GDI PREVENTIVE MAINTENANCE INSTRUCTION Date: 15/04/10 Rev: 0

Maximo Ref. MPM-312-03-07 SFI Code 312-03


Equip.
Baylor Brake
Description
Manufacturer Shanghai Sheng Equip. Location Drawworks skid

Model DWS50

MAINTENANCE SPECIFICATIONS

Frequency 3 Monthly Estimated Duration 4 Hours

Criticality 3 Area Authority Driller

Class Structure 2505 Failure Code DSDW

Craft Chief Electrician No. of Craft 1

SAFETY NOTES

• Complete required Permit-To-Work (PTW).


• Lockout / Tag-out Permit required.
• Review / Complete Job-Safety-Analysis (JSA).
• Inform Area authority if work is carried out on critical equipment for ongoing
operation.
• Do not wear jewellery when working around rotating machinery.
• Wear all proper safety equipment.

JOB PLAN INSTRUCTION

1. Check the brake assembly for damage and cleanliness.


2. Ensure the cooling water discharge free falls into an open funnel. (Non Restrictive).
3. Check the flow alarm and high temperature alarm and ensure all alarms are visible and audible.
4. Ensure all vents and breathers are clean and not obstructed. (See to Figure 2)
5. Check all cables and connections on the brake assembly for damage and tightness.
6. Check the complete brake assembly for Exd integrity.
7. Check the flame path on the cable connection box and ensure it is paint free.
8. Check the main control panel for damage and cleanliness.
9. Ensure all doors with electrical equipment are earth linked to the panel main frame.
Check the mains cable and control cable connections for tightness and overheating
10.
discolouration.
11. Check all drives and contactors for overheating and free movement.
12. Ensure all meters and indicating lights are operating correctly.
13. Check the battery cabinet for damage and cleanliness.
14. Ensure all the battery connections are tight and clean.
15. Ensure all indicating lights are operational.

1
GDI PREVENTIVE MAINTENANCE INSTRUCTION Date: 15/04/10 Rev: 0

Maximo Ref. MPM-312-03-07 SFI Code 312-03


Equip.
Baylor Brake
Description
Manufacturer Shanghai Sheng Equip. Location Drawworks skid

Model DWS50

JOB PLAN INSTRUCTION


Ensure the battery chargers are operational and the meters displaying the voltage and Charging
16.
rate.
17. Check all cooling fans are operational and air filters for cleanliness.
18. Ensure all doors with electrical equipment are earth linked to the panel main frame.
19. Test emergency stop button and ensure battery back-up is operational.
20. Ensure all electrical equipment is correctly grounded.
21. Measure coil F1/F2 internal resistance and record the reading. (See Figure 1)
22. Measure coil F3/F4 internal resistance and record the reading. (See Figure 1)
23. Measure coil F5/F6 internal resistance and record the reading. (See Figure 1)
24. Measure coil F7/F8 internal resistance and record the reading. (See Figure 1)
25. Megger coil F1/F2 resistance to ground and record the reading. (See Figure 1)
26. Megger coil F3/F4 resistance to ground and record the reading. (See Figure 1)
27. Megger coil F5/F6 resistance to ground and record the reading. (See Figure 1)
28. Megger coil F7/F8 resistance to ground and record the reading. (See Figure 1)
29. Measure the air gap on the drillers side at 12 O’clock and record the reading.
30. Measure the air gap on the drillers side at 4 O’clock and record the reading.
31. Measure the air gap on the drillers side at 8 O’clock and record the reading.
32. Measure the air gap on the off drillers side at 12 O’clock and record the reading.
33. Measure the air gap on the off drillers side at 4 O’clock and record the reading.
34. Measure the air gap on the off drillers side at 8 O’clock and record the reading.

2
GDI PREVENTIVE MAINTENANCE INSTRUCTION Date: 15/04/10 Rev: 0

Maximo Ref. MPM-312-03-07 SFI Code 312-03


Equip.
Baylor Brake
Description
Manufacturer Shanghai Sheng Equip. Location Drawworks skid

Model DWS50

CHECKS AND MEASUREMENTS


MAXIMO ALLOWABLE UPPER/LOWER LIMITS
Recorded Lower Value Lower Value Upper Value Upper Value
Description Unit
Readings Action Alarm Action Alarm

Coil F1/F2 Internal Ω


12 13 16 14.5
Res.
Coil F3/F4 Internal Ω
12 13 16 14.5
Res.
Coil F5/F6 Internal Ω
12 13 16 14.5
Res.
Coil F7/F8 Internal Ω
12 13 16 14.5
Res.
Coil F1/F2 Megger MΩ 8 10 99999 9999
Coil F3/F4 Megger MΩ 8 10 99999 9999
Coil F5/F6 Megger MΩ 8 10 99999 9999
Coil F7/F8 Megger MΩ 8 10 99999 9999
Air gap on the drillers
0.89 0.90 1.11 1.10
side at 12 O’clock. mm
Air gap on the drillers
0.89 0.90 1.11 1.10
side at 4 O’clock. mm
Air gap on the drillers
0.89 0.90 1.11 1.10
side at 8 O’clock. mm
Air gap on the off
drillers side at 12 0.89 0.90 1.11 1.10
mm
O’clock.
Air gap on the off
drillers side at 4 0.89 0.90 1.11 1.10
mm
O’clock.
Air gap on the off
drillers side at 8 0.89 0.90 1.11 1.10
mm
O’clock.

3
GDI PREVENTIVE MAINTENANCE INSTRUCTION Date: 15/04/10 Rev: 0

Maximo Ref. MPM-312-03-07 SFI Code 312-03


Equip.
Baylor Brake
Description
Manufacturer Shanghai Sheng Equip. Location Drawworks skid

Model DWS50

FIGURES/DRAWINGS

Figure 1 – Coil Cable Connections.

Earth Point

Internal Resistance
Reading Points (Ω)
Resistance Reading Points. (MΩ)

4
GDI PREVENTIVE MAINTENANCE INSTRUCTION Date: 15/04/10 Rev: 0

Maximo Ref. MPM-312-03-07 SFI Code 312-03


Equip.
Baylor Brake
Description
Manufacturer Shanghai Sheng Equip. Location Drawworks skid

Model DWS50

Figure 2 – Brake Assembly