AA PROJECT

Architecture Design and Project Execution

MASJID
AL FURQON
SEPTEMBER 2022
- Gambar Perencanaan Kegiatan Rehabilitasi dan Renovasi
Masjid Al Furqon
- Kecamatan Awar awar - Kabupaten Situbondo
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Kondisi Eksisting LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Kondisi Eksisting LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid Malam Hari LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
Client Project Drawn By Location Issue Description Measure
Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Site Plan LT :
LB :
AA PROJECT
Architecture Design and Project Execution

GAMBAR PERENCANAAN DAN


PERHITUNGAN KEBUTUHAN ITEM PEKERJAAN
KEGIATAN :
REHABILITASI DAN RENOVASI MASJID AL - FURQON

LOKASI :
KEC AWAR AWAR - KAB SITUBONDO
SEPTEMBER 2022
Pekerjaan Pengecatan

Pemasangan Tulisan Timbul


Masjid Al Furqon Penambahan Variasi
Kolom dan dindingi depan

Pekerjaan Pengecatan

Pekerjaan Pengecatan

Pekerjaan Pengecatan

Pemasangan
Batu Alam
Pemasangan Pemasangan
Batu Alam Batu Alam
Penambahan Roaster/
Roaster Pekerjaan Motif
Kerawangan Lengkung Masjid (Cor)

Pekerjaan Pengecatan

Pekerjaan Pondasi

Client Project Drawn By Location Issue Description Measure


Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
Roaster Tulisan Timbul
20 x 20
Atau Kerawangan Metal/Chrome

Cat lapis
Water Prof
Cat lapis
Water Prof Warna Putih
Warna Gold

Batu Alam
Batu Alam Candi/Lapis
Andesit legit/Palimanan

Warna Cat Opsi Batu Alam

Cat Gold/Emas Cat Putih BA Lapis Legit BA Candi BA Palimanan BA Andesit

Client Project Drawn By Location Issue Description Measure


Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
L4

L3
L2 L1

KEBUTUHAN BATU ALAM DINDING KEBUTUHAN BATU ALAM KOLOM


Luasan 1 (L-R) : 20,43 m2 Total Kebutuhan batu alam L4 = 13m2
47,21 m2 atau dibulatkan
Luasan 2 (L-R) : 19,62 m2 menjadi 50 m2 dengan rincian Ukuran B. Alam : 20cm x 20cm = 0,04m2
Kebutuhan B. Alam :
Luasan 3 (ALL) : 7,16 m2 sebagai berikut :
13m2 : 0,04m2 = 325 Batu Alam
Total : 47,21 m2 Ukuran B. Alam : 20cm x 20cm = 0,04m2
Ukuran B. Alam : 20cm x 40cm = 0,08m2
Kebutuhan B. Alam :
50m2 : 0,04m2 = 1250 Batu Alam Kebutuhan B. Alam :
13m2 : 0,08m2 = 162,5 Batu Alam
Ukuran B. Alam : 20cm x 40cm = 0,08m2
Kebutuhan B. Alam :
50m2 : 0,08m2 = 625 Batu Alam

Client
Bapak Imam Project Drawn By Location Issue Description Measure
Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
2,5 m

Roaster Motif Uk 20x20


Kebutuhan 105 buah

Lengkung Kuba’
Cor Bekisting Krawangan Grc
5,25 cm
11,89 m

0,15 m
0,6
m

Client Project Drawn By Location Issue Description Measure


Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
2,5 m

Dak Beton Bertulang

Lapisan Finishing Cat Warna Putih


Cor Beton Bertulang dan Bekisting

Lapisan Plesteran dan Acian


Cor Kolom Struktur 15/15 dan bekisting

845cm
8,5,2 m
Tulangan Kolom Struktur

Pasangan Bata Merah


Kebutuhan Bata Merah 4,5 m2
Pondasi Footplat (Menyesuaikan) 4,5 m2 dibutuhkan 350 Bata Merah

0,6
m
0,15 m

Client Project Drawn By Location Issue Description Measure


Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
20cm

8,5 m

1,5 m

Client Project Drawn By Location Issue Description Measure


Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Fasad Masjid LT :
LB :
URAIAN PEKERJAAN RENOVASI DAN REHABILITASI
MASJID AL FURQON
I Pekerjaan Persiapan IV Pekerjaan pasangan dan plesteran ( Batu Alam )
1. Pasangan Batu Alam candi/palimanan Uk (20x20 atau 20x40)
II Pekerjaan Tanah 2. Pasangan Batu Andesit (Kolom) Uk (20x20 atau 20x40)
1. Galian Tanah Pondasi 3. Acian/perekat
2. Urugan Tanah Kembali
3. Urugan Pasir Pondasi V Pekerjan Pengecatan
1. Dinding (Putih)
III Pekerjaan Beton ( Area Depan ) 2. pilar (Putih)
1. Beton K100 lantai kerja 5cm 3. Kubah (Gold)
2. Beton Pondasi Telapak, Besi 12 4. Kolom penyangga (Gold)
-Beton K175 5. Pengecatan Plafond (Putih)
-Besi Polos
3. Beton kolom 15 x 15, besi 8 dan 12 Kebutuhan Cat
-Beton K175 1. Cat Gold 3 Kaleng, Isi perkaleng 2,5 Liter
-Besi Polos 2. Cat Putih 5,5 Kaleng, Isi perkaleng 2,5 Liter
-Bekisting
4. Beton balok / plat dak beton besi 10 VI Pekerjaan Lampu Downlight/Light area
-Beton K175
-Besi Polos
-Bekisting VII Pemasangan Tulisan Timbul Masjid Al Furqon
5. Pasangan dan plesteran
-Kebutuhan 350 Buah Bata Merah
-Pasangan Bata Merah ( 1 : 4 ) VIII Pekerjaan Taman
-Plesteran 1. Galian
6. Beton lengkung kubah besi 12 2. Pasangan Bata Merah ( 350 Bata Merah )
-Pasangan Roaster 20 x 20 3. Plesteran Sisir
Atau Kerawangan Motif Grc Custom 4. Tanah Urug
5. Aplikasi tanaman dan pohon

Client Project Drawn By Location Issue Description Measure


Bapak Imam Masjid Al Furqon Ari Andriyanto, S.T Awar awar - Situbondo 20.09.2022 Item Pekerjaan LT :