ISLAMABAD ELECTRIC SUPPLY COMPANY LIMITED

Phone No: 051-8481046 Office of Korang Sub Division


FAX______________________ IESCO, Rawalpindi.
Email: Sdokorang@yahoo.com Media Town, Block-D, Rawalpindi.

NO. 3492-98 / Kor. Dated: 17 /_10_/2022

MR MUHAMMAD SIKANDER ARSHED,


H NO 33, ST NO 5, BLOCK-C, SOWAN GARDEN, ISBD.
Contact No: 0333-5564447

Subject: NET METERING APPROVAL NO NMA/ 00470 /2022


Reference: Application Diary No. 470 Dated: 08-09-2022
Enclosed please find herewith “Net Metering Approval” granted by the
Operation Sub Division Korang IESCO to MR MUHAMMAD SIKANDER ARSHED for 9.720
KW photovoltaic solar based distributed Generation Facility located at H NO 33, ST NO 5,
BLOCK-C, SOWAN GARDEN, ISBD as per IESCO SOP / NEPRA (Alternative & Renewable
Energy) Distributed Generation and Net Metering Regulations, 2015.

D/A:
As Above
ASIF HAIDER
SUB DIVISIONAL OFFICER (OPR)
IESCO KORANG SUB DIVISION
RAWALPINDI

Copy To:
1- Chief Engineer (P&E) IESCO Islamabad for information please.
2- DG (IS/IT) IESCO Islamabad, He is directed to requested to direct the concerned
officer/ official to maintain the signed soft copy of “Net Metering-Approval” and
upload the same in IESCO website
3- SE (E) Cantt Circle IESCO Rawalpindi for information please.
4- Executive Engineer (E) Operation Cantt Division IESCO Rawalpindi for information
and N/A please.
5- Circle Manager (M&T) IESCO Rawalpindi for information & N/A please.
6- CSO (P) Cantt IESCO Rawalpindi for information please.
7- Committee Members / Test Inspector (P&I & M&T), IESCO Islamabad for
information please.
8- Net Metering File.
ISLAMABAD ELECTRIC SUPPLY COMPANY
GENARATION LICENCE
NO.NMA/ 00470 /2022

The SDO (E) Operation Sub Division Korang IESCO Islamabad is hereby grants Net
Metering Approval MR MUHAMMAD SIKANDER ARSHED for 9.720 KW photovoltaic solar
based Distributed generation facility having Reference No 12-14614 2202904 H NO 33, ST
NO 5, BLOCK-C, SOWAN GARDEN, ISBD under the National Electric Power Regulatory
Authority (Alternative & Renewable Energy) Distributed Generation and Net Metering
regulations, 2015 (the “A&RE Regulations”) for a period of Seven (07) years, this
Approval is valid up to 26-10-2029.
1- The Net Metering Approval Distributed Generator Shall abides by the
provisions under the A&RE Regulations during the currency of the Net Metering
Connection.
2- The Technical parameters of Net Metering arrangement are as under.

I. Primary Energy Source: Solar


II. Size of Distributed Generation Facility: 9.720 KW
III. Generator / Invertor Information:
Manufacture: JA SOLAR
Model No: MOD 10KTL3-X
IV. Vendor / Installer name: NABEEL AHMED
V. Generation Type: INVERTER
VI. Company Name UB SOLAR & SECURITY SOLUTIONS

3- The approval may be renewed subject to IESCO SOP / NEPRA Net


Metering Regulations.

ASIF HAIDER
SUB DIVISIONAL OFFICER (OPR)
IESCO KORANG SUB DIVISION
RAWALPINDI