Ground Floor Plan: Store
Ground Floor Plan: Store
Ground Floor Plan: Store
X
9,300
200 3,000 200 2,500 200 3,000 200
200
200
store
4,000
4,000
assistant
chief's chief's
03
office office
6,600
200
200
waiting area
2,000
2,000
X
200
200
200 3,000 200 2,500 200 3,000 200
01
GROUND FLOOR PLAN
GSPublisherVersion 0.0.100.100
2,8
09 07
2,8
816
ELEVATION 03
04
4,000
ELEVATION 04
ROOF DETAILS
1. 28g corrugated iron s
2. 100x50mm celcured
3. 100x50mm celcured c
4. 200x25mm celcured c
FOUNDATION DETAILS
2,850
1. 200mm wide bituminous f
2. 125mm thick VRC concre
4. 1000g polthene as DPM
5. 50mm thick murram blind
6. 300mm thick Quarry stone
7. 200mm thick natural stone
8. 600x200 mm thick VRC in
ELEVATION 01
02
X
S
ed iron sheet roof covering on
celcured cypress timber external & internal member for truss on
elcured cypress timber wall plate
elcured cypress timber fascia board
AILS
minous felt in DPC
C concrete bed including BRC A142
s DPM
am blinding
rry stone as hard core
ural stone walling in foundation walling
k VRC in strip foundation
ELEVATION 02
have heavy duty covers
CDF Samburu North
P.O Box 3-20600
Maralal.
PROJECT NAME
Proposed Construction
of Chief Office
DRAWING TITLE
Ground & First Floor
LayoutsElevations &
Sections
CONSULTANTS
PUBLIC WORKS
SAMBURU COUNTY
SCALE DRAWN BY
1:100
DRAWING NO. DATE:
May2022
NOTES
1. All dimensions are in mm
otherwise specified
CLIENT
The Fund Manager
CDF Samburu North
P.O Box 3-20600