Professional Documents
Culture Documents
Des 2022 Brigada Eskwela Tip Mosa A4 1
Des 2022 Brigada Eskwela Tip Mosa A4 1
Des 2022 Brigada Eskwela Tip Mosa A4 1
Department of Education
Caraga Region
Schools Division Office of Surigao City
DAY-ASAN ELEMENTARY SCHOOL
School ID: 132249
Brgy. Day-asan, Surigao City
Installed of
COVID-19
directional
signages for
safety measure
and protocol
standards
Disinfected
classrooms and
school facilities
BE activities
were monitored
and facilitated
successfully.
Enhanced Basic Monitored and
Teacher In-charge Education consolidated LIS
Facilitating and encoding Enrollment
an volunteers, Enrollment P 1,000.00 Quick count
through LIS Quick
parents Form (EBEEF), Enrollment Status
Laptop online
WINs
WINs Coordinator Health
Conducting, facilitating, and Symposium and
, Asst. WINs Essentials,
advocating WINs Symposium and P 1,000.00 Activities
Coordinator, Handwashing
Activities conducted and
Parents, and SPG facilities
facilitated
Did repairing and
Carpentry tools,
Do some minor repairs & classroom classroom
Teacher In-charge equipment,
beautification P 3,000.00 beautification and
an volunteers facilities, &
Continuation of the painting activities continuation of
school supplies
painting activities
Revisited,
Revisiting, Updating and Rearranging SBM Principle 2 Files and Updated and
P 500.00
SBM Files Coordinators Documents Rearranged SBM
Files
Revisited,
Revisiting, Updating and Rearranging WINs Files and Updated and
P 500.00
WINs Files Coordinators Documents Rearranged WINs
Files
Checking & preparing other important
BE activities
school documents Teacher In-charge
School supplies P 500.00 were monitored
Monitoring of BE activities an volunteers
successfully.
(Attendances, documentation, etc.)
Rearranged and
cleaned
classroom
Rearranging & cleaning the classroom facilities
facilities and other things Carpentry tools,
Improving Garden Teacher In-charge equipment, Improved GPP
P 1,000.00
Installing new repaired/repainted an volunteers facilities, &
classroom signages and other school supplies Installed new
classroom materials repaired/repainted
classroom
signages and
other classroom
materials
Finalized
Finalizing classroom structuring classroom
Teacher In-charge
Checking & finalizing other necessary School supplies P 1,500.00 structuring and
an volunteers
things for classroom beautification other necessary
things
POST-IMPLEMENTATION PHASE
Reports were
Reporting/Submission of
ASP Coordinator, Laptop, submitted to
accomplishment in narrative form with August 30,
Teacher In-charge computer, ink, P 1,000.00 School BE
pictures and other evidences at School 2022
an volunteers folder Coordinator for
Level
consolidation.
Reports were
Reporting/Submission of
ASP Coordinator, Laptop, submitted to
accomplishment in narrative form with September
Teacher In-charge computer, ink, P 3,000.00 Division BE
pictures and other evidences at 16, 2022
an volunteers folder Coordinator for
Division Level
consolidation.