Professional Documents
Culture Documents
Inquiry Report Afzal
Inquiry Report Afzal
Inquiry Report Afzal
EXECUTIVE ENGINEER
PASRUR LINK DIVISION SIALKOT
E: Mail: xenpsr_canal@yahoo.com
No.___________________________
Irrigation Dated ____________/________2021
Department
To,
Chief Engineer Irrigation,
Lahore Zone Lahore,
Brief
The undersigned was appointed as enquiry Officer by Chief Engineer
Irrigation Lahore Zone Lahore against Mr. Malik Muhammad Afzal , Sub Engineer &
corruption.
accused official with copy to all concern vide this office letter No. 1080-81/27-E dated
respectively and directed to appear before the Enquiry Officer along with defense
Page 1 of 6
ii. He failed to perform his legitimate official field duties to ensure
Bahirinwala.
as public occurred.
as public occurred.
PROSECUTION PROCEEDINGS
1ST HEARING
The date of hearing was fixed on 09/12/2020
The accused Sub Engineer and Mate has attended and received allegation statement .
he requested defense reply will be submitted on next date.
2nd
HEARING
The date of hearing was fixed on 23/12/2020
The accused Sub Engineer and Mate Attended the inquiry proceeding on fixed date
and time, submitted defense reply.
3rd HEARING
The date of hearing was fixed on 05/01/2021
The accused Sub Engineer and Mate as well as SDO (D.R) has attended the inquiry
proceeding on fixed date and time, and submitted their reply.
Sub Division Officer, Sheikhurpura Sub Division,UCC Sheikhurpura was
appointed as Departmental Representative in terms of Section 9(1)(c). read with section 12 of
Act ibid by the Authority vide No. 1464/Admn(II) LHR/2020/20985/E-File dated
22.10.2020. The Departmental Representative were called on each date of hearing as fixed
by enquiry officer mentioned above and was requested to furnish his reply, and defend the
case on the prosecution side accordingly and provide the relevant record to the enquiry
officer.
Page 2 of 6
DEFENCE REPLY OF ACCUSED SUB ENGINEER.
The accused Sub Engineer submitted his defense reply, received in this office
offences which were reported vide their office canal wire No.1802, dated: 18-03-
Charge No.1
He has failed to check, report and control over water theft offences on
Rajbah Bahrianwala.
Reply
undersigned has been shown in detail attached in tabular form, and documentary
support. It is worth mention that whenever any incident of water theft came into my
knowledge, I rushed to the site, Report it through canal wire, SMS sent to PMIU Data
base and also repair/ Close / remove the offence at the same time.
Charge No.2
Reply
The undersigned performed Govt. Duties with best of my ability and try
to control over water theft by visiting the channel round the clock and whenever any
incident of water theft came under my knowledge, I suddenly remove the same after
necessary reports to the departments and PMIU data base. Sometimes the tails
found short because of water theft in upper reach and growing of weed / grass in the
bed of the channel which was also removed through the departmental establishment.
Page 3 of 6
(I) Of “The Punjab Employees Efficiency Discipline and Accountability
Page 4 of 6
FINDINGS.
Bahrianwala Minor:
Repair
Sr Outlet SBE SDO
Side Offence Robkar Tawan of Outlet FIR
.# /RD Canal wire Check
34 & 39 dt No.225
No.222 dt .No.2202 dt 07.07.2020 dt
1 14985 R Closed at site 34000/-
22.06.2020 22.06.2020 186 dt 25.06.20
5.10.20 20
Tempered due to No. 739 683/20 dt
freshly temporary No.739 dt No.1503 dt 214 dt dt 3.10.20
2 26457 L 49300/-
closed ghurlu (8”x8”) at 13.08.2020 15.08.2020 06.11.2020 13.08.20
U/S side of outlet 20
491-20 dt
Running ghurlu (6”x6”) No.739 dt No.1503 dt 179 dt
3 3-4 L 15300/- 29.09.20
in bank of the channel 13.08.2020 15.08.2020 05.09.2020
491-20 dt
Closed cut (2’x2’) at No.739 dt No.1503 dt 76 dt
4 3-4 L 13600/- 29.09.20
site 13.08.2020 15.08.2020 15.09.2020
491-20 dt
Freshly closed Takki No.739 dt No.1503 dt 228 dt
5 3-4 L 17850/- 29.09.20
(1’x1’) at site 13.08.2020 15.08.2020 17.11.2020
No. 738 dt 491-20 dt
Freshly closed cut 12.08.2020 No.1503 dt 76 dt 29.09.20
6 4-5 L 15708/-
(2’x2’) at site No.739 dt 15.08.2020 15.09.2020
13.08.2020
228 dt 491-20 dt
Closed cut (2’x2’) at No.739 dt No.1503 dt 17.11.2020 29.09.20
7 7-8 L 80908/-
site 13.08.2020 15.08.2020 148 dt
4.9.20
242 dt 619/20
Sign of Syphone Pipe at No.216 dt No.1701 dt 12.12.2020
8 10-11 R 11900/-
site 16.06.2020 17.06.2020 228 dt
17.11.20
Unauthorized running 739 dt 942/20 dt
No.739 dt No.1503 dt 214 dt
9 31-32 L fixed pipe (4” dia) at 29750/- 13.08.20 24.11.20
13.08.2020 15.08.2020 06.11.2020
site 20
Total 268316
CONCLUSION.
After scrutiny of record attached with defense reply and produce by the
Representative,
RECOMMENDATION.
Page 5 of 6
DA/ As above Executive Engineer
i) Enquiry report = _____ Sheets Pasrur Link Division
ii) D.R report = _____Sheets Sialkot
iii) Defense reply of accused official (Enquiry Officer)
along with relevant record =_____ Sheets
Page 6 of 6