BOOSTER CONNECTION TO
FIRE ENGINEER'S DETAIL.
1. This drawing is to be read in conjunction with all other
architectural and engineering drawings as relevant.
EDGE OF TARRED ROAD
2. No dimensions are to be scaled from this drawing.
WATER MAIN LOCATED IN ROAD RESERV ERE 3. All power and data ducts/ sleeves are to be installed in the road
W
SE
and platform earthworks in accordance with the relevant electrical
engineering details.
M
Cameras mounted on 5m Pole
18
AC
MH 4
1014.15 11 O
5. Drainage pipe from HVAC P-traps (4 no.) shall be in 110mm dia.
T class 51 uPVC pipe laid at 1% slope with necessary fittings and
SAFETY LOOP AC
MH 2 MH 2 EXIT
GUARD ENTRANCE 110mmØ CLASS 16 uPVC 1
terminated into storm water channel/catchpit as indicated.
SEWER
EX.SEWER
EX.
SAFETY LOOP
1000
1000
17.8m M
L=5.3
A
L=10
E ENTRY
6 1014.129 1013.913 7 16
TELCO SIT
MH6 MH5 2
1000
SAFETY LOOP Pedestrian Barrier Fence
MH 3
1 2 3 4 5 6 7 8 9
8 9 10
G
SAFETY LOOP
2
1000
1000
63mm DIA. RING
RING MAIN
MAIN
IN
MH 3 Boom Access controlled MH 2
DD
MH 2
8 14 13
BE
18,446
1013.891
A
E ENTRY
72
S
TELCO SIT
AS
SL1
MH 3
CL
GENERAL
71
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 SL3
35
MH 2
GENERAL
Fire Assembly
30,143
m
Point
70
.7
A
F. H
E ENTRY
21
1014.115
MH 3 1014.076
1013.887
L=
TELCO SIT
1013.897 1013.887
80Ø
69
MH 2
1,424
MH 3 MH 2 MH 3 MH 2
1013.806
36
B C
8,721
Condenser plinth
@ 1014.550 1014.256 17,687
SL1 995HVAC
1,058drainage connected
MH 3 MH 2
MH4
1013.844
ISSUED FOR CONSTRUCTION
68
100 1,056 999 1,054 999 1,058 995 1,058 995 1,058 999 1,054 999 1,058 995 1,058 97
720
8,966
MH 4
73
37
100
3,000
FH
MH 2
2,489
Proposed 1000mm*3000mm
1014.450
4,720
1,230
A A A A A A A A A A
A
1000 Fibre entry manhole
67
4,720
4,706
11,697
Condenser plinth
38
A A A A A A A A A @ 1014.550
2,015
74
8,721
720
FL
66
1014.130
102
8,966 P-trap
Condenser plinth with
2
rodent protection
P in to
1014.30 1014.30
1,141
1,141
open accessible gully to Mechanical open accessible gully to Mechanical
39
14 MH 3 Engineer Specification. Engineer Specification. MH 2 MH 2
MH 4
1014.30
FL FL FL FL
75
65
2,982
MH 2
40
3000x2000x100mm 100 Ø TO EXTERNAL
13,901 100Ø PVC CL16 HIGH CONCRETE 5,460 HYDRANTS RING 5,000
PLINTH MAIN
64
ELECTRIC PUMP EXTRACT
FAN
W
3,230
CONTROL PANEL
FH
76
41
ALARM HORN
JOCKEY
Fire Hydrant
Engineers details
Ø50 Supply to Building
2500x2400mm HIGH
WATER TANK & PUMP-ROOM
ROLLER SHUTTER
63
DIESEL PUMP
1,000
DOOR
PLATE
1 25 May 2022 WIRE WAYS RE-ROUTING
77 MH 3
1013.752 CP6
62
110mm DIA. PIPE
43
80 Ø DRAIN
1000
600X450 PORTAL CULVERT
3
750mm x 750mm
110 mmø
ACCESS PANEL 20 mmø
13 FROM
61
RETICULATION BY 50 mmø 50 mmø
78
15 BUILDING CONNECTION
CIVIL ENGINEER
MH2
GABANA ARCHITECTS
Driveway (delivery only)
110 mmø
20 mmø
60
12,627
CONSORTIUM
45
MH 2 MH 2
79
59
46
VORTEX INHIBITOR
80 Ø DRAIN
750mm x 750mm
ACCESS PANEL
58
80
1014.251
47
2,935 7,550 3,825
MH 2
1,270
57
STEEL TANK ON 7550 x 230 x 600mm HIGH
2,060
48
783
MH 3
MH 3 MH 4
A A
1,270
56
3,311
783
1000
Condeser plinth
49
@ 1014.550 A
A
1,270
FL
82
4,741 3,825
1014.276
783
55
MH 2
19,472
50
1,270
2,965
54
520
MH 3 32,803
2,461
1x9kg FOAM FIRE
230 MH 3
1014.60 MH 1 MH 4
83
EXTINGUISHER
51
SITE BOUNDARY
1014.046 1x9kg FOAM FIRE
P-trap with10,069
500 11,281 500 10,453 MH 3
FL FL MH 2 MH 2
3,715
MH 2
C EXTINGUISHER rodent protection in to C MH 3
FL
200
1013.844 CLIENT:
230 900 230
Future Generator 5
Future Generator 6
Future Generator 7
Future Generator 8
LOADING BAY
900
Engineer Specification.
TELCO SITE ENTRY B
53
Generator 2
Generator 3
Generator 4
230mm concrete trench wall
TANK A
1013.805
NETWORKS
4,670
A MH 3
6,400
6,000
6,000
6,400
A
9,531
900
52
4,854
Generator plinth MH 2
4A (PROPRIETARY LIMITED)
2,823 4,715 Condeser plinth
50 HDPE
@ 1014.550
Generator plinth
Generator plinth
4
@ 1014.550
MH 3
39 837 kg 39 837 kg
FUEL LINE TRENCH
200 OPTION
200 2 FUEL LINE TRENCH OPTION 2
Generator plinth
@ 1014.550
1,218
4
200 200
MH 2 MH 3 750 750
200
200
750 750
4A
1000 ca 27 2,838 2,838
on me 1,3 2,438 1,500 2,438 1,500 2,438 1,500 2,438 1,500 2,438 1,500 2,438 1,500 2,438 1,500 2,438
lig ras
TELCO SITE ENTRY B
SUBSTATION
NO LITTERING NO LITTERING
1,667
1,752
Condeser plinth
@ 1014.550 EXPANSION (DC PHASE 2)
3,600
1013.909 1014.238
BPC
GMS STAIRCASE
5 4B
MH 2
230 23,653
BC3: 220.040
MH 2
817
MH 2
MH 3 MH 3
9,123
UTILITY SITE ENTRY
180
MH 3
Generator trench
110Ø METERED FIRE WATER RING MAIN 63mm DIA. RING MAIN
MH 2
7,286
MH 1 MH 4
4,623
4,623
MH 2
UTILITY POWER
SITE ENTRY TELCO SITE
MANHOLE ENTRY
REFUSE SKIP HVAC drainage connected
MANHOLE B
TELCO SITE ENTRY B
Access road and parking area design levels .....VALVE Manhole position on proposed sewer line
DR. K. J
S.arch.:
MR. L. K. T
GSPublisherVersion 0.3.100.100
REVISIONS REV. 04