Project Name : AL MANA-EDITION HOTEL AT WEST BAY


Project No. : 1213-15 Form No.: P07-F12 Rev. 0 Feb. 2012
Client Consultant: Contractor:

MATERIAL INSPECTION REQUEST (MIR)


gr

Type : - Material - Plant / Equipment MIR No. : RTC-161-MIR-A-ID-174 Rev.: 0


Discipline : - Civil / Structural - Mechanical Date of Insp. : 21-Sep-22 Time: 8:30 AM
- Architectural - Electrical - Others Storage Location: KHALID CORPORATION STORAGE AREA

Description of Material / Equipment: References:


a.) MAR Ref. No. RTC-161-RAR-A-ID-016R0

Off Site Material Inspection Request for Free Standing Bathtub - 21095T-0 (Option 2) - 1700
b.) MAR Status : B Approved as Noted
X 750 X 600mm

( REFER TO ATTACHED DOCUMENTS/DELIVERY NOTES) c.) Specs. Ref. : MR 4.00 Rockwell Group
d.) BOQ Ref. :

e.) Drwg Ref. :

Delivery Details: Manufacturer / Supplier Details:

a.) Delivery Note No. : DN-RMC-002 a.) Supplier / Agent Name : KHALID CORPORATION

b.) Quantity : Refer to attached delivery note b.) Manufacturer : KOHLER

c.) Date Delivered: : 20-Sep-22 c.) Country of Origin : CHINA

d.) Type of Delivery : - Full Delivery - Partial Delivery d.) Others :

CONTRACTORS SIGNATURES Verification Checklist (by Contractor) :


OK Not OK N/A
Requested by: (Contractors PE or CM) Recommended for Approval: (Contractors PM) a.) Delivery Note
b.)Verify requisition and LPO

Engr. Youssef Shiref Engr. Essam Hamaky c.) Quantity of material


Name / Sign / Date Name / Sign / Date d.) Size of Material
Comments by the Consultant: e.) Grade of material
Previous comments about uneven gaps/clearance f.) Name of Sup. as per LPO
around the drain cover can be managed in the site during g.) Packaging No Damage
installation. h.) Visual check (Packaging)
NO expected aesthetic and functionality issues will be i.) Test results/Reports
observed after final fix installation. j.) Compliance Certificate
k.) Ref./Batch No
l.) Date of Expiry
m.) Guarantee/ Warranty
n.) As per Approved MAR
o.) Complied with Consultant Comments
p.) As per Approved Actual Sample
q.) Approved Supplier?
r.) Others
Inspection Status : Verification (by Consultant) :
YES NO
- A - Accepted / Approved for use a.) Whether any physical damages
- B - Accepted with minor comments or concession b.) Wheteher approved for construction
- C - Revise / Resubmit c. Whether this can be included in valuation
- D - Rejected payment?
CONSULTANT APPROVAL & SIGNATURES
Inspected by: (AEB Discipline Engineer) Reviewed by: (AEB SE or RE) Endorsed by: (AEB PM)

J.C.R J.Carlo.Reyes / Sr. Architect

Name / Sign / Date Sept.2022 Name / Sign / Date Sept.2022 Name / Sign / Date

Note: Inspection and approval by AEB shall not relieve the Contractor from his obligation to perform the work in accordance with other contract documents and HSE requirements.

Material Inspection Request Form No.: P07-F12 / Rev. 0 / Feb. 2012


AEB Construction Supervision Department Quality Forms 1 of 1
 
 
August 28, 2022 
 
To:    RAMCO TRADING AND CONTRACTING CO WLL   
 
 
Subject:  Kohler Product Certification‐ Country of Origin   
 
Dear Sir,   
 
This letter serves as clarification that KOHLER USA sets the manufacturing quality standards that are applied 
across all Kohler global factories in America, Europe, Asia and Africa. 
 
Kohler has more than 50 production facilities worldwide, and all our engineering and production groups 
adhere to the company’s Guiding Principles and global approach to quality. 
 
The above applies to the manufacturing of the below mentioned items. 
 

Reference Number Description Factory

21095T-0 EVOK 1.7m LITHOCAST BATH (drain included) China


   

We hope our products from across the globe serve your needs.

Best Regards,

Richard Castillo

Kohler Middle East


Technical Manager – Middle East

 
 
EVOK 1.7m LITHOCAST BATH
1.7

K-21095T
ROUGHING-IN (Unit:mm)( )
1700

375

750

605 600

1291 591

PRODUCT INFORMATION

Water Depth Installation Notes


(To Overflow Hole Bottom 420mm ( )
) ! Install this product according to the
installation guide.
Capacity !
(To Overflow Hole Bottom 335L ( ) ! LITHOCAST baths are extremely heavy,
) making some installations difficult.
!
Basin area 1214mm ( ) 400mm ( )
! NOTE: Use lifting straps to lift or move the
Top area 1660mm ( ) 692mm ( )
bath.
!
! Unless otherwise specified floor support
under bath must provide for a minimum of
550kg loading (including the weight of
bathtub, water and one user).
!
550kg (
)

Accessory Information

Drain ....................................................................................................................................1144009-0

Compiled information is subject to change without prior notice

1366291-T01-A -1-
EVOK
SERVICE PARTS PAGE

1.7m LITHOCAST BATH


1.7
K-21095T

1323280-*
Assy, Round Drain Cover

1158041
Drain Pipe

Color code (-*) or finish (-**) must be specified when ordering.


(-*) (-**)

1366291-T01-A -2-
Project Logo:
Project Name : ALMANA EDITION HOTEL AT WEST BAY
Project No. : 1213-15 Form No. : P07-F10a / Rev. 02 / Mar. 2018
Client: Consultant: Contractor:

REQUEST FOR ALTERNATIVE or REPLACEMENT MATERIALS (RAR)


gr

RAR Ref. No.: RTC-161-RAR-A-ID-016 Rev.: 0 Trade / Discipline :


Date Requested : 5-Mar-22 - Civil - Architectural - Electrical - Information Tech. (IT)
Date Required : Urgent - Structural - Mechanical - Plumbing / FF - Others ID Package Works
References:
a.) Specs. Ref. : MR 4.00 Rockwell Group c.) QCS 2014 Ref.: Not Specified
b.) Drawing Ref.: d.) Standards Ref.:
c.) BOQ Ref. : e.) Others :
Reason for Request: - Non-availability of Specified Material - Insufficient Available Quantity - Value Engineering - Time Saving - Cost Saving
Others :
Cost & Time Implication:
A. Cost Saving YES NO How much COST Savings due to proposed alternative? 261,386.50 Qatari Riyal
B. Time Saving YES NO How much TIME Savings due to proposed alternative? (days)

SN Description Specified AS PER Project Specification Proposed Alternative / Replacement

1 Material Description Custom Standing Bathtub Free Standing Bathtub - 21095T-0 (OPTION 2)

2 Manufacturer Apaiser Kohler

3 Country of Origin VIC AUS China

4 Supplier / Agent Apaiser Khalid Corporation for Sanitary

5 Quantity Required As per project Requirement As per Project Requirement

6 Date Required at Site Urgent Urgent

7 Estimated Time Arrival (Site) Urgent Urgent

SN COMPLIANCE CERTIFICATION COMPLY NOT COMPLY REMARKS


1 Warranty / Guarantee is the same as per the specified product. P

2 Local (Qatar) maintenance services and replacement parts is available P

3 Proposed alternative does not affect dimensions & functional clearance P

4 Certificate of Non-Availability of the specified materials from the schedule of vendors is attached. N/A

5 Price quotations from three different sources for the proposed alternative is attached. N/A
Additional cost or time relative to the proposed alternative are deemed to be waived. Cost to other
6 P
disciplines and/or Subcontractors shall be borne by the Main Contractor.
Cost for changes in engineering design, detailing and relative construction cost including approvals from
7 concerned authorities caused by the proposed alternative shall be fully the responsibility of the contractor P
and at no cost to the client.
Does Material has defined the life cycle (Eco frinedly, energy saving and recommendation for usage,
8 P
recycling/treatment) and method of disposal as per ISO 14001:2015
Coordination, installation, builder's work and other changes as necessitated with respect to the proposed
9 P
alternative is complete in all respects.
The contractor acknowledges that the acceptance of the proposed alternative does not waive his
10 P
obligations to the client as detailed in the Conditions of Contract.
Prepared by: Verified by: (Architect) Requested for Approval by: (Contractor's PM)

Khalid Corporation for Sanitary Engr. Ahmed Zidan Engr. Essam Hamaky
Name / Sign / Date Name / Sign / Date Name / Sign / Date

COMMENTS BY THE CONSULTANT


*** Proposed KOHLER exquisite EVOK 1.7m LITHOCAST BATH K21095T-0 is acceptable as alternative material for the APAISER-Custom Freestanding Bathtub as per the
discussion in the progress meeting no. 76 dated 16 March 2022 subject to the following comments below:
- Not applicable for Presidential Suite (1 no.) and Vice-presidential Suites (3 nos). To provide or follow the specified in the RWG Material Schedule MR4.00 - APAISER
- Draft warranty letter should start from the date of substantial completion.
- Value Engineering amount to be submitted officially with corresponding cost breakdown for review and acceptance.
- To proceed with the bulk order for the entire buthtub to be used in the guestrooms

Status of the Request:


- A - Approved - B - Approved as Noted - C - Incomplete Data / Revise and Resubmit - D -Rejected / NOT Approved

Reviewed by: (AEB Senior Engineer) Verified by: (AEB Resident Engineer) Recommended for Client Endorsement by: (AEB PM)

J.Carlo Reyes/Sr. Architect 14.Mar.2022 Warren Roque 17-Mar-2022


Name / Sign / Date Name / Sign / Date Name / Sign / Date

THE APPROVAL OF ANY ALTERNATIVE OR REPLACEMENT PRODUCT / METHOD SHALL BE SOLELY AT THE DISCRETION OF THE ENGINEER AND SUCH APPROVAL SHALL IN NO WAY RELIEVE THE CONTRACTOR OF ANY OF HIS LIABILITIES AND OBLIGATIONS UNDER THE GENERAL CONDITIONS OF CONTRACT
CLAUSE 51 AND CLAUSE 56 (1) OR AS AMENDED TO SUIT PROJECT REQUIREMENTS. COST SAVING / VALUE ENGINEERING SHALL BE SUBMITTED AND AGREED WITHIN 14 DAYS FROM RECEIPT OF THIS APPROVAL BY ENGINEER, OTHERWISE IT SHALL BE FINALIZED UNILATERALLY BY THE ENGINEER.

Client Representative Comments: Client Approval / Endorsement :

Name & Signature

Designation Date

Request for Alternative or Replacement Materials (RA) Form No.: P07-F10a / Rev. 02 / Mar. 2018
AEB - CSD Quality Forms 1 of 1