MR Muhammad Sikander Arshed
MR Muhammad Sikander Arshed
D/A:
As Above
ASIF HAIDER
SUB DIVISIONAL OFFICER (OPR)
IESCO KORANG SUB DIVISION
RAWALPINDI
Copy To:
1- Chief Engineer (P&E) IESCO Islamabad for information please.
2- DG (IS/IT) IESCO Islamabad, He is directed to requested to direct the concerned
officer/ official to maintain the signed soft copy of “Net Metering-Approval” and
upload the same in IESCO website
3- SE (E) Cantt Circle IESCO Rawalpindi for information please.
4- Executive Engineer (E) Operation Cantt Division IESCO Rawalpindi for information
and N/A please.
5- Circle Manager (M&T) IESCO Rawalpindi for information & N/A please.
6- CSO (P) Cantt IESCO Rawalpindi for information please.
7- Committee Members / Test Inspector (P&I & M&T), IESCO Islamabad for
information please.
8- Net Metering File.
ISLAMABAD ELECTRIC SUPPLY COMPANY
GENARATION LICENCE
NO.NMA/ 00470 /2022
The SDO (E) Operation Sub Division Korang IESCO Islamabad is hereby grants Net
Metering Approval MR MUHAMMAD SIKANDER ARSHED for 9.720 KW photovoltaic solar
based Distributed generation facility having Reference No 12-14614 2202904 H NO 33, ST
NO 5, BLOCK-C, SOWAN GARDEN, ISBD under the National Electric Power Regulatory
Authority (Alternative & Renewable Energy) Distributed Generation and Net Metering
regulations, 2015 (the “A&RE Regulations”) for a period of Seven (07) years, this
Approval is valid up to 26-10-2029.
1- The Net Metering Approval Distributed Generator Shall abides by the
provisions under the A&RE Regulations during the currency of the Net Metering
Connection.
2- The Technical parameters of Net Metering arrangement are as under.
ASIF HAIDER
SUB DIVISIONAL OFFICER (OPR)
IESCO KORANG SUB DIVISION
RAWALPINDI