MP 26
MP 26
A SCAFFOLDING DS NS DS NS DS NS DS NS DS NS
1 Install & Dismantle Scaffolding At Furnace Up To Roof
2 Install & Dismantle Scaffolding Outside Furnace
3 Install & Dismantle Scaffolding Return Leg to Loop Seal
4 Install & Dismantle Scaffolding At Big Opening L & R
5 Install & Dismantle Scaffolding At Cyclone
6 Install & Dismantle Scaffolding At Coal Feeder
7 Install & Dismantle Scaffolding At APH
8 Install & Dismantle Scaffolding At Economizer
9 Install & Dismantle Scaffolding At Vortex
10 Install & Dismantle Scaffolding At Sand Blow Out Deni Roni / Zulfahmi
11 Install & Dismantle Scaffolding At Second Pass
12 Install & Dismantle Scaffolding At Expantion Joint Big Opening
13 Install & Dismantle Scaffolding At PAF,SAF, IDF Outlet
14 Install & Dismantle Scaffolding At Drain Boliler
15 Install & Dismantle Scaffolding At Inside Widbox
16 Install & Dismantle Scaffolding At Pipe Main Steam
17 Install & Dismantle Scaffolding At Inside Windbox
18 Install & Dismantle Scaffolding At ESP
B MECHANICAL WORK
1 Repair Wall Tube Furnace
2 Repair Drain Boiler
3 Welding Fin Wall Tube
4 Welding Fin Tube Furnace
5 Bending Tube
6 Build up Wall Tube
ARIF SAPUTRO / 10 10
7 Repair Grid nozzle furnace
SUPARDI
8 Install Anti Abration Grid 2 2 4 4 10 10 80
9 Repair Sandblow Out Furnace To Windbox
10 Welding Sandblow Out Outside Furnace
11 Replace Valve Transmiter Main Steam
SUB TOTAL 52 4 8 20 80
16
#VALUE!
63 Other 45 hrs Apr 24 4:00 PM Apr 26 1:00 PM
64 452 Provide power supply 24 VDC for support maintenance 45 hrs Apr 24 4:00 PM Apr 26 1:00 PM
job and tube cleaning
65 452 Inspection , repair/replace part & cleaning motor terminal, 45 hrs Apr 24 4:00 PM Apr 26 1:00 PM
cooling fan/body motor
5 hrs Apr 24 4:00 PM Apr 26 1:00 PM Johan + Truba MPS