0 Revision No. 00
z
<
E-4
r:Ij SAUDI ELECTRICITY COMPANY
r:Ij Engineering Drawings Standard (SEEDS)
For Preparation, Processing & Managing Transmission
Drawings/Documents
Cl)
Z z
0
1-1 u;
5
w
c:: z
0
GUIDELINES RELATED TO
<
i=
Q. DRAWINGS/DOCUMENTS PREPARATION
a:
c..>
Cl) AND CONTROL
w
c

Z
1-1

Z
1-1 PROPRIETARY INFORMATION

Q) This document contains proprietary information developed by and for exclusive use of Saudi
1ii
c Electricity Company. Your acceptance of the document is an acknowledgement that it must be
Z
used for the identified purpose/application and during the period indicated. It cannot be used or
copied for any other purposes nor released to others without prior written authorization of Saudi
Electricity Company. Saudi Electricity Company will not be responsible for misuse and/or
c:i ...... N <">
Z misapplication, and any harm resulting therefrom. Saudi Electricity Company also reserves the
right to take any necessary actions to protect its interest against unauthorized use.

I I r:Ij ,
APPROVEDBY

Engr. Abdullah M. AI-Garni


Engr. Saleh N. AI-Sohaibani
Department Manager, Executive Director,
Transmission Standards &
Engineering & Projects
Specifications
Date of Approval: April 29, 2009

SEEDS-I-OO Page No. 1 of 22


SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

TABLE OF CONTENTS

1. SCOPE.

2. DEFINITIONS.

3. SOW/TS, CONCEPTUAL DRAWING & PLANT NUMBERS.

4. QUALITY ASSURANCE/CONTROL OF SOW/TS & CONCEPTUAL


DRAWINGS.

5. REPRODUCTION OF SOW/TS PACKAGES TO ALL USERS.

6. SAFE RETENTION OR CUSTODIAN OF STANDARDS AND


SPECIFICATIONS FOR SEC ORGANIZATION.

7. ISSUANCE OF SEC STANDARDS & SPECIFICATIONS TO CONTRACTORS,


ENGINEERING CONSULTANTS, BIDDERS AND EXTERNAL AGENCIES,

8. ALLOCATION OF ENGINEERING DRAWING & PLANT NUMBERS TO


TURNKEY PROJECTS.

9. ALLOCATION OF STANDARD DRAWING NUMBERS.

10. ENGINEERING DRAWINGS/DOCUMENTS /MANUALS

11. QUALITY ASSURANCE /CONTROL OF NEW AND EXISTING DESIGN,


CONSTRUCTION DRAWINGS/ DOCUMENTS/MANUALS.

12. APPROVAL/CERTIFICATION OF DESIGN, CONSTRUCTION & AS-BUILT


DRAWINGS/DOCUMENTS/MANUALS AND PERMANENT ARCHIVAL
(ELECTRONICALLY) IN EDMS.

13. TS&SD/TDMD MAJOR RESPONSIBILITIES.

14. TS&SD/TDMD OTHER RESPONSIBILITIES.

15. APPLICABLE DOCUMENTS

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 2 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

1. SCOPE

This document describes the activities, responsibilities and services provided by Document
Management Group of TS&SD/TDMD. It also establishes the guidelines and procedure for
the preparation and control of documents for end user. This standard shall be read in
conjuction with SEC Engineerings Drawings Standard - II (SEEDS-II).

Document Management Group is an integral part of TS&SD/TDMD and responsible for


implementation of SEEDS-I.

2. DEFINITIONS

2.1 Abbreviations and Letter Symbols:


These shall be used where physical space prevents complete spellings as in title
blocks and in small drawings. Abbreviations shall only be used when absolutely
necessary and never be used when the meaning is to be clear. SEC standard
Abbreviations and Letter Symbols shall be used to maintain consistency within the
SEC documents.

2.2 CADD Drawings:


Engineering Drawings generated electronically using software approved by SEC as
its standard medium for development and permanent retention.

2.3 CADD Standard Manual:


The tool that provides a unique method to apply the SEC CADD Standard Tools
Manual User Guide.

2.4 CAD Operator(s):


The Design, Construction and Engineering Consultants, CAD Operators;
Manufacturers; Vendors; Government Agencies; and other similar organizations,
having a contractual relationship or a prospective contractual relationship with SEC
that may receive drawings from, or generate drawings for SEC. Assistant CAD
Operators shall also be considered as CAD Operators.

2.5 Design Agency:


Refers to any SEC organization Assistant Engineering Consultant, CAD Operator or
Draftsman charged by SEC with the responsibility of developing and/or modifying
of SEC Engineering Drawings/Documents.

2.6 Drawing Name:


File system name of the Engineering Drawing in a standard SEC format. The name
format is used when transferring drawings to or from EDMS (TS&SD/TDMD).

2.7 Drawing Number:


An arrangement of eight alpha/numeric characters (prefix + size + “-” + number)
used to provide the unique identity for individual Engineering Drawings.

2.8 E&DD (Engineering & Design Divisions in All Operating Areas) of E&DD
(Engineering & Design Department):

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 3 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

Refers to the organization that handles engineering, design and procurement of SEC
transmission projects.

2.9 EDMS (Enterprise Drawing Management System):


Refers to the set of software installed and well-established application on the SEC-
CADD System and SEC-Intranet which controls the creation, revision, workflow and
archival of As-built Drawings/Documents/Manuals and Specifications/Standards etc.
It provides tools to manage above effectively in a secured and friendly environment.

2.10 Engineering Activity Drawing:


As used throughout in this procedure, is a document produced on an approved SEC
engineering form, by SEC (or for SEC by approved sources) which bears a SEC
engineering drawing number and which is prepared for the purpose of identifying
engineering related information to be used for the design construction, operation or
maintenance of a SEC Substation/Transmission and Facilities.

2.11 Proponent:
Department of SEC organization charged with the overall responsibilities of
initiation of projects/facility, maintenance, safety and protection of a SEC facility,
equipment or property.

2.12 End Users:


Departments of SEC Organization charged with the overall responsibility of taking
over the built facility for safe retention , reliable operation and maintenance.

2.13 SOW/TS
Scope of Work and Technical Specifications.

2.14 SEC:
Saudi Electricity Company.

2.15 SEEDS:
Saudi Electricity Company Engineering Drawing Standards.

2.16 Standard Drawings:


Specially prepared engineering drawings that have been pre-approved by responsible
SEC organization for mandatory application in the design of SEC facilities.The
information they contain is applicable and has appropriate during design. The
production of a Standard Drawing follows the normal production requirements
presented in this separate Standard Drawings.

2.17 TDMD (Transmission Document Management Division) of TS&SD


(Transmission Standards & Specifications Department):
Authorized to operate Company CADD and EDMS (Enterprises Drawing
Management System) equipment hardware and software for the development or
revision of engineering drawings. It has overall control of the SEC drawings
database, revision number assignments, and original drawings. TDMD is the
Proponent for Transmission Sector. TS&SD/TDMD is located in Room 1-200West,
Saudi Electricity Company, Eastern Region Administration Office, Dammam.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 4 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

2.18 Title Block:


The reserved portion of a drawing containing information about the drawing projects
of Substation/Transmission, Facilities, Communication & Others.

2.19 User:
The SEC organization department, which creates, controls and/or contracts
engineering, procurement and/or construction work to outside CAD Operator is the
User. If there is no separate User organization, the Proponent is the User.

3. SOW/TS, CONCEPTUAL DRAWING & PLANT NUMBERS

TS&SD/TDMD issue SOW/TS, conceptual drawing and plant number for the purpose of
development of new project when the End User submits the request.

An estimated block of SOW/TS, Plant and drawing numbers for any project shall be
obtained electronically by log in to TS&SD/TDMD web page, click here. (see Appendix R)

4. QUALITY ASSURANCE /CONTROL OF SOW/TS & CONCEPTUAL DRAWINGS

TS&SD/TDMD shall verify quality of SOW/TS & conceptual drawings prior to final
acceptance.

TS&SD/TDMD shall make archives for all the original SOW/TS packages and their
electronic files for proper records and future references.

5. REPRODUCTION OF SOW/TS PACKAGES TO USER

Upon the request from the user, TS&SD/TDMD shall provide hard and soft copy(ies) of
SOW/TS packages.

6. SAFE RETENTION OR CUSTODIAN OF STANDARDS & SPECIFICATIONS FOR


SEC ORGANIZATION

TS&SD/TDMD is responsible for issuance of the latest SEC Standards & Technical
Specifications to the requestor.

7. ISSUANCE OF SEC STANDARDS & SPECIFICATIONS TO CONTRACTORS,


ENGINEERING CONSULTANTS, BIDDERS AND EXTERNAL AGENCIES

Based on the request, TS&SD/TDMD shall issue the SEC Standards & Material
Specifications in CD. The requestor shall deposit the required amount to the bank and
produce bank documents while collecting the CD.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 5 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

8. ALLOCATION OF ENGINEERING DRAWING & PLANT NUMBERS TO


TURNKEY PROJECTS

TS&SD/TDMD shall allocate an estimated block of drawings numbers for any project when
the user submits the request as per SEEDS-II.

These are considered to be all the drawings prepared for a specific Turnkey Project whether
they are for the design, construction or for procurement.

8.1 Drawings Sheet Quality and Lettering

8.1.1 All Project Engineering Drawings/Documents provided to TS&SD/TDMD


in the form of soft copy.

8.1.2 All Project Engineering drawings shall be prepared in capital letters in


English language with 3mm x 2.5mm letters on A and B size sheets and
2.5mm x 2mm letters on C, D and E size sheets.

8.1.3 All Project Engineering drawings A to E size shall be prepared in


MicroStation Latest version ONLY. CADD format and submitted to
TS&SD/TDMD Offices in concern respective Operating Areas.

8.1.4 All Project Engineering drawings shall be created using the latest version of
SEEDS software (Guide lines related to Drawings/Documents Preparation
& Control by TS&SD/TDMD).

8.1.4.1 All disciplines symbology table-1 (Appendix - L).


8.1.4.2 Electrical one line diagram symbology table-2 (Appendix - M).
8.1.4.3 Graphic symbols Electrical & Electronic Diagrams(IEEE Std.
315)
8.1.4.4 Communication Symbols (SES-T-011)

8.1.5 SEC color pen-table & boarder sample shall be received from
TS&SD/TDMD with SEC standard setting.

8.1.6 All Project Engineering drawings save setting shall be as per SEC standard.

8.2 Drawing Numbers Request

An estimated block of drawings numbers for any project (as agreed on by the Project
Manager or Project Engineer and CAD Operator) shall be obtained by submitting
SEC form no. 15367 (Appendix-K) to TS&SD/TDMD Office in concern respective
Operating Areas OR login to TS&SD/TDMD Web Site, for details click here (see
Appendix S)

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 6 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

8.3 Drawing Control Sheet

8.3.1 The Drawing Control Sheet shall be prepared listing details of all As-Built
Engineering Drawings required for a particular project, listed by index and
drawing numbers in sequence.

8.3.2 The Drawing Control Sheet shall be prepared and submitted in Excel
format. SEC form no. 16758 (Appendix-H).

8.3.3 The first drawing number from the allocated block of drawing numbers
shall be assigned to the Drawing Control Sheet (If only one location).

8.3.4 More than one locations in one project allocated block of drawing numbers
can be broken-up as per locations and then be assigned the first drawing
number from the break-up block.

8.3.5 The Drawing Control sheet Number shall be mentioned on all drawings
sheets in the reference drawings area.

8.3.6 Drawing Control Sheet shall be prepared separately for each location.

8.3.7 Documents and Manuals required for a particular project shall be


mentioned in the last sheet.

8.3.8 Vendor reference drawing number can be entered in remarks column.

8.4 Drawing Numbering System

All Project Engineering drawings shall consist of the following elements (in the
order they appear):

JOB/CONT.No. INDEX PLANT No. DWG No. SHEET No. REV.


No.
1234567 P DA123 EA-123456 04 of 05 00

8.4.1 Prefix letters C, E, S and W indicate SEC Operating Areas.

C - For Central Operating Area drawings.


E - For Eastern Operating Area drawings.
S - For Southern Operating Area drawings.
W - For Western Operating Area drawings.

8.4.2 Drawing Sheet Size

Second letter following prefix letter indicates the sheet size, as follows:

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 7 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

A - Size sheet, 711 x 1016mm or (28 x 40 in.).


B - Size sheet, 508 x 711 mm or (20 x 28 in.).
C - Size sheet, 356 x 508 mm or (14 x 20 in.).
D - Size sheet, 279 x 432 mm or (11 x 17 in.).
E - Size sheet, 211 x 297 mm or (8.27 x 11.69 in.).

No sheet sizes differing from these listed shall be used on any Turnkey
Project under any circumstances.

Example-I E A - 123456

Prefix (Region code) Drawing No.


Size of drawing

8.4.3 Drawing Number

A six (6) digit identifying a drawing number shall be assigned from the
allocated block of numbers.

8.4.4 Drawing Revision

For Final Projects Drawings (as-built) submitted to TS&SD/TDMD shall


have zero revision (Existing drawings shall be with next higher revisions).

8.4.5 Drawing Sheet Number

A drawing sheet number shall be indicated whenever a drawing consists of


more than one sheet, e.g., Sheet 01 of 05, 02 of 05, etc. (All sheets shall
have the same title, index, plant no. and sheet size).

8.4.6 Drawing Plant Numbers

8.4.6.1 Five-character code indicating a facility, process or system.


Plant codes are maintained by TS&SD/TDMD and determine
SEC geographic area, and Plant Title. The Geographical Map
with all SEC proposed plant number as shown is attached for
ready reference. The plant numbers for Kingdom wide
Transmission System location should be used on all drawings.

8.4.6.2 Plant numbers are two alphabet (upper case) and three numeric
characters in length.

Example-I : (RD123) RD indicates plant or facility in


Riyadh area and 123 is numeric numbers assign
for plant or facility location.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 8 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

Example-II : (JD123) JD indicates plant or facility in Jeddah


area and 123 is numeric numbers assign for
plant or facility location.

Example-III : (DA123) DA indicates plant or facility in


Dammam area and 123 is numeric numbers
assign for plant or facility location.

Example-IV : (AS123) AS indicates plant or facility in Asir


area and 123 is numeric numbers assign for
plant or facility location.

8.4.6.3 Only one Plant Number shall be assigned to an Engineering


Drawing.

Exception : More than one plant number may be allowed under


certain circumstances.

Example : When the drawing contains interrelated


information for more than one plant: continuation
of transmission lines, interface points, jumpers, tie-
in points etc and all such plants fall under the
responsibility of the same operating organization.

8.4.6.4 Drawings requiring more than one Plant Number shall be


approved by the Division Manager of TS&SD/TDMD.

8.4.6.5 When an Engineering Drawing is typical for more than one


plant, then a separate drawing shall be produced for each plant
(Substations, Transmission lines…..etc.) with other new
drawing number.

8.4.6.6 While changing the plant number of an existing drawing, revise


the drawings that involve changing the plant number and plant
description in the title block and state in the revision description
CHANGED PLANT NO. FROM XXXXX TO XXXXX along
with As-built revision, if any.

8.4.7 Drawing Index

8.4.7.1 The Drawing Index is a single character in the range of A to Z


(excluding I and O). For complete listing, refer to standard
drawing TSE-036001 Rev. 04. (Appendix-N).

8.4.7.2 The Index is shown on Engineering Drawings in the title block.


A maximum of three index letters are acceptable on a drawing,
arranged by order of importance The Drawing Index Letter shall
be correctly selected in accordance with the main subject of the
drawing. If drawing shows details of Power and Civil work.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 9 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

Example-I : Index A/P for Plan and profile.


(Underground or overhead transmission line).

Example-II : Index P/Q for power and civil work.

Example-III : Index A/P/T for Plan and profile.


(Underground or overhead transmission line
and telecommunication work).

8.4.7.3 The Index implies, but does not determine, a group of associated
types.

8.5 Drawing Title

Details in the Title block of the drawings should be “Tag Values” instead of plain
text wherever there is a text, which denotes reference of another drawing like “Refer
Drawing No.”Tag Values” should be used instead of plain text. (Appendix-D).

The title shall be prepared in the following order:

First line for Subject of the Drawing.


Second line for Service or Equipment.
Third line for Project Title.
Fourth line for Project Location.

EXAMPLE - I: : PLAN AND PROFILE


380kV OVERHEAD TRANSMISSION LINE
FROM GHAZLAN P/P TO 380/230 kV GHUNAN SUBSTATION
GHAZLAN-GHUNAN SAUDI
ARABIA

EXAMPLE - II: EQUIPMENT LAYOUT


: CONTROL AND SWITCHGEAR BUILDING
AL-NUZHA 115/13.8kV SUBSTATION
AL-HASA SAUDI
ARABIA

8.6 Reference Drawings, Legend and Notes

Reference drawings Legend and Notes shall be placed in the area provided above the
title block. Reference drawings listed shall be the necessary minimum engineering
drawings only. Do not include Plant or Index reference of the referred drawings nor
Standard Drawings. (Appendix-D).

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 10 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

8.7 Scale

8.7.1 Graphic Scale, a line scale reference shall be included on both new and
existing drawing just above the title block on scale drawings. The line
scale shall be divided into units of length as determined by the scale of the
drawing. Refer to SECS-Auto for a list of graphic scales symbols.

8.7.2 The SEEDS files and attached borders are created at 1:1 scale. Seed file
scale should not be changed at all.

8.7.3 Scale symbols shall match the border scale.

8.7.4 For scaled drawings, use the auto-dimensioning command where applicable
and don’t drop it.

8.7.5 Drawings should not be scaled down instead, rearrange the drawing or split
the drawing into two drawings as needed.

8.7.6 The setting of all SEC border files are set at (Global Origin) GO=0,0. This
GO is defined at the left bottom corner of the border. Changes are not
allowed in the GO setting for all drawing types including scaled drawings.

8.7.7 The scale chosen for a drawing depends on the size of the drawing sheet
and the size of the object to be depicted. The scale shall be large enough to
permit easy and clear interpretation. Details that is too small for clear
dimensioning in the main view(s) shall be shown in a separate view to a
larger scale.

8.7.8 General drawings shall be made to a scale compatible with any anticipated
reduction of the drawing such that legibility is maintained.

8.7.9 The scale is the ratio of the linear dimension of an element of an object as
represented in the original drawing, to the real linear dimension of the same
element of the object itself.

8.7.10 Drawings may be produced to various scales, dependent upon the nature of
the drawing concerned. An enlargement scale is where the ratio is greater
than 1:1 Full size is indicated by 1 : 1 enlargement by X : 1 and reduction
by 1 : X Where it is necessary to use more than one scale on a drawing,
each scale shall be clearly identified.

8.8 Drafting Requirements

8.8.1 All existing drawings (raster files) shall be revised and redrawn in an
electronic format utilizing Microstation Latest version ONLY, if required
for new project with higher revision.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 11 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

8.8.2 Existing Drawing Control Sheet shall be retyped and submitted in Excel
format (latest version). SEC form no. 16758 (Appendix-H) if required for
new project with the next higher revision.

8.8.3 Existing drawings shall be utilized for any modification of a


facility. Creation of new drawings to indicate a change in an existing
facility will not be accepted. If, however, this is unavoidable for some
reasons such as being too crowded or major revision changes, then a new
sheet shall be added to the existing drawing.

8.8.4 New drawings that are created as a continuation of an existing design are
considered as continuation drawings of that design bearing the next
sequential (numeric) sheet number of that drawing set.

8.8.5 When revising an existing drawing, the incorrect information on the title
block including substation/transmission/facilities description and drawing
type shall be corrected or completed.

8.8.6 Revision diamonds 01 shall be placed in the drawing area in such a


way as to make it possible to locate revisions quickly.

8.8.7 Old revision diamonds, clouds and related notes shall be removed from the
drawing.

8.8.8 If a drawing is completely redrawn, the words completely redrawn and


incorporated revisions (indicate the revision number incorporated) shall be
entered in the description column in the revision area above the title block.

8.8.9 When revising some pages of bulk drawings that have a single electronic
file of the complete set such as scope of work, the revision block of only
first sheet shall indicate the changes and revision number change. Complete
set shall be submitted.

8.8.10 The standard north arrow symbol shall be drawn in a prominent place in the
upper left side of the drawing for all plan view drawings. It shall be drawn
pointing upward, or if unavoidable, pointing left, but shall never point right
or down.

8.8.11 Information covered by Standard Drawings, elaborated details, unnecessary


views, repetitions and information outside the border must be deleted.

8.8.12 Non-essential items from design, which add nothing to the accuracy,
completeness and clarity of the drawing, shall be eliminated.

8.8.13 Any shading element is not allowed on drawings. Hatching may be used as
an alternative to shading. (Minimum 2mm distance is required between
hatching lines).

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 12 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

8.8.14 Revisions on drawings may be encircled or clouded on the prescribed layer


for easy identification of the revised portion during certification and review
cycle. However, for 100% As-Built drawings, all revision encirclement or
clouding shall be removed prior to submitting the drawings to
TS&SD/TDMD.

8.8.15 The letter O and I shall not be used for identification symbols on the
drawings, as they are often confused with Zero and One.

8.8.16 Text on drawings shall always be upper case.

8.8.17 SEC or Consultant or Manufacturer CAD Operator should not use their
company’s LOGO in the SEC Engineering drawings and in drawing control
sheet. SEC or Consultants or Manufacturer should use the reserved place
in the title block for their Company LOGO. (Appendix-D).

8.8.18 CAD Operator can place manufacturer drawing number or vendor drawing
number in left side lower corner. (Appendix-D).

9. ALLOCATION OF STANDARD DRAWING NUMBERS

The responsibilities for allocation of Standard Drawings Numbers is with TDMD in


coordination with concerned Division Managers of TS&SD. The sequence of Standard
Drawings numbers already issued should be continued in line with the Guidelines (SEEDS).

TS&D/TDMD issues standard drawing numbers for the development of Standard drawings.
Request from the proponent, TS&SD/TDMD is entertained and accordingly the standard
drawings nubmers are issued.

10. ENGINEERING DRAWINGS/DOCUMENTS /MANUALS

TS&SD/TDMD provides engineering drawings/documents/manuals based on request from


User as mentioned in SEEDS-II.

11. QUALITY ASSURANCE/CONTROL OF NEW AND EXISTING ENGINEERING,


CONSTRUCTION DRAWINGS/ DOCUMENTS/MANUALS

After final submission of design drawings/documents/manuals, TS&SD/TDMD shall be


responsible for quality checking based on SEC standard guidelines which is specified in the
SEEDS-II.

12. APPROVAL/CERTIFICATION OF DESIGN, CONSTRUCTION & AS-BUILT


DRAWINGS/DOCUMENTS/MANUALS AND PERMANENT ARCHIVAL
(ELECTRONICALLY) IN EDMS

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 13 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

When approved, certified and dated as required by SEEDS-II project final design
drawings/documents/manuals (soft copy) are submitted to TS&SD/TDMD for filing.
Document Management Group verified the Approval/Certification information on each
drawing.

EDMS Administrator of TS&SD/TDMD certifies all soft copy of final project documents
and issues the final acceptance certificate for suitability of drawings/documents files format
as compatible and acceptable for uploading in Enterprises Drawing Management System
(EDMS).

Keep archive for all original submittal documents (electronic files) for future reference.

12.1 Submittal

All SEC new, revised, updated cancelled and superseded Engineering Drawings shall
be submitted to the corporate Enterprises Drawing Management System (EDMS) for
permanent retention and management.

12.1.1 Deliverables

When submitting drawings to TS&SD/TDMD, the following shall be


delivered depending on the type of submittal:

12.1.1.1 Manual Submittal

* Completed Original Form No. 15057 (Appendix -F).


* Drawing Control Sheet. Form No. 16758 (Appendix-H).
* Electronic Drawing/document/manual files (On CD).

12.1.1.2 Interactive Submittal

* Completed Original Form No. 15057 (Appendix -F).


* Drawing Control Sheet. Form No. 16758 (Appendix-H).
* Generated list of processed drawings.

12.1.2 Electronic Drawing File

12.1.2.1 Data compression is not to be used on submitted files.

12.2.1.2 MicroStation files shall have naming format as follows:

EA123456.0001.0000.dgn
E is the Prefix letter, second letter A is the size of drawing,
123456 is the 6-digit drawing number, .0001 is the sheet number
and .0000 is the revision number.

12.2.2.3 Microsoft Excel/Word/Acrobat (PDF) files shall have a naming


format as follows:

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 14 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

Excel - EE123456.0001.0000.exls.
Word - EE123456.0001.0000.doc.
Acrobat - EE123456.0001.0000.pdf.

E is the Prefix letter, second letter E is the size of drawing,


123456 is the 6-digit drawing number, X or W or P the file type
(Excel or Word or Acrobat PDF), .0001 is the sheet number and
.0000 is the revision number.

12.2 CAD Operator's Responsibilities for Preparation and Production of


Engineering Drawings

12.2.1 Prepare engineering drawings in an electronic format utilizing MicroStation


Latest version ONLY, Microsoft Excel or Microsoft Word or Acrobat
PDF (conceptual, PTS, E size) as per the requirements of SEC.

12.2.2 Prepare the engineering drawings using the latest version of SEC CADD
Standards Manual User Guide provided by the Transmission Document
Management Division (TDMD).

12.2.3 Prepare and submit all engineering drawings in accordance with SEC
CADD Standards Manual User Guide.

12.2.4 Ensure to fill the box beneath the title block to indicate the file format type
i.e. VECTOR, EXCEL or WORD.

12.2.5 Ensure that every new drawing is prepared using the latest version of the
border from the CADD Standards Manual User Guide.

12.2.6 Ensure that each existing drawing is revised/redrawn electronically and


carried the higher version of the existing border that includes
Approval/Certification Information While revising an existing drawing the
old border can be replaced by the latest version.

12.2.7 Request engineering drawing numbers and other engineering data as


described in SEC CADD Standards Manual User Guide to use with project
detail engineering drawings.

12.2.8 Request existing design drawings and revise these as per requirement of the
project.

12.2.9 Return all unused data and drawing numbers to SEC at the completion of
the project.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 15 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

12.3 Instructions

12.3.1 Engineering Drawings/Documents Data

12.3.1.1 The User is accountable for all Engineering


Drawings/Documents Data and drawing numbers transferred to
the User's custody. The User shall ensure that Engineering
Drawings/Documents Data is protected against loss,
unauthorized disclosure, modification, reproduction and
destruction. Users are not required to log drawing transfers
except for Originals and Duplicate Originals.

12.3.1.2 The User shall ensure that only the needed amount of original
and duplicate original Engineering Drawing Data, to efficiently
perform the specified work, shall be transferred out of SEC to
the CAD Operator.

12.3.1.3 The User and the CAD Operator shall restrict the number of
copies, duplicate reproducible, and reference prints made of
Engineering Drawing Data on the basis of need-to-know only.
Shredding beyond recognition immediately when no longer
required shall destroy all such documents.

12.3.1.4 The CAD Operator is responsible for the safety, security and
confidentiality of all Engineering Drawing Data generated for
all SEC Projects. This includes all data generated, including the
manner in which Engineering Drawing Data are put into hard
copy form such as printing and/or plotting of drawings. Work
will be done in the same secured environment as where the
computer workstations are located.

12.3.2 Transmittals

12.3.2.1 All Engineering Drawings/Documents Data shall be formally


transferred using the appropriate forms available with Document
Management Group.

12.3.2.2 Pickup or delivery of Engineering Drawings/Documents Data


shall be accomplished by the requester of such data or by a
courier, or any other secure delivery system, authorized by the
User (such as a courier service organization) or SEC internal
mail system. Transfer of custody by any other mail system shall
be avoided.

12.3.2.3 Electronic transfer of Un-encrypted Engineering


Drawings/Documents Data is permissible only where secure
electronic delivery is assured. Where Engineering
Drawings/Documents Data shall be transferred via unsecured
lines, files shall be encrypted and encryption keys shall be

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 16 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

exchanged via an alternate communications method.


Unauthorized copying and/or transmittal of files are strictly
prohibited. Voilation of the rules will be dealt as per Company
establised system.

12.3.3 Minimum Security Requirements

12.3.3.1 The area(s) where Engineering Drawings/Documents Data are


handled and stored shall be inaccessible to unauthorized
personnel at all the times. All main entrances shall be controlled
with an access control system. Emergency exits shall be
equipped with security alarms that shall sound whenever the
unauthorized exit shall be used. User’s department manager
shall approve exception to this requirement prior to its
implementation for Engineering Drawings/Documents Data to
be removed from the secured areas for the purpose of cross
checking, design reviews, etc., prior written approvals shall be
acquired from the User. Furthermore, during the time such
Engineering Data is outside the secured area, it shall be kept in
locked cabinets during non-working hours. All visitors shall be
escorted.

12.3.3.2 User Department shall designate a custodian to receive the


original and duplicate original drawings and to assume
responsibility for their safety, security and confidentiality. The
custodian shall be responsible for limiting and logging the
access to these original and duplicate original drawings on a
need-to-know basis and advising other personnel on the security
procedures. This custodian and designated alternate(s) shall be
responsible for tracking all Engineering Drawings/Documents
Data requested by, or in the custody of, the CAD Operator.

12.3.3.3 All unwanted hard and electronic copies of Engineering


Drawings/Documents Data shall be returned to TS&SD/TDMD.

12.3.3.4 All drawing reproduction shall be performed within the CAD


Operator's facilities or in premises outside of CAD Operator's
facilities approved by the User in writing. Such approval shall
be given based on an objective evaluation of such premises'
internal control procedures to handle confidential documents for
clients. Such written approval shall be in place before any
Engineering Drawings/Documents Data are delivered to such
firms.

12.3.3.5 The CAD Operator shall obtain the User's written permission
prior to transferring Engineering Drawings/Documents Data to
any third party. The CAD Operator shall ensure that the third
party agrees in writing to comply with this procedure for the
specified form..

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 17 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

The CAD Operator shall return all originals, and duplicate


originals of, Engineering Drawings/Documents Data to the User
immediately, upon completion of work or when they are no
longer needed.

12.3.4 Electronic Engineering Drawings/Documents Data Access

12.3.4.1 An Enterprises Drawing Management System (EDMS) shall be


implemented, restricting access to only those personnel whose
work requires them to have an access to specific set of
Engineering Drawings/Documents Data. Such access system
shall utilize a combination of individual user LOGIN ID,
password and access rules.

12.3.4.2 The Enterprises Drawing Management System (EDMS) by


CAD Operator personnel is strictly prohibited under any
circumstances and any voilation to the incident shall be reported
to the User immediately.

12.3.4.3 Users of Enterprises Drawing Management System (EDMS)


shall have individual user LOGIN IDs and passwords that shall
be changed monthly and when necessary. Access for personnel
leaving the project, or whose jobs no longer requires access to
Enterprises Drawing Management System (EDMS), shall be
canceled immediately. LOGIN IDs and passwords shall not be
shared in any circumstances.

12.3.5 Enterprises Drawing Management System (EDMS) Files Back-up and


Storage

12.3.5.1 Daily and weekly back-ups are required to be prepared for all
Enterprises Drawing Management System (EDMS) files.
Weekly back-up files shall be stored in off-site fireproof safe(s)
approved by the User and shall be kept for the duration of the
job until three (3) months after the submittal of all the
Enterprises Drawing Management System (EDMS) to the User
after which all back-ups shall be destroyed by means of
mechanical shredding equipment when approved by the User.

12.4 Responsibilities

12.4.1 Proponents

12.4.1.1 The Proponents shall safeguard all Enterprises Drawing


Management (EDMS) in their custody per this procedure.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 18 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

12.4.1.2 The Proponents shall verify and concur the Engineering


Drawings/Digital Files Request prepared by the Users prior to
submittal of the request to the TS&SD/TDMD. The Proponent
may elect to waive this requirement on specific projects with the
written review and concurrence of TS&SD/TDMD.

12.4.2 Users

12.4.2.1 The Users shall review and approve of the CAD Operator
security procedures to ensure they meet the minimum
requirements of this procedure prior to releasing any
Engineering Drawings/Documents Data to the CAD Operator.

12.4.2.2 Prior to releasing Engineering Drawings/Documents Data to a


CAD Operator, the User shall assign a member of his project
team to oversee the CAD Operator’s compliance with this
procedure throughout the execution of the project.

12.4.2.3 If no contractual relationship for the work exists between a


Senior CAD Operator, Junior CAD Operator, the Users shall
ensure that each:

“CAD Operator agrees in writing to commit himself to meet the


minimum security requirements by signing a confidentiality
agreement as provided by the Contracting organization prior to
transferring any original, or copies of Engineering
Drawings/Documents Data or related documents to the CAD
Operator which shall be returned to the User after the
completion of the purpose for which these documents were
provided to the CAD Operator”.

12.4.2.4 The Users shall ensure the Engineering Drawings/Documents


Data designated by the Proponents as CONFIDENTIAL or
RESTRICTED are stamped as such per the SEC requirement.

12.4.2.5 The Users shall review the Cad Operators utilization of the
Engineering Drawings/Documents Data and drawing numbers,
in the CAD Operators custody, at each project review phase and
perform final counts prior to signing each Final Release Receipt
Agreement (FRRA).

12.4.2.6 The Users shall be accountable for all Engineering


Drawings/Documents Data and drawing numbers under their
care for use by the CAD Operators.

12.5 Non-Compliance

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 19 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

In the event of Mishandling by the Senior CAD Operator, or his personnel, of any
SEC Engineering Drawings/Documents Data, in the custody of the Senior CAD
Operator, the User, jointly with the Proponent, shall investigate the matter and bring
their findings to the attention of the SEC contract proponent who may take
appropriate action.

13. TS&SD/TDMD MAJOR RESPONSIBILITIES

The Division Manager of Transmission Document Management Division (TDMD) is


responsible for the following:

13.1 Check the Approval/Certification information on each drawing prior to inclusion of


the drawings into the Enterprises Drawing Management System (EDMS).

13.2 Keep archive for all original submittal documents and electronic files for future
references.

13.3 Keep SEEDS updated as per the latest Microstation technologies, maintain and
authorize the versions of SEEDS to be used.

13.4 Provide system documentation, format instructions and referenced procedures as


required to produce drawings in the COMPANY format.

13.5 Provide CAD Operators with periodic updates of the information.

13.6 Issuance of SEC approved unified Standard and Material Specifications to outside
Engineering Consultants, manufacturers and contractors throughout the Kingdom as
explained in Section 7.0.

TDMD maintain the records of the issue of unified Standard and Material
Specifications.

14. TS&SD/TDMD OTHER RESPONSIBLITIES

14.1 Provide CD to CAD Operators with SEEDS software (Installable Windows XP


based software, Microstation V8 compliant software) that contains seed files,
reference files, cell libraries, font library, menus, command files and user commands
to produce engineering drawings in accordance with SEC standards guidelines
specified in SEEDS-II.

14.2 Provide system documentation, format instructions and referenced procedures as


required to produce drawings in the COMPANY format.

14.3 Provide CAD Operators with periodic updates of the information.

14.4 Monitor implementation of SEC drafting standard.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 20 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

14.5 Maintain centralized control of all SEC Drawings.

14.6 Safeguard the Engineering Drawings/Documents Data in its custody as set forth in
this chapter.

14.7 Track drawings overdue for submission by the Users.

14.8 Provide copies of drafting procedures/specifications and sample of drawing sheet in


soft copies.

14.9 Enter data of engineering drawings/documents/manuals into the Enterprises Drawing


Management System (EDMS).

14.10 Provide CADD Standards Manual User Guide which is available on TS&SD Web
site.

14.11 Issue drawing numbers for the purpose of development of new drawings as well as
revision number for modification of existing drawings as set forth in SEEDS which
is available on TS&SD Web site.

14.12 Verify the accuracy of drawings submitted conform to related SEEDS.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 21 of 22
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-I)

15. APPLICABLE DOCUMENTS

APPENDIX - D : Preparation of Engineering Drawing (Sample).

APPENDIX - F : Engineering Drawing Submittal, SEC Form No. SEC-15057.

APPENDIX - H : Drawing Control Sheet (DCS), SEC Form No. SEC-16758.

APPENDIX - J : Original Drawings/Digital Files Request, SEC Form No. SEC-


15245.

APPENDIX - K : Request for Assignment of Engineering Drawing Numbers, SEC


Form No. SEC-15367.

APPENDIX - L : For all disciplines symbology (Table-1).

APPENDIX - M : For Electrical one line diagram symbology (Table-2).

APPENDIX - N : Index Key, Drawing and Equipment, (Drawing No.


KE-036001).

APPENDIX – R : Assignment of PTS, Conceptual Drawing & Plant Numbers.

APPENDIX - S : Assignment of Engineering Drawing & Plant Numbers.

APPENDIX - T : CADD Standards Manual User Guide.

SEEDS-I-00 Date of Approval: April 29, 2009


Page No. 22 of 22

You might also like