Risk Assessmet
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
Being Struck/buried by
piles or soil. Multiple 1 Review of inclinometer / Strain gauge results.
3 Collapse of Sheet
fatalities, Serious crush 2 5 10 Medium 2 Continually monitor leaks and water ingress rate. 1 5 5 Low
piles
injuries. Those at risk 3 Emergency rescue plan in place
Site Works
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
6. Removal of
1.Provided necessary PPE
excavated materials
2. Provision of Component Workers
out of site & clean 1.Hit by moving
3. Assigning Signalmen once Moving Machinery
surrounded area for machinery 5 2 10 Medium 3 1 3 Low
4. Install necessary Signboard
concreting. Hit by 2.Slips & falls
5.Supervision for labours and Supervisors
moving machinery
6. Barricade area which is covered in rotating radius.
Slips & falls
8.Workmen exhausted
due to exposure to 1. Provide 8 hrs. Work schedules. Two shift operation
1.Prolonged Exposure to
direct sunlight and 2.Provide adequate drinking water to the workers
sunlight 4 3 12 Medium 1 3 3 Low
windy conditions for 3Provide Sunshades / shelters for resting workers.
2.Awkward posture
extended working 4.Job rotation shall be implement
hours
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
1.Projection rebar.
2.Pricking nails/irons.
1. Provide PPE Such as Boots and Gloves
3.Stuck legs through the
2. Covering the Projection Objects
reinforcement net.
3.laying timber planks on the reinforcement net
4.Walking on the
21.Reinforcement 4.laying timber planks on the reinforcement net
reinforcement net. 5.Prick 3 2 6 Meduim 2 1 2 Low
work at site 5.Use goggles while working in the reinfordcement net
by binding wires.
6..Provision frequent intervels
6.Renforcement bar
7.Change workers by on and off
binding.
8. Keep good Supervision and Hose keeping
7.Crushing by tor steel
while binding
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
1.Exposure to dust
2.Hit By moving trucks
1.Provide PPE such as dust masks/Spraying Water
31.Embankment/sub and machines
2.Good Supervision
grade/sub base 3.Struck by moving 3 2 6 Meduim 1 2 2 Low
3.demarcate by barricade the location.
Construction object
4.Warning signs
4.contact with damage
power cables
1.Exposure to dust 1.spraying water
2.Exposure to noise 2.Provide PPE such as ear plugs
32. Use of Machinery
3.Vibration roller 3..Occupation of competent operator
(unloading/Loading / 3 2 6 Meduim 1 2 2 Low
4.Hit by moving 4.Periodical preventive maintainanace
Laying/Compaction
machines and objects 5.Displaying Warning signboards
5.Exposure to Sunlight 6.Good Supervision
1.Hit By moving trucks 1.Displaying proper Warning signboards
and machines 2.Good Supervision
33. Use of heavy
2.Exposure to noise 3 2 6 Meduim 3..Periodical maintanance of machinery 1 2 2 Low
machineries
3.Vibration roller 4.Occupation of competent operator
4.Exposure to Prime 5..Employ skilled labours to prime work
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS
Occurrence
Occurrence
Occurrence
Occurrence
Frequency
Frequency
Risk Level
Risk Level
Risk Level
Risk Level
Remarks
Residual
Original
Severity
Severity
Activity Hazard Mitigation Action
1.regular maintenance
2. employe competent Drivers.
34.Transportation of
1.Meet with accidents 3 2 6 Meduim 3.periodically service & maintenance of vehicles 2 1 2 Low
Employee
4. Proper safety method of Transport Vehicle( Such as
covering and sheets availbe )
1.Exposure to Dust
2.Manual Handling 1.Supervision
3.Unsafe conditions of 2.Monthly inspections for Conditions of the machine
36. Pre casting works
machines 4.concrete 3 2 6 Meduim 3. daily self inspection before operating 1 2 2 Low
/Concrete works
contacting with eyes 4.Employ skilled workers
5.concrete contaminating 5.protective covering clothes
with skin