)
CHIEF ENGI NEER (WR)
WATER RESOURCES DEPARTMENT
PUNE NAGPUR
GOVERNMENT OF MAHARASHTRA,WATER RESOURCES DEPARTMENT
COMMON SCHEDULE OF RATES FOR 2022-23
SECTION-12 :- LIFT IRRIGATION SCHEME AND PIPE DISTRIBUTION NETWORK
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 1 Excavation for deep trenches for laying rising main in
Earth Soil of all types, sand, gravel and soft murum
including trimming to correct line, level and to specified
widths including removing the excavated material and
stacking or spreading the same upto a distance of 1 km
and all lifts as directed, preparing the bed for
foundation and necessary safety precautions , keep the Section 12.1 cum 148.35 20.46
trench undisturbed till pipe laying & fixing necessary
specials etc complete as per detailed specifications As
Directed.
(Payable measurements with vertical excavation)
68
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 7 Providing and laying sand bedding in trenches with
sand of approved quality including watering and Section 12.3 cum 1360.65 148.02
compaction etc complete as directed.
LIPDN 8 Backfilling the trenches using available material from
excavation in layers not exceeding 300 mm, each layer
shall be compacted by watering and ramming without
disturbing the pipe line with excavated stuff , including
breaking of clods of soil etc complete as directed. (The Section 12.4 cum 46.25 2.51
backfilling on the two sides of the pipeline should be
carried out simultaneously)
69
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 12 Providing and Erecting "Y" connection with Crotch
plate made out of MS plate conforming to IS 2062:1992
including procurement of plates, gas cutting to required
size and shape, rolling, tack welding, full welding on
either automatic welding machine or manually and
forming 'V' edge on all the three ends for welding it to
pipe, including fabrication and full welding of crotch
plate and stiffeners as per design requirements,third
party inspection charges ,lowering & laying to correct
position etc, complete as per IS - 3589 and IS - 5504 as
applicable as per detailed specifications. Cost of
welding of crotch plate is included in the rate. Cost of Section 12.7 Kg 137.25 23.68
longitudanal welding and " V " edging required for
circumferencial welding required to connect MS special
to Rising main /delivery pipe is inclusive in the rate
however circumferencial welding required for
connecting Y-piece to Rising main / manifold pipe shall
be paid seperately on running meter basis.As directed.
(No negative Tolerance in thickness is permissible).
70
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 15 Providing and Erecting M S bends made out of MS
plate conforming to IS 2062:1992 including
procurement of plates, gas cutting to required size and
shape, rolling, tack welding, full welding on either
automatic welding machine or manually and forming 'V'
edge on both ends for welding it to pipe, including
fabrication & full welding of stiffeners as per design
requirements, lowering & laying to correct position,
third party inspection charges etc, complete as per
IS - 3589 and IS - 5504 as applicable as per detailed
Section 12.7 kg 120.50 21.65
specifications. Cost of longitudinal welding and " V "
edging required for circumferencial welding required to
connect MS special to Rising main /delivery pipes is
inclusive in the rate however circumferencial welding
required for connecting M.S. special to Rising Main
shall be paid separately on running meter basis. As
Directed..
(No negative Tolerance in thickness is permissible).
71
Rate for 2022 23
(Rate in Rs.)
Item No. Description Specifications Unit
Completed
Labour rate
rate
1 2 3 4 5 6
LIPDN 20 Providing & applying Liquid epoxy coating system to
the external surface of Rising Main Pipes as per
Annex-B of IS 3589:2001, with one coat of Zinc rich
epoxy primer (90 % zink (DFT 40 micron , coverage 9
Sqm / lit) and two coats of coal tar epoxy paint (DFT
120 X 2 micron coverage 5 Sqm / Lit / coat) including
Section 12.11 Sq. m. 671.10 406.99
cleaning the surface to the satisfaction of Engineer in
charge by sand blasting / scraping removing oil, grease,
other foreign materials including all necessary material ,
labour with all lifts etc. complete.As directed.
73
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-2023
1 2 3 4 5
LIPDN 27 Providing and supplying ISI standard D. I. specials & Section 12.18
fitting with sealing rubber gasket of S.B.R, complete with cast
iron follower gland and M. S. nut bolts coated or otherwise
protected from rusting and suitable for D.I. pipes including cost
of labour, materials, and transportation to stores / site, loading
and unloading excluding GST levied by GOI & GOM in all
respect, as per IS-9523. For all types of specials, bends, tees
etc. complete
1 a) up to 300 mm dia. Kg 168.00
2 b) 350 mm & above dia. Kg 168.00
LIPDN 28 Hydraulic testing of D.I. pipe line to specified pressure Section 12.19
including cost of all materials and labour and water for testing
for specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type
pumps which should be able to provide specified test pressure
gauges and other necessary equipments, labour, operation
charges, etc. required for testing. The rate under this item shall
also include cost of retesting, if necessary and reinstating to
original position using water supplied by the contractor.
1 80 mm Km 7217.30
2 100 mm Km 7435.05
3 125 mm Km 7760.50
4 150 mm Km 8517.10
5 200 mm Km 9463.50
6 250 mm Km 10646.35
7 300 mm Km 12831.55
8 350 mm Km 15919.85
9 400 mm Km 19547.50
10 450 mm Km 23328.00
11 500 mm Km 27344.95
12 600 mm Km 32224.15
13 700 mm Km 38430.70
14 750 mm Km 41888.65
15 800 mm Km 45583.00
16 900 mm Km 53651.00
17 1000 mm Km 62725.00
18 1100 mm Km 72714.00
19 1200 mm Km 83649.00
74
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
II. POLYVINYL CHLORIDE (P.V.C.) PIPES
LIPDN 29 Providing and supplying in standard lengths ISI mark Section 12.20
rigid unplasticised PVC pipes suitable for potable water
with solvent cement joints including cost of couplers, as per
IS specification no. 4985 / 1988 excluding GST levied by
GOI and GOM in all respect, including transportation, freight
charges, inspection charges, loading, unloading,
conveyance to the departmental stores and stacking the
same in closed shed duly protected from sun rays and rains
including cost of jointing material i.e. solvent cement, etc.
complete (selffit type to be jointed with cement solvent).
75
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
d) Working Pressure 10 Kg./Sq.cm
1 63 mm Rmt 214.00
2 75mm Rmt 299.00
3 90mm Rmt 432.00
4 110 mm Rmt 655.00
5 125 mm Rmt 844.00
6 140 mm Rmt 1052.00
7 160 mm Rmt 1394.00
8 180 mm Rmt 1660.00
9 200 mm Rmt 2166.00
10 225 mm Rmt 2742.00
11 250 mm Rmt 3438.00
12 280 mm Rmt 4267.00
13 315 mm Rmt 5420.00
14 400 mm Rmt 13726.00
e) Working Pressure 12.5 Kg./Sq.cm
1 110 mm Rmt 972.00
2 125 mm Rmt 1273.00
3 140 mm Rmt 1571.00
4 160 mm Rmt 2060.00
5 200 mm Rmt 3292.00
6 250 mm Rmt 5265.00
7 315 mm Rmt 8387.00
8 400 mm Rmt 17707.00
LIPDN 30 Lowering, laying and jointing with P.V.C. pipes and Section 12.21
specials of following class and diameter including cost of
conveyance from stores to site of works including cost of all
labour, material, except cement solvent, rubber ring, as per
IS code, etc. complete (with cement solvent joint / ring fit
joint). (for all class of pipes)
1 63 mm Rmt 16.10
2 75mm Rmt 19.55
3 90mm Rmt 23.75
4 110 mm Rmt 28.60
5 125 mm Rmt 31.75
6 140 mm Rmt 34.05
7 160 mm Rmt 35.75
8 180 mm Rmt 48.85
9 200 mm Rmt 48.85
10 225 mm Rmt 57.25
11 250 mm Rmt 63.60
12 280 mm Rmt 70.70
13 315 mm Rmt 80.35
14 400 mm Rmt 99.65
76
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
LIPDN 31 Providing and supplying ISI mark P.V.C. pipes Section 12.22
fitting/specials including loading, unloading,
trasnporatation upto departmental store, stacking excluding
GST levied by GOI & GOM in all respect etc.complete.
1 63 mm Km 6373.50
2 75mm Km 7168.75
3 90mm Km 7321.45
4 110 mm Km 7558.15
5 125 mm Km 7760.50
6 140 mm Km 8356.20
7 160 mm Km 8687.50
8 180 mm Km 9056.60
9 200 mm Km 9463.50
10 225 mm Km 10025.35
11 250 mm Km 10646.35
12 280 mm Km 11469.50
13 315 mm Km 13303.45
14 400 mm Km 19547.50
77
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
III. P.V.C.-O PIPES
LIPDN 33 Providing and supplying in ISI mark rigid PVC-O class-500 Section
s/s pipes (push on joints) pressure pipes confirming to IS 12.24
specifications no 16647- 2017 inclusive cost of EPDM gasket
seals on joints including all statutory duties excluding GST levied
by Government of India and Government of Maharashtra in all
respect including third party inspection charges of agency
approved by WRD, transit insurance loading, unloading charges
conveyance to the departmental store / site and stacking the
same in closed shade duly protected from sunrays etc complete.
Note :-
Diameter wise overlapping lengths are respectively, 110mm-
2.92%, 160mm- 3.33%, 200mm- 3.75%, 250mm- 4.5%, 315mm-
5.42%, 400mm- 6.25%
a) Class - 500 PN - 12.5
i) 110 mm Rmt 755.00
ii) 160 mm Rmt 1245.00
iii) 200 mm Rmt 1632.00
iv) 250 mm Rmt 2255.00
v) 315 mm Rmt 3036.00
vi) 400 mm Rmt 4578.00
b) Class - 500 PN - 16
i) 110 mm Rmt 829.00
ii) 160 mm Rmt 1389.00
iii) 200 mm Rmt 1841.00
iv) 250 mm Rmt 2401.00
v) 315 mm Rmt 3269.00
vi) 400 mm Rmt 4936.00
c) Class - 500 PN - 25
i) 110 mm Rmt 1001.00
ii) 160 mm Rmt 1456.00
iii) 200 mm Rmt 1981.00
iv) 250 mm Rmt 2738.00
v) 315 mm Rmt 4461.00
vi) 400 mm Rmt 6604.00
LIPDN 34 Lowering, laying and jointing with P.V.C.-O pipes and Section
specials of following class and diameter including cost of 12.25
conveyance from stores to site of works including cost of all
labour, material, except cement solvent, rubber ring, as per IS
code, for all class of pipe, etc. complete (with cement solvent
joint / ring fit joint).
78
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 35 Providing and supplying ISI mark P.V.C.-O pipes fitting / Section
specials including loading, unloading, trasnporatation upto 12.26
departmental store, stacking excluding GST levied by GOI &
GOM in all respect etc.complete.
i) 110 mm Km 7558.15
ii) 160 mm Km 8687.50
iii) 200 mm Km 9463.50
iv) 250 mm Km 10646.35
v) 315 mm Km 13303.45
vi) 400 mm Km 19547.50
79
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
IV. PRE-STRESSED CEMENT CONCRETE PIPES (PSC)
LIPDN 37 Providing and supplying ISI standard Pre-stressed Section
Cement concrete pipes of following class and diameter 12.28
including cost of all meterial and labour required, cost,
inspection charges, transportaion to stores, unloading and
stacking excluding GST levied by GOI & GOM in all respect
etc. complete as per IS-784-2001.
i) Factory test pressure
a) Site test pressure + 01N/mm 2, For working pressure upto 1
N/mm 2
b) Site test pressure + 02N/mm 2, For working pressure upto 1
N/mm 2
80
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
10 1100 mm Rmt 12127.00
11 1200 mm Rmt 14536.00
12 1300 mm Rmt 18503.00
13 1400 mm Rmt 19759.00
14 1500 mm Rmt 21209.00
15 1600 mm Rmt 22897.00
16 1700 mm Rmt 25150.00
17 1800 mm Rmt 27202.00
18 1900 mm Rmt 36688.00
19 2000 mm Rmt 38489.00
c) Factory Test Pressure 8 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4033.00
4 500 mm Rmt 4184.00
5 600 mm Rmt 5369.00
6 700 mm Rmt 6090.00
7 800 mm Rmt 7596.00
8 900 mm Rmt 9428.00
9 1000 mm Rmt 10814.00
10 1100 mm Rmt 12457.00
11 1200 mm Rmt 14975.00
12 1300 mm Rmt 19099.00
13 1400 mm Rmt 20340.00
14 1500 mm Rmt 21929.00
15 1600 mm Rmt 23702.00
16 1700 mm Rmt 26058.00
17 1800 mm Rmt 28661.00
18 1900 mm Rmt 37872.00
19 2000 mm Rmt 39810.00
d) Factory Test Pressure 10 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4033.00
4 500 mm Rmt 4184.00
5 600 mm Rmt 5418.00
6 700 mm Rmt 6252.00
7 800 mm Rmt 7834.00
8 900 mm Rmt 9704.00
9 1000 mm Rmt 11219.00
10 1100 mm Rmt 12874.00
11 1200 mm Rmt 15337.00
12 1300 mm Rmt 19571.00
13 1400 mm Rmt 21072.00
14 1500 mm Rmt 22730.00
15 1600 mm Rmt 24932.00
16 1700 mm Rmt 27493.00
17 1800 mm Rmt 30050.00
18 1900 mm Rmt 39112.00
19 2000 mm Rmt 41189.00
e) Factory Test Pressure 12 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3835.00
3 450 mm Rmt 4051.00
81
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
4 500 mm Rmt 4225.00
5 600 mm Rmt 5558.00
6 700 mm Rmt 6490.00
7 800 mm Rmt 8052.00
8 900 mm Rmt 9958.00
9 1000 mm Rmt 11509.00
10 1100 mm Rmt 13302.00
11 1200 mm Rmt 15938.00
12 1300 mm Rmt 20117.00
13 1400 mm Rmt 21718.00
14 1500 mm Rmt 23376.00
15 1600 mm Rmt 25375.00
16 1700 mm Rmt 27881.00
17 1800 mm Rmt 31363.00
18 1900 mm Rmt 41461.00
19 2000 mm Rmt 43762.00
f) Factory Test Pressure 14 kg/Sqcm
1 350 mm Rmt 3592.00
2 400 mm Rmt 3899.00
3 450 mm Rmt 4136.00
4 500 mm Rmt 4314.00
5 600 mm Rmt 5765.00
6 700 mm Rmt 6715.00
7 800 mm Rmt 8304.00
8 900 mm Rmt 10272.00
9 1000 mm Rmt 11880.00
10 1100 mm Rmt 13746.00
11 1200 mm Rmt 16433.00
12 1300 mm Rmt 20686.00
13 1400 mm Rmt 22800.00
14 1500 mm Rmt 25270.00
15 1600 mm Rmt 27510.00
16 1700 mm Rmt 30448.00
17 1800 mm Rmt 33311.00
18 1900 mm Rmt 42440.00
19 2000 mm Rmt 45023.00
g) Factory Test Pressure 16 kg/Sqcm
1 350 mm Rmt 3628.00
2 400 mm Rmt 3934.00
3 450 mm Rmt 4222.00
4 500 mm Rmt 4686.00
5 600 mm Rmt 5879.00
6 700 mm Rmt 6877.00
7 800 mm Rmt 8578.00
8 900 mm Rmt 11384.00
9 1000 mm Rmt 12812.00
10 1100 mm Rmt 15377.00
11 1200 mm Rmt 17749.00
12 1300 mm Rmt 22212.00
13 1400 mm Rmt 23863.00
14 1500 mm Rmt 26784.00
15 1600 mm Rmt 30043.00
16 1700 mm Rmt 33300.00
17 1800 mm Rmt 36556.00
82
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
18 1900 mm Rmt 45125.00
19 2000 mm Rmt 48845.00
h) Factory Test Pressure 18 kg/Sqcm
1 350 mm Rmt 3685.00
2 400 mm Rmt 4007.00
3 450 mm Rmt 4306.00
4 500 mm Rmt 4831.00
5 600 mm Rmt 6089.00
6 700 mm Rmt 7520.00
7 800 mm Rmt 9385.00
8 900 mm Rmt 11869.00
9 1000 mm Rmt 13948.00
10 1100 mm Rmt 16096.00
11 1200 mm Rmt 18604.00
12 1300 mm Rmt 22763.00
13 1400 mm Rmt 28277.00
14 1500 mm Rmt 31883.00
15 1600 mm Rmt 35938.00
16 1700 mm Rmt 39988.00
17 1800 mm Rmt 44040.00
i) Factory Test Pressure 20 kg/Sqcm
1 350 mm Rmt 3743.00
2 400 mm Rmt 4075.00
3 450 mm Rmt 4400.00
4 500 mm Rmt 4981.00
5 600 mm Rmt 6305.00
6 700 mm Rmt 8330.00
7 800 mm Rmt 11084.00
8 900 mm Rmt 13102.00
9 1000 mm Rmt 15761.00
10 1100 mm Rmt 18736.00
11 1200 mm Rmt 23562.00
12 1300 mm Rmt 25925.00
13 1400 mm Rmt 30287.00
14 1500 mm Rmt 34334.00
15 1600 mm Rmt 38400.00
16 1700 mm Rmt 42463.00
17 1800 mm Rmt 46529.00
LIPDN 38 Lowering, laying and jointing in proper grade and Section
alignment Pre-Stressed Cement Concrete Pipes with 12.29
rubber ring joints including cost of conveyance from stores to
site of works, all labour involved, etc. complete but excluding
cost of rubber rings (for all class of pipes)
83
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
9 1000 mm Rmt 401.80
10 1100 mm Rmt 571.35
11 1200 mm Rmt 585.70
12 1300 mm Rmt 685.75
13 1400 mm Rmt 685.75
14 1500 mm Rmt 800.05
15 1600 mm Rmt 869.20
16 1700 mm Rmt 907.45
17 1800 mm Rmt 1147.05
18 1900 mm Rmt 1176.15
19 2000 mm Rmt 1267.95
LIPDN 39 Providing and supplying ISI standard specials & fitting Section
suitable for P. S. C. pipes including cost of labour, materials, 12.30
and transportation to stores / site, loading and unloading
excluding GST levied by GOI & GOM in all respect, complete.
84
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
V. BAR WRAPPED STEEL CYLINDER PIPES (BWSC)
LIPDN 41 Providing and supplying Bar Wrapped steel cylinder pipes, Section
conforming to IS-15155-2002 (suitable for overlaping steel 12.32
welded joint or butt welded steel joints) of following class and
diameter including cost of all material and labour required,
inspection charges, transportation to stores, transit insurance,
loading, unloding and stacking excluding GST levied by GOI &
GOM in all respect, etc. complete.
85
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 37536.00
xvii) 1600 mm Rmt 39974.00
xviii) 1700 mm Rmt 43421.00
xix) 1800 mm Rmt 46262.00
c) Factory Test Pressure 8 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 37536.00
xvii) 1600 mm Rmt 39974.00
xviii) 1700 mm Rmt 43421.00
xix) 1800 mm Rmt 46262.00
d) Factory Test Pressure 10 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11209.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 16848.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 37536.00
xvii) 1600 mm Rmt 39974.00
xviii) 1700 mm Rmt 43421.00
xix) 1800 mm Rmt 46262.00
86
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
e) Factory Test Pressure 12 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 5978.00
vii) 600 mm Rmt 7591.00
viii) 700 mm Rmt 9710.00
ix) 800 mm Rmt 11840.00
x) 900 mm Rmt 14543.00
xi) 1000 mm Rmt 17686.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27313.00
xiv) 1300 mm Rmt 30794.00
xv) 1400 mm Rmt 35108.00
xvi) 1500 mm Rmt 38116.00
xvii) 1600 mm Rmt 41736.00
xviii) 1700 mm Rmt 46198.00
xix) 1800 mm Rmt 51222.00
f) Factory Test Pressure 14 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5482.00
vi) 500 mm Rmt 6164.00
vii) 600 mm Rmt 7812.00
viii) 700 mm Rmt 10666.00
ix) 800 mm Rmt 13060.00
x) 900 mm Rmt 15618.00
xi) 1000 mm Rmt 19528.00
xii) 1100 mm Rmt 24628.00
xiii) 1200 mm Rmt 27780.00
xiv) 1300 mm Rmt 32454.00
xv) 1400 mm Rmt 38129.00
xvi) 1500 mm Rmt 42350.00
xvii) 1600 mm Rmt 46777.00
xviii) 1700 mm Rmt 52355.00
xix) 1800 mm Rmt 57187.00
g) Factory Test Pressure 16 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4880.00
v) 450 mm Rmt 5724.00
vi) 500 mm Rmt 6644.00
vii) 600 mm Rmt 8443.00
viii) 700 mm Rmt 11621.00
ix) 800 mm Rmt 14267.00
x) 900 mm Rmt 17106.00
xi) 1000 mm Rmt 21559.00
xii) 1100 mm Rmt 26288.00
xiii) 1200 mm Rmt 30461.00
87
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
xiv) 1300 mm Rmt 35827.00
xv) 1400 mm Rmt 41911.00
xvi) 1500 mm Rmt 46786.00
xvii) 1600 mm Rmt 51583.00
xviii) 1700 mm Rmt 58268.00
xix) 1800 mm Rmt 64740.00
h) Factory Test Pressure 18 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4393.00
iv) 400 mm Rmt 4987.00
v) 450 mm Rmt 5918.00
vi) 500 mm Rmt 6857.00
vii) 600 mm Rmt 8790.00
viii) 700 mm Rmt 12100.00
ix) 800 mm Rmt 14886.00
x) 900 mm Rmt 17833.00
xi) 1000 mm Rmt 22562.00
xii) 1100 mm Rmt 27396.00
xiii) 1200 mm Rmt 31811.00
xiv) 1300 mm Rmt 37308.00
xv) 1400 mm Rmt 44076.00
xvi) 1500 mm Rmt 48779.00
xvii) 1600 mm Rmt 54844.00
xviii) 1700 mm Rmt 61751.00
xix) 1800 mm Rmt 68162.00
e) Factory Test Pressure 20 kg/Sqcm
i) 250 mm Rmt 3492.00
ii) 300 mm Rmt 3966.00
iii) 350 mm Rmt 4469.00
iv) 400 mm Rmt 5285.00
v) 450 mm Rmt 6281.00
vi) 500 mm Rmt 7337.00
vii) 600 mm Rmt 9421.00
viii) 700 mm Rmt 13056.00
ix) 800 mm Rmt 16360.00
x) 900 mm Rmt 19415.00
xi) 1000 mm Rmt 24829.00
xii) 1100 mm Rmt 29888.00
xiii) 1200 mm Rmt 34644.00
xiv) 1300 mm Rmt 40669.00
xv) 1400 mm Rmt 48366.00
xvi) 1500 mm Rmt 54449.00
xvii) 1600 mm Rmt 60323.00
xviii) 1700 mm Rmt 68267.00
xix) 1800 mm Rmt 75510.00
88
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 42 Lowering, laying and jointing in proper grade and Section
alignment Bar wrapped steel cylinder pipes with couplings 12.33
& gasket including cost of conveyance from stores to site of
works, all labour involved, etc. complete (for all class of pipes)
89
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
VI. GLASS FIBRE REINFORCED PLASTIC PIPES (GRP)
LIPDN 45 Providing and supplying Glass fibre reinforced plastic Section
(GRP) pipes confirming to IS 14402 with double bell REKA 12.36
GRP coupling EPDM rubber gaskets for sealing of following
pressure diameter and stiffness class including cost of all
material and labour required, insurance, transportation to store,
unloading and stacking excluding GST levied by GOI & GOM in
all respect etc. complete.
A. Class (SN) 2500 (124 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 2990.00
ii) 350 mm Rmt 3457.00
iii) 400 mm Rmt 3806.00
iv) 450 mm Rmt 4281.00
v) 500 mm Rmt 4844.00
vi) 600 mm Rmt 6149.00
vii) 700 mm Rmt 7628.00
viii) 800 mm Rmt 9437.00
ix) 900 mm Rmt 11521.00
x) 1000 mm Rmt 13665.00
xi) 1100 mm Rmt 16637.00
xii) 1200 mm Rmt 19399.00
xiii) 1300 mm Rmt 21951.00
xiv) 1400 mm Rmt 25383.00
xv) 1500 mm Rmt 28842.00
xvi) 1600 mm Rmt 33603.00
xvii) 1700 mm Rmt 40219.00
xviii) 1800 mm Rmt 43884.00
xix) 1900 mm Rmt 49057.00
xx) 2000 mm Rmt 53029.00
xxi) 2100 mm Rmt 59297.00
xxii) 2200 mm Rmt 63656.00
xxiii) 2300 mm Rmt 68785.00
xiv) 2400 mm Rmt 73520.00
xxv) 2500 mm Rmt 80010.00
xxvi) 2600 mm Rmt 86751.00
xxvii) 2700 mm Rmt 92590.00
xxviii) 2800 mm Rmt 99363.00
xxix) 2900 mm Rmt 106367.00
xxx) 3000 mm Rmt 113357.00
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 3104.00
ii) 350 mm Rmt 3546.00
iii) 400 mm Rmt 3985.00
iv) 450 mm Rmt 4423.00
v) 500 mm Rmt 4934.00
vi) 600 mm Rmt 6404.00
vii) 700 mm Rmt 8004.00
viii) 800 mm Rmt 9819.00
ix) 900 mm Rmt 11981.00
x) 1000 mm Rmt 14263.00
xi) 1100 mm Rmt 17295.00
xii) 1200 mm Rmt 20059.00
xiii) 1300 mm Rmt 22944.00
xiv) 1400 mm Rmt 26276.00
xv) 1500 mm Rmt 29987.00
xvi) 1600 mm Rmt 35011.00
xvii) 1700 mm Rmt 41851.00
xviii) 1800 mm Rmt 45578.00
xix) 1900 mm Rmt 51030.00
xx) 2000 mm Rmt 55221.00
xxi) 2100 mm Rmt 61617.00
xxii) 2200 mm Rmt 66431.00
xxiii) 2300 mm Rmt 71573.00
xiv) 2400 mm Rmt 76437.00
xxv) 2500 mm Rmt 84719.00
xxvi) 2600 mm Rmt 91078.00
xxvii) 2700 mm Rmt 97568.00
xxviii) 2800 mm Rmt 104427.00
xxix) 2900 mm Rmt 112081.00
xxx) 3000 mm Rmt 119749.00
90
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 3203.00
ii) 350 mm Rmt 3720.00
iii) 400 mm Rmt 4147.00
iv) 450 mm Rmt 4702.00
v) 500 mm Rmt 4934.00
vi) 600 mm Rmt 6789.00
vii) 700 mm Rmt 8496.00
viii) 800 mm Rmt 10634.00
ix) 900 mm Rmt 12961.00
x) 1000 mm Rmt 15388.00
xi) 1100 mm Rmt 18608.00
xii) 1200 mm Rmt 21639.00
xiii) 1300 mm Rmt 24989.00
xiv) 1400 mm Rmt 28743.00
xv) 1500 mm Rmt 32637.00
xvi) 1600 mm Rmt 38128.00
xvii) 1700 mm Rmt 45743.00
xviii) 1800 mm Rmt 50004.00
xix) 1900 mm Rmt 55604.00
xx) 2000 mm Rmt 60302.00
xxi) 2100 mm Rmt 67154.00
xxii) 2200 mm Rmt 72231.00
xxiii) 2300 mm Rmt 77974.00
xiv) 2400 mm Rmt 84105.00
xxv) 2500 mm Rmt 96179.00
xxvi) 2600 mm Rmt 104306.00
xxvii) 2700 mm Rmt 111726.00
xxviii) 2800 mm Rmt 119946.00
xxix) 2900 mm Rmt 128377.00
xxx) 3000 mm Rmt 136781.00
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3392.00
ii) 350 mm Rmt 3914.00
iii) 400 mm Rmt 4360.00
iv) 450 mm Rmt 5228.00
v) 500 mm Rmt 4934.00
vi) 600 mm Rmt 7306.00
vii) 700 mm Rmt 9075.00
viii) 800 mm Rmt 11284.00
ix) 900 mm Rmt 13847.00
x) 1000 mm Rmt 16523.00
xi) 1100 mm Rmt 20294.00
xii) 1200 mm Rmt 23674.00
xiii) 1300 mm Rmt 26817.00
xiv) 1400 mm Rmt 30902.00
xv) 1500 mm Rmt 35333.00
xvi) 1600 mm Rmt 41032.00
xvii) 1700 mm Rmt 49266.00
xviii) 1800 mm Rmt 54055.00
xix) 1900 mm Rmt 59839.00
xx) 2000 mm Rmt 65089.00
xxi) 2100 mm Rmt 72560.00
xxii) 2200 mm Rmt 78279.00
xxiii) 2300 mm Rmt 87079.00
xiv) 2400 mm Rmt 94425.00
xxv) 2500 mm Rmt 127648.00
xxvi) 2600 mm Rmt 137384.00
xxvii) 2700 mm Rmt 147131.00
xxviii) 2800 mm Rmt 158015.00
xxix) 2900 mm Rmt 173389.00
xxx) 3000 mm Rmt 178797.00
91
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3531.00
ii) 350 mm Rmt 4078.00
iii) 400 mm Rmt 4537.00
iv) 450 mm Rmt 5228.00
v) 500 mm Rmt 6009.00
vi) 600 mm Rmt 7852.00
vii) 700 mm Rmt 9772.00
viii) 800 mm Rmt 12231.00
ix) 900 mm Rmt 15119.00
x) 1000 mm Rmt 17952.00
xi) 1100 mm Rmt 22054.00
xii) 1200 mm Rmt 25601.00
xiii) 1300 mm Rmt 29537.00
xiv) 1400 mm Rmt 33827.00
xv) 1500 mm Rmt 38417.00
xvi) 1600 mm Rmt 44585.00
xvii) 1700 mm Rmt 54344.00
xviii) 1800 mm Rmt 59353.00
xix) 1900 mm Rmt 66299.00
xx) 2000 mm Rmt 72198.00
xxi) 2100 mm Rmt 82844.00
xxii) 2200 mm Rmt 89630.00
xxiii) 2300 mm Rmt 96707.00
xiv) 2400 mm Rmt 103256.00
B. Class (SN) 5000 (248 kpa)
a) 3 Kg/Sq.cm :
i) 300 mm Rmt 3204.00
ii) 350 mm Rmt 3759.00
iii) 400 mm Rmt 4224.00
iv) 450 mm Rmt 4816.00
v) 500 mm Rmt 5390.00
vi) 600 mm Rmt 6936.00
vii) 700 mm Rmt 8663.00
viii) 800 mm Rmt 10771.00
ix) 900 mm Rmt 13306.00
x) 1000 mm Rmt 15834.00
xi) 1100 mm Rmt 19223.00
xii) 1200 mm Rmt 22544.00
xiii) 1300 mm Rmt 25820.00
xiv) 1400 mm Rmt 29503.00
xv) 1500 mm Rmt 33714.00
xvi) 1600 mm Rmt 39200.00
xvii) 1700 mm Rmt 47043.00
xviii) 1800 mm Rmt 51558.00
xix) 1900 mm Rmt 57410.00
xx) 2000 mm Rmt 62484.00
xxi) 2100 mm Rmt 69546.00
xxii) 2200 mm Rmt 75074.00
xxiii) 2300 mm Rmt 83294.00
xiv) 2400 mm Rmt 90002.00
xxv) 2500 mm Rmt 96970.00
xxvi) 2600 mm Rmt 104161.00
xxvii) 2700 mm Rmt 112005.00
xxviii) 2800 mm Rmt 119721.00
xxix) 2900 mm Rmt 128466.00
xxx) 3000 mm Rmt 137254.00
92
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
b) 6 Kg/Sq.cm :
i) 300 mm Rmt 3254.00
ii) 350 mm Rmt 3823.00
iii) 400 mm Rmt 4224.00
iv) 450 mm Rmt 4816.00
v) 500 mm Rmt 5548.00
vi) 600 mm Rmt 7088.00
vii) 700 mm Rmt 8888.00
viii) 800 mm Rmt 11033.00
ix) 900 mm Rmt 13632.00
x) 1000 mm Rmt 16193.00
xi) 1100 mm Rmt 19835.00
xii) 1200 mm Rmt 23067.00
xiii) 1300 mm Rmt 26510.00
xiv) 1400 mm Rmt 30248.00
xv) 1500 mm Rmt 34503.00
xvi) 1600 mm Rmt 40170.00
xvii) 1700 mm Rmt 48196.00
xviii) 1800 mm Rmt 52807.00
xix) 1900 mm Rmt 58847.00
xx) 2000 mm Rmt 64158.00
xxi) 2100 mm Rmt 71350.00
xxii) 2200 mm Rmt 77142.00
xxiii) 2300 mm Rmt 85550.00
xiv) 2400 mm Rmt 92094.00
xxv) 2500 mm Rmt 99467.00
xxvi) 2600 mm Rmt 107524.00
xxvii) 2700 mm Rmt 115235.00
xxviii) 2800 mm Rmt 123387.00
xxix) 2900 mm Rmt 132271.00
xxx) 3000 mm Rmt 141200.00
c) 9 Kg/Sq.cm :
i) 300 mm Rmt 3372.00
ii) 350 mm Rmt 3952.00
iii) 400 mm Rmt 4447.00
iv) 450 mm Rmt 5062.00
v) 500 mm Rmt 5792.00
vi) 600 mm Rmt 7869.00
vii) 700 mm Rmt 9322.00
viii) 800 mm Rmt 12047.00
ix) 900 mm Rmt 14255.00
x) 1000 mm Rmt 17017.00
xi) 1100 mm Rmt 22299.00
xii) 1200 mm Rmt 25913.00
xiii) 1300 mm Rmt 29066.00
xiv) 1400 mm Rmt 32617.00
xv) 1500 mm Rmt 37483.00
xvi) 1600 mm Rmt 42218.00
xvii) 1700 mm Rmt 50898.00
xviii) 1800 mm Rmt 55401.00
xix) 1900 mm Rmt 60394.00
xx) 2000 mm Rmt 72468.00
xxi) 2100 mm Rmt 76610.00
xxii) 2200 mm Rmt 82844.00
xxiii) 2300 mm Rmt 93511.00
xiv) 2400 mm Rmt 100626.00
xxv) 2500 mm Rmt 105379.00
xxvi) 2600 mm Rmt 113779.00
xxvii) 2700 mm Rmt 121815.00
xxviii) 2800 mm Rmt 128232.00
xxix) 2900 mm Rmt 138096.00
xxx) 3000 mm Rmt 146645.00
93
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
d) 12 Kg/Sq.cm :
i) 300 mm Rmt 3468.00
ii) 350 mm Rmt 4114.00
iii) 400 mm Rmt 4548.00
iv) 450 mm Rmt 5266.00
v) 500 mm Rmt 6013.00
vi) 600 mm Rmt 7941.00
vii) 700 mm Rmt 9890.00
viii) 800 mm Rmt 12181.00
ix) 900 mm Rmt 15275.00
x) 1000 mm Rmt 17976.00
xi) 1100 mm Rmt 22299.00
xii) 1200 mm Rmt 25913.00
xiii) 1300 mm Rmt 29699.00
xiv) 1400 mm Rmt 34076.00
xv) 1500 mm Rmt 38687.00
xvi) 1600 mm Rmt 43420.00
xvii) 1700 mm Rmt 53867.00
xviii) 1800 mm Rmt 57944.00
xix) 1900 mm Rmt 64394.00
xx) 2000 mm Rmt 78156.00
xxi) 2100 mm Rmt 83760.00
xxii) 2200 mm Rmt 90046.00
xxiii) 2300 mm Rmt 102918.00
xiv) 2400 mm Rmt 108680.00
e) 15 Kg/Sq.cm :
i) 300 mm Rmt 3593.00
ii) 350 mm Rmt 4276.00
iii) 400 mm Rmt 4781.00
iv) 450 mm Rmt 5520.00
v) 500 mm Rmt 6300.00
vi) 600 mm Rmt 8229.00
vii) 700 mm Rmt 10407.00
viii) 800 mm Rmt 12998.00
ix) 900 mm Rmt 16089.00
x) 1000 mm Rmt 19195.00
xi) 1100 mm Rmt 23550.00
xii) 1200 mm Rmt 27594.00
xiii) 1300 mm Rmt 31357.00
xiv) 1400 mm Rmt 36235.00
xv) 1500 mm Rmt 41196.00
xvi) 1600 mm Rmt 46403.00
xvii) 1700 mm Rmt 56000.00
xviii) 1800 mm Rmt 60537.00
xix) 1900 mm Rmt 70425.00
xx) 2000 mm Rmt 81727.00
xxi) 2100 mm Rmt 89485.00
xxii) 2200 mm Rmt 93749.00
xxiii) 2300 mm Rmt 107130.00
xiv) 2400 mm Rmt 117053.00
94
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
LIPDN 46 Lowering, laying and jointing in proper grade and alignment Section
Glass fibre reinforced plastic (GRP) pipes with couplings & 12.37
gasket including cost of conveyance from stores to site of
works, all labour involved, etc. complete (for all class of pipes)
95
Item No. Description Specification Unit Rate
Ref. No. (in Rs.)
2022-23
1 2 3 4 5
LIPDN 48 Hydraulic testing of Glass fibre reinforced plastic (GRP) Section
pipes to specified pressure including cost of all materials and 12.39
labour and water for testing for the length upto 1 km. using
reciprocating type pumps which should be able to provide
specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for testing.
The rate under this item shall also include cost of retesting, if
necessary.
1 300 mm Km 12831.55
2 350 mm Km 15919.85
3 400 mm Km 19547.50
4 450 mm Km 23328.00
5 500 mm Km 27344.95
6 600 mm Km 32224.15
7 700 mm Km 38430.70
8 800 mm Km 45583.00
9 900 mm Km 53651.00
10 1000 mm Km 62725.00
11 1100 mm Km 72714.00
12 1200 mm Km 83649.00
13 1300 mm Km 95530.00
14 1400 mm Km 108357.00
15 1500 mm Km 125902.00
16 1600 mm Km 142052.00
17 1700 mm Km 157716.00
18 1800 mm Km 174326.00
19 1900 mm Km 191881.00
20 2000 mm Km 210381.00
21 2100 mm Km 229828.00
22 2200 mm Km 250909.00
23 2300 mm Km 272247.00
24 2400 mm Km 294530.00
25 2500 mm Km 317760.00
26 2600 mm Km 341935.00
27 2700 mm Km 367056.00
28 2800 mm Km 393122.00
29 2900 mm Km 420134.00
30 3000 mm Km 448092.00
96
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
VII. H.D.P.E. PIPES
LIPDN 49 Providing and supplying in standard lengths Polyethelene Section
Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with 12.40
nesessary jointing material like mechanical connector i.e. thread /
insert joint / quick release coupler joint / compression fitting joint
or flanged joint excluding coupler/specials, including
transportation and freight charges, inspection charges, loading /
unloading charges, conveyance to the departmental stores &
stacking the same in closed shade duly protecting from sunrays &
rains, excluding GST levied by GOI & GOM in all respect etc.
complete.
a) PE-100 : 3 Kg/Sq.cm
1 630 mm Rmt 6411.00
2 710 mm Rmt 8118.00
3 800 mm Rmt 10327.00
4 900 mm Rmt 12361.00
5 1000 mm Rmt 15218.00
6 1200 mm Rmt 19348.00
b) PE-100 : 4 Kg/Sq.cm
1 75 mm Rmt 122.00
2 90 mm Rmt 169.00
3 110 mm Rmt 248.00
4 125 mm Rmt 299.00
5 140 mm Rmt 377.00
6 160 mm Rmt 492.00
7 180 mm Rmt 622.00
8 200 mm Rmt 763.00
9 225 mm Rmt 971.00
10 250 mm Rmt 1190.00
11 280 mm Rmt 1490.00
12 315 mm Rmt 1890.00
13 355 mm Rmt 2393.00
14 400 mm Rmt 3039.00
15 450 mm Rmt 3832.00
16 500 mm Rmt 4715.00
17 560 mm Rmt 5909.00
18 630 mm Rmt 7465.00
19 710 mm Rmt 9520.00
20 800 mm Rmt 11198.00
21 900 mm Rmt 15227.00
22 1000 mm Rmt 18776.00
23 1200 mm Rmt 27059.00
97
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
c) PE-100 : 5 Kg/Sq.cm
1 75 mm Rmt 151.00
2 90 mm Rmt 209.00
3 110 mm Rmt 310.00
4 125 mm Rmt 374.00
5 140 mm Rmt 468.00
6 160 mm Rmt 614.00
7 180 mm Rmt 780.00
8 200 mm Rmt 955.00
9 225 mm Rmt 1213.00
10 250 mm Rmt 1501.00
11 280 mm Rmt 1870.00
12 315 mm Rmt 2372.00
13 355 mm Rmt 3006.00
14 400 mm Rmt 3798.00
15 450 mm Rmt 4785.00
16 500 mm Rmt 5930.00
17 560 mm Rmt 7442.00
18 630 mm Rmt 9404.00
19 710 mm Rmt 11906.00
20 800 mm Rmt 15144.00
21 900 mm Rmt 19192.00
22 1000 mm Rmt 23662.00
23 1200 mm Rmt 34040.00
d) PE-100 : 6 Kg/Sq.cm
1 75 mm Rmt 177.00
2 90 mm Rmt 252.00
3 110 mm Rmt 381.00
4 125 mm Rmt 460.00
5 140 mm Rmt 577.00
6 160 mm Rmt 756.00
7 180 mm Rmt 950.00
8 200 mm Rmt 1177.00
9 225 mm Rmt 1488.00
10 250 mm Rmt 1834.00
11 280 mm Rmt 2290.00
12 315 mm Rmt 2888.00
13 355 mm Rmt 3667.00
14 400 mm Rmt 4664.00
15 450 mm Rmt 4588.00
16 500 mm Rmt 7272.00
17 560 mm Rmt 9101.00
18 630 mm Rmt 11497.00
19 710 mm Rmt 14639.00
20 800 mm Rmt 18533.00
21 900 mm Rmt 23477.00
22 1000 mm Rmt 29006.00
23 1200 mm Rmt 41716.00
e) PE-100 : 8 Kg/Sq.cm
1 75 mm Rmt 219.00
2 90 mm Rmt 307.00
3 110 mm Rmt 462.00
4 125 mm Rmt 560.00
5 140 mm Rmt 704.00
6 160 mm Rmt 924.00
7 180 mm Rmt 1159.00
8 200 mm Rmt 1431.00
9 225 mm Rmt 1811.00
10 250 mm Rmt 2227.00
11 280 mm Rmt 2800.00
12 315 mm Rmt 3548.00
98
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
13 355 mm Rmt 4490.00
14 400 mm Rmt 5713.00
15 450 mm Rmt 7217.00
16 500 mm Rmt 8923.00
17 560 mm Rmt 11171.00
18 630 mm Rmt 14125.00
19 710 mm Rmt 17996.00
20 800 mm Rmt 22838.00
21 900 mm Rmt 28911.00
22 1000 mm Rmt 35698.00
23 1200 mm Rmt 51354.00
f) PE-100 : 10 Kg/Sq.cm
1 75 mm Rmt 266.00
2 90 mm Rmt 381.00
3 110 mm Rmt 561.00
4 125 mm Rmt 683.00
5 140 mm Rmt 856.00
6 160 mm Rmt 1122.00
7 180 mm Rmt 1420.00
8 200 mm Rmt 1747.00
9 225 mm Rmt 2219.00
10 250 mm Rmt 2726.00
11 280 mm Rmt 3424.00
12 315 mm Rmt 4332.00
13 355 mm Rmt 5493.00
14 400 mm Rmt 6998.00
15 450 mm Rmt 8798.00
16 500 mm Rmt 10871.00
17 560 mm Rmt 13623.00
18 630 mm Rmt 17254.00
19 710 mm Rmt 21882.00
20 800 mm Rmt 27821.00
21 900 mm Rmt 35170.00
22 1000 mm Rmt 43457.00
23 1200 mm Rmt 62534.00
g) PE-100 : 12.5 Kg/Sq.cm
1 75 mm Rmt 320.00
2 90 mm Rmt 455.00
3 110 mm Rmt 679.00
4 125 mm Rmt 832.00
5 140 mm Rmt 1044.00
6 160 mm Rmt 1361.00
7 180 mm Rmt 1715.00
8 200 mm Rmt 2116.00
9 225 mm Rmt 2684.00
10 250 mm Rmt 3314.00
99
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
11 280 mm Rmt 4153.00
12 315 mm Rmt 5255.00
13 355 mm Rmt 6660.00
14 400 mm Rmt 8454.00
15 450 mm Rmt 10657.00
16 500 mm Rmt 13174.00
17 560 mm Rmt 16500.00
18 630 mm Rmt 20887.00
19 710 mm Rmt 26548.00
20 800 mm Rmt 33702.00
21 900 mm Rmt 42649.00
22 1000 mm Rmt 52598.00
23 1200 mm Rmt 75742.00
h) PE-100 : 16 Kg/Sq.cm
1 75 mm Rmt 379.00
2 90 mm Rmt 542.00
3 110 mm Rmt 813.00
4 125 mm Rmt 988.00
5 140 mm Rmt 1242.00
6 160 mm Rmt 1618.00
7 180 mm Rmt 2044.00
8 200 mm Rmt 2530.00
9 225 mm Rmt 3193.00
10 250 mm Rmt 3945.00
11 280 mm Rmt 4954.00
12 315 mm Rmt 6255.00
13 355 mm Rmt 7958.00
14 400 mm Rmt 10099.00
15 450 mm Rmt 12718.00
16 500 mm Rmt 15715.00
17 560 mm Rmt 19710.00
18 630 mm Rmt 24921.00
19 710 mm Rmt 31656.00
20 800 mm Rmt 40187.00
21 900 mm Rmt 50851.00
22 1000 mm Rmt 62815.00
LIPDN 50 Lowering, Laying and Jointing H. D. P. E pipes in proper Section
position including all specials by compression fitting/electrofusion 12.41
and butt fusion jointing procedure as per relevent IS Code
complete with all materials for jointing procedure like
Electrofusion machine, Electric heater/butt fusion welding
machine with hydraulic jack, top loading clamp etc. and all
labours as directed by engineer in charge as per IS-7634 Part II
For all classes.
1 75 mm Rmt 58.00
2 90 mm Rmt 66.00
3 110 mm Rmt 72.00
4 125 mm Rmt 84.00
5 140 mm Rmt 97.00
6 160 mm Rmt 108.00
7 180 mm Rmt 114.00
8 200 mm Rmt 133.00
9 225 mm Rmt 166.00
10 250 mm Rmt 181.00
11 280 mm Rmt 222.00
12 315 mm Rmt 264.00
13 355 mm Rmt 305.00
14 400 mm Rmt 322.00
15 450 mm Rmt 338.00
16 500 mm Rmt 395.00
17 560 mm Rmt 414.00
18 630 mm Rmt 547.00
19 710 mm Rmt 570.00
20 800 mm Rmt 713.00
21 900 mm Rmt 950.00
22 1000 mm Rmt 988.00
23 1200 mm Rmt 1056.00
100
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 51 Providing and supplying ISI mark H. D. P. E pipes Section
fitting/specials including loading, unloading, trasnporatation 12.42
upto departmental store, stacking excluding GST levied by GOI &
GOM in all respect etc.complete.
75 mm & above dia. Rmt 2 % of per
mtr. rate of
pipe
LIPDN 52 Hydraulic testing of H. D. P. E. pipe line to specified pressure Section
including cost of all materials and labour and water for testing for 12.43
specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type pumps
which should be able to provide specified test pressure gauges
and other necessary equipments, labour, operation charges, etc.
required for testing. The rate under this item shall also include
cost of retesting, if necessary and reinstating to original position.
1 75 mm Km 7168.75
2 90 mm Km 7321.45
3 110 mm Km 7558.15
4 125 mm Km 7760.50
5 140 mm Km 8356.20
6 160 mm Km 8687.50
7 180 mm Km 9056.60
8 200 mm Km 9463.50
9 225 mm Km 10025.35
10 250 mm Km 10646.35
11 280 mm Km 11469.50
12 315 mm Km 13303.45
13 355 mm Km 16098.40
14 400 mm Km 19547.50
15 450 mm Km 23328.00
16 500 mm Km 27344.95
17 560 mm Km 30494.95
18 630 mm Km 33986.80
19 710 mm Km 39103.40
20 800 mm Km 45583.00
21 900 mm Km 53651.00
22 1000 mm Km 62725.00
23 1200 mm Km 83649.00
101
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
VIII. PRE-STRESSED CONCRETE CYLINDER PIPES (PCCP)
102
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
c) Factory Test Pressure 7 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6947.00
v) 600 mm Rmt 8022.00
vi) 700 mm Rmt 9998.00
vii) 800 mm Rmt 11498.00
viii) 900 mm Rmt 13340.00
ix) 1000 mm Rmt 16172.00
x) 1100 mm Rmt 17542.00
xi) 1200 mm Rmt 20140.00
xii) 1300 mm Rmt 24306.00
xiii) 1400 mm Rmt 26279.00
xiv) 1500 mm Rmt 28418.00
xv) 1600 mm Rmt 34274.00
xvi) 1700 mm Rmt 40358.00
xvii) 1800 mm Rmt 42716.00
xviii) 1900 mm Rmt 62099.00
xix) 2000 mm Rmt 66604.00
xx) 2100 mm Rmt 69691.00
xxi) 2200 mm Rmt 73730.00
d) Factory Test Pressure 8.5 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6947.00
v) 600 mm Rmt 8068.00
vi) 700 mm Rmt 10088.00
vii) 800 mm Rmt 11632.00
viii) 900 mm Rmt 13528.00
ix) 1000 mm Rmt 16381.00
x) 1100 mm Rmt 17815.00
xi) 1200 mm Rmt 20488.00
xii) 1300 mm Rmt 24685.00
xiii) 1400 mm Rmt 26747.00
xiv) 1500 mm Rmt 28979.00
xv) 1600 mm Rmt 34874.00
xvi) 1700 mm Rmt 41004.00
xvii) 1800 mm Rmt 43363.00
xviii) 1900 mm Rmt 62900.00
xix) 2000 mm Rmt 68330.00
xx) 2100 mm Rmt 71474.00
xxi) 2200 mm Rmt 74868.00
e) Factory Test Pressure 10 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6486.00
iv) 500 mm Rmt 6965.00
v) 600 mm Rmt 8140.00
vi) 700 mm Rmt 10206.00
vii) 800 mm Rmt 11765.00
viii) 900 mm Rmt 13716.00
ix) 1000 mm Rmt 16631.00
x) 1100 mm Rmt 18088.00
xi) 1200 mm Rmt 20785.00
xii) 1300 mm Rmt 25066.00
xiii) 1400 mm Rmt 27210.00
xiv) 1500 mm Rmt 29474.00
xv) 1600 mm Rmt 35474.00
xvi) 1700 mm Rmt 41674.00
xvii) 1800 mm Rmt 44032.00
xviii) 1900 mm Rmt 64518.00
xix) 2000 mm Rmt 69253.00
xx) 2100 mm Rmt 72716.00
xxi) 2200 mm Rmt 76144.00
103
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
f) Factory Test Pressure 11.5 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5960.00
iii) 450 mm Rmt 6503.00
iv) 500 mm Rmt 7027.00
v) 600 mm Rmt 8209.00
vi) 700 mm Rmt 10325.00
vii) 800 mm Rmt 11914.00
viii) 900 mm Rmt 13903.00
ix) 1000 mm Rmt 16840.00
x) 1100 mm Rmt 18365.00
xi) 1200 mm Rmt 21133.00
xii) 1300 mm Rmt 25496.00
xiii) 1400 mm Rmt 27618.00
xiv) 1500 mm Rmt 29976.00
xv) 1600 mm Rmt 36080.00
xvi) 1700 mm Rmt 42341.00
xvii) 1800 mm Rmt 44701.00
xviii) 1900 mm Rmt 65518.00
xix) 2000 mm Rmt 70304.00
xx) 2100 mm Rmt 75143.00
g) Factory Test Pressure 13 kg/Sqcm
i) 350 mm Rmt 5447.00
ii) 400 mm Rmt 5976.00
iii) 450 mm Rmt 6559.00
iv) 500 mm Rmt 7068.00
v) 600 mm Rmt 8281.00
vi) 700 mm Rmt 10445.00
vii) 800 mm Rmt 12065.00
viii) 900 mm Rmt 14052.00
ix) 1000 mm Rmt 17089.00
x) 1100 mm Rmt 18685.00
xi) 1200 mm Rmt 21482.00
xii) 1300 mm Rmt 25932.00
xiii) 1400 mm Rmt 28086.00
xiv) 1500 mm Rmt 31096.00
xv) 1600 mm Rmt 37334.00
xvi) 1700 mm Rmt 43007.00
xvii) 1800 mm Rmt 45349.00
xviii) 1900 mm Rmt 66396.00
xix) 2000 mm Rmt 71354.00
xx) 2100 mm Rmt 76490.00
h) Factory Test Pressure 14.5 kg/Sqcm
i) 350 mm Rmt 5461.00
ii) 400 mm Rmt 6026.00
iii) 450 mm Rmt 6596.00
iv) 500 mm Rmt 7129.00
v) 600 mm Rmt 8376.00
vi) 700 mm Rmt 10564.00
vii) 800 mm Rmt 12232.00
viii) 900 mm Rmt 14201.00
ix) 1000 mm Rmt 17298.00
x) 1100 mm Rmt 18958.00
xi) 1200 mm Rmt 21832.00
xii) 1300 mm Rmt 26260.00
xiii) 1400 mm Rmt 29111.00
xiv) 1500 mm Rmt 31681.00
xv) 1600 mm Rmt 37961.00
xvi) 1700 mm Rmt 44668.00
xvii) 1800 mm Rmt 47028.00
xviii) 1900 mm Rmt 68336.00
xix) 2000 mm Rmt 74024.00
xx) 2100 mm Rmt 77846.00
104
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
i) Factory Test Pressure 17 kg/Sqcm
i) 350 mm Rmt 5507.00
ii) 400 mm Rmt 6078.00
iii) 450 mm Rmt 6672.00
iv) 500 mm Rmt 7212.00
v) 600 mm Rmt 8495.00
vi) 700 mm Rmt 10740.00
vii) 800 mm Rmt 12466.00
viii) 900 mm Rmt 14615.00
ix) 1000 mm Rmt 17716.00
x) 1100 mm Rmt 19417.00
xi) 1200 mm Rmt 22379.00
xii) 1300 mm Rmt 27493.00
xiii) 1400 mm Rmt 30535.00
xiv) 1500 mm Rmt 33205.00
xv) 1600 mm Rmt 39109.00
xvi) 1700 mm Rmt 45414.00
xvii) 1800 mm Rmt 47772.00
xviii) 1900 mm Rmt 70541.00
xix) 2000 mm Rmt 76086.00
xx) 2100 mm Rmt 80922.00
j) Factory Test Pressure 18.5 kg/Sqcm
i) 350 mm Rmt 5537.00
ii) 400 mm Rmt 6112.00
iii) 450 mm Rmt 6727.00
iv) 500 mm Rmt 7272.00
v) 600 mm Rmt 8590.00
vi) 700 mm Rmt 10861.00
vii) 800 mm Rmt 12634.00
viii) 900 mm Rmt 14803.00
ix) 1000 mm Rmt 17965.00
x) 1100 mm Rmt 19738.00
xi) 1200 mm Rmt 23267.00
xii) 1300 mm Rmt 28483.00
xiii) 1400 mm Rmt 31078.00
xiv) 1500 mm Rmt 33886.00
xv) 1600 mm Rmt 41174.00
xvi) 1700 mm Rmt 45592.00
xvii) 1800 mm Rmt 47950.00
xviii) 1900 mm Rmt 72599.00
xix) 2000 mm Rmt 77989.00
xx) 2100 mm Rmt 83184.00
105
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
k) Factory Test Pressure 20 kg/Sqcm
i) 350 mm Rmt 5567.00
ii) 400 mm Rmt 6145.00
iii) 450 mm Rmt 6764.00
iv) 500 mm Rmt 7334.00
v) 600 mm Rmt 8662.00
vi) 700 mm Rmt 10979.00
vii) 800 mm Rmt 12802.00
viii) 900 mm Rmt 14988.00
ix) 1000 mm Rmt 18174.00
x) 1100 mm Rmt 20455.00
xi) 1200 mm Rmt 24028.00
xii) 1300 mm Rmt 28906.00
xiii) 1400 mm Rmt 31625.00
xiv) 1500 mm Rmt 35910.00
xv) 1600 mm Rmt 41994.00
xvi) 1700 mm Rmt 46478.00
xvii) 1800 mm Rmt 48836.00
xviii) 1900 mm Rmt 73580.00
xix) 2000 mm Rmt 80154.00
xx) 2100 mm Rmt 85362.00
l) Factory Test Pressure 21.5 kg/Sqcm
i) 350 mm Rmt 5599.00
ii) 400 mm Rmt 6197.00
iii) 450 mm Rmt 6821.00
iv) 500 mm Rmt 7394.00
v) 600 mm Rmt 8734.00
vi) 700 mm Rmt 11098.00
vii) 800 mm Rmt 12934.00
viii) 900 mm Rmt 15215.00
ix) 1000 mm Rmt 18822.00
x) 1100 mm Rmt 20813.00
xi) 1200 mm Rmt 24416.00
xii) 1300 mm Rmt 29416.00
xiii) 1400 mm Rmt 34134.00
xiv) 1500 mm Rmt 36998.00
xv) 1600 mm Rmt 44292.00
xvi) 1700 mm Rmt 48738.00
xvii) 1800 mm Rmt 51583.00
xviii) 1900 mm Rmt 76093.00
xix) 2000 mm Rmt 82552.00
106
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
m) Factory Test Pressure 23 kg/Sqcm
i) 350 mm Rmt 5614.00
ii) 400 mm Rmt 6230.00
iii) 450 mm Rmt 6858.00
iv) 500 mm Rmt 7456.00
v) 600 mm Rmt 8828.00
vi) 700 mm Rmt 11216.00
vii) 800 mm Rmt 13102.00
viii) 900 mm Rmt 15402.00
ix) 1000 mm Rmt 19151.00
x) 1100 mm Rmt 21169.00
xi) 1200 mm Rmt 25073.00
xii) 1300 mm Rmt 31968.00
xiii) 1400 mm Rmt 35172.00
xiv) 1500 mm Rmt 38950.00
xv) 1600 mm Rmt 45482.00
xvi) 1700 mm Rmt 53527.00
xvii) 1800 mm Rmt 59112.00
xviii) 1900 mm Rmt 78406.00
xix) 2000 mm Rmt 82817.00
n) Factory Test Pressure 24.5 kg/Sqcm
i) 350 mm Rmt 5644.00
ii) 400 mm Rmt 6265.00
iii) 450 mm Rmt 6914.00
iv) 500 mm Rmt 7496.00
v) 600 mm Rmt 8900.00
vi) 700 mm Rmt 11336.00
vii) 800 mm Rmt 13268.00
viii) 900 mm Rmt 15990.00
ix) 1000 mm Rmt 19410.00
x) 1100 mm Rmt 21527.00
xi) 1200 mm Rmt 27121.00
xii) 1300 mm Rmt 32476.00
xiii) 1400 mm Rmt 35851.00
xiv) 1500 mm Rmt 40202.00
xv) 1600 mm Rmt 47051.00
xvi) 1700 mm Rmt 54778.00
xvii) 1800 mm Rmt 61092.00
107
Rate
Specification
Item No. Description Unit (in Rs.)
Ref. No.
2022-23
1 2 3 4 5
LIPDN 54 Lowering, Laying and Jointing in proper grade and Section
alignment Prestressed Concrete Cylinder Pipes (PCCP) 12.45
with welding & mortor coating joints including cost of
conveyance from stores to site of works, loading, unloading,
hoisting, all labour involved,etc.complete but excluding cost of
rubber rings (For all class of pipes)
i) 350 mm Rmt 349.45
ii) 400 mm Rmt 397.30
iii) 450 mm Rmt 408.85
iv) 500 mm Rmt 486.50
v) 600 mm Rmt 538.20
vi) 700 mm Rmt 643.80
vii) 800 mm Rmt 744.70
viii) 900 mm Rmt 817.60
ix) 1000 mm Rmt 908.25
x) 1100 mm Rmt 997.60
xi) 1200 mm Rmt 1099.85
xii) 1300 mm Rmt 1220.10
xiii) 1400 mm Rmt 1296.80
xiv) 1500 mm Rmt 1431.20
xv) 1600 mm Rmt 1479.95
xvi) 1700 mm Rmt 1667.30
xvii) 1800 mm Rmt 1701.30
xviii) 1900 mm Rmt 1734.60
xix) 2000 mm Rmt 1986.50
xx) 2100 mm Rmt 2019.40
xxi) 2200 mm Rmt 2052.35
LIPDN 55 Providing and supplying ISI standard specials & fitting Section
suitable for P. C. C. pipes including cost of labour ,materials, 12.46
and transportation to stores / site, loading and unloading
excluding GST levied by GOI & GOM in all respect etc.
complete.
i) 350 mm & above dia. kg 144.00
LIPDN 56 Hydraulic testing of Prestressed Concrete Cylinder Pipes Section
with rubber ring joints to specified pressure including cost of all 12.47
materials and labour and water for testing for the length upto 1
km. using reciprocating type pumps which should be able to
provide specified test pressure guages and other necessary
equipments, labour, operation charges, etc. required for testing.
The rate under this item shall also include cost of retesting, if
necessary.
i) 350 mm Km 15919.85
ii) 400 mm Km 19547.50
iii) 450 mm Km 23328.00
iv) 500 mm Km 27344.95
v) 600 mm Km 32224.15
vi) 700 mm Km 38430.70
vii) 800 mm Km 45583.00
viii) 900 mm Km 53651.00
ix) 1000 mm Km 62725.00
x) 1100 mm Km 72714.00
xi) 1200 mm Km 83649.00
xii) 1300 mm Km 95530.00
xiii) 1400 mm Km 108357.00
xiv) 1500 mm Km 125902.00
xv) 1600 mm Km 142052.00
xvi) 1700 mm Km 157716.00
xvii) 1800 mm Km 174326.00
xviii) 1900 mm Km 191881.00
xix) 2000 mm Km 210381.00
xx) 2100 mm Km 229828.00
xxi) 2200 mm Km 250909.00
108
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
1 2 3 4 5 6
109
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
110
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
111
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
112
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
113
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
114
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
115
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
116
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
a) Butterfly valves - PN -1
1 100 mm 7460.00 1497 8957
2 150 mm 10259.00 1497 11756
3 200 mm 13678.00 1497 15175
4 250 mm 18652.00 6112 24764
5 300 mm 29533.00 6112 35645
6 350 mm 37460.00 6112 43572
7 400 mm 44455.00 6112 50567
8 450 mm 49429.00 11611 61040
9 500 mm 65749.00 11611 77360
10 600 mm 108339.00 11611 119950
11 700 mm 153569.00 21224 174793
12 750 mm 158543.00 21224 179767
13 800 mm 185123.00 21224 206347
14 900 mm 211391.00 21224 232615
15 1000 mm 311335.00 24203 335538
16 1100 mm 354392.00 24203 378595
17 1200 mm 454180.00 24203 478383
b) Butterfly valves - PN -1.6
1 100 mm 7834.00 1497 9331
2 150 mm 10771.00 1497 12268
3 200 mm 14362.00 1497 15859
4 250 mm 19584.00 6112 25696
5 300 mm 31009.00 6112 37121
6 350 mm 39333.00 6112 45445
7 400 mm 46678.00 6112 52790
8 450 mm 51900.00 11611 63511
9 500 mm 69036.00 11611 80647
10 600 mm 113755.00 11611 125366
11 700 mm 161248.00 21224 182472
12 750 mm 166470.00 21224 187694
13 800 mm 194379.00 21224 215603
14 900 mm 221961.00 21224 243185
15 1000 mm 326903.00 24203 351106
16 1100 mm 372111.00 24203 396314
17 1200 mm 476889.00 24203 501092
117
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
a) Butterfly valves - PN -1
1 100 mm 9028.00 1497 10525
2 150 mm 12413.00 1497 13910
3 200 mm 16551.00 1497 18048
4 250 mm 22569.00 6112 28681
5 300 mm 35734.00 6112 41846
6 350 mm 45326.00 6112 51438
7 400 mm 53789.00 6112 59901
8 450 mm 59808.00 11611 71419
9 500 mm 79556.00 11611 91167
10 600 mm 131089.00 11611 142700
11 700 mm 185819.00 21224 207043
12 750 mm 191837.00 21224 213061
13 800 mm 223998.00 21224 245222
14 900 mm 255783.00 21224 277007
15 1000 mm 376716.00 24203 400919
16 1100 mm 428813.00 24203 453016
17 1200 mm 549559.00 24203 573762
b) Butterfly valves - PN -1.6
1 100 mm 9479.00 1497 10976
2 150 mm 13034.00 1497 14531
3 200 mm 17378.00 1497 18875
4 250 mm 23698.00 6112 29810
5 300 mm 37522.00 6112 43634
6 350 mm 47593.00 6112 53705
7 400 mm 56479.00 6112 62591
8 450 mm 62799.00 11611 74410
9 500 mm 83534.00 11611 95145
10 600 mm 137643.00 11611 149254
11 700 mm 195110.00 21224 216334
12 750 mm 201429.00 21224 222653
13 800 mm 235198.00 21224 256422
14 900 mm 268573.00 21224 289797
15 1000 mm 395552.00 24203 419755
16 1100 mm 450254.00 24203 474457
17 1200 mm 577036.00 24203 601239
118
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
119
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
1 150 mm 72042
2 200 mm 74863
3 250 mm 79565
4 300 mm 84825
5 350 mm 87045
6 400 mm 89266
7 450 mm 93003
8 500 mm 101165
9 600 mm 113408
10 700 mm 118012
11 750 mm 120232
12 800 mm 123272
13 900 mm 133667
14 1000 mm 141260
120
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
PN 1.0
1 100 mm 4314.00 87 4401
2 150 mm 7189.00 144 7333
3 200 mm 9038.00 181 9219
4 250 mm 12734.00 254 12988
5 300 mm 15404.00 308 15712
6 350 mm 21567.00 432 21999
7 400 mm 28756.00 575 29331
8 450 mm 34506.00 690 35196
9 500 mm 41079.00 822 41901
10 600 mm 50528.00 1011 51539
11 700 mm 64494.00 1290 65784
12 750 mm 79282.00 1586 80868
13 800 mm 87293.00 1746 89039
14 900 mm 95304.00 1906 97210
15 1000 mm 124675.00 2493 127168
16 1100 mm 161441.00 3229 164670
17 1200 mm 198001.00 3960 201961
PN 1.6
1 100 mm 4573.00 91 4664
2 150 mm 7620.00 152 7772
3 200 mm 9580.00 192 9772
4 250 mm 13498.00 270 13768
5 300 mm 16329.00 327 16656
6 350 mm 22860.00 457 23317
7 400 mm 30481.00 609 31090
8 450 mm 36577.00 731 37308
9 500 mm 43544.00 871 44415
10 600 mm 53559.00 1071 54630
11 700 mm 68364.00 1368 69732
12 750 mm 84040.00 1681 85721
13 800 mm 92531.00 1851 94382
14 900 mm 101022.00 2020 103042
15 1000 mm 132156.00 2644 134800
16 1100 mm 171127.00 3423 174550
17 1200 mm 209882.00 4198 214080
121
Specification Supply Rate in Erection Rate Total Rate in
Item No. Item Description
Ref. No. Rs. in Rs. Rs.
122
PDN CSR 2022-23 PIPE FITTINGS/SPECIALS ABSTRACT
S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Reinforced Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Plastic (G.R.P) (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes Pipes (P.C.C)
Pipes Pipes
1 2 3 4 5 6 7 8 9 10
1 75 mm & above dia. 2 % of per mtr.
rate of pipe
123
S.N. Classification/ diameter Ductile Polyvinyl Oriented Polyvinyl Pre-Stressed Bar Warapped Glass High Density Pre-Stressed
Iron (D.I.) Chloride Chloride (P.V.C - O) Cement Steel Cylinder Reinforced Polyethylene Concrete
Pipes (P.V.C) Pipes Pipes Concrete (B.W.S.C) Plastic (G.R.P) (H.D.P.E) Cylinder
(P.S.C) Pipes Pipes Pipes (P.C.C)
Pipes Pipes
124
Hydraulic testing of All types of pipe line to specified pressure including cost of all materials and
labour and water for testing for specified length including cutting, placing end cap making
arrangement for filling safe water using reciprocating type pumps which should be able to provide
specified test pressure gauges and other necessary equipments, labour, operation charges, etc.
required for testing. The rate under this item shall also include cost of retesting, if necessary and
reinstating to original position.
1 2 3 4
1 63 mm km 6373.50
2 75 mm km 7168.75
3 80 mm km 7217.30
4 90 mm km 7321.45
5 100 mm km 7435.05
6 110 mm km 7558.15
7 125 mm km 7760.50
8 140 mm km 8356.20
9 150 mm km 8517.10
10 160 mm km 8687.50
11 180 mm km 9056.60
12 200 mm km 9463.50
13 225 mm km 10025.35
14 250 mm km 10646.35
15 280 mm km 11469.50
16 300 mm km 12831.55
17 315 mm km 13303.45
18 350 mm km 15919.85
19 355 mm km 16098.40
20 400 mm km 19547.50
21 450 mm km 23328.00
22 500 mm km 27344.95
23 560 mm km 30494.95
24 600 mm km 32224.15
25 630 mm km 33986.80
26 700 mm km 38430.70
27 710 mm km 39103.40
28 750 mm km 41888.65
29 800 mm km 45583.00
30 900 mm km 53651.00
31 1000 mm km 62725.00
32 1100 mm km 72714.00
33 1200 mm km 83649.00
125
Sr No. Dia of pipe Unit Rate for 2022-23 (Rate in Rs.)
1 2 3 4
34 1300 mm km 95530.00
35 1400 mm km 108357.00
36 1500 mm km 125902.00
37 1600 mm km 142052.00
38 1700 mm km 157716.00
39 1800 mm km 174326.00
40 1900 mm km 191881.00
41 2000 mm km 210381.00
42 2100 mm km 229828.00
43 2200 mm km 250909.00
44 2300 mm km 272247.00
45 2400 mm km 294530.00
46 2500 mm km 317760.00
47 2600 mm km 341935.00
48 2700 mm km 367056.00
49 2800 mm km 393122.00
50 2900 mm km 420134.00
51 3000 mm km 448092.00
126
ANNEXURE-2
GOVERNMENT RESOLUTION FOR REFERENCE
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö
¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ) †×¬Ö×−ÖµÖ´Ö 1996 ŸÖÃÖê“Ö ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü
×−ÖµÖ´Ö 1998 †ÓŸÖÖÔŸÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö
ú¸üÖ¾ÖµÖÖ“Öß úÖµÖÔ¯Ö¬¤üŸÖß ×−ÖÛ¿“ÖŸÖ ú¸üÖê²ÖÖ²ÖŸÖ
´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö
ˆªÖêÖ, ‰ú•ÖÖÔ ¾Ö úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖ,
¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ Îú´ÖÖÓú : ²ÖßÃÖß‹ 2009/¯ÖÏ.Îú. 108/úÖ´ÖÖÖ¸ü 7-†
´ÖÓ¡ÖÖ»ÖµÖ, ´ÖÓã²Ö‡Ô- 32.
פü−ÖÖÓú 17 •Öã−Ö 2010
¯ÖÏßÖÖ¾Ö−ÖÖ :-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996 ¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ †×¬Ö×−ÖµÖ´Ö 1996 Æêü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖÓ¬ÖúÖ´Ö ´Ö•Öæ¸üÖÓ−ÖÖ, •Öê ¸üÖ•µÖ ¿ÖÖÃÖ−ÖÖ−Öê ÖךüûŸÖ êú»Ö껵ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ
»ÖÖ³ÖÖ£Öá ´ÆüÖæ−Ö −ÖÖëפüŸÖ —ÖÖ»Öê»Öê ×Óú¾ÖÖ •µÖÖ úÖ´ÖÖÖ¸üÖÓ“Öß »ÖÖ£ÖÖ£Öá ´ÆüÖã−Ö −ÖÖë¤üÖß ú¸üµÖÖŸÖ µÖêÖÖ¸ü †ÖÆêü †¿ÖÖ
úÖ´ÖÖÖ¸üÖÓ“Öê ú»µÖÖÖ ú¸üµÖÖ“µÖÖ ˆ§êü¿ÖÖ−Öê ¯ÖÖ¸üßŸÖ êú»Öê»Öê †ÖÆêüŸÖ. ÃÖ¤ü¸ü úÖµÖªÖ“Öß ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖÖŸÖ
†Ó´Ö»Ö²Ö•ÖÖ¾ÖÖß ú¸üµÖÖ“µÖÖ ¥üÛ™üü−Öê ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 2007
ŸÖµÖÖ¸ü ú¸üµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. †×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü פü.26.6.1997 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸ü ¯ÖÖÓ“Ö
¿ÖÖÃÖúßµÖ ÃÖ¤üõÖÖÓ“Öê ´ÖÓ›üôû ãÖÖ¯Ö−Ö ú¸üµÖÖŸÖ †Ö»Öê»Öê †ÖÆêü. µÖÖ †×¬Ö×−ÖµÖ´ÖÖÓŸÖÖÔŸÖ ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ“Öß
ŸÖÃÖê“Ö ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê ´Ö㻵ÖÖÓÓú−Ö ú¸üµÖÖ“Öß ŸÖ¯Ö¿Ö߻־ÖÖ¸ü úÖµÖÔ¯Ö¬¤üŸÖß ŸÖµÖÖ¸ü ú¸üµÖÖÃÖÖšüß ´ÖÓÓסִÖÓÓ›üôûÖ−Öê פü−ÖÖÓú
12/05/2010 ¸üÖê•Öß ŸÖŸ¾ÖŸÖ: ´ÖÖ−µÖŸÖÖ ‘ÖêµÖÖŸÖ †Ö»Öß, ŸµÖÖ −ÖãÃÖÖ¸ ´ÖÖ. ´ÖãµÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß−Öê
×−ÖÛ¿“ÖŸÖ êú»Öê»Öß úÖµÖÔ¯Ö¬¤üŸÖß ¯Öãלü»Ö¯ÖÏ´ÖÖÖê †ÖÆêü.
¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ:-
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ †×¬Ö×−ÖµÖ´Ö
27/1996) †Ö×Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996 (ëúצüµÖ
†×¬Ö×−ÖµÖ´Ö 28/1996) (ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö ) Æêü úÖµÖ¤êü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö Öê¡ÖÖŸÖ úÖµÖÔ¸üŸÖ
†ÃÖ»Ö껵ÖÖ ²ÖÖÓ¬ÖúÖ´Ö ´Ö•Öæ¸üÖÓ“µÖÖ ú»µÖÖÖúÖ¸üß ˆ«êü¿µÖÖ−Öê •ÖÃÖê úß,†Ö¸üÖêµÖ, ÃÖã¸üÖÖ †Ö×Ö ú»µÖÖÖ ‡ŸµÖÖ¤üß µÖÖê•Ö−ÖÖ
²ÖÖÓ¬ÖúÖ´Ö Öê¡ÖÖŸÖ úÖ´Ö ú¸üÖÖ·µÖÖ úÖ´ÖÖÖ¸üÖ−Ó ÖÖ ¯Öã¸ü×¾ÖµÖÖ²ÖÖ²ÖŸÖ“µÖÖ ŸÖ¸üŸÖã¤üß ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ †ÖÆêüŸÖ. êÓ¦ü
¿ÖÖÃÖ−ÖÖ−Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998 †Ó´Ö»ÖÖŸÖ †ÖÖ»Öê»Öê †ÖÆêüŸÖ. ´ÖãµÖ
†×¬Ö×−ÖµÖ´ÖÖŸÖᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−ÖÖ−Öê ²ÖßÃÖß‹ 32003/ÃÖ߆ָü 146/ úÖ´ÖÖÖ¸ü 7 פü.5.2.2007
†−¾ÖµÖê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá) ×−ÖµÖ´Ö 2007 ŸÖµÖÖ¸ü êú»Öê»Öê
†ÖÆêüŸÖ. ŸÖÃÖê“Ö ×¤ü.18.9.2007 “µÖÖ šü¸üÖ¾ÖÖ−ÖãÃÖÖ¸ü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö •Ö´ÖÖ ú¸üµÖÖÃÖÖšüß ÖÖŸÖê Îú´ÖÖÓú
004220110000153 ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ µÖê£Öê ˆ‘Ö›üµÖÖŸÖ †Ö»ÖÖ †ÖÆêü.
2. ´ÖãµÖ †×¬Ö×−ÖµÖ´Ö ¾Ö ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖã¤üß ¯Ö׸üÛ¿Ö™ü 1 ´Ö¬µÖê −Ö´Öã¤ü êú»Ö껵ÖÖ †ÖÆêüŸÖ.
3. ÖÖ•ÖÖß Øú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´ÖÖ“µÖÖ ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ ÃÖÓ¤ü³ÖÖÔŸÖ •Öê ×¾Ö³ÖÖÖ ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ †Ö¸üÖÖ›ü¶ÖÃÖ
´ÖÖ−µÖŸÖÖ ¤êüµÖÖÃÖ ÃÖÖ´Ö †ÖÆêüŸÖ, •ÖÃÖê úß (1) ´ÖÆüÖ−ÖÖ¸ü ¯ÖÖ×»ÖúÖ,−ÖÖ¸ü¯ÖÖ×»ÖúÖ ¯ÖÏ¿ÖÖÃÖ−Ö †Ö×Ö −ÖÖ¸ü ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ
(ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−Öú ÃÖÓãÖÖÓ“µÖÖ ²ÖÖ²ÖŸÖߟÖ). (2) וֻÆüÖ¯Ö׸üÂÖ¤ü, ÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ †Ö×Ö ÖÏÖ´Ö ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ (ÃÖ¾ÖÔ ÖÏÖ´Ö
¯ÖÓ“ÖÖµÖŸÖß). (3) ˆªÖêÖ ×¾Ö³ÖÖÖ (‹´Ö.†ÖµÖ.›üß.ÃÖß. †Ö×Ö ×¾ÖúÖÃÖ †ÖµÖ㌟Ö, ‹ÃÖ‡Ô—Öê›ü) †Ö×Ö ÃÖ¾ÖÔ ¸üÖ•µÖ /ëú¦ü
¿ÖÖÃÖ−ÖÖ“Öê ×¾Ö³ÖÖÖ •µÖÖ´Ö¬µÖê ²ÖÖÓ¬ÖúÖ´Ö “ÖÖ»Öæ †ÖÆêü ¾Ö ŸµÖÖŸÖ úÖ´ÖÖÖ¸ü ×−ÖµÖãŒŸÖ êú»Öê †ÖÆêüŸÖ, ŸµÖÖÓ−ÖÖ ŸµÖÖÓ“µÖÖ ×¾Ö³ÖÖÖßµÖ
¯ÖÏ´ÖãÖÖÓ−Öß ŸÖÖŸÖ›üß−Öê ÃÖæ“Ö−ÖÖ ªÖ¾µÖÖ.
(1). ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ¾ÖÃÖæ»Ö ú¸üŸÖÖ−ÖÖ, ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ ‹æÖ
´Ö㻵ÖÖ−ÖãÃÖÖ¸ü(•Ö´Öß−Öß“Öß Øú´ÖŸÖ ¾ÖÖôæû−Ö )ŸÖÃÖê“Ö ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖãÖÖ¯Ö−Öê−Öê úÖ´ÖÖÖ¸üÖÓ−ÖÖ Øú¾ÖÖ ŸµÖÖÓ“µÖÖ −ÖÖŸÖ»ÖÖÖÓ−ÖÖ
úÖ´ÖÖÖ¸üÖÓÃÖÖšüß −ÖãúÃÖÖ−Ö ³Ö¸ü¯ÖÖ‡Ô †×¬Ö×−ÖµÖ´Ö 1923 ´Ö¬Öᯙ ŸÖ¸üŸÖã¤üß−ÖãÃÖÖ¸ü úÖêÖŸµÖÖÆüß ¯ÖÏúÖ¸ü“Öß ³Ö¸ü¯ÖÖ‡Ô ×¤ü»Öê»Öß
†ÃÖê»Ö ŸÖß ¸üŒú´Ö ¾ÖÖôæû−Ö ˆ¾ÖÔ¸üßŸÖ ²ÖÖÓ¬ÖúÖ´Ö ´Ö㻵ÖÖ¾Ö¸ü 1 % ˆ¯Öú¸ ¾ÖÃÖã»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ÆüÖ ˆ¯Öú¸ü ÖÖ•ÖÖß
ŸÖÃÖê“Ö ¿ÖÖÃÖúßµÖ ²ÖÖÓ¬ÖúÖ´ÖÖ¾Ö¸ü ¤êü×Ö»Ö ¾ÖÃÖæ»Ö ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.
(2). ²ÖÖÓ¬ÖúÖ´ÖÖ“Öß †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü×¾ÖµÖÖ²ÖÖ²ÖŸÖ −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−ÖÖ ´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾Öê ×−ÖÖÔ×´ÖŸÖ
ú¸üµÖÖÃÖÖšüß ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ †Ö»Öê †ÖÆêüŸÖ. ¾Ö −ÖÖë¤üÖß ´ÖÆüÖ×−Ö׸üÖú µÖÖÓ−Öß µÖÖ²ÖÖ²ÖŸÖßŸÖ Ã¾ÖŸÖÓ¡Ö†Ö¤êü¿Ö ×−ÖÖÔ×´ÖŸÖ ú¸üÖ¾ÖêŸÖ.
†¿ÖÖ ¯ÖÏúÖ¸êü ×−ÖÛ¿“ÖŸÖ êú»Ö껵ÖÖ ´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾ÖÖÓ“ÖÖ †Ö×Ö ŸµÖÖ ´Ö¬µÖê ¾ÖêôûÖê¾Öêôßü êú»Ö껵ÖÖ ÃÖã¬ÖÖ¸üÖÖÓ“ÖÖ †Ö¬ÖÖ¸ü
²ÖÖÓ¬ÖúÖ´ÖÖ“Öê †Ó¤üÖ×•ÖŸÖ ´Öã»µÖ šü¸ü×¾ÖŸÖÖ−ÖÖ ‘µÖÖ¾ÖÖ.
(3) −ÖÖë¤ü¾ÖÆüß šêü¾ÖÖê ¾Ö ´ÖÖ×ÃÖú ×¾Ö¾Ö¸üÖ ¯Öãœüᯙ ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öã¾Öá †¬µÖÖ, ´ÖÆüÖ¸üÖÂ™Ò ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü
²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ ú»µÖÖÖ ´ÖÓ›üô, ´ÖãÓ²Ö‡Ô (¯Ö׸ü׿Ö™ü 2 ¯ÖÏ´ÖÖÖê)µÖÖÓ“µÖÖ ú›êü ¯ÖÖšü¾ÖÖ¾Öê. •ÖêÖêú¹ý−Ö µÖÖÓ−ÖÖ •Ö´ÖÖ
êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“µÖÖ ¸üŒú´Öê“ÖÖ ŸÖÃÖê“Ö ²ÖÑúêŸÖ/úÖêÂÖÖÖÖ¸üÖŸÖ •Ö´ÖÖ —ÖÖ»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ (¯Ö׸ü׿Ö™ü 3 ¯ÖÏ´ÖÖÖê)
ŸÖÖôû´Öêôû ‘ÖêÖê ¿ÖŒµÖ ÆüÖê‡Ô»Ö. ŸÖÃÖê“Ö ˆ¯Öú¸ü¾ÖÃÖã»Öß“µÖÖ −ÖÖë¤üß šêü¾ÖµÖÖÃÖÖšüß −ÖÖê¤ü¾ÖÊÖ ¾Ö ´ÖÖ×ÃÖú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
šêü¾ÖµÖÖ²ÖÖ²ÖŸÖ ×¤ü.1.12.2009 ¯Ö׸ü¯Ö¡ÖúÖ´Ö‘µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ ÃÖã“Ö−ÖÖÓ“ÖêÆüß ¯ÖÖ»Ö−Ö ú¸üÖ¾Öêü.
(4) ‡´ÖÖ¸üŸÖ ¾Ö ‡üŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ¸êü ¾Ö ŸµÖÖÃÖÓ¤ü³ÖÖÔŸÖᯙ ˆ¯Öú¸ü •Ö´ÖÖ ú¸üÖÖ·µÖÖ ×¾Ö³ÖÖÖ/ãÖÖ×−Öú
þָüÖ•µÖ ÃÖÓãÖÖ/¯ÖÏÖ׬Öú¸üÖ µÖÖÓ−Öß ŸµÖÖÓ“Öê µÖÖÃÖÓ¤ü³ÖÖÔŸÖß»Ö ×¾Ö¾Ö¸üÖ¯Ö¡Öê ¾Ö ¾ÖÖÙÂÖú †Æü¾ÖÖ»Ö ¯Ö׸ü׿Öšü 4 ¯ÖÏ´ÖÖÖê ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ¯ÖÏŸµÖêú ¯Öãלü»Ö†ÖÙ£Öú ¾ÖÂÖÖÔ“µÖÖ 15 ´Öê ¯Öæ¾Öá ÃÖÖ¤ü¸ü ú¸üÖ¾ÖêŸÖ. Æêü
¾ÖÖÙÂÖú ×¾Ö¾Ö¸üÖ¯Ö¡Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖÓ“µÖÖ †ÖŸÖ ´ÖÓ›üôû ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ †Ö¸üÖÖ›üµÖÖÃÖ ´ÖÓ•Öæ¸üß ¤êüÖÖ·µÖÖ ¾Ö
ˆ¯Öú¸ü ÖÖêôûÖ ú¸üÖÖ·µÖÖ ÃÖÓ²ÖÓ×¬ÖŸÖ ¯ÖÏÖ׬Öú¸üÖÖÃÖ ÃÖ¤ü¸ü ˆ¯Öú¸ü ÖÖêôûÖ ú¸üµÖÖÃÖÖšüß —ÖÖ»Ö껵ÖÖ Ö“ÖÖÔ“ÖÖ ( •Ö´ÖÖ -
— ÖÖ»Öê»ÖÖ ˆ¯ÖúÖ¸üÖ“µÖÖ 1 ™üŒúÖ¯ÖêÖÖü †×¬Öú −ÖÖÆüß) ¯Ö¸üŸÖÖ¾ÖÖ ú¸üß»Ö.
4. ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö, •Ö»ÖÃÖÓ¯Ö¤üÖ ¾Ö ¾Ö−Ö ×¾Ö³ÖÖÖ ŸÖÃÖê“Ö ×•Ö»ÆüÖ ¯Ö׸üÂÖ¤ü µÖÖÓ“µÖÖ«üÖ¸êü êú»Öß •ÖÖÖÖ¸üß •Öß úÖ´Öê
"‡´ÖÖ¸üŸÖ ¾Ö ²ÖÖÓ¬ÖúÖ´ÖÖ“µÖÖ ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ †¿ÖÖ úÖ´ÖÖÓÃÖÖšüß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê Óú¡ÖÖ™ü ‘ÖêÖÖ·µÖÖ
ÓúÓ¡ÖÖ™ü¤üÖ¸ü/†×³Öú¸üÖ µÖÖÓ“µÖÖ ¤êüµÖúÖŸÖæ−Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×¾Ö×ÆüŸÖ ¤ü¸üÖ−Öê ¾ÖÃÖæ»Ö
ú¸üµÖÖŸÖ µÖÖ¾ÖÖ." ÃÖ¤ü¸ü •Ö²ÖÖ²Ö¤üÖ¸üß ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖ“Öß †ÃÖê»Ö ŸÖÃÖê“Ö •Öß ¤êüµÖêú úÖêÂÖÖÖÖ¸üÖŸÖ ÃÖÖ¤ü¸ü ÆüÖêŸÖᯙ †¿ÖÖ
¤êüµÖúÖŸÖ ÃÖÓ²ÖÓ×¬ÖŸÖ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ·µÖÖ−Öê "‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü" µÖÖ“Öß
¾ÖÃÖæ»Öß ¤ü¿ÖÔ¾ÖÖ¾Öß ¾Ö ŸµÖÖ−ÖãÃÖÖ¸ü úÖêÂÖÖÖÖ¸üÖ−Öê ÃÖ¤ü¸ü ¾ÖÃÖæ»Öß ú¸üÖ¾Öß.
5. ÃÖ¾ÖÔ †ÖÆü¸üÖ ¾Ö ÃÖÓ×¾ÖŸÖ¸üÖ †×¬ÖúÖ-µÖÖÓ−ÖÖ ¾Ö ÃÖ¾ÖÔ ¿ÖÖÃÖúßµÖ †×³ÖúŸµÖÖÕ−ÖÖ ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ µÖÖ¾ÖêŸÖ úß, µÖÖ
ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 †Ö×Ö ëú¦ü¿ÖÖÃÖ−ÖÖ“µÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö
1998 “µÖÖ ×−ÖµÖ´Ö 3 −ÖãÃÖÖ¸ü ×−ÖÖÔ×´ÖŸÖ êú»Ö껵ÖÖ ×¤ü.26.9.1996 “µÖÖ †×¬ÖÃÖã“Ö−Öê−ÖãÃÖÖ¸üü 1 ™üŒúÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
ŸµÖÖÓ−Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖŸÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖß−Öê פü.1.7.2010 ¯ÖÖÃÖæ−Ö −Ö “ÖãúŸÖÖ •Ö´ÖÖ
ú¸üÖ¾Öß.
6. •Öß ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Öê ‘‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ×¾Ö×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996’ “µÖÖ ú»Ö´Ö 2 (1) (›üß) †−ÖãÂÖÓÖÖ−Öê ¯Ö׸ü³ÖÖÂÖêŸÖ µÖêŸÖÖŸÖ ¾Ö •µÖÖ“Öê úÖ´Ö ‘ÖêµÖÖÃÖÖšüß“ÖÖ ú¸üÖ¸ü
פü−ÖÖÓú 01 •Öã»Öê 2010 ¾ÖÖ ŸÖ¤Ëü−ÖÓŸÖ¸ü ú¸üµÖÖŸÖ µÖê‡Ô»Ö †¿ÖÖ ÃÖ¾ÖÔ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖÓ−ÖÖ ¾Ö¸üᯙ ¯Ö¬¤üŸÖ »ÖÖÖæ
¸üÖÆüß»Ö.
7. ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖÓ¿Öß ×¾Ö“ÖÖ¸ü×¾Ö×−Ö´ÖµÖ ú¹ý−Ö ˆ¯Öú¸ü ¾ÖÃÖæ»Öß´Ö¬µÖê ÃÖãÃÖæ¡ÖŸÖÖ µÖêµÖÖÃÖÖšüß ¯ÖÏŸµÖêú
¯ÖÏú¸üÖÖÃÖ µÖã×−Ö Îú´ÖÖÓú ¤êüµÖÖ²ÖÖ²ÖŸÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Ö פü.26.10.2009 †−¾ÖµÖê ÃÖ×¾Ößָü ×−Ö¤ìü¿Ö ¤êüµÖÖŸÖ
†Ö»Öê»Öê †ÖÆêüŸÖ. ŸµÖÖ−ÖãÃÖÖ¸ü ÃÖ¤ü¸ü µÖã×−Öú Îú´ÖÖÓúÖ“Öß ¯Ö¬¤üŸÖ ™ü¯µÖÖ™ü¯µÖÖ−Öê ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖú›æü−Ö ¸üÖ²Ö×¾ÖµÖÖŸÖ µÖÖ¾Öß
¾Ö ¯ÖÏ£Ö´Ö ™ü¯¯µÖÖŸÖ −ÖÖ¸ü ×¾ÖúÖÃÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ´ÖÆüÖ−ÖÖ¸ü¯ÖÖ×»ÖúÖ, −ÖÖ¸ü¯ÖÖ×»ÖúÖ, ÃÖ¾ÖÔ ¿ÖÆü¸üß Ã£ÖÖ×−Öú
ÃÖÓãÖÖ ¾Ö ¯ÖÏÖ׬Öú¸üÖê ‡ŸµÖÖ¤üß ŸÖÃÖê“Ö ÖéÆü×−Ö´ÖÖÔÖ ×¾Ö³ÖÖÖ ¾Ö ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ ÃÖ¾ÖÔ ÃÖÓãÖÖ/¯ÖÏÖ׬Öú¸üÖ µÖÖÓ−ÖÖ ¯ÖÏ£Ö´Ö
™ü¯¯µÖÖŸÖ »ÖÖÖæ ¸üÖÆüß»Ö, ŸÖÃÖê“Ö ¯Öãœüᯙ ™ü¯¯µÖÖÓÃÖÖšüß úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖÖú›æü−Ö Ã¾ÖŸÖÓ¡Ö¯ÖÖê ÃÖæ“Ö−ÖÖ ¤êüµÖÖŸÖ µÖêŸÖß»Ö.
8. ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ ÆüÖ ´ÖãµÖÃÖד־ÖÖÓ“µÖÖ †¬µÖÖŸÖêÖÖ»Öᯙ ÃÖ×´ÖŸÖß“µÖÖ ²ÖîšüúßŸÖ —ÖÖ»Ö껵ÖÖ “Ö“Ö쓵ÖÖ
†−ÖãÂÖÓÖÖ−Öê ¾Ö ÃÖ¤ü¸ü ²ÖîšüúßÃÖ ˆ¯ÖÛÃ£ÖŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖÖÓ“µÖÖ ¯ÖϬÖÖ−Ö ÃÖד־Ö/ÃÖד־ÖÖÓ“µÖÖ ÃÖÆü´ÖŸÖß−Öê
×−ÖÖÔ×´ÖŸÖ ú¸üµÖÖŸÖ µÖêŸÖ †ÖÆêü.
(ú×¾ÖŸÖÖ Ö㯟ÖÖ )
ÃÖד־Ö,úÖ´ÖÖÖ¸ü
¯ÖÏŸÖ-
´ÖÖ.¸üÖ•µÖ¯ÖÖ»Ö µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´ÖãµÖ´ÖÓ¡Öß µÖÖÓ“Öê ¯ÖϬÖÖ−Ö ÃÖד־Ö,
´ÖÖ.ˆ¯Ö´ÖãµÖ´ÖÓ¡Öß µÖÖÓ“Öê ÃÖד־Ö,
´ÖÖ.´ÖÓ¡Öß (úÖ´ÖÖÖ¸ü) µÖÖÓ“Öê ÖÖ•ÖÖß ÃÖד־Ö,
´ÖÖ.¸üÖ•µÖ´ÖÓ¡Öß (úÖ´ÖÖÖ¸ü) µÖÖÓ“Öê ÖÖ•ÖÖß ÃÖד־Ö,
´ÖãµÖ ÃÖד־Ö, ´ÖÆüÖ¸üÖ™Òü ¿ÖÖÃÖ−Ö,
†¯Ö¸ü ´ÖãµÖ ÃÖ×“Ö¾Ö / ¯ÖϬÖÖ−Ö ÃÖ×“Ö¾Ö / ÃÖ×“Ö¾Ö ÃÖ¾ÖÔ ´ÖÓ¡ÖÖ»ÖµÖß−Ö ×¾Ö³ÖÖÖ, ´ÖÓ¡ÖÖ»ÖµÖ,´ÖãÓ²Ö‡Ô.
(´ÖÓ¡ÖÖ»ÖµÖß−Ö ÃÖ¾ÖÔ ×¾Ö³ÖÖÖÖÓú›æü−Ö ÆüÖ ¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ ŸµÖÖÓ“µÖÖ †×¬Ö−ÖÃŸÖ †ÃÖ»Ö껵ÖÖ ÃÖ¾ÖÔ ÃÖÖ¾ÖÔ•Ö×−Öú
ˆ¯ÖÎú´ÖÖÓ“µÖÖ ×−Ö¤ü¿ÖÔ−ÖÖÃÖ †ÖÖµÖÖŸÖ µÖÖ¾ÖÖ.)
´ÖãµÖ †×³ÖµÖÓŸÖÖ, ÃÖÖ¾ÖÔ•Ö×−Öú ²ÖÖÓ¬ÖúÖ´Ö ×¾Ö³ÖÖÖ,
´ÖãµÖ †×³ÖµÖÓŸÖÖ, •Ö»ÖÃÖÓ¯Ö¤üÖ ×¾Ö³ÖÖÖ,
ÃÖ¾ÖÔ ×¾Ö³ÖÖÖßµÖ †ÖµÖ㌟Ö,
úÖ´ÖÖÖ¸ü †ÖµÖ㌟Ö, ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ, ´ÖãÓ²Ö‡Ô.
ÃÖ¾ÖÔ ×•Ö»ÆüÖ׬ÖúÖ¸üß,
ÃÖ¾ÖÔ ´ÖãµÖ úÖµÖÔúÖ¸üß †×¬ÖúÖ¸üß, וֻÆüÖ ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ ´ÖÆüÖ−ÖÖ¸ü¯ÖÖ×»ÖúÖ †ÖµÖ㌟Ö,
ÃÖ¾ÖÔ Ö™ü×¾ÖúÖÃÖ †×¬ÖúÖ¸üß, ¯ÖÓ“ÖÖµÖŸÖ ÃÖ×´ÖŸÖß,
ÃÖ¾ÖÔ ´ÖãµÖÖ׬ÖúÖ¸üß, −ÖÖ¸ü ¯Ö׸üÂÖ¤üÖ,
ÃÖ¾ÖÔ −ÖÖë¤üÖß †×¬ÖúÖ¸üß,
úÖ †×¬ÖúÖ¸üß (¯ÖÏ¿ÖÖÃÖ−Ö-2) ˆªÖêÖ,‰ú•ÖÖÔ ¾Ö úÖ´ÖÖÖ¸ü ×¾Ö³ÖÖÖ µÖÖÓ−ÖÖ ÃÖ¤ü¸ü ¿ÖÖÃÖ−Ö ×−ÖÖÔµÖ ¾Öê²ÖÃÖÖ‡Ô™ü¾Ö¸ü
™üÖúµÖÖ“µÖÖ ×¾Ö−ÖÓŸÖßÃÖÆü †ÖÏê×ÂÖŸÖ./×−Ö¾Ö›ü−ÖßÖß.
¯Ö׸ü׿Ö™ü -1
´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾Öê.
×−ÖµÖ´Ö ¾Ö †×¬Ö×−ÖµÖ´Ö
1) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) †×¬Ö×−ÖµÖ´Ö 1996
2) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö 1996
3) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ˆ¯Öú¸ü ×−ÖµÖ´Ö 1998
4) ´ÖÆüÖ¸üÖ™Òü ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü (¸üÖê•ÖÖÖ¸ü ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá ×−ÖµÖ´Ö−Ö) ×−ÖµÖ´Ö 2007
פü.5.2.2007
´ÖÆüŸ¾ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß ¾Ö ŸµÖÖ“µÖÖ †Ó´Ö»Ö²Ö•ÖÖ¾ÖÖß²ÖÖ²ÖŸÖ ´ÖÖÖÔ¤ü¿ÖÔú ŸÖŸ¾Öê.
1. ‘‘‡´ÖÖ¸üŸÖ Øú¾ÖÖ ‡ŸÖ¸ü ²ÖÖ¬ÖúÖ´Ö ü úÖ´Ö’’ “Öß ¾µÖÖµÖÖ (ú»Ö´Ö 2 (d) ) ´Ö¬µÖê פü»Öê»Öß †ÖÆêü.
²ÖÖÓ¬ÖúÖ´Ö, ±êú¸ü±úÖ¸ü, ¤ãü¹ýßÖß,¤êüÖ³ÖÖ»Ö, Øú¾ÖÖ ¯ÖÖ›æü−Ö ™üÖúÖê ‡ŸµÖÖ¤üß ‡´ÖÖ¸üŸÖ, ¸üßÖê,´ÖÖÖÔ, ¸êü»¾Öê,
™ÒüÖ´Ö¾Öê•Ö,‹†¸ü ×±ú»›üÃÖË, ¯ÖÖšü²ÖÓ¬ÖÖ¸êü, •Ö»Ö×−ÖÃÃÖÖ¸üÖ,²ÖÓ¬ÖÖ¸üÖ ¾Ö −Öê¾ÆüßÖê¿Ö−Ö úÖ´Ö, ¯Öã¸ü ×−ÖµÖÓ¡ÖÖÖ“Öê
úÖ´Ö (¾ÖÖ¤üôûÖ´Öãôêû •Ö»Ö×−ÖÃÃÖÖ¸üÖÖ“µÖÖ úÖ´ÖÖÃÖÆüߟÖ), ŸÖê»Ö ¾Ö ¾ÖÖµÖã“Öß •ÖÖê›üÖß ™üÖúÖê, ×¾ÖªãŸÖ
»ÖÖ‡Ô−ÃÖ, ¾ÖÖµÖ¸ü»ÖêÃÖ, ¸êü›ü߆Öê, ™êü×»Ö¾Æüß•Ö−Ö, ™êü×»Ö±úÖê−Ö, ™êü×»ÖÖÏÖ±ú, †Ö×Ö ÃÖ´Öã¦üÖ¯ÖÖ¸ü ¤üôûÖ¾ÖôûÖ,
¬Ö¸üÖê, úÖ»Ö¾Öê,•Ö»ÖÖ¿ÖµÖê,•Ö»Ö¯ÖϾÖÖÆü, ²ÖÖêÖ¤êü, ¯Öã»Ö, ÃÖêŸÖã, ÃÖêŸÖã¯ÖÏÖÖ»Ö, ¯ÖÖ‡Ô¯Ö»ÖÖ‡Ô−Ö, ™üÖò¾ÖÃÖÔ, ãú»ÖßÖ
™üÖò¾Ö¸üÃÖÔ, ¯ÖÖ¸êüÂÖÖ ™üÖò¾ÖÃÖÔ †Ö×Ö µÖÖ ¯ÖÏúÖ¸ü“Öê ‡ŸÖ¸ü úÖ´Öê ÃÖ´Öã×“ÖŸÖ ¿ÖÖÃÖ−Ö †×¬ÖÃÖã“Ö−Öê«üÖ¸êü »ÖÖÖã ú¹ý
¿ÖúŸÖê ¯Ö¸ÓüŸÖæ úÖ¸üÖÖ−Öê †×¬Ö×−ÖµÖ´Ö, 1948 Øú¾ÖÖ ÖÖÖ †×¬Ö×−ÖµÖ´Ö, 1952 “µÖÖ ŸÖ¸üŸÖæ¤üß •µÖÖ
†ÖãÖÖ¯Ö−ÖêÃÖ »ÖÖÖã ÆüÖêŸÖÖŸÖ ŸµÖÖÓ−ÖÖ ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß »ÖÖÖã
ÆüÖêÖÖ¸ü −ÖÖÆüߟÖ.
2. úÖêÖŸµÖÖÆüß ×¤ü¾Ö¿Öß 10 Øú¾ÖÖ ŸµÖÖ¯ÖêÖÖ •ÖÖÃŸÖ úÖ´ÖÖÖ¸ü úÖ´ÖÖ¾Ö¸ü šêü¾Ö»Öê †¿ÖÖ ÃÖ¾ÖÔ †ÖãÖÖ¯Ö−ÖÖ−ÖÖ
ÆüÖ úÖµÖ¤üÖ »ÖÖÖã ÆüÖêŸÖÖê. ‘‘†ÖãÖÖ¯Ö−ÖÖ’’ ´ÆüÖ•Öê ú»Ö´Ö 2 (•Öê) úÖêÖŸÖßÆüß †ÖãÖÖ¯Ö−ÖÖ •Öß
¿ÖÖÃÖ−ÖÖ“µÖÖ ×−ÖµÖÓ¡ÖÖÖŸÖ †ÖÆêü. úÖêÖŸµÖÖÆüß ×−ÖÖ´Ö“µÖÖ ×−ÖµÖÓ¡ÖÖÖÖÖ»Öß †ÖÆêü Øú¾ÖÖ ¾µÖ¾ÖÃÖÖµÖ
ÃÖÓãÖꓵÖÖ ×−ÖµÖ¡ÖÖÖÖÖ»Öß †ÖÆêü †Ö×Ö ¾ÖîµÖŒŸÖßú Øú¾ÖÖ †ÃÖÖêÃÖß‹¿Ö−Ö Øú¾ÖÖ ‡ŸÖ¸ü ¾ÖîµÖŒŸÖßú
ÃÖÓãÖÖÓ“µÖÖ †ÓŸÖÖÔŸÖ •Öê ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ×−ÖµÖãŒŸÖ ú¸üŸÖÖŸÖ †Ö×Ö •µÖÖŸÖ Óú¡ÖÖ™ü¤üÖ¸üÖÓ“ÖÖ ÃÖ´ÖÖ¾Öê¿Ö
ÆüÖêŸÖÖê ¯Ö¸ÓüŸÖæ ¾µÖŒŸÖßÖŸÖ׸üŸµÖÖ •Öê †ÃÖê úÖ´ÖÖÖ¸ü ŸµÖÖÓ“Öê þ֟Ö:“Öê ‘Ö¸ü ²ÖÖÓ¬ÖµÖÖú¸üߟÖÖ ¹ý¯ÖµÖê 10 »ÖÖÖ
¯ÖµÖÔŸÖ ¯ÖêÖÖ •ÖÖßÖ
−ÖÃÖê»Ö ŸÖê ŸµÖÖÓ−ÖÖ †ÖãÖÖ¯Ö−Öê“Öß ¾µÖÖµÖÖ »ÖÖÖã ÆüÖêÖÖ¸ü −ÖÖÆüß.
3. ‘‘ ´ÖÖ»Öú ’’ “Öß ¾µÖÖµÖÖ ú»Ö´Ö 2 (i) ´Ö¬µÖê ‡Ã™üÖ²»Öß¿Ö´Öë™ü ÃÖÓ²ÖÓ¬ÖÖŸÖ −Ö´Öã¤ü êú»Öê»Öß †ÖÆêü.
ŸµÖÖŸÖ ÖÖ»Öᯙ ¯ÖÏ´ÖÖÖê †ÓŸÖ³ÖÖÔ¾Ö ÆüÖêŸÖÖê :-
i) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´Ö Ã£ÖÖ×−Öú ÃÖÓãÖÖÓŸÖ±ìú Øú¾ÖÖ ‡ŸÖ¸ü †ÖãÖÖ¯Ö−Öê´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ
µÖêŸÖ †ÃÖ»µÖÖÃÖ ¾Ö •µÖÖŸÖ ¯ÖÏÖ׬ÖúÖ¸üß −Öê´Öã−Ö ×¤ü»Öê»ÖÖ −ÖÃÖ»µÖÖÃÖ †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ×¾Ö³ÖÖÖÖ“ÖÖ
¯ÖÏ´ÖãÖ.
ii) •Öê£Öê ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê úÖ´Ö Ã£ÖÖ×−Öú ¯ÖÏÖ׬Öú¸üÖÖ´ÖÖ±ÔúŸÖ ü Øú¾ÖÖ ‡ŸÖ¸ü
†ÖãÖÖ¯Ö−ÖÖ´ÖÖ±ÔúŸÖ, £Öê™ü Óú¡ÖÖ™ü¤üÖ¸üÖ ×¿Ö¾ÖÖµÖ ú¸üµÖÖŸÖ µÖêŸÖê †¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ ŸµÖÖ ¯ÖÏÖ׬ÖúÖ¸üÖÖ“ÖÖ
Øú¾ÖÖ †ÖãÖÖ¯Ö−Öê“ÖÖ ´ÖãµÖ úÖµÖÔúÖ¸üß †×¬ÖúÖ¸üß,
iii) ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü Óú¡ÖÖ™ü¤üÖ¸üÖ´ÖÖ±ÔúŸÖ Øú¾ÖÖ ´ÖÖ»ÖúÖ´ÖÖ±ÔúŸÖ ú¸üµÖÖŸÖ µÖêŸÖê
†¿ÖÖ ²ÖÖ²ÖŸÖßŸÖ Óú¡ÖÖ™ü¤üÖ¸ü
4. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 3 ¾Ö ×−ÖµÖ´Ö 4 (3) −ÖãÃÖÖ¸ü ëú¦ü ¿ÖÖÃÖ−ÖÖ−Öê ‹ÃÖ†Öê −ÖÓ.2899,
פü−ÖÖÓú 26.3.1996 †−¾ÖµÖê ײֻÖÖŸÖæ−Ö 1 % ˆ¯Öú¸ü ú¯ÖÖŸÖ ú¸üµÖÖ²ÖÖ²ÖŸÖ ×−ÖÖÔ×´ÖŸÖ êú»Ö껵ÖÖ
†×¬ÖÃÖã“Ö−ÖꓵÖÖ †−ÖãÂÖÓÖÖ−Öê ú¯ÖÖŸÖ êú»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Öê“ÖÖ ¬Ö−ÖÖúÂÖÔ ´ÖÆüÖ¸üÖ™Òü ¸üÖ•µÖ ‡´ÖÖ¸üŸÖ
¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖúÖ¸üß ´ÖÓ›üôû, ´ÖãÓ²Ö‡Ô µÖÖÓ“ÖÖ ÖÖŸÖê Îú´ÖÖÓú
004220110000153 ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ ´ÖãÓ²Ö‡Ô µÖÖ ²ÖÑêú“µÖÖ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿ÖÖÖêŸÖ
ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ “Ö»Ö−ÖÖ«üÖ¸êü •Ö´ÖÖ ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü.
5. ˆ¯Öú¸ü ×−ÖµÖ´ÖÖ“µÖÖ ×−ÖµÖ´Ö, 4 (4) †−ÖãÃÖÖ¸ü •Öê£Öê ²ÖÖÓ¬ÖúÖ´ÖÖú¸üߟÖÖ Ã£ÖÖ×−Öú ÃÖÓãÖê“Öß ´ÖÓ•Öæ¸üß
†Ö¾Ö¿µÖú †ÖÆêü. ŸÖê£Öê †¿ÖÖ ´ÖÓ•Öæ¸üßú¸üߟÖÖ ¯ÖÏÖ¯ŸÖ —ÖÖ»Ö껵ÖÖ ¯ÖÏŸµÖêú †•ÖÖÔ ÃÖÖê²ÖŸÖ ´ÖÓ›üôûÖ“µÖÖ −ÖÖÓ¾Öê
ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß“ÖÖ ¸êüÖÖÓ×úŸÖ ¬Ö−ÖÖúÂÖÔ (‹úÖ ¾ÖÂÖÖÔ“µÖÖ ²ÖÓÖ¬ÖúÖ´ÖÖ“µÖÖ †Ó¤üÖ•ÖßŸÖ Ö“ÖÖÔ“µÖÖ 1 %
¸üŒú´Öê ‹¾ÖœüÖ)ÃÖ¤ü¸ü ãÖÖ×−Öú ÃÖÓãÖêÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.
6. ¯Öãœêü ×−ÖµÖ´Ö 5 −ÖãÃÖÖ¸ü ¿ÖÖÃÖ×úµÖ úÖµÖÖÔ»ÖµÖ/ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´Ö/ãÖÖ×−Öú ÃÖÓãÖÖ“µÖÖ ²ÖÖ²ÖŸÖߟÖ
¾ÖÃÖæ»Öß †×¬ÖúÖ-µÖÖÓ−Öê ×−ÖµÖ´Ö 4 †ÓŸÖÖÔŸÖ •Ö´ÖÖ êú»Öê»ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö “Ö»Ö−ÖÖ«üÖ¸êü ¯ÖÏŸµÖÖ Ö“ÖÔ
—ÖÖ»Öê»Öß ¸üŒú´Ö •Öß 1 % ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖÖÖ¸ü ŸÖê¾Öœüß ú´Öß ú¹ý−Ö ˆ¾ÖÔ¸üßŸÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö
•Ö´ÖÖ ú¸êü»Ö.
7. ×−ÖµÖ´Ö 5 (3) −ÖãÃÖÖ¸ü •Ö´ÖÖ êú»Öê»Öß ¸üŒú´Ö ´ÖÓ›üôûÖú›êü 30 פü¾ÖÃÖÖÓŸÖ •Ö´ÖÖ ú¸üÖê †Ö¾Ö¿µÖú †ÖÆêü.
8. úÖêÖŸµÖÖÆüß ²ÖÖÓ¬ÖúÖ´Ö †ÖãÖÖ¯Ö−Öê−Öê Øú¾ÖÖ ²ÖÖÓ¬ÖúÖ´Ö ´ÖÖ»ÖúÖ−Öê Øú¾ÖÖ ˆ¯Öú¸ü ¾ÖÃÖã»Öß †×¬ÖúÖ-µÖÖ−Öê
Øú¾ÖÖ Ã£ÖÖ×−Öú ÃÖÓãÖê−Öê Øú¾ÖÖ ¿ÖÖÃÖúßµÖ úÖµÖÖÔ»ÖµÖÖ−Öê Øú¾ÖÖ ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´ÖÖ−Öê Øú¾ÖÖ »ÖÖ³ÖÖ£Öá
úÖ´ÖÖÖ¸üÖ−Öê ´ÆüÖ•Öê“Ö •Öê úÖêÖß ú»µÖÖÖ ´ÖÓ›üôû ×−Ö¬Öß´Ö¬µÖê ˆ¯Öú¸ü †£Ö¾ÖÖ »ÖÖ³ÖÖ£Öá −ÖÖë¤üÖß ¿Öã»ú
µÖÖ“ÖÖ ³Ö¸üÖÖ ú¸üÖÖ¸ü †ÃÖŸÖᯙ ŸÖê ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖ“µÖÖ ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ
´Ö¬Öᯙ ´ÖÆüÖ¸üÖ™ÒüÖŸÖᯙ úÖêÖŸµÖÖÆüß ¿ÖÖÖêŸÖ ú¸üµÖÖú׸üŸÖÖ ÃÖÖê²ÖŸÖ •ÖÖê›üµÖÖŸÖ †Ö»Ö껵ÖÖ ×¾Ö×ÆüŸÖ
“Ö»Ö−ÖÖ«üÖ¸êü ÃÖ¤ü¸ü ³Ö¸üÖÖ ú¸üŸÖß»Ö. µÖÖ “Ö»Ö−ÖÖ“Öß 4 ¯ÖÏŸÖßŸÖ ×¾Ö³ÖÖÖÖß †ÃÖæ−Ö 2 ¯ÖÏŸÖß ²ÖÑú
þ֟Ö:ú›êü šê¾Öæ−Ö ˆ¾ÖÔ׸üŸÖ 2 ¯ÖÏŸÖß ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ ¾µÖŒŸÖßÃÖ (¸êü×´Ö™ü¸üú›êü) ¤êüµÖÖŸÖ µÖê‡Ô»Ö. ÃÖ¤ü¸ü
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê 1 ¯ÖÏŸÖ ÃÖ×“Ö¾Ö ‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ
¯ÖÖšü¾ÖÖ¾ÖµÖÖ“Öß †ÖÆêü. ¤ü¸ü ´Ö×Æü−µÖÖ“µÖÖ 10 ŸÖÖ¸üÖê¯Öæ¾Öá ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ
¸üú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ×¾Ö»Ö껵ÖÖ ´ÖÖ×ÃÖú ŸÖŒŸµÖÖŸÖ •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ˆ¯Öú¸ü ³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê
ú»µÖÖÖ ´ÖÓ›üôûÖú›êü ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öß †ÖÆêü. ŸÖÃÖê“Ö •ÖÖê›ü¯Ö¡Ö-4 ´Ö¬µÖê −Ö´Öæ¤ü êú»Ö껵ÖÖ
ŸÖŒŸµÖÖŸÖ ¿ÖÖÃÖúßµÖ ×¾Ö³ÖÖÖ, ãÖÖ×−Öú ÃÖÓãÖÖ ¾Ö ÃÖÖ¾ÖÔ•Ö×−Öú ˆ¯ÖÎú´Ö µÖÖÓ−Öß ¾ÖÖÙÂÖú ×¾Ö¾Ö¸üÖ¯Ö¡Ö
ú»µÖÖÖ ´ÖÓ›üôûÖú›êü ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“Öê †ÖÆêü. †Ö¸üÖÖ›üÖ ´ÖÓ•Öæ¸ü ú¸üÖÖ-µÖÖ ¯ÖÏÖ׬ÖúÖ-µÖÖ−Öê ¤êüÖß»Ö
ˆ¯Ö¸üÖêŒŸÖ ¯ÖÏ´ÖÖÖê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü ú»µÖÖÖ ´ÖÓ›üôûÖú›êü “Ö»Ö−ÖÖ«üÖ¸êü ³Ö¸üÖÖ
ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. ŸÖÃÖê“Ö ŸµÖÖ²ÖÖ²ÖŸÖ“ÖÖ ´ÖÖ×ÃÖú †Æü¾ÖÖ»Ö •ÖÖê›ü¯Ö¡Ö-3 ´Ö¬µÖê ¾Ö ¾ÖÖÙÂÖú
×¾Ö¾Ö¸üÖÖ¯ÖÖê™üß •ÖÖê›ü¯Ö¡Ö-5 ´Ö¬µÖê ú»µÖÖÖ ´ÖÓ›üôûÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖ¾ÖµÖÖ“ÖÖ †ÖÆêü. “Ö»Ö−ÖÖ“Öß ˆ¾ÖÔ׸üŸÖ ¯ÖÏŸÖ
³Ö¸üÖÖ ú¸üÖÖ-µÖÖ−Öê þ֟Ö:ú›êü šêü¾Öæ−Ö ¸üú´ÖꓵÖÖ ‡ŸÖ¸ü ŸÖ¯Ö׿ֻÖÖÃÖÆü ´ÖÓ›üôûÖ−Öê ŸÖ¯ÖÖÃÖÖßú׸üŸÖÖ
´ÖÖ×ÖŸÖ»µÖÖÃÖ ÃÖÖ¤ü¸ü ú¸üÖê †Ö¾Ö¿µÖú †ÃÖê»Ö.
9. ˆ¯Öú¸ü ŸÖÃÖê“Ö »ÖÖ³ÖÖ£Öá −ÖÖê¤ÓüÖß ¿Öã»ú ²ÖÑêú“µÖÖ •µÖÖ ¿ÖÖÖê´Ö¬µÖê •Ö´ÖÖ ÆüÖêŸÖ †ÃÖê»Ö ŸÖß ¿ÖÖÖÖ ¤ü¸ü´ÖÆüÖ
²ÖÑú †Öò±ú ‡Ó×›üµÖÖ µÖÖÓ“µÖÖ ´ÖãÓ²Ö‡Ô µÖê£Öᯙ ŸÖÖ›ü¤êü¾Ö ¿ÖÖÖêŸÖ “Ö»Ö−ÖÖ“µÖÖ ˆ¾ÖÔ¸üßŸÖ ¯ÖÏŸÖß ‹úס֟֯ÖÖê ÃÖÖ¤ü¸ü
ú¸êü»Ö. •ÖêÖêú¹ý−Ö ²ÖÑú †Öò±ú ‡Ó×›üµÖÖ, ú»µÖÖÖ ´ÖÓ›üôû µÖÖÓ−ÖÖ †Ö¯ÖÖ¯ÖÃÖÖŸÖ •Ö´ÖÖ ˆ¯Öú¸ü ¾Ö »ÖÖ³ÖÖ£Öá
−ÖÖë¤üÖß ¿Öã»úÖ“ÖÖ ŸÖÖôû´Öêôû ‘ÖÖ»ÖÖê ¿ÖŒµÖ ÆüÖê‡Ô»Ö.
10.ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´ÖÖ“µÖÖ ú»Ö´Ö 6 (1) −ÖãÃÖÖ¸ü ¯ÖÏŸµÖêú ´ÖÖ»Öú ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê úÖ´Ö ÃÖã¹ý
—ÖÖ»µÖÖ¯ÖÖÃÖæ−Ö 30 פü¾ÖÃÖÖŸÖ Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸ü»µÖÖ −ÖÓŸÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-
µÖÖÃÖ ¯ÖÏ¯Ö¡Ö 1 ´Ö¬µÖê ´ÖÖ×ÆüŸÖß ÃÖÖ¤ü¸ü ú¸êü»Ö (¯ÖÏŸÖ •ÖÖê›ü»Öß †ÖÆêü.)
11.×−ÖµÖ´Ö 7 −ÖãÃÖÖ¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ŸµÖÖÓ−ÖÖ ±úÖò´ÖÔ 1 ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ−ÖÓŸÖ¸ü 6
´Ö×Æü−µÖÖ¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖ»Ö껵ÖÖ úÖ»ÖÖ¾Ö¬ÖßŸÖ ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ²ÖÖ²ÖŸÖ“Öê †Ö¤êü¿Ö ¯ÖÖ¸üߟÖ
ú¸êü»Ö.•Ö¸ü ŸÖÖê ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖÖ“µÖÖ ²ÖÖ²ÖŸÖßŸÖ ÃÖ´ÖÖ¬ÖÖ−Öß †ÃÖê»Ö ŸÖ¸ü
12. µÖã×−Öú úÖê›ü −ÖÓ. :- i) ÃÖ¾ÖÔ ÃÖÓ²ÖÓ×¬ÖŸÖ ×¾Ö³ÖÖÖ ¿ÖÖÃÖúßµÖ/×−Ö´Ö ¿ÖÖÃÖúßµÖ ˆ¯ÖÎú´Ö µÖÖÓ−Öß
²ÖÖÓ¬ÖúÖ´ÖÖÃÖ ¯Ö¸ü¾ÖÖ−ÖÖß ¤êüµÖÖ“µÖÖ ¯ÖÏŸµÖêú ¯ÖÏú¸üÖÖÃÖ ÆüÖ µÖã×−Öú Îú´ÖÖÓú ªÖ¾ÖÖ. †Ö×Ö
ÆüÖ Îú´ÖÖÓú ²ÖÖÓ¬ÖúÖ´Ö ÃÖã¹ý ú¸üµÖÖ“µÖÖ ¯ÖÏ´ÖÖÖ¯Ö¡ÖÖ´Ö¬µÖê −Ö´Öæ¤ü ú¸üÖ¾ÖÖ. ´ÖÆüÖ¸üÖ™Òü ¾Ö ‡ŸÖ¸ü
²ÖÖÓ¬ÖúÖ´Ö ˆ¯Öú¸üÖ ÃÖÓ²ÖÓ¬Öß“ÖÖ ÆüÖ µÖã×−Öú úÖê›ü −ÖÃÖê»Ö ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö ÃÖã¹ý ú¸üµÖÖ“Öê ¯ÖÏ´ÖÖÖ¯Ö¡Ö
†¯ÖæÖÔ †ÃÖ»µÖÖ“Öê ´ÖÖ−ÖµÖÖŸÖ µÖÖ¾Öê. ÆüÖ µÖã×−Öú úÖê›ü Îú´ÖÖÓú ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“µÖÖ
µÖã×−Öú úÖê›ü“µÖÖ ¬ÖŸÖá¾Ö¸ü †ÃÖê»Ö.
ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖ−Öê ªÖ¾ÖµÖÖ“ÖÖ µÖã×−Öú úÖê›ü −ÖÓÓ. ÆüÖ ¿ÖÖÃÖ−Ö ¯Ö׸ü¯Ö¡Öú
פü.26.10.2009 †−¾ÖµÖê ×−Ö¬ÖÖÔ׸üŸÖ êú»µÖÖ−ÖãÃÖÖ¸ü †ÃÖê»Ö.
13. ˆ¯Öú¸ü †×¬Ö×−ÖµÖ´Ö, ¾Ö ŸµÖÖ †ÓŸÖÖÔŸÖ ×−ÖµÖ´ÖÖ“µÖÖ ŸÖ¸üŸÖæ¤üß−ÖãÃÖÖ¸ü •Ö¸ü ¯ÖãŸÖÔŸÖÖ êú»Öß −ÖÖÆüß ŸÖ¸ü
ÖÖ»Öᯙ ¯ÖÏ´ÖÖÖê úÖ¸ü¾ÖÖ‡Ô“Öß ŸÖ¸üŸÖæ¤ü ú¸üµÖÖŸÖ †Ö»Öê»Öß †ÖÆêü :-
¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö Øú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´ÖÖ»ÖúÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²ÖÖúß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖêµÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´ÖÖ»ÖúÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »ÖÖ¾ÖµÖÖ¯Öã¾Öá ´ÖÖ»ÖúÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖêµÖÖú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´ÖÖÖÖß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •ÖÖÖÖ¸ü −ÖÖÆüß.
3) •ÖÖê úÖêÖß ÆêüŸÖã¯Öã¸üïָü ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ³Ö¸üµÖÖÃÖ ™üÖôûÖ™üÖôû ú¸üŸÖÖê †¿ÖÖÓ−ÖÖ 6
´Ö×Æü−µÖÖ¯ÖµÖÔŸÖ“Öß îú¤ü †£Ö¾ÖÖ ¤Óü›ü †£Ö¾ÖÖ ¤üÖê−Æüß ÆüÖê‰ú ¿ÖúŸÖê.
4) úÖêÖŸÖêÆüß −µÖÖµÖÖ»ÖµÖ †¿ÖÖ Öã−ÆüµÖÖÓ“Öê ¤üÖ»Ö ‘ÖêÖÖ¸ü −ÖÖÆüß •ÖÖê ¯ÖµÖÔŸÖ êú¦ü ¿ÖÖÃÖ−ÖÖ“µÖÖ ¯ÖÏÖ׬ÖúÖ-
µÖÖÓ−Öê ŸÖÎúÖ¸ü êú»Öê»Öß −ÖÃÖê»Ö.
¸üŒú´Ö −Ö ³Ö¸ü»µÖÖÃÖ ˆ¯Öú¸ü ×−ÖµÖ´Ö 12 −ÖãÃÖÖ¸ü ¤Óü›ü :- (1) ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓÃÖ †ÃÖê •Ö¸ü †ÃÖê
†Öœüôæ−Ö †Ö»Öê úß, ´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ×−Ö¬ÖÖÔ¸üÖ †Ö¤êü¿ÖÖŸÖ −Ö´Öã¤ü êú»µÖÖ−ÖãÃÖÖ¸ü ³Ö¸ü»Öß
−ÖÃÖê»Ö Øú¾ÖÖ ú´Öß ³Ö¸ü»Öß †ÃÖê»Ö Øú¾ÖÖ ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ‹ãúÖ ¸üŒú´Öê¾Ö¸ü ú´Öß úÖ¯Ö»Öß
†ÃÖê»Ö ŸÖ¸ü ´ÖÖ»ÖúÖÃÖ ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß −ÖÖê™üßÃÖ £Öú²ÖÖúß †ÃÖ»µÖÖ“Öê úôû×¾Ö»Ö †Ö×Ö µÖÖêµÖ
ŸÖß “ÖÖîú¿Öß ú¹ý−Ö ˆ¯Öú¸ü ×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ¸üß ´ÖÖ»ÖúÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Öê»Ö.•ÖÖê ˆ¯Öú¸üÖ“µÖÖ
¸üŒú´Öê¯ÖêÖÖ •ÖÖÃŸÖ −ÖÃÖê»Ö.
¯Ö¸ÓüŸÖæ †ÃÖÖ ¤Óü›ü »ÖÖ¾ÖµÖÖ¯Öã¾Öá ´ÖÖ»ÖúÖÃÖ ŸµÖÖÓ“Öê ´ÆüÖÖê ‹îãú−Ö ‘ÖêµÖÖú¸üߟÖÖ ÃÖÓ¬Öß ¤êüµÖÖŸÖ µÖê‡Ô»Ö ¾Ö
´ÖÖ»ÖúÖ−Öê ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö −Ö ³Ö¸üµÖÖ ´ÖÖÖÖß úÖ¸üÖê µÖÖêµÖ ¾Ö ¯Öã¸êü¿Öß †ÖÆêüŸÖ †ÃÖê ×−Ö¬ÖÖÔ¸üÖ
†×¬ÖúÖ-µÖÖÓ“Öê ´ÖŸÖ —ÖÖ»µÖÖÃÖ ŸµÖÖÓ“µÖÖ ×¾Ö¹ý¬¤Ëü ¤Óü›ü »ÖÖ¾Ö»ÖÖ •ÖÖÖÖ¸ü −ÖÖÆüß.
•ÖÖê›ü¯Ö¡Ö - 1 “Öê ¯Ö׸ü׿Ö™ü
¯ÖÏ¯Ö¡Ö 1 (×−ÖµÖ´Ö 7)
−ÖÖë¤üÖß Îú.
‡´ÖÖ¸üŸÖ ¾Ö ‡ŸÖ¸ü ²ÖÖÓ¬ÖúÖ´Ö úÖ´ÖÖÖ¸ü
(¸üÖê•ÖÖÖ¸ü ×−ÖµÖ´Ö−Ö ¾Ö ÃÖê¾ÖÖ¿ÖŸÖá)
†×¬Ö×−ÖµÖ´Ö, 1996 †ÓŸÖÖÔŸÖ
−ÖÖë¤üÖß ¯ÖÏÖ׬ÖúÖ¸üß
1) †ÖãÖÖ¯Ö−Öê“Öê −ÖÖÓ¾Ö :-
2) ¯Ö¢ÖÖ
3) úÖ´ÖÖ“Öê −ÖÖÓ¾Ö/þֹý¯Ö
4) ×−ÖµÖãŒŸÖ êú»Öê»Öê úÖ´ÖÖÖ¸ü ÃÖÓµÖÖ
5) úÖ´Ö ÃÖã¹ý¾ÖÖŸÖ —ÖÖ»µÖÖ“Öß úÖ´ÖÖ“Öê †Ó¤üÖ•Öê úÖ»ÖÖ¾Ö¬Öß
ŸÖÖ¸üßÖ/´Ö×Æü−ÖÖ/¾ÖÂÖÔ ´Ö×Æü−Öê / ¾ÖÂÖÔ
6) ²ÖÖÓ¬ÖúÖ´ÖÖ“Öê ˆ¯Öú¸ü
†Ó¤üÖ•ÖßŸÖ ´Öã»µÖ ³Ö¸üµÖÖ²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ.
™ü¯¯Öê ´Öã»µÖ ¸üŒú´Ö, “Ö»Ö−Ö Îú.¾Ö †ÖÏß´Ö - ‹
פü−ÖÖÓú ¾Ö•ÖÖ¾Ö™ü - †
†ÓŸÖß´Ö - ‹±ú
¯ÖÆüß»Öê ¾ÖÂÖÔ
¤ãüÃÖ¸êü ¾ÖÂÖÔ
ןÖÃÖ¸êü ¾ÖÂÖÔ
“ÖÖî£Öê ¾ÖÂÖÔ
‹ãúÖ
---------------------------------------------------------------------------------------------------
´ÖÖ»ÖúÖ“Öß Ã¾ÖÖÖ¸üß
´ÖÖ»ÖúÖ“Öê −ÖÖÓ¾Ö
פü−ÖÖÓú
×−Ö¬ÖÖÔ¸üÖ †×¬ÖúÖ-µÖÖÓ−Öê ³Ö¸üÖ¾ÖµÖÖ“Öê
7.¯ÖãÖÔŸ¾ÖÖ“Öß ŸÖÖ¸üßÖ 8. †Ó×ŸÖ´Ö ´Ö㻵Ö
9) ×−Ö¬ÖÖÔ¸üÖÖ“Öß ŸÖÖ¸üßÖ 10) ×−Ö¬ÖÖÔ¸üßŸÖ ¸üŒú´Ö
11) †×¯Ö»ÖÖ“Öß ŸÖÖ¸üßÖ †ÃÖ»µÖÖÃÖ 12) †×¯Ö»ÖÖÃÖÓ²ÖÓ¬Öß“µÖÖ †Ö¤êü¿ÖÖ“Öß ŸÖÖ¸üßÖ
13) †×¯Ö»ÖÖ“µÖÖ †Ö¤êü¿ÖÖ−ÖãÃÖÖ¸ü 14) ˆ¯Öú¸üÖ“Öß ¸üŒú´Ö ´ÖÓ›üôûÖŸÖ •Ö´ÖÖ êú»µÖÖ“Öß
¸üŒú´Ö ŸÖÖ¸üßÖ
15) ÆüßÖÖÓŸÖ¸üßŸÖ ¸üŒú´Ö - “Ö»Ö−Ö Îú. ¾Ö פü−ÖÖÓú
þÖÖÖ¸üß
Ææü¤ü¤ËüÖ
¯Ö׸ü׿Ö™ü- 2
ˆ¯Öú¸üÖ¯ÖÖê™üß •Ö´ÖÖ ú¸üµÖÖŸÖ †Ö»Ö껵ÖÖ ¸üŒú´Öê“ÖÖ ŸÖ¯Ö×¿Ö»Ö ¤ü¿ÖÔ×¾ÖÖÖ¸üÖ ´ÖÖ×ÃÖú ŸÖŒŸÖÖ
ÃÖÓ¤ü³ÖÔ Îú´ÖÖÓú
†.Îú †ÖÙ£Öú ¾ÖÂÖÖÔŸÖ •Ö´ÖÖ ³Ö¸üÖÖ ÃÖ¾ÖÔ 12 •Ö´ÖÖ ú¸üµÖÖŸÖ ´ÖÓ›üôûÖŸÖ±ìú
´ÖÓ•Öæ¸ü ú¸üµÖÖŸÖ êú»Ö껵ÖÖ êú»Ö껵ÖÖ ´Ö×Æü−µÖÖ“Öê †Ö»Ö껵ÖÖ †Ö¸üÖÖ›êü ´ÖÓ•Öæ¸ü
†Ö»Ö껵ÖÖ ˆ¯Öú¸üÖ“Öß ˆ¯Öú¸üÖ“Öß ´ÖÖ×ÃÖú ˆ¯Öú¸üÖÃÖÓ²ÖÓ¬Öß ú¸üµÖÖŸÖ
†Ö¸üÖÖ›üµÖÖ“Öß ¸üŒú´Ö ¸üŒú´Ö ×¾Ö¾Ö¸üÖ¯Ö¡Ö —ÖÖ»Öê»ÖÖ ¯ÖÏŸµÖÖ †Ö»Ö껵ÖÖ
ÃÖÓµÖÖ ¹ý¯ÖµÖê ¹ý¯ÖµÖê ÃÖÖ¤ü¸ü êú»Öê Ö“ÖÔ †×¬ÖúÖ-µÖÖÓ−ÖÖ
†ÖÆêüŸÖ úÖµÖ (1 % ¯ÖêÖ ˆ¯Öú¸
†Ö×Ö ³Ö¸üÖÖ •ÖÖÃŸÖ ÖÖêôûÖ
êú»Ö껵ÖÖ −ÖÃÖ»Öê»ÖÖ) ú¸üµÖÖÃÖÖšüß
ˆ¯Öú¸üÖ“Öß Ö“ÖÔ ú¸üµÖÖŸÖ
¸üŒú´Öê“ÖÖ †Ö»Ö껵ÖÖ
´Öêôû ²ÖÃÖ»ÖÖ ¸üŒú´Öê“Öß
úÖµÖ ú¸üµÖÖŸÖ
†Ö»Ö껵ÖÖ
¯Ö¸ü߯ÖãŸÖá
²ÖÖ²ÖŸÖ“ÖÖ
ŸÖ¯Ö׿ֻÖ
(´ÖÓ›üôûÖú¸üߟÖÖ
1. 2. 3. 4. 5. 6. 7.
जलसंपदा विभागाने प्रवििर्षी दरसूचीिर
आधारीि भाििाढ वनदे शांक प्रवसध्द करणेबाबि
महाराष्ट्र शासन
जलसंपदा विभाग
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
मंत्रालय, मंबई - 400 032.
िारीख: 22 मे, 2017
प्रस्िािना:-
एखाद्या प्रकल्पाच्या बांधकामाचा कालािधी मोठा असिो िेव्हा भाििाढीमळे प्रकल्पाच्या खचाि
होणारी िाढ ही अवनिायण ि अपवरहायण असिे. तयामळे दीर्णकाळ चालि असलेल्या प्रकल्पािील सकमििाढीचे
विश्लेर्षण करिांना प्रथमि: भाििाढीमळे झालेली सकमििाढ वनविि करुन िी अपवरहायण म्हणून िेगळी
काढली पावहजे. सधारीि प्रकल्प अहिाल ियार करिाना सविस्िर पवरगणना कूनन भाििाढीमळे प्रकल्प
खचाि होणारी िाढ काढण्याि येिे. िथापी, सधारीि प्रकल्प अहिालाच्या िपासणीच्या प्रतयेक टप्पप्पयािर
भाििाढीमळे होणारी प्रकल्प खचािील िाढीच्या सविस्िर पवरगणनेची आकडे िारी िपासणी शक्य होि नाही.
यासाठी भाििाढीमळे होणारी सकमििाढ स्स्िकारिाना सधारीि प्रशासकीय मान्यिा दे णाऱ्या प्रावधकरणास
पडिाळणीसाठी सटसटीि, सलभ ि िकणसंगि कायणपध्दिी विकवसि करणे गरजेचे ठरिे. ससचन विर्षयक
विशेर्ष चौकशी सवमिीच्या अहिालािील प्रस्िाविि 42 सधारणांमध्ये सधारणा क्र.18 पढीलप्रमाणे आहे.
“जलसंपदा विभागाने प्रिीिर्षी दरसूचीिर आधावरि भाििाढ वनदे शांक प्रवसध्द करािा”.
केंवद्रय बांधकाम विभागाच्या धिीिर असे वनदे शांक ठरविण्यासाठी मख्य अवभयंिा (जसं) ि सह सवचि यांच्या
अध्यक्षिेखाली अधीक्षक अवभयंिा, जायकिाडी प्रकल्प मंडळ औरंगाबाद आवण अधीक्षक अवभयंिा, महाराष्ट्र
कृष्ट्णा खोरे विकास महामंडळ हे सदस्य सवचि असलेली सवमिी गवठि करण्याि आली होिी.
राज्यािील मोठे ,मध्यम ि लर्ू प्रकल्पांच्या विविध कामांच्या 6 वनविदांचा (मोठ्या प्रकल्पािील मािी
धरण, द्वारयक्ि उतसारी भागाची कामे, मध्यम प्रकल्पाचे मािी धरणाचे काम, उपसा ससचन योजनेची कामे,
लपा प्रकल्पांच्या धरणाचे काम, अस्िरीकरणासह कालव्यांची कामे आवण मोठ्या प्रकल्पािील बॅरेजेसची
कामे) अभ्यास कूनन िसेच दरम्यानच्या कालािधीि केंद्रीय जलआयोगाने एवप्रल 2016 मध्ये जलसंपदा
प्रकल्पाच्या अंदाजपत्रक ियार करणेसाठीच्या प्रवसध्द केलेल्या मसूदा मागणदशणक सूचनाचा अभ्यास कूनन
सवमिीने आपला अहिाल सादर केला.
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
1) जलसंपदा विभागासाठी भाििाढ वनदे शांक पवरगवणि करिाना प्रकल्प सकमिीिर पवरणाम
करणाऱ्या र्टकांचे पढील प्रमाणे अवधमान (Weightage) वनविि करणेि यािे.
All Commodities :- 35 %
Cement :- 18 %
Steel :- 12 %
Fuel :- 10 %
Labour :- 25 %
2अ) वसमेंट, स्टील ि All Commodities साठी केंद्र शासनाचे Office of the Economic Advisor
Ministry of Commerce and Industries यांनी मवहना वनहाय प्रवसध्द केलेले Indices विचाराि
घ्यािेि. (http://eaindustry.nic.in)
2ब) इंधनासाठी Indian Oil यांनी मंबईसाठी प्रवसध्द केलेले दर विचाराि र्ेणेि यािेि.
(http://www.iocl.com)
2क) लेबर Indices साठी लेबर ब्यरोने प्रवसध्द केलेले Consumer Price Index for Industrial
workers विचाराि र्ेणेि यािेि. (http://labourbureau.nic.in) यासाठी मंबई, नागपूर , नावशक,
पणे, सोलापूर साठीच्या Indices ची सरासरी विचाराि र्ेणेि यािी.
(3) अथणसंकल्पाि िर्षासाठीची करप्रणाली वनविि होि असिे. तयामळे दरिर्षीचा भाििाढ वनदे शांक
पवरगवणि करिाना एवप्रल मवहन्यािील वनदे शांक विचाराि घ्यािेि.
सवमिीने उपरोक्ि गृहीिकािर आधारीि ससचन प्रकल्पासाठीचे सन 2000 पासनचे िार्षर्षक वनदेशांक
पवरगवणि कूनन शासनास सादर केले.
सवमिीचा अहिाल स्स्िकृि कूनन शासनाने ससचन प्रकल्पांचे भाििाढ वनदे शांकाबाबि पढील प्रमाणे वनणणय
र्ेिला आहे.
शासन वनणणय-
2) एखाद्या िर्षी जलसंपदा विभागाची दरसूची प्रवसध्द न झाल्यास दरसूचीिील बाबीचे दर िदथणपणे
िाढििाना सदर वनदे शांकािील िाढ विचाराि घ्यािी.
पृष्ट्ठ 4 पैकी 2
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
3) दरिर्षीचे भाििाढ वनदे शांक एवप्रल मवहन्याचे प्रसावरि होणाऱ्या वनदे शांकाचे आधारािर प्रवसध्द
करािेि.
पृष्ट्ठ 4 पैकी 3
शासन वनणणय क्रमांकः संकीणण2014/(289/14)/ लपा-2
पवरवशष्ट्ट -1
पृष्ट्ठ 4 पैकी 4
HETRTTHA
tadowrpy.w@maharashtrajgov i
ATE.
T.341 1TS)
37 tay
T i )FTYTEETTUET.