7/17/22

MAS:Architectural Sustainability & Design 8


Date28.06.2022
rev07

Sustainable architecture Design8


NO. Month Week Date
Time Couse out line Time Couse out line
Introduction(Green Building :Guidebook for sustainalble
1 Feb 1 SAT 26 1:00-3:00 2 3:00-6:00 3 Introduce Highrise building
Architecture/Fundamentals of Sustainable Urban design)
Site selection & presentation, High rise building design concept idea
2 2 SAT 5 1:00-3:00 2 Fundamentals of Sustainable Urban Design 3:00-6:00 3
presentation
3 March 3 SAT 12 1:00-3:00 2 Sustainable design (24) [assigment01:Green building sample] 3:00-6:00 3 Site analysis and diagram concept
4 4 SAT 19 1:00-3:00 2 Assigment(rating system),Casbee rating sample,woven city 3:00-6:00 3 Concept diagram,draft modeling,sketch)
5 5 SAT 26 1:00-3:00 2 B1 Sustainable design(25-47) [assigment02 : Building rating] 3:00-6:00 3 Design check(draft facade,modeling, draft floor layout,etc)
6 6 SAT 2 1:00-3:00 2 B2 Conscientious handling of Resources (50) 3:00-6:00 3 Design check(draft facade,modeling, draft floor layout,etc)
7 7 SAT 9 1:00-3:00 2 Design,construction,commissioning and Monitoring for green building 3:00-6:00 3 Design check(draft facade,modeling, draft floor layout,etc)
8 SAT 16 1:00-3:00 Khmer new year 3:00-6:00 Khmer new year
April
9 8 SAT 23 1:00-3:00 2 C1: Building 3:00-6:00 3 Design check(draft facade,modeling, draft floor layout,etc)

10 9 SAT 30 1:00-3:00 2 Building material debate,review on C1: Building [assigment03 : Building envenlop] 3:00-6:00 3 Draft presentation board A0 submission

11 10 SAT 7 1:00-3:00 2 C2:Building service Engineering 3:00-6:00 3 Modeling making ,3D rendering,Architectural design,Structural,MEP
12 11 SUN 8 1:00-3:00 2 C3: Comssioning 3:00-6:00 3 Modeling making ,3D rendering,Architectural design,Structural,MEP
13 12 SAT 14 1:00-3:00 2 C4:Monitoring 3:00-6:00 3 Modeling making ,3D rendering,Architectural design,Structural,MEP
14 May 13 SUN 15 1:00-3:00 2 [Assigment04: Building material] 3:00-6:00 3 Modeling making ,3D rendering,Architectural design,Structural,MEP

15 SAT 21 Permit

16 SAT 28 Permit
World sustainable Cities /Assigment05 [Walkable city,how to make Phnom penh
18 14 SAT 11 1:00-3:00 2 3:00-6:00 3 Drawings(Floors plan,sections,elevation,3D perspectives)
to be more walkable] [Assigment 5 : Walakable city]
D:A closer look-Green building in detail ,D1: Dockland Building in Hamburge
20 15 SAT 18 1:00-3:00 2 (146)/D2: Soka Building in Wiesbaden/D3&D4: SKS Tuebingen,LBBW Stuttgart 3:00-6:00 3 Drawings(Floors plan,sections,elevation,3D perspectives)
[Assigment05: Selecting Building Design ]
22 16 SAT 25 1:00-3:00 2 D5: The Art Museum in Stuggard (172) 3:00-6:00 3 A0 boards 2 pages( programs,Drawings,3D rendering,Model)

23 17 SAT 2 1:00-3:00 2 D6:European investment bank(EIB) in luxembourge(178) 3:00-6:00 3 Recheck A0 Board

July 19 SAT 9 1:00-3:00 2 D8: Dr Byen, Copenhangen (190) 3:00-6:00 3 Final Presentation A0 Boards

20 SUN 10 1:00-3:00 2 D9: D&S Advance Building Technologies Building,Stuttgart (196) 3:00-6:00 3 Final board recheck

20 SAT 10 16 2 Assigment submission 3:00-6:00 3 Update A0 Board & file Submission

Note:This schedule is subject to be changed