1 Calculation of Loads:-
Design of steel girder erection 16.48m eff. Span (say 16.5m) over track portion:-
Dead load:-
Weight of BOW String Steel Girder = 300 T
Live load:-
Live load = 1.2x16.5x3.6 = 71.28 KN (Live load 3.6 KN/m2 as per Cl 4.2.2 of IRC- 87-2018)
Wind load :-
Upward or Downward Vertical Wind Load Ft = PtX A3XGxCL (As per IRC-6 —2017)
Average height of Exposed Area = 10 m
Basic Wind Velocity = 44 m/sec (Appendix “A” IS : 875-pt 3)
Basic wind pressure P, = 0.464 KN/m2 (as per IRC - 6 - 2017 )
Basic wind Pressure (P,) 44/33 X0.464 = 0.619 KN/m2
Gust Factor = 2 = 2
Lift Co-
efficient ‘Ct’ = 0.75 0.75
=
Area(A3) = 1.20 X16.5 = 19.8 m2
= 23.33756 mm
= 23.33756 mm < 50.76 mm Hence Ok