Ref: PF-10/E&C/SAH/22/963
Date: 18" October 2022
Mr. Moharram Salem
General Manager
M/s: Elegancia Kitchens Equipment Trading & Maintenance W.L.L. (the
“Contractor”
National Address: The Eighteen Tower, Bui
P.O. Box 201184
Lusail City, State of Qatar
ing No. 325, Street 303, Zone 69,
Tel: (+974) 4429 2200
Fax: (+974) 4429 2244
Email: m.salem@eleganciagroup.com
PROJECT: THE PEARL ISLAND
SUBJECT: CP/30-1: DESIGN AND BUILD OF CENTRAL PRODUCTION UNIT
(CPU), AT PARCEL 17 (UNITS 392 & 393) OF PORTO ARABIA
PRECINCTS AT THE PEARL ISLAND
REP CLAUSE 2,1,7- DRAFT BASELINE SCHEDULE FOR REVIEW
AND COMMENTS
Dear Mr. Salem,
With reference to your letter ref. EHGEN-EDTC-UDC-LET-22-0075/CPU dated is
October 2022 and received on 16th October 2022 regarding the baseline schedule,
we regret to inform you that the above schedule is rejected and our
comments/findings on the schedule are attached herewith for your reference and
action.
The Contractor shall revise and resubmit incorporating all our comments and in
compliance with the contract and project requirements within three (3) working days
upon receipt of this letter.
It is worthy of note that the Contractor will be solely responsible for any negative
impact on the project performance and/or timely completion due to delays and non-
finalization of baseline schedule.
This is for your information and immediate action
Yours faithfully,
For UNITED. DEVELOPMENT COMPANY Q.P.S.C.
‘Sulaiman Al-Hail
Engineering & Construction Director
rE sygag | GRSESle: | Reuter .
os Ts Sa cower Ma Penlicane | SppyeteacutanatasyastUris
Encl: - Observation and comments sheet
CC: Mr. Mohammad Badran, Executive Director Operations, UDC
Mr, Mohamad Kobeissi, Project Manager, E&C, UDC
sm aetsee a cosentes | MRERstee
Ole) 25S | ORES | secmmeseJactage: Jp30-: cenTRAL PRODUCTION UNIT 392 and UNIT 393 at Parcel
loocument Reference Number & Tle cra0-.UeHGEN-€OTC UOC 22.075.CPU- Da asaine Schedule or Review snd Comments Dated 35.302022
locs Ret. No. lvoc-exc oo
ste oF review: lssocez2
[ASSESSMENT CODES:
la= Appeoved. (Consuitant/ Contractor may proceed)
| ine ftloming document(s) have been reviewed andar retuned with [®*APBr0ved with Comments (Conments shal be actioned to achieve Status before contruction wlan)
Meoraeyefoedanerat pearls iaaiaet [c= Revise & Resubmit. (Resubmission requir)
a eaeecnanemenrsee Jo=Rejacted (New Submission Requires)
le= For information Only
eee ae a ls per the panning kick off meeting held on th October 2022 the Contractor was required to submit the comprehensive planning |g
a eae ewe eee aaa Package on 10th October 2022. However, the Contractor submitted draft schedule on 15th October 2022
[re contractor to provide full baseine pogramme narrative repor that dscuss comprehensive strategy and to discuss and to
nude the following tems
sexecutve eumman-todecus cope of work and what the contractual milestones sang other things
+Executionsrategy Genera strategy of execution. Number of teams tobe utlized,
2 | usc |eosoa.uer- | we bewaleranotencuncsionsou amar Si pl a a a
To ube | Gao Le ENGEN ROTC VDE TOOTS. ‘Ganenat [We have noticed the programme has substantial lags Tor sore adviles: The contador to lnk ose avian. Oy
31 UbC [C303 LETENGEN-EOTC UOC 22-0075-CFU. ‘Genera ro spit the Kickoff meeting inthe design Milestones. Of
[Contactor to inl in the submission the following chars
22] voc |coz0..terensen-tore-uoc-2.0075-cru Seneral |-Progress Surv showing pln cumulative Versus progress percentage. The wl be updated on weekly bass on
+Manpower histogram [Direct & Indirect showing plan mangewer versus actual per week and pr month,
fhe contractor to ensure that each Construction activity should have at leat folowing predecessors
+Associted Shop Drawings Review and approval activity,
23 | voc |coz0..Lerencen-core-unc-2.0075-chu ene Associated method statement Review and approval activ on
sAsiocited Mater delivery actvty,
associated constuction work activity.
Te Ube [ePSo- LET ENGEN ETC UDC TROIS OU ‘General [organization char tobe included in the abr. oA
35 | uoc —erb0-1.ETENGEN-EDTC-UDC 22 0075-chU" ‘Gene Rsk register tobe provided identifying ll major risks and riigntion pan an
te | woe lerao-1uerencen core voc 22.0075 cru ‘ceneral regan be rer ee (poe on a eng wth poring oa rno Te on
Tr | Ube — [eran LENGE EDT UDC ROOTS ‘General [The Contractor to refer LOA for Contract Agreement Signature Gate oA
18 | — voc |cpa01..eeHGEN-€0TC U0C-22-0075-cPU_ ‘General [Design Curation, As per PTC #7: Tender programme the overall duration ofthe Dag eG) Gays on
39”| oc |cos02LerenGeN-e0Tc ubc 22.0075-CPU_ General Procurement i missngin the Milestones 0
20 | ud 30:1: LETEHGEN-EOTC-UDC-72-0075-CPU_ General [Mobiization starts dates 27 Noverber 2022, Te Conracor to revit or datfy 0
21 ube —[ePa0-1LET-EHGEN-€OTC-UDC-22.0075-CPU- General [Demobization is missing rm
22] upc —[er30-1 LET ENGEN-EDTC-UDC 22 0075-CPU. ‘General Project Plansand Project Pernt missing 0A,
23 | — uc |cpa0.3.UeT-eHGEN-€OTC UDC-22-0075-¢PU General Provision of insurances, Perormance Bond tere not neladed om,
ve | une lersoaterencen-eore-uoe-2007s cou General sv A Biss ravings or Cet To it te eave AS Bursaries aus on Gen hws eA | gy
B_| Ube | Gao LETENGeN-eOTC UDC TOOTS. CFU Enginenng [Design o be under Engineering WHS Weghtage of Design to Be 10% A
26_|_UdC 30: LET-ENGEN-EOTC UOC 22-0075-CFU_ Engineering [Design calculation Submision of Calculations along with the Desig drawings shoul be mentioned oR
[Oct & 2 tobe removed from the programme,
a7 | uc |ceso.-Ler-nsen-eore-voe-22-0075-cPU, Engineering on
[The Contractor to vein he dorations othe Engineer review
28 | voc |cez0..ter-encen-eorc-u0e-22.0075-cPU. [cient design review Given duration of 3 days for Cent review and approval of Desig snot log. Minimum review duration sé | 08
lye
Review Gyles 2 Cys of review al be adapted fora subnitalsuch os Design, Shop Graig, MAR, Prequaation As bale
[erawings and Method statements as follows:
-Preparaton bythe contracor(Using Calendar o 6 ys)
23 | voc ferso.sterencenceorcuoc22.007-cPu engineering and Procurement) ets 'unt acura sent os son) on
incorporation of Engineer's commentsUsing calendar of 6 dys)
+ Engineer's fa evew Using Calendar of $day)
30 | voc |erso-.er-eHcen-eorc-unc-22-c07s-chu Engineering and Procurement] Structural drawing & submittals misting in Engineering on
PaRETef231 [UOC [CP30-14LET-fHGEN-EOTCUDC-2-0075.°U Procurement [Toidenfy the long ee tems inthe schedule om
32 [une _[cr20-11eT-eHGeN-eDTC-UDc-2.0075.650 Procurement [To identify the Cl Works Matas and delves for snidpated Gv Works under Conarotion 0A,
33 [une —[era0-1L67-EHGEN-€TC-UDC-72.0075.5U Procurement [Procurement As per PTC #7: Tender programme: the overall duration of the Procurement 90 days 0A,
34 [ube era0-FLFT-enGeN-z0TC-U0c-22-0075.C50 Procurement |Prequaiation was considered only for MEP and metl works, What about others? Of
35 | une fevzo-.irr-encen-eore-uoe-22-075-cPu rroaranan [CRO UEC or srod oYWiRSOTFAT/SHT PG, ii ST on
several Actives are missing sucha Suspended Flor System, Glass Patton system, Meta ladding/Specal surface Finishing,
[cubces, Wooden Doors, Gass Doors, Aluminium Doors & Windows, Stee stl Kitchen Cabinet & countertop, Fir Stopping
Ivateral,
36 | voc |coz0-.Ler-encen-eorc-uoc-22.0075-chu construction MANET mooie velted aces on
[cctv sytem. standalone MS system Et and Emergency Lighting System. Structured Cabling, OATA and Telecom. tracing and
[connectivity with applicable Author ten, UDC-TPO Control Center, ase bul ling systems ec Stel Ladder.
37] uae — [eran eT ERGEN-EDTCUDEOOTSOPU ‘Consrocion [Roof Werks missing oy
'38_| upc —[crs0-1.E7-EHGEN-EDTC UDC 22.0075-CPU ‘Construction [Elevator missing oN
39 | voc coso-1.er-eHcen-eorc-voc-22.0075.crU Construction _|the Contactorhas considered Ground lor 35 part of her scope inthe programme.the contractor to dary on
ao 00s [ers EnGEN EDT UDC OTS CU ‘Construction fire Protection required for API] AuRhoriy Raving Jurado): Anal site ining oy
“a1 ube [€P30-1 LET-EHGEN-£DTC-UDC-22-0075.C°U | Teng & Commissioning [Final texting of electra system (Power shouldbe completed prior to ark MEP T&C actus fuch a6 OT HVACTEC cy
: ‘authors approvat [THE Author Inspection & Approvals" WAS to rove up before “Preliminaries! WBS a
25] voc | jorao-acr-enceh-eoro-uca2o0rs-cPU) normies Approval | wring inspection by Kahramaa isnot required. The contractor tobe removed from the authority approval
[ube | Fao eT EHGEN EDTE OE TD DOTE CHU “uthorities Approval —|weqood approval to baad in the WAS "Authors Inspection & Appeava™ my
rsa be _]or30-1-FT-EHGEN-£0TC-UDC-22-0075.CPU Project Close Out |The contractor to breakdown the As bul drawings based on floor levels 08
[oisngitersin Project closeout & Randover (System wise)
+"Spare parts and asset repistr
spore parts material handover
as | unc |crz0..ter-naen-eorc-upe-22.0075-cPu Project Close Out | swarrantes and Guaantes on
-asintenance sehedule
trainings and Haning-ove Reports
-keys Handover
as | oc ferso-1.er-encen-