Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Min DETAIL A

50kN The hoisting points have to be positioned in the centerline above


every end support, intermediate support (if exists).
and/or above truss joints of each movingwalk .
If no hoisting points can be provided by the builder, hoisting
frames have to be provided. (This point has to be clarified
with the local installation team manager)

31143+5
-5

916 27910 2317

min. 12586
Need to consider additional floor thickness based on this dimension
52 kN
per unit

min. 2300
Min
50kN

5960+5
-5
32610-10
Vertical Concrete
Intermediate Support
Vertical Concrete not in schindler scope

13480-10
Intermediate Support
48 kN not in schindler scope
per unit

12°
B
1150+20
0

SIDE ELEVATION
4050+20
0

Drainage of pit by others

11648+5
-5 9000+5
-5

Section D-D

11648+5
-5 9000+5
-5
800

min. 3080

min. 3080
3180+10

1580
0

Vertical Concrete Vertical Concrete


Intermediate Support Intermediate Support
not in schindler scope not in schindler scope
800

min. 350 min. 350

4050+20
0

Drainage of pit by others


31143+5
-5

Section E-E

By signing this dra


from the factory a
requirement by Sc
to start.
Client Name :

800
Signature :
Date :

3180+10
1580

0
The production

800
G

min. 14903
E
Need to consider additional floor thickness based on this dimension

Builders Plan View


C

06Apr2021 Firs
0

R DATE

Basic according
Additional norms

Schindler O

Schindler
Scale Projec
1:25

Town

You might also like