Professional Documents
Culture Documents
General Comments
General Comments
General Comments
RECYCLED HYDROGEN
0003 PFD 3 21
FROM T-502
10
11
3 3
MAKE UP HYDROGEN
0002 ---- 9
TO C-501 C-502
V-503
C-501 V-501
4 4
RESIDUAL WATER
12 0004 -----
TO DRAIN SYSTEM
TREATED DIESEL
0008 PFD 4 28
TO E-501
UNTREATED DIESEL
0001 ----- 1
5 FROM STORAGE TANK 5
UNTREATED MIXED FEED
DIESEL PRODUCT
0007 -----
TO STORAGE
FL-501 E-501
6 BATANGAS STATE UNIVERSITY 6
Department of Chemical Engineering
C-501 V-501 C-502 FL-501 E-501 V-502 V-503 P-501 E-502 ARIAL NARROW / FS:9 / UNDERLINE
MAKE UP HYDROGEN KNOCKOUT DRUM RECYCLED HYDROGEN PARTICLE FILTER FEED HEAT EXCHANGER FEED SURGE DRUM COALESCING FILTER FEED CHARGED PUMP FEED HEAT EXCHANGER ARIAL NARROW / FS: 9
SIZE, CAPACITY SIZE, CAPACITY SIZE, CAPACITY
COMPRESSOR SIZE, CAPACITY COMPRESSOR DES. PRES. @ TEMP
SEPARATOR SIZE, CAPACITY SIZE, CAPACITY ARIAL NARROW / FS: 6
DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP
SIZE, CAPACITY SIZE, CAPACITY DES. PRES. @ TEMP
1 SIZE, CAPACITY
DES. PRES. @ TEMP
MAT. OF CONST. DES. PRES. @ TEMP
MAT. OF CONST. MAT. OF CONST.
MAT. OF CONST. DES. PRES. @ TEMP MAT. OF CONST. MAT. OF CONST.
1
INSULATION INSULATION INSULATION
MAT. OF CONST. MAT. OF CONST. INSULATION MAT. OF CONST. INSULATION INSULATION ABBREVIATIONS
INSULATION
INSULATION INSULATION DES – DESIGN
PRES – PRESSURE
TEMP – TEMPERATURE
MAT – MATERIALS
CONST – CONSTRUCTION
REQT – REQUIREMENT
CAPACITY - Capacity (Flow and D/P)
INSULATION - Insulation/Tracing
2 2
PROCESS FLUID
0000 PFD N/N 21
FROM / TO
10
11
3 3
PROCESS FLUID
0000 PFD N/N 9
FROM / TO
C-502