400 Bored Pile
400 Bored Pile
400 Bored Pile
Pile Axial Working Capacity, Qa [SLS] = 484 (kN) (> 400, ok) Cut-off Depth = 0.30 (m) [RL = 29.20 m]
Utimate Shaft Friction, Qps [ULS] = 968 (kN) Termination Depth = 13.50 (m) [RL = 16.00 m]
Total Pile Length = 13.20 (m)
(C) Check Uplift / Tension Capacity • In Soil/Hard Material = 13.20 (m)
• In Rock = 0.00 (m)
Pile Uplift Capacity, Qt [SLS] = ###
= 242 (kN) (> 240, ok)
file:///conversion/tmp/activity_task_scratch/622577711.xls
Aecom Job number :
Calc. sheet no. :
Job Name : Drawings no. :
Structure : Calculation by : WTF
Part of Works : Pile Geotechnical Bearing Capacity Reviewed :
Micropile Pile WITH Rock Socket
1. Data
Pier Ref. No. = 0
Borehole Ref. No. = BH 1
Pile Cap Type = Pilecap Beam
Type of Pile = Micropile
Pile Dia. = 250 (mm)
Concrete fcu = 40 (N/mm2)
Pile Struct Cap (SLS) = 600 (kN)
Max Axial Load, WL = 600 (kN) [SLS]
Max Uplift, P-ve = 100 (kN) [SLS]
file:///conversion/tmp/activity_task_scratch/622577711.xls 2/4
Aecom Job number :
Calc. sheet no. :
Job Name : Drawings no. :
Structure : Calculation by : WTF
Part of Works : Pile Geotechnical Bearing Capacity Reviewed :
Micropile Pile WITH Rock Socket
file:///conversion/tmp/activity_task_scratch/622577711.xls 3/4
SMHB Sdn. Bhd. Job number : J938
Calc. sheet no. :
Job Name : 0 Drawings no. :
Structure : 0 Calculation by : TKH/WKK
Part of Works : Estimation of Shear Modulus Reviewed :
100,000
110,000
120,000
130,000
140,000
150,000
160,000
10,000
20,000
30,000
40,000
50,000
70,000
80,000
90,000
60,000
1 0.0 29.40 0 1 Clay
2 1.5 27.90 2 1 Phyllite #N/A #N/A #N/A
0
0.0 1 1
3 4.50 24.90 7 1 Sand #N/A #N/A #N/A 1.5
4 6.00 23.40 6 1 Sand #N/A #N/A #N/A 3.0
5 7.50 21.90 11 1 Sand #N/A #N/A #N/A 4.5
6.0
6 9.00 20.40 68 1 Sand #N/A #N/A #N/A
7.5
7 10.50 18.90 100 1 Sand #N/A #N/A #N/A 9.0 Validation Data (Do Not Delete)
8 12.00 17.40 214 1 Sand #N/A #N/A #N/A 10.5 Pile WITH Rock Socket
9 13.50 15.90 103 1 Sand #N/A #N/A #N/A 12.0 Pile WITHOUT Rock Socket
10 15.00 14.40 231 1 Sand #N/A #N/A #N/A 13.5 2
15.0
11 16.50 12.90 15 1 Sand #N/A #N/A #N/A
16.5
12 18.00 11.40 12 1 Sand #N/A #N/A #N/A 18.0
13 19.50 9.90 16 1 Sand #N/A #N/A #N/A 19.5 2 2
14 21.00 8.40 23 2 Sand #N/A #N/A #N/A 21.0
15 22.50 6.90 333 2 Sand #N/A #N/A #N/A 22.5
24.0
16 24.00 5.40 83 2 Sand #N/A #N/A #N/A
25.5
17 25.50 3.90 79 2 Sand #N/A #N/A #N/A 27.0
18 27.00 2.40 214 2 Sand #N/A #N/A #N/A 28.5
19 28.50 0.90 214 2 Sand #N/A #N/A #N/A 30.0 4 2
20 30.00 -0.60 214 2 Sand #N/A #N/A #N/A 31.5
21 0 0 0 33.0
34.5
22 0 0 0
36.0
23 0 0 0 37.5
24 0 0 0 39.0
25 0 0 0 40.5
26 0 0 0 42.0
43.5
27 0 0 0
45.0
28 0 0 0 46.5
29 0 0 0 48.0
30 0 0 0 49.5
31 0 0 0 51.0
52.5
32 0 0 0
33 0 0 0
34 0 0 0
35 0 0 0
36 0 0 0
No. of layers = 2
ADOPTED SHEAR MODULUS (G)
SUMMARY OF DATA Top Point Bottom Point Layer Thick.
dG dG/dZ
Pier No : 0 Layer Depth G Value Depth G Value dZ
BH Ref : BH 7 (BSAS ) (m) (kPa) (m) (kPa) (Mpa) (m) (MPa/m)
PileCap : Pile Cap for Cantilver Exten 1 0.3 10,000 19.5 20,000 10.000 19.2 0.521
Pile Cut-off Depth : 0.30 (m) 2 19.5 20,000 30.0 90,000 70.000 10.5 6.667
Termination Depth : 13.50 (m) 3
Total Pile Length : 13.20 (m) 4
• In Soil/Hard Material : 13.20 (m) 5
• In Rock : 0.00 (m) 6
7
8
9
10
SdZ = 29.7