Case Study
WATER TREATMENT
AT A GLANCE
CUSTOMER
Central Arkansas Water
LOCATION
Little Rock, Arkansas
CHALLENGE
Provide standby emergency
power for Ozark Point water
treatment plant equipment
SOLUTIONS
• KOHLER® KD1250-A
generator
The Ozark Point water treatment 480 VAC emergency generator set
plant uses several high-horsepower voltage to the 2400 VAC utility service
motors for the filter backwash voltage connected to the 2400 VAC
process and water distribution system paralleling switchgear. The new 2400
pressurization. When Central Arkansas VAC paralleling switchgear would
Water (CAW) wanted to expand its service all existing water treatment
water treatment facility and ensure plant loads as well as a new 200-hp
constant power for its new high service high-service pump. In addition to the
pumps, new backwash blowers, and new 200-hp pump, other high-service
other existing plant loads, it knew pumps were added including 125-hp,
it could rely on KOHLER® standby 300-hp, and 400-hp units. By design,
power solutions and the expertise of the additional motors would be shed
authorized distributor, RP Power, which during emergency operation, making
specializes in water and wastewater it possible to optimize the generator
treatment facility power needs. set capacity, and yet keep the plant
operational given a utility outage.
Founded in 1998, RP Power is the
authorized distributor for KOHLER SOLUTION
Power Systems in Arkansas, Kentucky, The emergency standby solution for
Mississippi, Louisiana, and Oklahoma the water treatment plant expansion
for power generator systems. includes a KOHLER KD1250-A
It provides rapid response for parts generator set, featuring a KOHLER
and maintenance 24/7 and prides brushless, permanent-magnet pilot
itself on unmatched technical exciter alternator for excellent voltage
assistance and support services. Its response and short circuit capability.
goal is to become the most trusted The generator features the KOHLER
single-source provider of premium KD Series™ engine, specifically
power products and services. engineered for generator applications.
The engine offers the highest power
CHALLENGE density and lowest fuel consumption,
The project posed several challenges,
at more nodes between 800 and
not least among them, the location
4000 kW, than any competitive
The solution for Central Arkansas of the site. Adjacent to an historic
product. The result is higher
Water includes the KOHLER area, the streets were narrow and had
performance at reduced operating
PD-Series switchgear, KOHLER several tight curves, posing difficulties
costs. It runs smoothly and quietly,
PD-Series switchgear control panel for the cranes, semitrucks and other
creating very little vibration, even under
with HMI screen, and the APM603 heavy equipment required for the
extreme operating conditions. On-
controller. delivery, offloading, and installation of
board diagnostics provide operator
the equipment.
insight for easier maintenance and
KOHLER Power Systems has deliv-
Complicating the solution was the long-term performance.
ered energy solutions for markets
need to power the existing electrical
worldwide since 1920. For more An aluminum sound level 2 enclosure
service with 2400 VAC, three-phase.
information, visit KohlerPower.com. with Power Armor™ automotive-grade
The design was based on providing
finish provides advanced corrosion
2400 VAC switchgear to match
and abrasion protection as well as
the existing electrical service.
enhanced edge coverage and color
Subsequently, a decision was made
retention. An internal silencer provides
to provide a 480 VAC, three-phase
quiet operation, maximum component
generator that could accommodate
life, and increased operator safety. A
the integration of a rental generator
cold-weather package consisting of
when the permanent generator
a generator heater, block heater, and
was down for service or repairs. To
battery charger ensure operation in
facilitate this addition, a step-up
inclement conditions.
transformer was used to step up the
WATER TREATMENT CASE STUDY
RESULTS
The integrated emergency standby power
solution for Central Arkansas Water (CAW)
has been commissioned and is performing
exceptionally well. The staff at CAW knows
it can count on Kohler reliability. The custom
work performed by Max Foote Construction
as well as Koontz Electric to properly
integrate the Kohler solution allowed CAW
to meet a precise need now, as well as into
the future, as further expansion plans are
being developed. According to CAW
Operations Manager, Doug Farler,
“The collaboration between Kohler, RP
Power, and Max Foote allows CAW to
maintain full plant operation regardless of
external power issues.”
KOHLERPOWER.COM