Institutional Assessment
For
ELECTRICAL
INSTALLATION AND
MAINTENANCE NC II
RATING SHEET
Evidence Plan
Competency Electrical Installation And Maintenance
standard: NC II
Unit of competency: Install Electrical Protective Devices For
Distribution, Power, Lighting, Auxiliary,
Lightning Protection And Grounding
Systems
Ways in which evidence will be
collected:
Demonstration
[tick the column]
&Questioning
Written Test
Portfolio
The evidence must show that the trainee
can…
4. At the end of the assessment, the assessor shall give you feedback
on the result of the assessment. The feedback shall indicate
whether you are:
a. Competent
Work area
Materials
Tools
Equipment
c. Competent
Hard Hat
Safety Shoes
Electrical Tape
Cover Plate
Switches
WORK AREA
DEMONSTRATION CHECKLIST
Electrical Date Developed: Document No.
Installation and
Issued by:
Maintenance October 2022 Page 8 of
NC II
Developed by: SPCMOI 22
Mr. George R.
Install Lighting Gultimo, LPT Revision # 01
Fixture and
Auxiliary Outlet
Student’s name:
Assessor name:
Competency Install Electrical Protective Devices For
Assessment: Distribution, Power, Lighting, Auxiliary,
Lightning Protection And Grounding Systems
Date of assessment:
Time of assessment:
Instructions for demonstration
Given the necessary tools, materials and equipment, the
trainee should be able to install electrical protective devices for
distribution, power, lighting, auxiliary, lightning protection and grounding
systems specific instruction within 3 hours:
Safety Questions
4. Can you manage safety electrical protection system?
Yes, I can handle
5. Do you use a hard hat when needed?
1. PEC provisions on
2(1,2) 2(3,5) 1 (4) 5(16.67%)
electrical protection system
3. Safety procedures in
installing electrical protection 2(1,4) 2(2,5) 1(3) 5(16.67%)
system
14(46.66%
TOTAL 10(33.34%) 6(20%) 30(100%)
)
Item Specification:
The institutional evaluation for Install Electrical Protective
Devices for Distribution, Power, Lighting, Auxiliary, Lightning
Protection and Grounding Systems, consists of multiple of choice
and identification test.
Multiple Choice 15
Identification 15
Total No. of Items 25
General Instructions:
1. Read the directions CAREFULLY.
2. DO NOT WRITE anything or TEAR this test questionnaire.
Write your answers on the answer sheet provided. Use
capital letter only.
3. Do not forget to write your name. STRICTLY NO ERASURE.
I. Multiple Choice. Instruction: Read each item or question carefully. Choose the
correct answer. Write the letter of your answer on the blanks provided before the
number.
3. Circuit Breakers are the most powerful devices in the system as they are
Joining
A. Nuisance Tripping
B. System processes
C. Break Trip
Switching
7. A safety switch detects the loss of power from the circuit and cuts the
seconds
attended by a ____________________.
Limit
Switching
Electrical Date Developed: Document No.
Installation and
October 2022 Issued by:
Maintenance
NC II Page 17 of
Developed by: SPCMOI
20
Install Lighting Mr. George R.
Gultimo, LPT Revision # 01
Fixture and Auxiliary
Outlet
11. A Conventional Lightning Rod (Spike Arrester) or lightning conductor is
a __________?
charges.
C. Earthing D. Arrester
metal rod made of Copper, GI, and SS, which is mounted on top of a
C. Earthing D. Arrester
C. Heading D. Rod
strikes.
C. Earthing D. Rod
installation and cut the power and mainly used in TT earthing systems.
2. It is a voltage operated circuit breaker. The device will function when the
5. These devices are no longer used due to its drawbacks like if the fault is
between live and a circuit earth, they will disconnect the supply.
7. This system is not permitted for conductors less than 10 mm2 or for
portable equipment.
8. From the first letter (I) it is clear that, in this type of IT system, neutral is
10. IT system is not really isolated from the earth, but is still linked to.
11. Those persons who are permitted to work on or near exposed energized
parts and are trained in the applicable electrical safe work practices.
available.
13. Nonconductive surfaces if they are used where the employee or the
ANSWER KEY
6. A
7. D
I.
8. C
1. D
9. A
2. B
10. A
3. C
11. A
4. D
12. A
5. B
Electrical Date Developed: Document No.
Installation and
October 2022 Issued by:
Maintenance
NC II Page 21 of
Developed by: SPCMOI
20
Install Lighting Mr. George R.
Gultimo, LPT Revision # 01
Fixture and Auxiliary
Outlet
13. A 5. Earth Leakage Circuit Breaker
(ELCB)
14. A
6. TN-S (Terre Neutral – Separate)
15. A
7. TN-C (Neutral Terre – Combined)
8. IT (Isolated Terre)
9. TT (Double Terre)
10. Zs impedance