Requirements: -
Scenarios: -
Ground floor in all buildings has distribution switch which connects every floor switches.
This switch connects every floor switch via (SVI)
We have data center which has data center switch (core switch) which connects every building
distribution switches.
We have ISPs (internet service providers) and their routers.
We have two branch buildings. Named by Engineering Branch Suit and Sales Branch Site.
They have 5 floors.
All floors in each building have his own switch
All floors in each building have his own computer, wireless device (Laptop), wife access point,
work station & video conference device
All floor devices have their own Ip Addresses.
Every floor has his own VLAN
They are connected by 2 ISPs,
Engineering building: - can access all of networks Sales building and also General
building to the head office.
Sales building: - can access General building but can’t Engineering building to the head
office.