NOTES:

1. ALL DIMENSIONS ARE IN MM UNLESS SPECIFIED.


2. CABLE TRAY BRANCH ROUTING IS TENTATIVE SAME
TO BE ROUTED ACCORDINGLY AS PER SITE CONDITION.
3. GS FLAT RUN THROUGH OUT THE CABLE TRENCH FOR
EARTHING OF CABLE TRAY IN BOTH MAIN AND BRANCH
ROUTES SINGLE RUN25X3 GS FLAT WILL BE USED.
CONNECTION OF CABLE TRAY TO EARTH MAT WILL
BE PROVIDED AT EVERY 30M INTERVAL.
4. ORIENTATION OF EQP.SHALL BE VERIFIED WITH RESPECT
TO LAYOUT BEFORE CONTRACTION.
5. FOR CONTROL CABLE & POWER CABLE 50mm DIA PVC PIPE
SHALL BE USED.
6. ALL TRENCH SHALL BE BRICK TYPE AND SAME SHALL
BE SHOWN IN CIVIL DRAWINGS.
7. ALL HT CABLES SHALL BE BEND WITHIN MAX.
BENDING RADIUS i.e. 15xD BENDING IS ALLOWED.

1100

TCE.10297A-EL-VDT-37 16.05.2017

DEVELOPMENT OF 50 MW SOLAR POWER PLANT


AT PALWANCHA MINPUR TELANGANA(INDIA)

M/S DINKAR TECHNOLOGIES PVT. LTD.

KIRTI 16.05.2017
DEVELOPMENT OF 50 MW SOLAR POWER PLANT
AT PALWANCHA MINPUR TELANGANA(INDIA)

M/S DINKAR TECHNOLOGIES PVT. LTD.