Camp Condor Extend Grab N Go

A.) Connecting Both CHU


1.) Preparation for Constructing a Floor between two Containers to creat a Single Unit
2.) Installation of 2x4 tubular steel Chassis
B.) Clearing
1.) Remove the 3 Doors
2.) Remove the 4 window type a/c Unit
3.) Dissembling the wall part indicated from the drawings
4.) Removed Entire Sub Floor and Floorings

need to prioritize which one of the 2 containers to be done earlier for transition of All equipment from existing
C.) Installation- Grab N Go to Proceed replacement of their subfloor

Installation of New Columns to Support structural components to construct of additionsl roof of make a single Unit Construction of both
1.) Additional Walling to Connect the both Unit
Installation of Plumbing Pipelines to Connect from the Existing Water Supply and Water Heater for the Preparation of Transpering the
2.) Equipment of Existing Grab and Go to renovate the Floorings
3.) Closing the removed doors and A/c Unit
4.) Installation for the Replacement of Sub Flooring and Tiling
5.) Constructing of Double Doors for Equipment Acces

6.) Installation of Flooring for the new Construct floor between the two chu and Construct of New Roof and Ceiling to make 1 single Unit
7.) Connecting from the Main Power Supply to Panel board and Rewirings of all electrical Cable
8.) Installation of New 1 ton A/C Unit and Install of 2 new Air Curtain
9.) Installation of All receptacles /Switches/Lights/Bug Zupper
10.) Grouting of Tiles and Installing of Pvc Skirting
11.) Finishing one of the CHU Unit for Preparing and transferring of all Equipment from the existing Grab N Go

D Existing Grab N Go
1.) Removed all Sub Floor and Florring
2.) Cleaning and Priming for exisitng Chassis
3.) Laying 3/4 Plywood
4.) Laying Cement Board
5.) Tiling
7.) Removing and Clearing all tools and cleaning the surroundings of the Job Site for the Complete Turn Over