"CCNA Final project”

On 10 Buildings and 2 Branch Office’s Networking


in the capital city.

Name: - Abdisa Gezachew


Batch: - 2
Topology & Description: - Electrical Works Company
(Level’s Electrical)
P.O. Box 15549
Addis Ababa - Ethiopia
CEO & Founder: - Abdisa Gezachew

S.to: - Mr. Daniel Abebe


S. Date: - 5/19/2022
LEVEL’S ELECTRICAL WORKS COMPANY TEN BUILDINGS NETWORKING TOPOLOGY & DESCRIPTION

Scenario and requirements for the network topology.

Requirements: -

software Modeling tool for the topology. MS Visio


Network simulation software. Packet tracer
Draw hierarchical networking design

Scenarios: -

We have 10 buildings which have 10 floors for each of them


 We have 2 of unique buildings named by Engineering building and Sales building and
rest of them are categorized by General building. Each of them has their own
connectivity access character.
 Engineering building: - can access all of networks Sales building and also
General building.
 Sales building: - can access General building but can’t Engineering building.
 General building: - only can access General building by itself.
All floors in each building have his own switch
All floors in each building have his own computer, wireless device (Laptop), wife access point,
work station & video conference device
All floor devices have their own Ip Addresses.
Every floor has his own VLAN

Ground floor in all buildings has distribution switch which connects every floor switches.
This switch connects every floor switch via (SVI)

We have data center which has data center switch (core switch) which connects every building
distribution switches.
We have ISPs (internet service providers) and their routers.

We have two branch buildings. Named by Engineering Branch Suit and Sales Branch Site.
They have 5 floors.
All floors in each building have his own switch
All floors in each building have his own computer, wireless device (Laptop), wife access point,
work station & video conference device
All floor devices have their own Ip Addresses.
Every floor has his own VLAN
They are connected by 2 ISPs,
 Engineering building: - can access all of networks Sales building and also General
building to the head office.
 Sales building: - can access General building but can’t Engineering building to the head
office.
Example Physical topology for the head office one of building .