RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.Risk assessment/ method statement briefing given to all


operatives
Overturning of crane into
2.Use only trained, competent and skilled operators and
excavation failure of
01.Liffting 3 5 15 Medium riggers. 1 5 5 Low
lifting gear objects falling
3.Liffting plan to be followed.
onto Persons
4. Lifting capacities location of crane stability of ground
to be controlled

1.When lifting /carrying material only carry recommended


amounts.
Strains, pulled muscles , 2. Tie materials correctly when using lifting gear and
2. Lifting carrying
skeletal injuries and rope Sling rope, if passing hand to hand , ensure receiver has
materials, Raising 3 5 10 Medium 1 5 5 Low
burns ,Those at risk the material in his/her grasp before releasing.
/lowering materials
workers 3 Wear correct type of Gloves .
4 Use correct manual handling techniques.
5 Undertake manual handling training

Being Struck/buried by
piles or soil. Multiple 1 Review of inclinometer / Strain gauge results.
3 Collapse of Sheet
fatalities, Serious crush 2 5 10 Medium 2 Continually monitor leaks and water ingress rate. 1 5 5 Low
piles
injuries. Those at risk 3 Emergency rescue plan in place
Site Works

1 Safe system of work in place and briefing given to


operators 2. Use
Falls fro men and running lines when working from struts with double
4. Working at Height material injuries those at 3 4 12 Medium lanyard fall restraint system 1 4 4 Low
risk site operators 3.Use designated safe access only
4.Cease work if adverse weather prevails
5.Close supervision of work force
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1. Brief workers in Emergency Rescue: ensure equipment


Supervision trauma, fall
5. Rescue person(s) is available at the location (Man basket Stretcher etc.).
injuries to those carrying 2 4 8 Medium 1 4 4 Low
after major incident 2. Rescue in accordance with the rescue plan and
out the rescue.
understood by the scaffold operatives before work starts.

6. Removal of
1.Provided necessary PPE
excavated materials
2. Provision of Component Workers
out of site & clean 1.Hit by moving
3. Assigning Signalmen once Moving Machinery
surrounded area for machinery 5 2 10 Medium 3 1 3 Low
4. Install necessary Signboard
concreting. Hit by 2.Slips & falls
5.Supervision for labours and Supervisors
moving machinery
6. Barricade area which is covered in rotating radius.
Slips & falls

1. All edges of excavated side shall be sloped to safe


angle
1.Cotact with sharp edges 2. Excavation shell be marked with warning tapes and
7.Falls due to
2.Use unsafe ladders Hard barrier
Collapsing of edges of 4 3 12 Medium 1 3 3 Low
3.Collapse material 3. Additional loadings shall not be positioned so closes to
pit due to lose earth
stacking racks the edge of and excavation the distance of 1 meter away
from the edge
4. Warning signs in order to restrict access

8.Workmen exhausted
due to exposure to 1. Provide 8 hrs. Work schedules. Two shift operation
1.Prolonged Exposure to
direct sunlight and 2.Provide adequate drinking water to the workers
sunlight 4 3 12 Medium 1 3 3 Low
windy conditions for 3Provide Sunshades / shelters for resting workers.
2.Awkward posture
extended working 4.Job rotation shall be implement
hours
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.Compactors shall be provided with 10 kg form fire


1 . Fuel Spills extinguishers.
9. Risk of Fire. Diesel
2. Slip and fall 2.Pre-operational checks by Operator or Engineers for
and Gasoline operated 3 4 12 Medium 1 4 4 Low
3.Manual Handling potential fuel leaks.
engines or compactors
4.Expose to fire 3. Depray provided for all the Location where we storage
Fuel
10.Excessive noise
from machines and
compactors engine.
1.Exposure to air 1.Operators and workmen in operate who shall wear ear
(Over 90 dB). 4 4 16 Medium 1 4 4 Low
emissions protectors
Potential to expose to
Noise induce hearing
loss

1.Accident meet with


Unsafe driving 1.Daily tool box meeting shall be conducted for all staff.
2.Prolong strain to same Assigned experience Operators for all machineries with
position banks men.
3.Exposure to dust 2. All drivers must have valid license for said equipment
11. Transporting and 4.Struck by moving class
unloading Material machinery 3. All personal working in the area must wear prescribed
Struck and falling 5.Exposure to Noise 3 4 12 Medium PPE for work. 2 2 4 Low
while unloading 6.Live wire broken due to 4. All dump trucks drivers shall maintained check list
contact with machine part 5.Regular inspection by safety officer
7.Exposure to air 6. Arrange vehicle stopper 1 meter distance from the
emissions excavation pit for unload material.
8.Accidents caused by 7. Proper access to the excavation area for transportation
unexpected/ outside material.
vehicle movement
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1. Daily toolbox talks shall be conducted for all workmen


1.childrern play at site by safety officers to educate them on hazards and
12. Human failures /
2.Wrong postural preventive actions.
Unsafe acts which 4 4 16 Medium 1 4 4 Low
3.Unauthorized Entry to 2. Regular inspections by safety Officers
may lead to accidents
the site 3. Explain the site Situation to the villages
4. Install No Entry Signboards at the site
1. warning signboard / signals
1. Hit by Moving Object
2. Close monitoring.
2.Collapse of spoil soil
3. .Excavation with Proper manner
3.Falling in to pits
13. Form work at site 3 2 6 Medium 4 .Proper access and egress 2 1 3 Low
Excavation 4.Using
5.Employee skilled workers for hand tools and power
power tools and hand
tools 6.
tools
Hard Barricade Excavation area
1. Provide gloves and Boots
1. Pricking nails / irons 2. Spraying water
2.Expose to dust 3. Supervision
14. Clearing Site /
3.Hit by Moving trucks 4 3 12 Medium 4.Educated by training 2 2 4 Low
Road side
and machines 5. Use competent operators
4.Hit by Moving Object 6 .warning signboard / signals

1.Exposure to dust 1.spraying water


15.Heavy Machinery 2.Struck by moving 2.cover the truck bucket to avoid any spill
5 2 10 Meduim 3 1 3 Low
moving machinery 3.Warning signboards and Instructions
3.Vehicle accident 4.Engaged experience drivers

1.Contact with lubricants


2.Contact with sharp 1.Warning of overall competent mechanisation
16.Machiery edges 2.Provide gloves and Boots
4 3 12 Meduim 2 1 3 Low
breakdwon and repair 3.Static Postures 3.Taking of frequent breaks
4.Stuck against 4. employee competent workers
machinary parts
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.Contact with lubricants


17.Lack of First aid
2. Eletrocution 1. Basic first aid materials shall be provided in site
materials in 4 3 12 Meduim 2 2 4 Low
3.Neck/Body pains 2.Basic first aid Traing for site workers
construction site.
4.Skin allergics

1.adhere to proper safety policy in electrical wiring.


18. Electrical wiring
1. Electrocution 3 2 6 Meduim 2. provision skill electricians. 2 2 4 Low
and supply .
3. Educate all site workers by Traning and meeting
1.Falling to deep
1.Displaying Appropriate Warning signboard
19. Excavation of excavation
3 4 12 Meduim 2. Hard Barricade excavated area more than 1.5m. if soil 1 3 3 Low
excess 2.Hit by moving
unstable
machinery

1·Operations of plant by accredited personnel. / Personal


Protective Equipment (PPE) – hardhat, high visibility
1.Working of heavy vest, hearing protection, safety footwear etc./Maintain a
machinery & equipment. safety working area around moving plant. Protect surfaces
2.collapse of spoil soil. from plant movements.
20. Excavation work 3.Falling in to excavation. 4 4 16 Meduim 2.Excavation with proper manner . 2 2 4 Low
4.Hit by moving object. 3.Proper supervision and Employ skill workers for the
5.Child move to the site. job.
6. Cave-ins 4.Warning signboards and Supervision.
5. cover the site with GI sheets to prevent child enter
6.Supervision and Use of competent Operators
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.Projection rebar.
2.Pricking nails/irons.
1. Provide PPE Such as Boots and Gloves
3.Stuck legs through the
2. Covering the Projection Objects
reinforcement net.
3.laying timber planks on the reinforcement net
4.Walking on the
21.Reinforcement 4.laying timber planks on the reinforcement net
reinforcement net. 5.Prick 3 2 6 Meduim 2 1 2 Low
work at site 5.Use goggles while working in the reinfordcement net
by binding wires.
6..Provision frequent intervels
6.Renforcement bar
7.Change workers by on and off
binding.
8. Keep good Supervision and Hose keeping
7.Crushing by tor steel
while binding

1.Employ skilled workers


11.concrete droplets
2. protective covering clothes
contacting with eyes
3. Inspect scapolding structure Befor start the concrete
2.concrete contacting
works by compitent person
with skin 3.Scafolding
4.Make Proper access and egress
22.Concreting collaps 4 4 16 Meduim 2 2 4 Low
5. Provide sufficient lighting system in night works.
4.Falling from height
6..Provide PPE Such as Boots and Covering the
5.protruding reinforcing
Projection Objects
6.Unsafe conditions of
7.Annual inspections for Conditions of the machine and
machines /trucks
daily self inspection before operating
1.Collapse of trimme
while concreting 1.Fixing the all trimmies to arm of pump car
23. Use of Pump car 2.Hit by moving trimme 4 3 12 Meduim 2.keep proper supervision 2 2 4 Low
pipes 3.Periodical maintainace
3.Exposure to Noice
1.Good supervision and Housekeeping
1.Falling from height
24.Wall construction 2.Provide propergloves and boots
2.Handling G.I 3 2 6 Meduim 1 2 2 Low
work 3. Employ skilled workers
Sheets/pipes
4. Educate Workers
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.Material fall from 1.Instruction to workers


height 2. Provide proper PPE
25.Machinery works 3 2 6 Meduim 1 2 2 Low
2.Thrown objects from 3.Good supervision
height elevation 4.Employ skilled workers
1. Falling material 1.Good supervision
2.Falling from Height 2 .Employ skilled workers
3.broken the lifting cables 3. Training progarams
or tackles 4.Entry restriction to unwanted workeres from working
26. Superstructure 4.Hit By moving site
4 3 12 Meduim 2 2 4 Low
element handling machines 5.Keep good Supervision
5.Crushing by moving 6. use proper P.P.E
objects 7.Provision of competent Operators
6.contact with overhead 8. use banksman and worning Signboards
power lines 9. Good Housekeeping
1. lifting Work by team
1.Lifting of weights
2.Supervision
2.Pricking nails/irons
3.Provide Gloves and Boots
27.Manual Work 3.Snake bites 4 4 16 Meduim 2 2 4 Low
4.Instruction about site Activity
4.Electrical shocks by
5.Proper insulation
faulty equipments
2.Pre inspection with available data and.Supervision
1.Frequently change the postures
1.Awkward posture 2.Provide safety belts and proper guard rails
28.Surveying 2.Falling from height 3 4 12 Meduim 3.Person who selected has capability to especially work at 2 2 4 Low
3.Moving vehicles height
4. Wearing Hi visible safety jackets

29.Temporary flat flood or any other natural


2 3 6 Meduim 1.Construct proper drainage system for water drain off 1 2 2 Low
form Disaster
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.Contact with live


current 2.Projection Nails
1.Proper insulation
and Prongs 3.Drilling
2.Provide PPE Such as Boots and Covering the Projection
machines
Objects
30 .Use of hand tools 4.Cutting Machine 3 2 6 Meduim 1 2 2 Low
3.keep good housekeeping
5.Wood cutting and
4.Employ competent workers
adjusting by power saw
5.Use of good condition machineries
6.Exposure to wood dust
7.Exposure to noice

1.Exposure to dust
2.Hit By moving trucks
1.Provide PPE such as dust masks/Spraying Water
31.Embankment/sub and machines
2.Good Supervision
grade/sub base 3.Struck by moving 3 2 6 Meduim 1 2 2 Low
3.demarcate by barricade the location.
Construction object
4.Warning signs
4.contact with damage
power cables
1.Exposure to dust 1.spraying water
2.Exposure to noise 2.Provide PPE such as ear plugs
32. Use of Machinery
3.Vibration roller 3..Occupation of competent operator
(unloading/Loading / 3 2 6 Meduim 1 2 2 Low
4.Hit by moving 4.Periodical preventive maintainanace
Laying/Compaction
machines and objects 5.Displaying Warning signboards
5.Exposure to Sunlight 6.Good Supervision
1.Hit By moving trucks 1.Displaying proper Warning signboards
and machines 2.Good Supervision
33. Use of heavy
2.Exposure to noise 3 2 6 Meduim 3..Periodical maintanance of machinery 1 2 2 Low
machineries
3.Vibration roller 4.Occupation of competent operator
4.Exposure to Prime 5..Employ skilled labours to prime work
RISK ASSESSMENT FOR CANAL CONSTRUCTION WORKS

Occurrence

Occurrence

Occurrence

Occurrence
Frequency

Frequency
Risk Level

Risk Level

Risk Level

Risk Level

Remarks
Residual
Original
Severity

Severity
Activity Hazard Mitigation Action

1.regular maintenance
2. employe competent Drivers.
34.Transportation of
1.Meet with accidents 3 2 6 Meduim 3.periodically service & maintenance of vehicles 2 1 2 Low
Employee
4. Proper safety method of Transport Vehicle( Such as
covering and sheets availbe )

1.Recruitment of experienced drivers


1.Unexpected incidents 2. periodically service & maintenance of vehicles
caused to accidents 3.Taking adequate breaks for long trips
35. Driving at site 3 2 6 Meduim 1 2 2 Low
2.Prolong strain in to seat 4.Prevent unauthorized driving.
3.Unsafe Drive 5. Educate Drivers by Traning
6.Install Signgboards

1.Exposure to Dust
2.Manual Handling 1.Supervision
3.Unsafe conditions of 2.Monthly inspections for Conditions of the machine
36. Pre casting works
machines 4.concrete 3 2 6 Meduim 3. daily self inspection before operating 1 2 2 Low
/Concrete works
contacting with eyes 4.Employ skilled workers
5.concrete contaminating 5.protective covering clothes
with skin

1.Contact with live 1.Proper insulation


37.Use for Welding/ current 2.Expose 2.Use sound proof genarator
5 1 5 Meduim 3 1 3 Low
Gas Cutting to noice 3.Provide adequate PPE's
3.Expose of fumes 4.Awareness traning programs

1.Expose to noice 1.Use sound proof genarator


38.Use for Electricity 2.Contact with live 2.Proper insulation
5 1 5 Meduim 3 1 3 Low
generate current 3.Provide adequate PPE's
3.Expose of fumes 4.Awareness traning