3.4.1 ECVL 420 Assignment 4
3.4.1 ECVL 420 Assignment 4
Question 1:
The table below includes the description of a project. You are required to:
Schedule the project using AON
Calculate each activity’s early and late start and end dates
Record project end date and critical path
1 of 3
Question 2:
Represent the activities below with an AOA network.
Activity Predecessors
A -
B A
C A
D B, C
E B, C
F E
G D
H F, D
Question 3:
The table below includes the description of a project. You are required to:
Schedule the project using AON
Calculate each activity’s early and late start and end dates
Record project end date and critical path
For each activity, calculate all types floats