IM-08-A Project EHS Plan
IM-08-A Project EHS Plan
Approval by
Client
(If applicable)
REVISION NUMBER Revision Status / Details Date Issued Remark
0
1
2
3
Infrastructure Independent Company
Name of the Project
Project EHS Plan
CONTENTS
1 Objective...............................................................................................................................................................3
2 Project Highlights..................................................................................................................................................3
3 Leadership and Commitment...............................................................................................................................3
3.1 Visibility..........................................................................................................................................................3
3.2 Proactive in target setting..............................................................................................................................4
3.3 Company Culture............................................................................................................................................4
3.4 Involvement of Senior Management..............................................................................................................4
4 EHS Policy..............................................................................................................................................................5
5 Integrated management system..........................................................................................................................5
6 RESOURCES MANAGEMENT AND ORGANISATION CHART.................................................................................5
7 Responsibilities.....................................................................................................................................................5
7.1 Project Manager.............................................................................................................................................5
7.2 Cluster EHS Manager......................................................................................................................................6
7.3 EHSO...............................................................................................................................................................6
7.4 Section / Area In-charges...............................................................................................................................7
7.5 All Employees.................................................................................................................................................8
7.6 Site Engineers.................................................................................................................................................8
7.7 Project EHS Committee Members..................................................................................................................8
7.8 Sub-Contractors..............................................................................................................................................9
8 Project EHS Committee.........................................................................................................................................9
9 EHS RISK ASSESSMENT.........................................................................................................................................9
10 List of applicable legal & other requirements..................................................................................................9
11 General EHS Rules & Regulations.....................................................................................................................9
12 Work Permit Systems......................................................................................................................................10
13 Check-lists and Reports...................................................................................................................................10
14 EMERGENCY RESPONSE PLAN........................................................................................................................10
15 List of Job Specific PPE to be used in the Site................................................................................................10
16 TRAINING.........................................................................................................................................................10
17 Communication and Reporting.......................................................................................................................10
17.1 Cascading Information..............................................................................................................................10
18 Any other information relevant to Project EHS Plan.....................................................................................10
19 Annexure A......................................................................................................................................................11
20 Annexure B......................................................................................................................................................12
Page 2 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
1
2 OBJECTIVE
3 PROJECT HIGHLIGHTS
This chapter shall address the brief details of the project such as:
L&T Infrastructure IC Senior Management provides demonstrable management leadership and commitment
through active participation in EHS activities.
Their leadership and commitments translate into necessary resources to develop, operate and maintain L&T
Infrastructure IC EHS Management System and to attain EHS Policy and legal requirements.
We are committed to manage all its activities, risks to ‘As Low As Reasonably Practicable’ (ALARP).
4.1 Visibility
The management will provide strong demonstrable visible leadership and commitments towards EHS by
personal example and action. The Management will participate in EHS meetings, conduct site Inspections
and EHS Audits, to encourage a positive attitude towards EHS.
COMPLIANCE VERIFICATION
No. TASK ACTION BY
TARGET DOCUMENT
Page 3 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
Min
EHS Committee EHS Inspection Report,
2. Project EHS Committee Inspection Frequency :
Members IM-09-B
1 month
5. Giving Safety Certificates, with token gift to the PM Monthly Copies of Certificates
“Best safety conscious personnel” of the month
to recognise good EHS practices.
COMPLIANCE VERIFICATION
No. TASK ACTION BY
TARGET DOCUMENT
Jointly develop and discuss improvement targets and
MOM of Project
1. indicators for each location with Construction Managers &
PM Every Quarter EHS Committee
EHSO. (eg. Training of Workmen – Coverage, Inspection
Meeting
Compliance etc)
MOM of Project
2. Jointly review the Incidence rate of First Aid Cases and set a
PM Every Quarter EHS Committee
target for reduction.
Meeting
COMPLIANCE VERIFICATION
No. TASK ACTION BY
TARGET DOCUMENT
IC / SBG / BU
Put EHS as the “First agenda” of all review meetings at Head
1. Heads / CH / All time MOM
quarters, BUs, Clusters & projects
PM
Empowerment to Stop Work
Employees are empowered to stop work when the situation
warrants immediate action in view of imminent danger to Verbal
2. All All time
life / property / environment. Verification
PM must appreciate and reward those employees whose
prompt action helps avoid potential incident.
COMPLIANCE VERIFICATION
NO. TASK ACTION BY
TARGET DOCUMENT
Review Project EHS Performance and EHS plan implementation Project
1. BU Head -
in consultation with PM & HOD-EHS. Duration
Page 4 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
No evidence of
Ensure adequate professional EHS support is available for
Project EHS discrepancy
2. effectively implementing the EHS plan, fulfilling EHS targets CEHSM
Duration due to lack of
and attaining EHS objectives.
resources
No evidence of
Ensure sufficient support and resources are available to meet
Project EHS discrepancy
3. EHS targets (eg Infrastructure, vehicle, EHS steward, PM / CM
Duration due to lack of
communication, PC, etc )
resources
Impart necessary EHS training for Staff & workmen of the EHS Training
4. PM / CM As required
project. record
5 EHS POLICY
L&T INFRASTRUCTURE IC EHS Management system is established meeting the international standards - OHSAS
18001:2007, ISO 14001:2004 & ISO 9001:2008.
EHSO deployment
CEHSM decides the number of EHSO required to cater the EHS requirement of a project in consultation with
HOD-EHS & PM.
EHS steward deployment
EHS Steward shall be engaged depending on area, criticality of the work carried and work force. Number of EHS
steward may be increased depending upon the risk and work force.
8 RESPONSIBILITIES
EHS management is a line responsibility requiring active participation of all levels of management & supervision.
Individual EHS roles and responsibilities, along with task and target shall be distributed to the individuals for
action, as described below.
Page 5 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
2) EHS audits
Ensure that all staff & workmen are competent to perform their tasks safely
in compliance with EHS Management System and this plan requirement. He
shall do so by ensuring:
Screening of workmen is effectively implemented by the time office & Screening Record
site execution engineers. of workmen
3. Project Duration
EHS Induction provided for all staff & workmen by EHSO before EHS Induction for
deployment. Workmen
Regular monitoring and organise continuous in-house EHS trainings.
EHS Training
Establishing adequate control measures for the employees fitness in
Record
order to avoid fatigue, stress, extended working etc.
4. Project EHS Inspection and EHS Plan implementation monitoring Project Duration Inspection report
Investigation
Investigate all high potential incidents and non-compliance and ensure As & when
5. Reports and
immediate remedial action to stop recurrence. notified
action plans
8.2 CEHSM
VERIFICATION
NO. TASK TARGET
DOCUMENT
Supplement Project EHS inspections & relevant EHS training at the projects Once in Six CEHSM Site Visit
1.
in co-ordination with EHSO. Months Report
Incident
Investigate all serious incidents & recommend preventive actions at As and when
2. Investigation
projects. required
Report
Monitor all EHSO activities & co-ordinate with Clients, Project In charges, As and when No documentary
3.
CH, BUH, Service Dept Heads required evidence
During January & Record of EHS
Organise campaigns, competitions & other special emphasis programmes to
4. as and when Campaign and
promote EHS at workplace.
required competitions
5. Conduct EHS Audit and Inspection during the Project duration. As per schedule Audit Report
8.3 EHSO
VERIFICATION
NO. TASK TARGET
DOCUMENT
Disseminate and Communicate EHS Policy, EHS Management System
1. Project Duration -
requirements to project personnel.
Provide necessary advice, information and support in the effective
2. implementation of the EHS Management System requirements and this Project Duration -
EHS plan.
Update the EHS Plan to the requirements of the activities being carried
3. Project Duration EHS Plan
out when there is a revision.
Plan and conduct Internal EHS training programs, initiate drive to EHS Training
4. Project Duration
promote EHS awareness and performance. Records
Carry out EHS inspection of Work Area, P&M Equipments & Machineries, As per Monthly Inspection
5.
etc. as per the IMS requirement. Activity Plan Reports
Tool box talk
6. Creating EHS awareness through Tool Box talks. Every day
Report
7. Advise and co-ordinate with line management in preparing EHS Risk Project Duration EHS Risk
Page 6 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
Convene EHS Committee meeting & minute the proceedings for MOM – Project
Min Frequency –
9. circulation & follow-up action. EHS Committee
Once in a month
Meeting
Whenever work
Advise & co-ordinate for implementation of Work Permit Systems. Completed Work
10. requiring WPS is
Permit
executed
Plan procurement of PPE & safety devices and inspect before use as per Delivery Challan
11. laid down norms. Project Duration
Records
Report to CEHSM on all matters pertaining to status of EHS and
12. promotional programme at project level. Regular basis -
Screening &
13. Facilitate screening of workmen and conduct EHS induction. Project Duration Induction
Records
14. Monitor administration of First Aid. Project Duration First Aid Register
Fire Drill
Conduct Fire Drill, Procure, inspect and arrange to maintain Fire As scheduled in the Register, Fire
15. Extinguishers. monthly activity extinguishers
plan inspection
register
Organise campaigns, competitions & other special emphasis programmes Record of EHS
As and when
16. to promote EHS in the workplace. Campaigns &
required
Competitions
Customer
17. Register Customer complaints and take corrective action. Project Duration Compliant
Register
First Aid
Record, analyse and cascade lateral learning points from First Aid Cases, Register;
18. Near Miss Cases & Accidents to all project personnel and analyse the Monthly Incident
trends & effectiveness. Investigation
Report
Maintain all EHS related documents EHS related
19. Continuous
Update EHS training records Documents
Ensuring compliance of L&T Infrastructure IC basic EHS rules and applicable EHS Inspection
specifications by report,
Taking prompt action of project inspection and hazard findings. Project
2. EHS Risk
duration
Closing all the points identified in inspection reports Assessment
Ensure EHS Risk Assessment is done for all the jobs under him. records
Page 7 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
Ensure that all near miss cases / Reportable LTI / Dangerous Occurrence / As & when
3. Reports
Fatality are reported promptly. notified
4. Participate regularly in EHS meetings. As scheduled MOM
Page 8 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
Minimum
Analyse all the activities of the forthcoming period and identify the possible MOM – EHS
2. once in a
hazards and finalizing the precaution to be taken. Committee Meeting
month
Minimum
Monitor the EHS Performance of the project and suggesting improvements MOM – EHS
3. once in a
whenever needed. Committee Meeting
month
EHS Inspection
Actively participate in the EHS Committee Inspections & assess Key As per Report,
4.
performance indicators on EHS. Schedule
KPI report
8.8 Sub-Contractors
All Subcontractors / Vendor / Supplier / Third Party performing services at the Project shall be subject to this plan
requirement.
COMPLIANCE VERIFICATION
NO. TASK
TARGET DOCUMENT
Understand the EHS code of practice for subcontractors and sign the same Before starting EHS Code for Sub
1.
as a token of acceptance before starting the activity. the activity contractors
Subcontractor, his Supervisor and his workmen shall adhere all the laid
Monthly Evaluation
2. down EHS rules & regulations while working at site, follow the instruction / Continuous
of Subcontractors
advice of Site engineer & EHSO from time to time.
This section shall give the details of the Project EHS Committee formed as per the procedure IM – 10. Formation
of Project EHS Committee shall be detailed here.
This section shall comprise the EHS Risk assessments prepared as per the procedure manual.
This section shall detail the list of applicable legal & other requirements pertaining to EHS.
This section shall detail the general EHS Rules & Regulations to be adopted in the project for the following areas.
Use of Personal protective Equipment and safety devices relevant to project activities.
General housekeeping, stacking of materials.
Road safety inside project
Access, Egress & workstation safety
Safe use of construction power supply and upkeep / maintenance of installations.
Use, maintenance & Inspection of Plant & Machinery.
Scaffold & Formwork norms.
Use of safe material & personnel handling devices as per requirement.
Page 9 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
This section shall address the work permit system applicable for the project and details of the person authorised.
This section shall give the list of applicable checklists and EHS reports.
Emergency Response Plan shall be prepared as per the guideline provided in the EHS Manual and as per IM-28.
This section shall give a matrix of applicable PPE versus the activities. Typical Matrix is given in Annexure A, shall
be made project specific. List of Job specific special PPEs to be used in project shall also be included in the matrix.
17 TRAINING
This section shall give a matrix of applicable Training versus category of peoples. Typical Matrix is given in
Annexure B, shall be made site specific.
COMPLIANCE VERIFICATION
NO. TASK ACTION BY
TARGET DOCUMENT
EHS NOTICE BOARD
Fix EHS Notice board at project office and other conspicuous
locations for cascading EHS messages such as EHS Notices,
Daily / Weekly
1. Safety Alerts, Posters and incident evaluation etc., and EHSO EHS Notice Board
update
regularly update.
Install and maintain EHS performance board showing Safety
statistics i.e. days without LTI etc.
2. PROMOTION
Page 10 of 15
Infrastructure Independent Company
Name of the Project
Project EHS Plan
Monthly Incentive
Select “Safe Man of the month” on the basis of EHS Monthly Incentive Scheme
PM / EHSO
performance evaluation and award certificate of record
commendation along with a token gift.
Page 11 of 15
20 ANNEXURE A
PPE MATRIX
Hearing protection
Body Protection
Welding helmet
Safety harness
Foot Protection
PPE
Organic mask
against Dust
Safety glass
Respiratory
Face shield
Protection
Protection
Category
Executives / Supervisors
Foreman
Unskilled workmen
Formwork
Scaffolding
Masonry works
Barbending works
Grinding / Polishing
Rigging
Welding / Cutting
Painting
Sand blasting
Insulation work
Roof work
& Supervisor
Technician &
TRAINING
PM / CM / RE
Site Engineers
Sub-contractor
P&M Supervisor,
EHS Supervisors /
Site Supervisors &
REQUIREMENT
Manager, Engineer
Training
Topic
TRAINING MATRIX
EHS Induction
21 ANNEXURE B
EHS Plan Briefing
Abrasive Blasting
Blasting
Concreting
Confined Space
Demolition
Electrical safety
Note: This is an indicative matrix, it shall be made site specific.
Environment
Name of the Project
Excavation
Grinding
Page 13 of 15
Lighting
Managerial aspects
Material handling
Occupational health
Piling
PPE
Radiography
Road works
Safety signs
Structural erection
workmen
Formwork /
Bar bending
Operators &
Electrician &
TRAINING
Radiographers
Electrician Helper
Chemical handling
Scaffold Workmen
Security personnel
Welder, Gas cutter
Masonry workmen
REQUIREMENT
Drivers, Equipment
Electrical Workmen
workmen / Painters
Training
Topic
EHS Induction
Abrasive Blasting
Blasting
Concreting
Confined Space
Demolition
Electrical safety
Environment
Name of the Project
Excavation
Grinding
Page 14 of 15
Lighting
Managerial aspects
Material handling
Occupational health
Piling
PPE
Radiography
Road works
Safety signs
Structural erection
Page 15 of 15