JSA - Area Hard Barrication
JSA - Area Hard Barrication
Location:- Date :
Sr.No. Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
Only inducted worker shall be deputed at the work place.
Untrained worker Personal injury
1 Manpower Mobilization Given Tool Box Talk to all workers.
Break down Ensure daily maintance of excavator
Evaluating the capacity of the dumper
Provision of banks man for guiding the process and stopper for
vehicle.
Personal injury
2 Loading & unloading Fall/Slip/Trip Ensuring the level ground for unloading dumper at dumping area.
Material stacking not less than 1.5 mtrs from the edge of the pit .
Personal injury Ensuring safe working height for stacking of the material.(1.5 mtrs)
Name & Signature of Site Engineer / Supervisor :___________ Name & Signature of Site In-charge :___________