1 9th Llarch, 2019
Our ref: LAB26-18

The Permanent Secretary for lnfrastructure & Transport


Ministry of lnfrastructure and Transport
Nasitivata House
Samabuta
Swa

Attention: I\ r. ,rtikaete Belena

Dear Sir

Re: Scheme No .LAB 26-18: Electricity Supply to Vatudoya at Waiqele, Labasa.

Greetings from Energy Fiji Limited (EFL).

I refer to the apptication for the suppty of ete€tricity to Nagaiya's residence at Vatudova, Waiqele, Labasa.

Energy Fiji Limited vdshes to advise that the power suppty witt be made availab[e under the fottowing terms and
conditions:

'1.0 Cost of Capital Contribution

The capitat contribution for this scheme is S95.662.49rylPl.Energy Fiji Limited requires full pafnent to process
the scheme further.

2,O Formal Easement for Power-llnes E)(te]6lon Worts

The proposed route of the extension requires wayteave ctearance and therefore the appticant witt be required to
co-ordinate with our Wayteave Officers Prior to the instattation of our assets at tlE site.

3.0 Comunrer Sacurltv Deposit & ,l€ter Connectlon Fee for SuDDlY Connectlon

The appticant wilt be required to pay a meter connection fee before the etectrical instatlation is connected to the
EFL'S etectricity suppty grid. Energy Fiji Limited witl instatl a prepaid electricity meter for the appticant under this
scheme.

The above offer is valid for a period of tv,elve ('12) months from the date of this tetter. Energy Fiji Limited
reserves the right to review the quote shoutd there be a change in the proposed design arising from circumstances
beyond its controt.

Ptease contact us on tetephone 665 6434 or mobite 999 9242 stpuld you require any further information relating to
this scheme.

Yours faithfullv
zftu-j- t
-I/*-d".*"t
Bobby C Nalmatt/i
Actlng Chief ExecutiYe Officer

Enctosed: Attachment 1; Pretiminary Design with rope of \.tiork


Attachment 2; Project Cost for the scheme LAB26-18

Energy Fiji Limited: Head Office 2 itarlow Street Private Mail Bag Suva Fiji lstands T(679) 331 3333 F(679) 331 18E2
PRELIMINARY DESIGN
HV Rout6 l.flgth
LEGENDS
O PROPO!'D TRAN'fON ER

o
1J
;
a
o
IXISTING TnANSFORIIIEi

txltrl,G a
5lv IRAN'F.RMER - IRAN'FoRMER

*
'1, h,,
f@ ^"^"

b* *
4.
P6*,"'o
r P'", cr _de" lr
!i: "r -l
4t +"
fl;i* \,
ffiY
+ \*# * *.lr*
Y.
[. *
+ "(. +
\n'?
* \i *{r 4r
\^, J- b,n'
LOCALITY PLAN(NTS)

+t\;*fi
\,-"ff
u
--S- --dvs SCOPE OF WORK:
1, ERECT 11M POLE AT LOCATION MARKED 1].
i 4 ERECT 10.2POLESAT LOCAT|oN I ARKED tlpl tO 12 yt( UpZ,t/p3,t lp4,t tp5,1 ,2,3,4,5,6,7,8,9,10,11,12-
I
,1,
L TNSTALL 5kVA TRANsFOtul,rER AT POLE MARKED,B.
4.sTRING 10 HV HELIUM CONOUCTOR ON POLE MARKED
A,8,C, D, E, F, G, H,J, K,L,M, N, p,Q, R, S, t/pl, t/p2
,1p3,vp4,vp5,1,2,3,4,5,6,7 ,8,9,10,11 ,12,13.
5. DO VEGETATION MNAGEMENT.

No.
PRELIMINARY DESIGN

REVISION
28-06.18
DATE
SALVIN

DESIGN
CLIENT
SALVIN

PH:S966216
28,06-18

+
EFL
TITLE
ENERGY FIJI LIMITED
Supply to Vatudova, Waiqete

Labasa
SCALE
SCHEME NO:
LAB 26 -18

NTS
En€.gy Fiji Limii.d

Proied Cosi Esnmab

LAB 26.1E Ouotrtion OEie: 1go2J201g

ooE Sch€me N.me: Supply b Vauxrovr. Waiqclc - t b.r.

Co.b D€6.riplbn Ouantty Unit co6t Lin6 Total


l05a64L 1lm Concret€ Potes 1 't,697.56 1,697.56

t054651 10. 2m Concrlt! Pd.s 17 1.541.56 26.206,-52

t03965 HELIUM CONDUCTOR.T/3. 75MM AAAC 4.700 1.41 6.619.25

t0it361 5KVA 11KV24OV 10 PiUOUNTEO IX 1 1.944.E1 1,9216_61

B.PA.57A SINGTE POLE RURALTYPE STD 1 2,307-7 2,307.7

t01997 3OA HRC FUSE 3OHO7 ARUSH 2.e6 5.72

t02100 2A HT EXPULSION FUSE FAST I 8.9 E.9

1020E5 2A HT EXPULSION FUSE SLOW 1 E_68 8.68

&PA-58 GROUND STAY 10 228.15 22U_4A

&PA59 FLY STAY 1 1.358.4S r,356.45

105.t61 EM CONCRETE POLES .1 1,112.71 -t,112.71

l05a51L 1 1,576-2A 1,576.28

1P lTKV IOFF wlTH FUSE/LINK I 871-31 a7+31

1P 11KV THROUGH STRAIN 5 553.99 2,769.9/t

&PA-134 1P 11KV TERM DOUBLE XARM 5 314.96 1.574.E

&PA.12A 1P 11KV PINS DOUBLE XARM 6 410.85 2.465.0E

B.PA11A 1 PHASE 11KV SINGLE XARM 19 206.3 3.919.77

1027a3 M4O0 X M16 (16 X rE ) GALV 3.5 't 15.55

to27u M450 X Mr6 (18X y6 ) GALV IE 1.01 72.11

t02579 LT 75 PG ALU CLAMPS TO7 7/19SS 6 13.22 79.3

t062568 250mm x Dia-'19 Spacer Pip6 6 2.97 17_82

B.PCUN LINES GAN6 OAY 15 720_27 10.804.05

&PeoHc O&M OVERHEAD CABLE GANG 8 505.44 1,0!3.52

&PGINS ELECTRICAL/INSPECTION GANG 1 156.78 156.78

EOUIP Equipme Hir! 5o 100 5,000

RIVERSTONE River Slone EO

VEGETATION_HEAVY Veget lion Managemen! Heavy 10 360 3,6q)

POLEID Poie lD 1E 10 1E0

B.PA.O3A 1 PHASE LVTERM DOUBLE XqRM 1 197.19 197.19

CART lnlerna/ Cartage 19.5 100 1.9{9.E1

R0001 Engimg dsgn Dlawg3cls 10.99 100 r.098.7

R0002 hrdin Rte SVYM/L ACO 13.14 100 1,343.9

R0003 Financiil adninislration _7 100 69.9


R000a T.nder & Pocu€rnent cost 1.37 137.1

R0006 Constructon MengmusupNsn 37.81 100 3,780.5

R00r0 lnventory lranaf€menl ,u r00 84

347.753_75

Maftup Arnoulrt of 0.000, : t0.00

Vat Amount (9.0% , 37.898.74

TctC vdu€ lnd vAT : t95,552.49

Cusbm€. CoitihXirn (100%): 195.662-/19