Professional Documents
Culture Documents
Hong Kong Test Sample SOP
Hong Kong Test Sample SOP
standard process
1. Order material 2. Receive material
20 pairs amount material. Store H/K test materials separately.
Inform the suppliers the purpose of these materials.
Material order
x x
Cut out 3 areas from all materials and lab test
No hammering No sharp tool
x
Clean last Minimum cement
x
Cut all marked area and lab test
No hammering
9. Internal sample testing 10. Test in Gore lab
3.5 pairs. Send 1 pairs of shoes.
Half pair conduct Centrifuge Send shipping info to Gore lab.
(no need to send out this tested shoes).
3 pairs static waterproof test. (48 hours)
If fail, start from cutting.
Sample shipping