RTC-161-MIR-A-ID-174 - R0 - B Off Site Material Inspection Request For Free Standing Bathtub 21095T-0 (Option 2) From KHALID CORPORATION
RTC-161-MIR-A-ID-174 - R0 - B Off Site Material Inspection Request For Free Standing Bathtub 21095T-0 (Option 2) From KHALID CORPORATION
Off Site Material Inspection Request for Free Standing Bathtub - 21095T-0 (Option 2) - 1700
b.) MAR Status : B Approved as Noted
X 750 X 600mm
( REFER TO ATTACHED DOCUMENTS/DELIVERY NOTES) c.) Specs. Ref. : MR 4.00 Rockwell Group
d.) BOQ Ref. :
a.) Delivery Note No. : DN-RMC-002 a.) Supplier / Agent Name : KHALID CORPORATION
Name / Sign / Date Sept.2022 Name / Sign / Date Sept.2022 Name / Sign / Date
Note: Inspection and approval by AEB shall not relieve the Contractor from his obligation to perform the work in accordance with other contract documents and HSE requirements.
We hope our products from across the globe serve your needs.
Best Regards,
Richard Castillo
EVOK 1.7m LITHOCAST BATH
1.7
K-21095T
ROUGHING-IN (Unit:mm)( )
1700
375
750
605 600
1291 591
PRODUCT INFORMATION
Accessory Information
Drain ....................................................................................................................................1144009-0
1366291-T01-A -1-
EVOK
SERVICE PARTS PAGE
1323280-*
Assy, Round Drain Cover
1158041
Drain Pipe
1366291-T01-A -2-
Project Logo:
Project Name : ALMANA EDITION HOTEL AT WEST BAY
Project No. : 1213-15 Form No. : P07-F10a / Rev. 02 / Mar. 2018
Client: Consultant: Contractor:
1 Material Description Custom Standing Bathtub Free Standing Bathtub - 21095T-0 (OPTION 2)
4 Certificate of Non-Availability of the specified materials from the schedule of vendors is attached. N/A
5 Price quotations from three different sources for the proposed alternative is attached. N/A
Additional cost or time relative to the proposed alternative are deemed to be waived. Cost to other
6 P
disciplines and/or Subcontractors shall be borne by the Main Contractor.
Cost for changes in engineering design, detailing and relative construction cost including approvals from
7 concerned authorities caused by the proposed alternative shall be fully the responsibility of the contractor P
and at no cost to the client.
Does Material has defined the life cycle (Eco frinedly, energy saving and recommendation for usage,
8 P
recycling/treatment) and method of disposal as per ISO 14001:2015
Coordination, installation, builder's work and other changes as necessitated with respect to the proposed
9 P
alternative is complete in all respects.
The contractor acknowledges that the acceptance of the proposed alternative does not waive his
10 P
obligations to the client as detailed in the Conditions of Contract.
Prepared by: Verified by: (Architect) Requested for Approval by: (Contractor's PM)
Khalid Corporation for Sanitary Engr. Ahmed Zidan Engr. Essam Hamaky
Name / Sign / Date Name / Sign / Date Name / Sign / Date
Reviewed by: (AEB Senior Engineer) Verified by: (AEB Resident Engineer) Recommended for Client Endorsement by: (AEB PM)
THE APPROVAL OF ANY ALTERNATIVE OR REPLACEMENT PRODUCT / METHOD SHALL BE SOLELY AT THE DISCRETION OF THE ENGINEER AND SUCH APPROVAL SHALL IN NO WAY RELIEVE THE CONTRACTOR OF ANY OF HIS LIABILITIES AND OBLIGATIONS UNDER THE GENERAL CONDITIONS OF CONTRACT
CLAUSE 51 AND CLAUSE 56 (1) OR AS AMENDED TO SUIT PROJECT REQUIREMENTS. COST SAVING / VALUE ENGINEERING SHALL BE SUBMITTED AND AGREED WITHIN 14 DAYS FROM RECEIPT OF THIS APPROVAL BY ENGINEER, OTHERWISE IT SHALL BE FINALIZED UNILATERALLY BY THE ENGINEER.
Designation Date
Request for Alternative or Replacement Materials (RA) Form No.: P07-F10a / Rev. 02 / Mar. 2018
AEB - CSD Quality Forms 1 of 1