Inquiry Report Afzal

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

OFFICE OF THE

EXECUTIVE ENGINEER
PASRUR LINK DIVISION SIALKOT
E: Mail: xenpsr_canal@yahoo.com
No.___________________________
Irrigation Dated ____________/________2021

Department
To,
Chief Engineer Irrigation,
Lahore Zone Lahore,

Subject:- INQUIRY AGAINST MR.MALIK MUHAMMAD AFZAL SUB


ENGINEER & MR.ALLAHA DITTA MATE OF BAHRIANWALA
SECTION SHEIKHURPURA DIVISION UCC SHEIKHUPURA.

Brief
The undersigned was appointed as enquiry Officer by Chief Engineer

Irrigation Lahore Zone Lahore against Mr. Malik Muhammad Afzal , Sub Engineer &

Mr. Allaha Ditta Mate of Bahrianwala Section Sheikhurpura Division UCC

Sheikhupura ,vide order No. 1464/Admn(II) LHR/2020/20985/E-File dated

22.10.2020 under the “Punjab Employees Efficiency, Discipline and

Accountability Act 2006”,on the charges of in-efficiency, misconduct and

corruption.

To start the enquiry proceedings notices for hearing were served to

accused official with copy to all concern vide this office letter No. 1080-81/27-E dated

02.12.2020 ,No. 1135-36/27-E dt.10.12.2020 No.1225-26/27-E dt.26.12.2020

respectively and directed to appear before the Enquiry Officer along with defense

reply on subsequent dates.

The detail of charges pervaded by the Authority is produced as under:-

CHARGES AGAINST THE SUB ENGINEER


i. He has failed to check, report and control over water theft

offences on Rajbah Beharinwala.

Page 1 of 6
ii. He failed to perform his legitimate official field duties to ensure

equitable distribution of canal water supply up to tail enders of Rajbah

Bahirinwala.

Due to his serious negligence, the loss to Irrigation Department as well

as public occurred.

CHARGES AGAINST THE MATE


i. He failed to check and report of water theft of water theft offences on

Rajbah Bahrianwala to his seniors.

Due to his serious negligence, the loss to Irrigation Department as well

as public occurred.

PROSECUTION PROCEEDINGS

1ST HEARING
 The date of hearing was fixed on 09/12/2020
 The accused Sub Engineer and Mate has attended and received allegation statement .
he requested defense reply will be submitted on next date.
 2nd
HEARING
 The date of hearing was fixed on 23/12/2020
 The accused Sub Engineer and Mate Attended the inquiry proceeding on fixed date
and time, submitted defense reply.
3rd HEARING
 The date of hearing was fixed on 05/01/2021
 The accused Sub Engineer and Mate as well as SDO (D.R) has attended the inquiry
proceeding on fixed date and time, and submitted their reply.
Sub Division Officer, Sheikhurpura Sub Division,UCC Sheikhurpura was
appointed as Departmental Representative in terms of Section 9(1)(c). read with section 12 of
Act ibid by the Authority vide No. 1464/Admn(II) LHR/2020/20985/E-File dated
22.10.2020. The Departmental Representative were called on each date of hearing as fixed
by enquiry officer mentioned above and was requested to furnish his reply, and defend the
case on the prosecution side accordingly and provide the relevant record to the enquiry
officer.

Page 2 of 6
DEFENCE REPLY OF ACCUSED SUB ENGINEER.

The accused Sub Engineer submitted his defense reply, received in this office

on 23/12/2020. He written stated that:-

PMIU staff visited Bahrianwala Minor on 1508-2020 and detected some

offences which were reported vide their office canal wire No.1802, dated: 18-03-

2020. The allegation wise reply is as under.

Charge No.1

He has failed to check, report and control over water theft offences on

Rajbah Bahrianwala.

Reply

The charge is denied that preventive measure action taken by

undersigned has been shown in detail attached in tabular form, and documentary

support. It is worth mention that whenever any incident of water theft came into my

knowledge, I rushed to the site, Report it through canal wire, SMS sent to PMIU Data

base and also repair/ Close / remove the offence at the same time.

Charge No.2

He failed to perform his legitimate official field duties to ensure

equitable distribution of canal water supply up to tail Enders of Rajbah Bahrianwala.

Reply

The undersigned performed Govt. Duties with best of my ability and try

to control over water theft by visiting the channel round the clock and whenever any

incident of water theft came under my knowledge, I suddenly remove the same after

necessary reports to the departments and PMIU data base. Sometimes the tails

found short because of water theft in upper reach and growing of weed / grass in the

bed of the channel which was also removed through the departmental establishment.

In the light of above mentioned facts, it is clearly proved that

1- I am not guilty of inefficiency, within measuring of section-3

Page 3 of 6
(I) Of “The Punjab Employees Efficiency Discipline and Accountability

Act 2006” read with amendment therein.

2- I am not stand corrupt or may reasonably be considered as corrupt within

measuring of section-3 (II) of “ The Punjab Employees Efficiency Discipline

and Accountability Act 2006” read with amendment therein.

It is therefore humbly requested to file the inquiry against me so that I can

perform my duties with mental satisfaction.

Defense reply of Mr.Allaha Ditta Mate of Bahrianwala Section

Page 4 of 6
FINDINGS.
Bahrianwala Minor:
Repair
Sr Outlet SBE SDO
Side Offence Robkar Tawan of Outlet FIR
.# /RD Canal wire Check
34 & 39 dt No.225
No.222 dt .No.2202 dt 07.07.2020 dt
1 14985 R Closed at site 34000/-
22.06.2020 22.06.2020 186 dt 25.06.20
5.10.20 20
Tempered due to No. 739 683/20 dt
freshly temporary No.739 dt No.1503 dt 214 dt dt 3.10.20
2 26457 L 49300/-
closed ghurlu (8”x8”) at 13.08.2020 15.08.2020 06.11.2020 13.08.20
U/S side of outlet 20
491-20 dt
Running ghurlu (6”x6”) No.739 dt No.1503 dt 179 dt
3 3-4 L 15300/- 29.09.20
in bank of the channel 13.08.2020 15.08.2020 05.09.2020
491-20 dt
Closed cut (2’x2’) at No.739 dt No.1503 dt 76 dt
4 3-4 L 13600/- 29.09.20
site 13.08.2020 15.08.2020 15.09.2020
491-20 dt
Freshly closed Takki No.739 dt No.1503 dt 228 dt
5 3-4 L 17850/- 29.09.20
(1’x1’) at site 13.08.2020 15.08.2020 17.11.2020
No. 738 dt 491-20 dt
Freshly closed cut 12.08.2020 No.1503 dt 76 dt 29.09.20
6 4-5 L 15708/-
(2’x2’) at site No.739 dt 15.08.2020 15.09.2020
13.08.2020
228 dt 491-20 dt
Closed cut (2’x2’) at No.739 dt No.1503 dt 17.11.2020 29.09.20
7 7-8 L 80908/-
site 13.08.2020 15.08.2020 148 dt
4.9.20
242 dt 619/20
Sign of Syphone Pipe at No.216 dt No.1701 dt 12.12.2020
8 10-11 R 11900/-
site 16.06.2020 17.06.2020 228 dt
17.11.20
Unauthorized running 739 dt 942/20 dt
No.739 dt No.1503 dt 214 dt
9 31-32 L fixed pipe (4” dia) at 29750/- 13.08.20 24.11.20
13.08.2020 15.08.2020 06.11.2020
site 20
Total 268316

CONCLUSION.

After scrutiny of record attached with defense reply and produce by the

Departmental Representative and detailed discussion with Departmental

Representative,

RECOMMENDATION.

Page 5 of 6
DA/ As above Executive Engineer
i) Enquiry report = _____ Sheets Pasrur Link Division
ii) D.R report = _____Sheets Sialkot
iii) Defense reply of accused official (Enquiry Officer)
along with relevant record =_____ Sheets

Page 6 of 6

You might also like