CONTRATO NÚMERO

K-EPCN-154C MQ13-189-DR-1140-CO1000
K-EPCN-154C MQ13-189-DR-1140-CO1001
K-EPCN-154C MQ13-189-DR-1140-CO1002
K-EPCN-154C MQ13-189-DR-1140-CO1003
K-EPCN-154C MQ13-189-DR-1140-CO1004
K-EPCN-154C MQ13-189-DR-2030-SS4150
K-EPCN-154C MQ13-189-DR-3930-CE4131
K-EPCN-154C MQ13-189-DR-3930-EE4125
K-EPCN-154C MQ13-189-DR-3930-EE4132
K-EPCN-154C MQ13-189-DR-3930-EE4134
K-EPCN-154C MQ13-189-DR-3930-EE4149
K-EPCN-154C MQ13-189-DR-3930-EE4153
K-EPCN-154C MQ13-189-DR-3930-EE4155
K-EPCN-154C MQ13-189-DR-3930-EE4178
K-EPCN-154C MQ13-189-DR-4030-CE3029
K-EPCN-154C MQ13-189-DR-4030-CO2000
K-EPCN-154C MQ13-189-DR-4030-CO2001
K-EPCN-154C MQ13-189-DR-4030-CO2002
K-EPCN-154C MQ13-189-DR-4030-CO2003
K-EPCN-154C MQ13-189-DR-4030-CO2004
K-EPCN-154C MQ13-189-DR-4030-CO2005
K-EPCN-154C MQ13-189-DR-4030-CO2006
K-EPCN-154C MQ13-189-DR-4030-CO2007
K-EPCN-154C MQ13-189-DR-4030-CO2008
K-EPCN-154C MQ13-189-DR-4030-CO2009
K-EPCN-154C MQ13-189-DR-4030-CO2010
K-EPCN-154C MQ13-189-DR-4030-CO2011
K-EPCN-154C MQ13-189-DR-4030-CO2012
K-EPCN-154C MQ13-189-DR-4030-CO2013
K-EPCN-154C MQ13-189-DR-4030-CO2014
K-EPCN-154C MQ13-189-DR-4030-CO2015
K-EPCN-154C MQ13-189-DR-4030-CO2016
K-EPCN-154C MQ13-189-DR-4030-CO2017
K-EPCN-154C MQ13-189-DR-4030-CO2018
K-EPCN-154C MQ13-189-DR-4030-CO2019
K-EPCN-154C MQ13-189-DR-4030-CO2020
K-EPCN-154C MQ13-189-DR-4030-CO2021
K-EPCN-154C MQ13-189-DR-4030-CO2022
K-EPCN-154C MQ13-189-DR-4030-CO2023
K-EPCN-154C MQ13-189-DR-4030-CO2024
K-EPCN-154C MQ13-189-DR-4030-CO2025
K-EPCN-154C MQ13-189-DR-4030-CO2026
K-EPCN-154C MQ13-189-DR-4030-CO2027
K-EPCN-154C MQ13-189-DR-4030-CO2028
K-EPCN-154C MQ13-189-DR-4030-CO2029
K-EPCN-154C MQ13-189-DR-4030-CO2030
K-EPCN-154C MQ13-189-DR-4030-CO2031
K-EPCN-154C MQ13-189-DR-4030-CO2032
K-EPCN-154C MQ13-189-DR-4030-CO2033
K-EPCN-154C MQ13-189-DR-4030-EE4004
K-EPCN-154C MQ13-189-DR-4120-CO1005
K-EPCN-154C MQ13-189-DR-4120-CO1006
K-EPCN-154C MQ13-189-DR-4120-CO1014
K-EPCN-154C MQ13-189-DR-4310-SS4101
K-EPCN-154C MQ13-189-DR-4310-SS4102
K-EPCN-154C MQ13-189-DR-4310-SS4103
K-EPCN-154C MQ13-189-DR-4310-SS4104
K-EPCN-154C MQ13-189-DR-4320-SS4101
K-EPCN-154C MQ13-189-DR-4320-SS4102
K-EPCN-154C MQ13-189-DR-4320-SS4103
K-EPCN-154C MQ13-189-DR-4320-SS4104
K-EPCN-154C MQ13-189-DR-4330-SS4101
K-EPCN-154C MQ13-189-DR-4330-SS4102
K-EPCN-154C MQ13-189-DR-4330-SS4103
K-EPCN-154C MQ13-189-DR-4330-SS4104
K-EPCN-154C MQ13-189-DR-5110-SS4101
K-EPCN-154C MQ13-189-DR-5110-SS4102
K-EPCN-154C MQ13-189-DR-5110-SS4103
K-EPCN-154C MQ13-189-DR-5110-SS4104
K-EPCN-154C MQ13-189-DR-5210-CE4130
K-EPCN-154C MQ13-189-DR-5210-CO1006
K-EPCN-154C MQ13-189-DR-5210-CO1080
K-EPCN-154C MQ13-189-DR-5210-CO1081
K-EPCN-154C MQ13-189-DR-5210-CO1082
K-EPCN-154C MQ13-189-DR-5210-CO1083
K-EPCN-154C MQ13-189-DR-5210-CO1155
K-EPCN-154C MQ13-189-DR-5210-CO1156
K-EPCN-154C MQ13-189-DR-5210-CO1157
K-EPCN-154C MQ13-189-DR-5210-CO1158
K-EPCN-154C MQ13-189-DR-5210-CO1159
K-EPCN-154C MQ13-189-DR-5210-CO1160
K-EPCN-154C MQ13-189-DR-5210-CO1161
K-EPCN-154C MQ13-189-DR-5210-CO1162
K-EPCN-154C MQ13-189-DR-5210-CO1163
K-EPCN-154C MQ13-189-DR-5210-CO1164
K-EPCN-154C MQ13-189-DR-5210-CO1165
K-EPCN-154C MQ13-189-DR-5210-CO1285
K-EPCN-154C MQ13-189-DR-5210-CO1286
K-EPCN-154C MQ13-189-DR-5210-CO1287
K-EPCN-154C MQ13-189-DR-5210-CO1292
K-EPCN-154C MQ13-189-DR-5210-CO1293
K-EPCN-154C MQ13-189-DR-5210-CO1294
K-EPCN-154C MQ13-189-DR-5210-CO1295
K-EPCN-154C MQ13-189-DR-5210-CO1296
K-EPCN-154C MQ13-189-DR-5210-CO1297
K-EPCN-154C MQ13-189-DR-5210-CO1298
K-EPCN-154C MQ13-189-DR-5210-CO1299
K-EPCN-154C MQ13-189-DR-5210-CO1920
K-EPCN-154C MQ13-189-DR-5210-CO1921
K-EPCN-154C MQ13-189-DR-5210-CO1922
K-EPCN-154C MQ13-189-DR-5210-CO1923
K-EPCN-154C MQ13-189-DR-5210-CO1924
K-EPCN-154C MQ13-189-DR-5210-CO1925
K-EPCN-154C MQ13-189-DR-5210-CO1926
K-EPCN-154C MQ13-189-DR-5210-CO1927
K-EPCN-154C MQ13-189-DR-5210-CO1928
K-EPCN-154C MQ13-189-DR-5210-CO1929
K-EPCN-154C MQ13-189-DR-5210-CO1930
K-EPCN-154C MQ13-189-DR-5210-CO1931
K-EPCN-154C MQ13-189-DR-5210-CO1932
K-EPCN-154C MQ13-189-DR-5210-CO1933
K-EPCN-154C MQ13-189-DR-5210-CO1934
K-EPCN-154C MQ13-189-DR-5210-CO1936
K-EPCN-154C MQ13-189-DR-5210-CO1937
K-EPCN-154C MQ13-189-DR-5210-CO1938
K-EPCN-154C MQ13-189-DR-5210-CO1939
K-EPCN-154C MQ13-189-DR-5210-CO1940
K-EPCN-154C MQ13-189-DR-5210-CO1941
K-EPCN-154C MQ13-189-DR-5210-CO1942
K-EPCN-154C MQ13-189-DR-5210-CO1943
K-EPCN-154C MQ13-189-DR-5210-CO1944
K-EPCN-154C MQ13-189-DR-5210-CO1945
K-EPCN-154C MQ13-189-DR-5210-CO1946
K-EPCN-154C MQ13-189-DR-5210-CO1947
K-EPCN-154C MQ13-189-DR-5210-CO1948
K-EPCN-154C MQ13-189-DR-5210-CO1949
K-EPCN-154C MQ13-189-DR-5210-CO1950
K-EPCN-154C MQ13-189-DR-5210-CO1951
K-EPCN-154C MQ13-189-DR-5210-CO1952
K-EPCN-154C MQ13-189-DR-5210-CO1953
K-EPCN-154C MQ13-189-DR-5210-CO1959
K-EPCN-154C MQ13-189-DR-5210-CO1960
K-EPCN-154C MQ13-189-DR-5210-CO1961
K-EPCN-154C MQ13-189-DR-5210-CO1962
K-EPCN-154C MQ13-189-DR-5210-CO1963
K-EPCN-154C MQ13-189-DR-5210-CO1964
K-EPCN-154C MQ13-189-DR-5210-CO2000
K-EPCN-154C MQ13-189-DR-5210-CO2001
K-EPCN-154C MQ13-189-DR-5210-CO2003
K-EPCN-154C MQ13-189-DR-5210-CO2004
K-EPCN-154C MQ13-189-DR-5210-CO2005
K-EPCN-154C MQ13-189-DR-5210-CO2006
K-EPCN-154C MQ13-189-DR-5210-CO2007
K-EPCN-154C MQ13-189-DR-5210-CO2020
K-EPCN-154C MQ13-189-DR-5210-CO2021
K-EPCN-154C MQ13-189-DR-5210-CO2022
K-EPCN-154C MQ13-189-DR-5210-EE4021
K-EPCN-154C MQ13-189-DR-5210-EE4056
K-EPCN-154C MQ13-189-DR-5210-EE4109
K-EPCN-154C MQ13-189-DR-5210-EE4115
K-EPCN-154C MQ13-189-DR-5210-EE4117
K-EPCN-154C MQ13-189-DR-5210-EE4118
K-EPCN-154C MQ13-189-DR-5210-EE4135
K-EPCN-154C MQ13-189-DR-5210-EE4196
K-EPCN-154C MQ13-189-DR-5210-EE4197
K-EPCN-154C MQ13-189-DR-5210-EE4198
K-EPCN-154C MQ13-189-DR-5210-EE4199
K-EPCN-154C MQ13-189-DR-5210-EE4200
K-EPCN-154C MQ13-189-DR-5210-EE4346
K-EPCN-154C MQ13-189-DR-5210-EE4358
K-EPCN-154C MQ13-189-DR-5210-SS4028
K-EPCN-154C MQ13-189-DR-5210-SS4029
K-EPCN-154C MQ13-189-DR-5210-SS4030
K-EPCN-154C MQ13-189-DR-5210-SS4119
K-EPCN-154C MQ13-189-DR-5210-SS4120
K-EPCN-154C MQ13-189-DR-5210-SS4121
K-EPCN-154C MQ13-189-DR-6050-EE4322
K-EPCN-154C MQ13-189-DR-6050-EE4340
DESCRIPCIÓN
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTES LC2-1, L12-3, L12-2A Y L6-1 KM 0+000.00 A KM 0+089.67 Y KM 0+000.00 A K
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES LC1-4 Y LC1-5 KM 0+000.00 A KM 0+335.21
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES LC1-2 Y LC4-1 KM 0+000.00 A KM 0+187.77
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE LC5-1 KM 0+000.00 A KM 0+144.39
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTES LC7-1, LC7-2 Y LC7-3 KM 0+000.00 A KM 0+186.30 - KM 0+000.00 A KM 0+0
SOPORTE DE TRANSFORMADOR TIPO 0 - 10 KVA
OBRAS CIVILES TRANSFORMADOR 1000 KVA - DETALLE REFUERZOS - S.E. BARCAZAS
CERCO PERIMETRICO PARA S.E. EN PISO BARCAZAS
DETALLE DE DISPOSICION EN PISO DE TRANSFORMADOR 1000 KVA - S.E. BARCAZAS
MALLA DE TIERRA - TRANSFORMADOR 1000 KVA S.E. BARCAZAS
DETALLE DE MALLA DE PUESTA A TIERRA - TRANSFORMADOR 1000 KVA S.E. BARCAZAS
PLANTA GENERAL DE DISPOSICIÓN DE PARARRAYOS, ÁREA A PROTEGER Y PAT
DETALLE DE BANDEJAS PORTACABLES TIPO ESCALERILLA DE 300 MM ANCHO
PLANTA GENERAL - S.E. EN PISO ALIMENTACION BARCAZAS
CIMENTACIONES TIPO ZAPATA-COLUMNA TORRE TIPO T2+21
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-8 KM 0+000 A KM 0+181.89
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-7 KM 0+000 A KM 0+243.17
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT1-9, LT1-10 KM 0+000 A KM 0+19.48 / KM 0+000 A KM 0+51.85
PLANTA Y PERFIL CAMINO DE ACCESO A TORRES LT1 11 LT1 12 KM 0+000 A KM 0+117.996 KM 0+000 A KM 0+053.76
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-13 KM 0+000 A KM 0+484.65
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-14 KM 0+000 A KM 0+261.15
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-15 KM 0+000 A KM 0+267.77
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-16 KM 0+000 A KM 0+033.99
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-17 KM 0+000 A KM 0+133.37
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-18 KM 0+000 A KM 0+300.82
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT3-2 KM 0+000 A KM 0+208.49
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-19 KM 0+000 A KM 0+303.91
PLANTA Y PERFIL CAMINO DE ACCESO A TORRES LT1 20_LT3 1 KM 0+000 A KM0+099.55
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT3-3 KM 0+000 A KM 0+162.85
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT3-4 KM 0+000 A KM 0+083.07
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT3-5 KM 0+000 A KM 0+609.99
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT3-6 KM 0+000 A KM 1+206.5
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT3-7 KM 1+222 A KM 1+600
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES LT3-8 KM 1+600 A KM 1+937.03
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT3 9 KM 0+000.00 A KM 0+320.00
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT3 10 KM 0+320.00 A KM 0+962.16
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT2-2 KM 0+000 A KM 0+237.55
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT2 3 LT2 4 KM 0+000 A KM0+500
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT2-5, LT2-6, LT2-7 KM 0+500 A KM 0+988.76
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT4-1 KM 0+000.00 A KM 0+764.88
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT4 1 KM 0+000.00 A KM 0+764.88
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT4 4 KM 0+000.00 A KM 0+340.00
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT4 5 KM 0+340.00 A KM 0+780.73
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT4 2 KM 0+000.00 A KM 0+057.56
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-2 KM 0+000 A KM 0+227.43
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-3 KM 0+000 A KM 0+116.99
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-4 KM 0+000 A KM 0+178.57
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE LT1 5 KM 0+000 A KM 0+121.72
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE LT1-6 KM 0+000 A KM 0+048.87
DIAGRAMA UNIFILAR DE DISPOSICION DE LAS LINEA DE TRANSMISION 60KV
PLANTA Y PERFIL – CAMINO DE ACCESO A ESTRUCTURA 11 LINEA 4.16KV-KM 0+000.00 A KM 0+093.70
PLANTA Y PERFIL – CAMINOS DE ACCESO A ESTRUCTURAS 13.1 Y 13.2 LINEA 4.16KV-KM 0+000.00 A KM 0+068.996 - KM 0+00
PLANTA Y PERFIL - CAMINO DE ACCESO A ESTRUCTURA 15 LINEA 4.16KV-KM 0+000.00 A KM 0+071.26
PORTICO 60 KV - AGUAS ESTACION DREN - EXTENSION
PORTICO 60 KV - AGUAS ESTACION DREN - COLUMNA TRAMO 1
PORTICO 60 KV - AGUAS ESTACION DREN - COLUMNA TRAMO 2
PORTICO 60 KV - AGUAS ESTACION DREN - VIGA
PORTICO 60 KV - AGUAS ESTACION TORRES - EXTENSION
PORTICO 60 KV - AGUAS ESTACION TORRES - COLUMNA TRAMO 1
PORTICO 60 KV - AGUAS ESTACION TORRES - COLUMNA TRAMO 2
PORTICO 60 KV - AGUAS ESTACION TORRES - VIGA
PORTICO 60 KV - AGUAS ESTACION INTERMEDIA - EXTENSION
PORTICO 60 KV - AGUAS ESTACION INTERMEDIA - COLUMNA TRAMO 1
PORTICO 60 KV - AGUAS ESTACION INTERMEDIA - COLUMNA TRAMO 2
PORTICO 60 KV - AGUAS ESTACION INTERMEDIA - VIGA
PORTICO 60 KV S.E. PAPUJUNE - EXTENSION
PORTICO 60 KV S.E. PAPUJUNE -COLUMNA TRAMO 1
PORTICO 60 KV S.E. PAPUJUNE -COLUMNA TRAMO 2
PORTICO 60 KV S.E. PAPUJUNE - PLANO DE MONTAJE VIGA
OBRAS CIVILES TRANSFORMADOR 1 MVA – DETALLE DE POZA DE RECOLECCION DE ACEITE PRA - SALVEANI
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE 09
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE 22-21 KM 0+000 A KM 0+127.34-KM 0+000 A KM 0+46.80-KM 0+000 A KM 0
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L2-8 KM 0+000 A KM 0+328.61
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L1-9, L2-9 Y L6-9 KM 0+000 A KM 0+340
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L1-10, L2-10 Y L6-10 KM 0+000 A KM 0+328.61
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L7-17; KM 0+000 A KM 0+249.82
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L7-12, 13, 14, 15 Y 16 - KM 0+160 A KM 0+740
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L7-12, 13, 14, 15 Y 16 - KM 0+740 A KM 1+273.66
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L7-17; KM 0+000 A KM 0+249.82
PLANTA Y PERFIL CAMINO DE ACCESO A POSTE L7 18; KM 0+000 A KM 0+344.63
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L7 19 20 21; KM 0+000 A KM 0+187 /KM 0+000 A KM KM 0+644.56
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L7-22 - KM 0+000 A KM 614.91
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L7 23 24 KM 0+000 A KM 1+086.94
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L7 25; KM 0+000 A KM 0+137.73
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L7 26; KM 0+000 A KM 0+407.45
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L7 27; KM 0+000 A KM 0+271.26
PLANTA Y PERFIL CAMINO DE ACCESO A POSTE L8 14 KM 0+000 A KM 0+098.99
PLANTA Y PERFIL CAMINO DE ACCESO A POSTE L8 15 KM 0+000 A KM 0+094.26
PLANTA Y PERFIL CAMINO DE ACCESO A POSTE L8 16 KM 0+000 A KM 0+250
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L8-11A - 11B - 11C KM 0+000 A KM 0+167.53
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L8-19 KM 0+000 A KM 0+145.67
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L8-20, L7-28 KM 0+000 A KM 0+847.16 - KM 0+000 A KM 0+129.15
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L31-1 KM 0+000 A KM 0+061.02
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L31-2,3,4,5,6 KM 0+000 A KM 0+085.77 - KM 0+000 A KM 0+423.16
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L6-24, L8-1,2,3,4 KM 0+000 A KM 0+161.72 - KM 0+000 A KM 0+015.34 - KM
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L8-6,7 KM 0+000 A KM 0+490.95
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L8-8 KM 0+000 A KM 0+408.96
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L1-11, L2-11, L6-11 KM 0+000 A KM 0+420
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L1 11 L2 11 L6 11 KM 0+420 A KM 0+735.25
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L1 1213 Y L6 1213 KM 0+000 A KM 0+512.63
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L6 19 Y L1 17 KM 0+000 A KM 0+084.84 KM 0+000 A KM 0+068.78
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L6-23 KM 0+000 A KM 0+219.82
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L6-14 KM 0+000 A KM 0+241.40
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTES L6-15, 16 Y L1-14 KM 0+000 A KM 0+184.09
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE L7-27 KM 0+000 A KM 0+750
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE L7-27 KM 0+750 A KM 1+145.80
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L20-02 KM 0+000 A KM 0+117.62
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L20-01 KM 0+000 A KM 0+093.33
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L12-01 KM 0+000 A KM 0+039.41
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L12-02 KM 0+000 A KM 0+111.75
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L12-05 KM 0+000 A KM 0+106.70
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRE L121-02 KM 0+000 A KM 0+061.70
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRE L121-04 KM 0+000 A KM 0+107.10
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRE L6 11 KM 0+000 A KM 0+400
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRE L6 11 KM 0+400 A KM 0+667.62
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRES L1 11/L2 12 KM 0+000 A KM 0+142.72 / KM 0+000 A KM 0+095.09
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRE L8 17 KM 0+000 A KM 0+044
PLANTA Y PERFIL CAMINO DE ACCESO A TORRE L8 11 KM 0+000 A KM 0+146.41
PLANTA Y PERFIL CAMINO DE ACCESO A ESTRUCTURA L1 18 KM 0+000 A KM 0+081.46
PLANTA Y PERFIL CAMINO DE ACCESO A ESTRUCTURA L1 11 L2 12 L6 11 KM 0+000 A KM 0+668.98
PLANTA Y PERFIL CAMINO DE ACCESO A ESTRUCTURA L1 19 L1 21 L6 22 KM 0+000 A KM 0+326.37
PLANTA Y PERFIL CAMINO DE ACCESO A ESTRUCTURA L6 23 KM 0+000 A KM 0+125.54
PLANTA Y PERFIL CAMINO DE ACCESO A ESTRUCTURA L2 13 KM 0+000 A KM 0+103.66
INFORME POLIGONAL DE APOYO PARA REPLANTEO DE ESTRUCTURAS LT 60 KV LINEA L1 PAPUJUNE - S.E. INTERMEDIA
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES L6-11, L2-12 Y L2-13 KM 0+000 A KM 0+700.00
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRES L6-11, L2-12 Y L2-13 KM 0+700 A KM 1+565.16
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE L1-22 KM 0+000.00 A KM 0+975.82
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L14 1 Y L14 2 KM 0+000.00 A KM 0+097.50
PLANTA Y PERFIL CAMINO DE ACCESO A POSTES L14 3 Y L14 6 KM 0+000.00 A KM 0+405.87
PLANTA Y PERFIL – CAMINO DE ACCESO A TORRE L121-05 KM 0+000.00 A KM 0+749.64
PLANTA Y PERFIL – CAMINO DE ACCESO A BIPOSTE L12-04 KM 0+000.00 A KM 0+050.61
PLANTA Y PERFIL – CAMINO DE ACCESO A POSTE L12-6 KM 0+000.00 A KM 0+114.69
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L1-26, 27, 28, 29 Y 29A KM 0+000.00 A KM 0+388.69
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L7-1B, L7-1C Y L7-2 KM 0+000.00 A KM 0+276.56 - KM 0+000.00 A KM 0+038
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE L121-05 KM 0+000.00 A KM 0+163.53
PLANTA Y PERFIL - CAMINO DE ACCESO A TORRE L121-06 KM 0+000.00 A KM 0+135.53
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L5-04, L5-05 KM 0+000 A KM 0+048.61 / KM 0+000 A KM 0+040.30
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L5-06, L5-07 KM 0+000 A KM 0+196.22
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L5-08, L5-09 KM 0+000 A KM 0+397.48
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L5-09A KM 0+000 A KM 0+083.69
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L52-01, L55-02 KM 0+000 A KM 0+185.39
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L5-10 KM 0+000 A KM 0+190.88
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTE L5-12 KM 0+000 A KM 0+115.87
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L3-3, 4 Y 5 KM 0+000 A KM 0+133.91
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L3-6 Y 7 KM 0+000 A KM 0+282.55
PLANTA Y PERFIL - CAMINO DE ACCESO A POSTES L3-9 Y 11 KM 0+000 A KM 0+185.84
ARMADO DE ESTRUCTURA TERMINAL-TIPO HT(SIMPLE TERNA)
DETALLE DE AGUJEROS PARA POSTES – SIMPLE TERNA
PORTICO DE SEGURIDAD - CRUCE DE CAMINO PLANTA - MINA CON LT 138 KV
PORTICO DE SEGURIDAD - CRUCE DE CAMINO A DM1 CON LT 138 KV
PORTICO DE SEGURIDAD - CRUCE DE CAMINO A POZAS CON LT 138 KV
PORTICO DE SEGURIDAD - CRUCE DE CAMINO SALVEANI CON LT 138 KV
ARMADO DE S.E. POLVORIN Y ALMACENAMIENTO NITRATO
PLANTA Y PERFIL - LINEA 5210-LA-016/017
PLANTA Y PERFIL - LÍNEA 5210-LA-018
PLANTA Y PERFIL - LÍNEA 5210-LA-019
PLANTA Y PERFIL - LÍNEA 2830-LA-001
PLANTA Y PERFIL - LINEA 2830-LA-002
DERIVACION 5210-LA-001 / L1-24 / PA1-D
DERIVACION 2830-LA-002 / L1-27 / PA1-D
MONTAJE DE PÓRTICOS DE SEGURIDAD TIPO P3 PARA CRUCE DE CAMINOS
MONTAJE DE PÓRTICOS DE SEGURIDAD TIPO P4 Y P6 PARA CRUCE DE CAMINOS
MONTAJE DE PÓRTICOS DE SEGURIDAD TIPO P5 PARA CRUCE DE CAMINOS
PORTICO DE SEGURIDAD TIPO GIRATORIO - CRUCE DE CAMINOS CON LINEAS 22.9 KV
PORTICO DE SEGURIDAD TIPO GIRATORIO - CRUCE DE CAMINOS CON LINEAS 22.9 KV
TORRE TIPO TA- CRUCETA DE DERIVACION - ESTRUCTURA L1-7
DETALLE DE CONEXIÓN
ARMADO DE ESTRUCTURA TIPO PA3SEC (SIMPLE TERNA)
REV ESTATUS FECHA TMT IN
0 A 6/29/2021 22:55 Q1CO-K-EPCN-154C-T1655
0 A 26-Aug-2022 2:13:36 PM Q1CO-K-EPCN-154C-T2218
0 A 20-Aug-2021 5:03:51 PM Q1CO-K-EPCN-154C-T1796
0 A 26-Aug-2022 2:13:37 PM Q1CO-K-EPCN-154C-T2218
0 A 26-Aug-2022 2:13:38 PM Q1CO-K-EPCN-154C-T2218
0 D 3/13/2022 15:21 Q1CO-K-EPCN-154C-T1901
0 A 28-Apr-2022 3:00:39 PM Q1CO-K-EPCN-154C-T2126
0 A 5/17/2022 18:45 Q1CO-K-EPCN-154C-T2134
1 A 5/17/2022 18:45 Q1CO-K-EPCN-154C-T2134
0 A 28-Apr-2022 3:01:30 PM Q1CO-K-EPCN-154C-T2126
0 A 28-Apr-2022 3:02:04 PM Q1CO-K-EPCN-154C-T2126
0 A 5/21/2022 13:22 Q1CO-K-EPCN-154C-T2169
0 A 5/21/2022 13:22 Q1CO-K-EPCN-154C-T2169
0 A 5/17/2022 18:46 Q1CO-K-EPCN-154C-T2134
0 A 10/18/2021 22:42 Q1CO-K-EPCN-154C-T1901
0 A 11/4/2019 12:35 Q1CO-K-EPCN-154C-T596
0 A 11/4/2019 12:35 Q1CO-K-EPCN-154C-T596
0 A 11/4/2019 12:35 Q1CO-K-EPCN-154C-T596
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
1 A 15-Jan-2020 Q1CO-K-EPCN-154C-T831
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 11/12/2019 16:24 Q1CO-K-EPCN-154C-T638
0 A 23-Jan-2020 6:13:36 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:39 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:41 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:42 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:44 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:46 PM Q1CO-K-EPCN-154C-T852
0 A 18-Feb-20 Q1CO-K-EPCN-154C-T899
0 A 18-Feb-20 Q1CO-K-EPCN-154C-T899
2 AW 5/24/2021 1:16 Q1CO-K-EPCN-154C-T1567
1 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
1 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
0 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
0 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
0 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
0 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
0 A 4-Mar-20 Q1CO-K-EPCN-154C-T925
0 A 11/6/2020 12:56 Q1CO-K-EPCN-154C-T1193
0 A 11/6/2020 12:56 Q1CO-K-EPCN-154C-T1193
3 A 11/6/2020 12:56 Q1CO-K-EPCN-154C-T1193
0 A 11/27/2020 13:39 Q1CO-K-EPCN-154C-T1242
0 A 11/6/2020 12:56 Q1CO-K-EPCN-154C-T1193
0 A 10/16/2021 15:01 Q1CO-K-EPCN-154C-T1762
0 A 06-Dec-2021 2:58:36 PM Q1CO-K-EPCN-154C-T1962
0 A 06-Dec-2021 2:59:02 PM Q1CO-K-EPCN-154C-T1962
0 A 6/5/2022 21:20 Q1CO-K-EPCN-154C-T2124
1 A 10/9/2021 16:54 Q1CO-K-EPCN-154C-T1832
2 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1832
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1832
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1832
1 A 10/12/2021 1:13 Q1CO-K-EPCN-154C-T1882
2 A 10/12/2021 1:13 Q1CO-K-EPCN-154C-T1882
1 A 10/12/2021 1:13 Q1CO-K-EPCN-154C-T1882
1 A 10/12/2021 1:13 Q1CO-K-EPCN-154C-T1882
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1867
2 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1867
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1867
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1867
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1882
2 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1882
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1882
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1882
0 A 10/2/2021 16:51 Q1CO-K-EPCN-154C-T1784
1 A 15-Jul-19 Q1CO-K-EPCN-154C-T0314
0 A 6/17/2019 17:32 Q1CO-K-EPCN-154C-T229
0 A 6/17/2019 17:32 Q1CO-K-EPCN-154C-T229
0 A 6/17/2019 17:32 Q1CO-K-EPCN-154C-T229
0 A 6/17/2019 17:32 Q1CO-K-EPCN-154C-T229
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
1 A 14-Aug-2019 Q1CO-K-EPCN-154C-T406
1 A 8-Jul-19 Q1CO-K-EPCN-154C-T296
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
0 A 5/27/2019 19:15 Q1CO-K-EPCN-154C-T209
1 A 12-Aug-2019 Q1CO-K-EPCN-154C-T383
1 A 12-Aug-2019 Q1CO-K-EPCN-154C-T383
0 A 19-Jun-19 Q1CO-K-EPCN-154C-T258
1 A 19-Jul-19 Q1CO-K-EPCN-154C-T335
0 A 31-Jul-19 Q1CO-K-EPCN-154C-T368
0 A 31-Jul-19 Q1CO-K-EPCN-154C-T368
0 A 22-Jul-19 Q1CO-K-EPCN-154C-T336
0 A 22-Jul-19 Q1CO-K-EPCN-154C-T336
0 A 23-Jul-19 Q1CO-K-EPCN-154C-T347
0 A 23-Jul-19 Q1CO-K-EPCN-154C-T347
0 A 31-Jul-19 Q1CO-K-EPCN-154C-T368
0 A 8-Jul-19 Q1CO-K-EPCN-154C-T296
0 A 8-Jul-19 Q1CO-K-EPCN-154C-T296
0 A 8-Jul-19 Q1CO-K-EPCN-154C-T296
0 A 8-Jul-19 Q1CO-K-EPCN-154C-T296
0 A 8-Jul-19 Q1CO-K-EPCN-154C-T296
0 A 3-Oct-19 Q1CO-K-EPCN-154C-T526
0 A 3-Oct-19 Q1CO-K-EPCN-154C-T526
0 A 11/25/2019 11:23 Q1CO-K-EPCN-154C-T685
0 A 11/25/2019 11:23 Q1CO-K-EPCN-154C-T685
0 A 03-Dec-2019 1:45:13 PM Q1CO-K-EPCN-154C-T701
0 A 03-Dec-2019 1:45:14 PM Q1CO-K-EPCN-154C-T701
0 A 03-Dec-2019 1:45:16 PM Q1CO-K-EPCN-154C-T701
0 A 03-Dec-2019 1:45:17 PM Q1CO-K-EPCN-154C-T701
0 A 03-Dec-2019 1:45:19 PM Q1CO-K-EPCN-154C-T701
2 A 6/29/2021 22:55 Q1CO-K-EPCN-154C-T1654
1 A 16-Apr-2021 4:34:22 AM Q1CO-K-EPCN-154C-T1503
0 A 05-Dec-2019 Q1CO-K-EPCN-154C-T712
0 A 05-Dec-2019 Q1CO-K-EPCN-154C-T712
0 A 05-Dec-2019 Q1CO-K-EPCN-154C-T712
0 A 05-Dec-2019 Q1CO-K-EPCN-154C-T712
0 A 05-Dec-2019 Q1CO-K-EPCN-154C-T712
0 A 26-Dec-2019 2:52:57 PM Q1CO-K-EPCN-154C-T775
0 A 26-Dec-2019 2:53:24 PM Q1CO-K-EPCN-154C-T775
0 A 26-Dec-2019 2:53:48 PM Q1CO-K-EPCN-154C-T775
0 A 26-Dec-2019 2:54:15 PM Q1CO-K-EPCN-154C-T775
0 A 26-Dec-2019 2:54:38 PM Q1CO-K-EPCN-154C-T775
0 A 23-Jan-2020 6:13:55 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:57 PM Q1CO-K-EPCN-154C-T852
0 A 23-Jan-2020 6:13:59 PM Q1CO-K-EPCN-154C-T852
0 A 3/12/2020 13:16 Q1CO-K-EPCN-154C-T943
0 A 3/12/2020 13:16 Q1CO-K-EPCN-154C-T943
0 A 3/12/2020 13:16 Q1CO-K-EPCN-154C-T943
1 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1838
0 A 26-Aug-2022 2:13:43 PM Q1CO-K-EPCN-154C-T2229
0 A 6/29/2021 22:55 Q1CO-K-EPCN-154C-T1655
0 A 10/15/2021 2:05 Q1CO-K-EPCN-154C-T1841
0 A 26-Aug-2022 2:13:44 PM Q1CO-K-EPCN-154C-T2229
0 A 26-Aug-2022 2:13:45 PM Q1CO-K-EPCN-154C-T2229
0 A 26-Aug-2022 2:13:46 PM Q1CO-K-EPCN-154C-T2229
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 5-Nov-19 Q1CO-K-EPCN-154C-T609
0 A 11/25/2019 11:23 Q1CO-K-EPCN-154C-T685
0 A 11/25/2019 11:24 Q1CO-K-EPCN-154C-T685
0 A 11/25/2019 11:24 Q1CO-K-EPCN-154C-T685
1 A 7/3/2020 12:13 Q1CO-K-EPCN-154C-T1008
0 A 10-Jan-2020 Q1CO-K-EPCN-154C-T812
0 A 06-Aug-2021 11:35:56 PM Q1CO-K-EPCN-154C-T1781
0 A 06-Aug-2021 11:35:57 PM Q1CO-K-EPCN-154C-T1781
0 A 06-Aug-2021 11:35:57 PM Q1CO-K-EPCN-154C-T1781
0 A 06-Aug-2021 11:35:58 PM Q1CO-K-EPCN-154C-T1781
3 A 6/29/2021 22:55 Q1CO-K-EPCN-154C-T1633
0 D 11/23/2021 20:50 Q1CO-K-EPCN-154C-T1937
0 D 11/23/2021 20:50 Q1CO-K-EPCN-154C-T1937
0 D 11/23/2021 20:50 Q1CO-K-EPCN-154C-T1937
0 D 11/23/2021 20:50 Q1CO-K-EPCN-154C-T1937
0 D 11/23/2021 20:50 Q1CO-K-EPCN-154C-T1937
0 A 02-Dec-2021 10:00:09 PM Q1CO-K-EPCN-154C-T1948
0 A 02-Dec-2021 10:01:02 PM Q1CO-K-EPCN-154C-T1948
0 A 26-Aug-2022 2:13:47 PM Q1CO-K-EPCN-154C-T2197
0 A 26-Aug-2022 2:13:48 PM Q1CO-K-EPCN-154C-T2197
0 A 26-Aug-2022 2:13:48 PM Q1CO-K-EPCN-154C-T2197
0 A 10/18/2021 22:42 Q1CO-K-EPCN-154C-T1901
0 A 10/18/2021 22:42 Q1CO-K-EPCN-154C-T1901
0 A 10/18/2021 22:42 Q1CO-K-EPCN-154C-T1901
0 A 26-Aug-2022 2:13:49 PM Q1CO-K-EPCN-154C-T2229
0 A 3/11/2021 21:46 Q1CO-K-EPCN-154C-T1415
FECHA EN REV DE REVISADO POR FECHA
18-May-21 ING. SITE 18-May-21
9-Jul-22 ING 9-Jul-22
14-Aug-2021 ING. SITE 14-Aug-2021
9-Jul-22 ING 9-Jul-22
9-Jul-22 ING 9-Jul-22
16-Oct-21 ING 16-Oct-21
26-Apr-2022 ING 26-Apr-2022
30-Apr-2022 ING 30-Apr-2022
30-Apr-2022 ING 30-Apr-2022
26-Apr-2022 ING 26-Apr-2022
26-Apr-2022 ING 26-Apr-2022
20-May-22 ING 20-May-22
20-May-22 ING 20-May-22
30-Apr-2022 ING 30-Apr-2022
16-Oct-21 ING. SITE 16-Oct-21
4-Nov-19
4-Nov-19
4-Nov-19
12-Nov-19
15-Jan-2020
12-Nov-19
12-Nov-19
12-Nov-19
12-Nov-19
12-Nov-19
12-Nov-19
12-Nov-19
12-Nov-19
23-Jan-2020
23-Jan-2020
23-Jan-2020
23-Jan-2020
23-Jan-2020
23-Jan-2020
18-Feb-20
18-Feb-20
13-Apr-2021 ING. SITE 13-Apr-2021
4-Mar-20
4-Mar-20
4-Mar-20
4-Mar-20
4-Mar-20
4-Mar-20
4-Mar-20
4-Nov-20
4-Nov-20
4-Nov-20
25-Nov-20
4-Nov-20
28-Jul-21 ING. SITE 28-Jul-21
04-Dec-2021 ING. SITE 04-Dec-2021
04-Dec-2021 ING. SITE 04-Dec-2021
24-Apr-2022 ING 24-Apr-2022
10-Sep-2021 ING. SITE 10-Sep-2021
10-Sep-2021 ING. SITE 10-Sep-2021
10-Sep-2021 ING. SITE 10-Sep-2021
10-Sep-2021 ING. SITE 10-Sep-2021
4-Oct-21 ING. SITE 4-Oct-21
4-Oct-21 ING. SITE 4-Oct-21
4-Oct-21 ING. SITE 4-Oct-21
4-Oct-21 ING. SITE 4-Oct-21
25-Sep-2021 ING. SITE 25-Sep-2021
25-Sep-2021 ING. SITE 25-Sep-2021
25-Sep-2021 ING. SITE 25-Sep-2021
25-Sep-2021 ING. SITE 25-Sep-2021
4-Oct-21 ING. SITE 4-Oct-21
4-Oct-21 ING. SITE 4-Oct-21
4-Oct-21 ING. SITE 4-Oct-21
4-Oct-21 ING. SITE 4-Oct-21
06-Aug-2021 ING. SITE 06-Aug-2021
15-Jul-19
4-Jun-19
4-Jun-19
4-Jun-19
4-Jun-19
27-May-19
27-May-19
27-May-19
27-May-19
27-May-19
27-May-19
14-Aug-2019
8-Jul-19
27-May-19
27-May-19
27-May-19
12-Aug-2019
12-Aug-2019
19-Jun-19
19-Jul-19
31-Jul-19
31-Jul-19
22-Jul-19
22-Jul-19
23-Jul-19
23-Jul-19
31-Jul-19
8-Jul-19
8-Jul-19
8-Jul-19
8-Jul-19
8-Jul-19
3-Oct-19
3-Oct-19
25-Nov-19
25-Nov-19
30-Nov-19
30-Nov-19
30-Nov-19
03-Dec-2019
03-Dec-2019
18-May-21 ING. SITE 18-May-21
15-Mar-21 ING. SITE 15-Mar-21
05-Dec-2019
05-Dec-2019
05-Dec-2019
05-Dec-2019
05-Dec-2019
26-Dec-2019
26-Dec-2019
26-Dec-2019
26-Dec-2019
26-Dec-2019
23-Jan-2020
23-Jan-2020
23-Jan-2020
12-Mar-20
12-Mar-20
12-Mar-20
10-Sep-2021 ING. SITE 10-Sep-2021
29-Jul-22 ING 29-Jul-22
18-May-21 ING. SITE 18-May-21
11-Sep-2021 ING. SITE 11-Sep-2021
29-Jul-22 ING 29-Jul-22
29-Jul-22 ING 29-Jul-22
29-Jul-22 ING 29-Jul-22
5-Nov-19
5-Nov-19
5-Nov-19
5-Nov-19
5-Nov-19
5-Nov-19
5-Nov-19
25-Nov-19
25-Nov-19
25-Nov-19
3-Jul-20
10-Jan-2020
03-Aug-2021 ING. SITE 03-Aug-2021
03-Aug-2021 ING. SITE 03-Aug-2021
03-Aug-2021 ING. SITE 03-Aug-2021
03-Aug-2021 ING. SITE 03-Aug-2021
13-May-21 ING. SITE 13-May-21
18-Nov-21 ING. SITE 18-Nov-21
18-Nov-21 ING. SITE 18-Nov-21
18-Nov-21 ING. SITE 18-Nov-21
18-Nov-21 ING. SITE 18-Nov-21
18-Nov-21 ING. SITE 18-Nov-21
25-Nov-21 ING. SITE 25-Nov-21
25-Nov-21 ING. SITE 25-Nov-21
9-Jun-22 ING 9-Jun-22
9-Jun-22 ING 9-Jun-22
9-Jun-22 ING 9-Jun-22
16-Oct-21 ING. SITE 16-Oct-21
16-Oct-21 ING. SITE 16-Oct-21
16-Oct-21 ING. SITE 16-Oct-21
29-Jul-22 ING 29-Jul-22
2-Feb-21 11-Mar-21
TMT OUT FECHA
K-EPCN-154C-T-00324 29-Jun-21
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00349 20-Aug-2021
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00458 13-Mar-22
K-EPCN-154C-T-00486 28-Apr-2022
K-EPCN-154C-T-00498 17-May-22
K-EPCN-154C-T-00498 17-May-22
K-EPCN-154C-T-00486 28-Apr-2022
K-EPCN-154C-T-00486 28-Apr-2022
K-EPCN-154C-T-00501 21-May-22
K-EPCN-154C-T-00501 21-May-22
K-EPCN-154C-T-00498 17-May-22
K-EPCN-154C-T-00389 18-Oct-21
K-EPCN-154C-T-00115 4-Nov-19
K-EPCN-154C-T-00115 4-Nov-19
K-EPCN-154C-T-00115 4-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00160 15-Jan-2020
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00122 12-Nov-19
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00173 18-Feb-20
K-EPCN-154C-T-00173 18-Feb-20
K-EPCN-154C-T-00311 23-May-21
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00180 4-Mar-20
K-EPCN-154C-T-00226 6-Nov-20
K-EPCN-154C-T-00226 6-Nov-20
K-EPCN-154C-T-00226 6-Nov-20
K-EPCN-154C-T-00234 27-Nov-20
K-EPCN-154C-T-00226 6-Nov-20
K-EPCN-154C-T-00387 16-Oct-21
K-EPCN-154C-T-00411 06-Dec-2021
K-EPCN-154C-T-00411 06-Dec-2021
K-EPCN-154C-T-00512 5-Jun-22
K-EPCN-154C-T-00382 9-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00384 11-Oct-21
K-EPCN-154C-T-00384 11-Oct-21
K-EPCN-154C-T-00384 11-Oct-21
K-EPCN-154C-T-00384 11-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00378 2-Oct-21
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
F-Q1CO-SITE-T-02211 27-Aug-2019
K-EPCN-154C-T-00102 3-Oct-19
K-EPCN-154C-T-00102 3-Oct-19
K-EPCN-154C-T-00130 25-Nov-19
K-EPCN-154C-T-00130 25-Nov-19
K-EPCN-154C-T-00133 03-Dec-2019
K-EPCN-154C-T-00133 03-Dec-2019
K-EPCN-154C-T-00133 03-Dec-2019
K-EPCN-154C-T-00133 03-Dec-2019
K-EPCN-154C-T-00133 03-Dec-2019
K-EPCN-154C-T-00324 29-Jun-21
K-EPCN-154C-T-00294 15-Apr-2021
K-EPCN-154C-T-00135 05-Dec-2019
K-EPCN-154C-T-00135 05-Dec-2019
K-EPCN-154C-T-00135 05-Dec-2019
K-EPCN-154C-T-00135 05-Dec-2019
K-EPCN-154C-T-00135 05-Dec-2019
K-EPCN-154C-T-00150 26-Dec-2019
K-EPCN-154C-T-00150 26-Dec-2019
K-EPCN-154C-T-00150 26-Dec-2019
K-EPCN-154C-T-00150 26-Dec-2019
K-EPCN-154C-T-00150 26-Dec-2019
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00165 24-Jan-2020
K-EPCN-154C-T-00182 16-Mar-20
K-EPCN-154C-T-00182 16-Mar-20
K-EPCN-154C-T-00182 16-Mar-20
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00324 29-Jun-21
K-EPCN-154C-T-00386 14-Oct-21
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00116 5-Nov-19
K-EPCN-154C-T-00130 25-Nov-19
K-EPCN-154C-T-00130 25-Nov-19
K-EPCN-154C-T-00130 25-Nov-19
K-EPCN-154C-T-00210 8-Jul-20
K-EPCN-154C-T-00158 10-Jan-2020
K-EPCN-154C-T-00343 06-Aug-2021
K-EPCN-154C-T-00343 06-Aug-2021
K-EPCN-154C-T-00343 06-Aug-2021
K-EPCN-154C-T-00343 06-Aug-2021
K-EPCN-154C-T-00324 29-Jun-21
K-EPCN-154C-T-00405 23-Nov-21
K-EPCN-154C-T-00405 23-Nov-21
K-EPCN-154C-T-00405 23-Nov-21
K-EPCN-154C-T-00405 23-Nov-21
K-EPCN-154C-T-00405 23-Nov-21
K-EPCN-154C-T-00408 02-Dec-2021
K-EPCN-154C-T-00408 02-Dec-2021
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00389 18-Oct-21
K-EPCN-154C-T-00389 18-Oct-21
K-EPCN-154C-T-00389 18-Oct-21
K-EPCN-154C-T-00549 26-Aug-2022
K-EPCN-154C-T-00264 11-Mar-21