BA01-19 Quotation

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
ae pS &F L 24% October, 2019 erg ou maton ‘Our ref: BAO1-19, The Permanent Secretary for Infrastructure & Transport Ministry of infrastructure and Transport Nasilivata House Samabula Suva Attention: Mr, Mikaele Belena Dear Sir, Re: Scheme No, BAO1-19: Electricity Supply to Trinesh Prasad’s Residence at Qerelevu, Ba, Greetings from Energy Fiji Limited (“EFL”). {refer to the email from Mr. Trinesh Prasad regarding the supply of electricity to his residence at Qerelevu, Ba, Energy Fiji Limited wishes to advise that the power supply will be made available under the following terms and conditions: 1.0 Cost of Capital Contribution The capital contribution for this scheme is $38,109.03 (VIP) and Energy Fiji Limited requires full payment to process the scheme further. 2.0 Formal Easement for Power-lines Extension Works ‘The proposed route of the extension requires wayleave clearance and therefore the applicant will be required to co-ordinate with our Wayleave Officers prior to the installation of our assets at the site. 3.0 Meter Connection Fee for Supply Connection ‘The applicant will be required to pay a meter connection fee before the electrical installation is connected to EFL’s electricity supply grid, Energy Fiji Limited will install prepaid electricity meter for the applicant under this scheme, ‘The above offer is valid for a period of twelve (12) months from the date of this letter. Energy Fiji Limited reserves the right to review the quote should there be a change in the proposed design arising from circumstances beyond its control, Please contact us on telephone 665 6434 or mobile 999 9242 should you require any further information relating to this scheme. Fast lcm CHIEF EXECUTIVE OFFICER Enclosed: Attachment 1; Preliminary Design with scope of work ‘Attachment 2; Project Cost for the scheme BAO1-19) Energy Fili Limited: Head Office 2 Marlow Street Private Mail Bag Suva Fiji Islands 1(679) 331 3333 F(679) 331 1882 [PRELIMINARY DESIGN LEGEND @ LVPOLE @ HvaLV POLE © Prop pote MOUNTED Tx @ wxsrine TRANSFOMER —— _=xISTING om conpUCTOR |—-—---PROPOSED O/H CONDUCTOR PROPOSED SKVA TX: oY 4 1 GROUND STAY — FLYSTAY WORK SCOPE 1. ERECT 10.2m POLE AT LOCATION MARKED 1, 2, 3, 5&6 2. ERECT 11m POLE AT LOCATION MARKED 4 3. INSTALL SKVA TRANSFORMER ON POLE MARKED 4 ‘4. UPGRADE POLE ATO 11m RC POLE 5. STRING 1 @ HV HELIUM CONDUCTOR FROM POLE MARKED A TO 4 VIA POLES MARKED B, 1, 2 AND 3 6. STRING 1 @ LV HELIUM CONDUCTOR FROM POLE MARKED 4 TO 6 VIA POLE MARKED 5 raw | wkanr oo ENERGY FIJI LIMITED t SCHEME NO: ELECTRICITY SUPPLY AT QERELEVU, 84 loooea) waar BA01-19 mn im Dave [DESIGN nary Fp iio Prec Coat Emote setae Ne aorta Cuntaton Date orocre customer Nan: Tie Prat ‘Scheme Nam coy Supply at aries Ba Coe Desarston ‘uinnty nt cot Line Tt Bean 1 IK OFF WITH FUSEILINK 1 au wou BPA 1 +1KV PINS DOUBLE xARM 1 ssa6 ssa Beaaia 1 PHASE 11KY SINGLE XARIM 2 ‘wos e073 BAKA 1 1TKV THROUGH STRAIN 1 40426 40426 BPA 1P 11KV TERM DOUBLE xan 1 2330 2330 BPA | PHASE LV THROUGH STRAIN 1 ares zeros PAO 1 PHASE LV TERM DOUBLE HARM 2 seat 661 0s HELIUM CONDUCTOR-T5.75um4 AAAC 1.00 va saseza BPAse ccRouNn STAY ‘ 2620 6516 Beas ruystay 1 sez saeiza snzs00 2AHTEXPULSION FUSE FAST 2 ry soe sees 10.2 concReTE PoLes A som soe seo, 1m Cone Pole 2 109786 365712 sozoss 24HTEXPULSION FUSE SLOW 2 ous sas BecuN Lines Consrvton Team ‘ v0.2 ase Becone (08M Team (Oveheee) 4 ose 202078 secns ect ispecton Team 1 6070 15078 ‘onset kVA Pole Trantomer ' +9086 1.90808 BeASTA SINGLE POLE RURAL TYPE STD : 220131 2201 ‘over 308 HRC FUSE 90407 BRUSH 1 288 206 RVERSTONE Rover Stone ‘ © 0 cour Eaulpren re ‘0 250 cane nest Cage +0 2.000 oot Engng dean Dramas 07 +0 9.95 oz Pann Re SUYIM ACO war 00 sora 003 anda admnitin 103 ‘0 a2 00s Condruton MangmSupren sa 100 sata Roo. Iovrtry anaperen wa ‘00 128 VEGETATION HEAVY Vogetton Managemen: Heavy 2 0 70 Mxtup Amount of 000% Var Aevet 8.0%) Toate nel VAT ‘Cutamar Corton (00%): so4sezan so00 ssueee 10809 End oue

You might also like