TRASNFER POSTING
BUSINESS SCENARIO
CHAITANYABHANGALE@GMAIL.COM
Now i want to trasfer material from unrestricted to quality
CHAITANYABHANGALE@GMAIL.COM
I AM TRASFERING
135 STOCK
MOVEMENT TYPE
IS ENTERED
NO ACCOUNTING
GENERATED
MATERIAL IS
TRASFER IN
QUALITY STOCK
CHAITANYABHANGALE@GMAIL.COM
MATERIAL TO MATERIAL STOCK TRASFER
Material to material trasfer posting is used when material change its property
after certain period
BUSINESS SCENARIO
PREREQUISITE
CHAITANYABHANGALE@GMAIL.COM
STEPS 1 : CREATE MATERIAL
SR NO MATERIAL PRICE
1 MATERIAL A CONCENTRATED 300
2 MATERIAL A DILUTED 200
CHAITANYABHANGALE@GMAIL.COM
STEPS 2 TRASFER POSTING MATERIAL TO MATERIAL
MOVEMENT TYPE
309
I TRASFER 120
MATERIAL FORM
10070 TO 10071
BSX DEBIT
BSX CREDIT
CHAITANYABHANGALE@GMAIL.COM
STEPS 3 CHECK STOCK ENTRY
CHAITANYABHANGALE@GMAIL.COM
CONSIGNMENT TO WAREHOUSE STOCK TRASFER
When we have to trasfer stock from consignment stock to
warehouse stock
We have to do trasfer posting
Movement type 411
It is used when consignment procurement is done
CHAITANYABHANGALE@GMAIL.COM
STOCK TRASFER
BUSINESS SCENARIO
In jsw plant a have several storage location
Maintaince people need some material but due to some procurement issue
material is not availbale
So they took material from production storage location and kept in
maintaince storage location
Material is moved from one storage location to another storage location to
show in system we have to do stock trasfer
Storage location can be done single step and two step
If material is moved directly from sl1 to sl2 then single step 311
If storage location 2 is far away from storage location 2 then material is
moving in trolley cart we have to do in two step trasfer so that storage
location 1 to stock in trasit 313 and stock in trasit to Storage location2 315
movement type
CHAITANYABHANGALE@GMAIL.COM
In below example I have shown for storage location one to storage location two
one step (311 MOVEMENT TYPE SL1 TO SL2)
STORAGE
LOCATION 1 STOCK
480
CHAITANYABHANGALE@GMAIL.COM
I WANT TO
TRASFER
MATERIAL
STORAGE
LOCATION 1 TO
STORAGE
LOCATION 2
80 NOS
80 NOS IS
TRASFER TO
STORAGE
LOCATION 2
CHAITANYABHANGALE@GMAIL.COM
SAME WAY WE CAN DO STOCK TRASFER IN TWO STEP
STEP 1 CHECK MATERIAL STOCK
In two step
CHAITANYABHANGALE@GMAIL.COM
50 NOS MATERIAL
REMOVED FROM
STORAGE
LOCATION 1
CHAITANYABHANGALE@GMAIL.COM
STEP 4 TRASFER POSTIONG 315 FROM STOCK IN TRASIT
TO STORAGE LOCATION 2
MATERIAL IS
TRASFER FROM
TRASIT TO
STORAGE
LOCATION 2
50 NOS DEBITED
50 NOS RECEIVED
Similar way for stock trasfer from one plant to another plant same process to
be follow on system
CHAITANYABHANGALE@GMAIL.COM
STOCK TRASPORT ORDER
Sometime destination plant is far away from destination
This type of stock transfer involves not only Inventory Management but also
Purchasing at the receiving plant.
The process begins when receiving plant purchasing department send stock
transport order to receiving plant
A goods issue referencing this stock transport order is then entered in the
issuing plant
The quantity booked out is initially managed as stock in transit at the
receiving plant.
The process is ended by the posting of the goods receipt against the stock
transport order at the receiving plant.
CHAITANYABHANGALE@GMAIL.COM
I Require material in Mumbai plant 400 nos from Gujarat plant
ITEM CATEGORY U
SYSTEM
AUTOMATICALLY
ASK FOR SUPPLY
PLANT
WE HAVE TO GIVE
DOCUMENT TYPE
SYSTEM DIRECT ADOPT
ALL DATA FROM
PURCHASE REQ
CHAITANYABHANGALE@GMAIL.COM
STEP 3 CHECK MATERIAL STATUS
MATERIL IS ON
ORDER STOCK
MATERIAL IS ISSUE
FROM SUPPLYING
PLANT
MATERIAL IS REMOVED
FROM CB51 PLANT
MATERIAL IS IN TRASIT
CHAITANYABHANGALE@GMAIL.COM
STEP 6 GOOD RECEIPT IN CB50 PLANT
MATERIAL IS
RECEIVED TO CB50
PLANT
480 NOS IS
RECEIVED IN
PLANT CB51 PLANT
CHAITANYABHANGALE@GMAIL.COM
STOCK TRASFER WITHOUT
STOCK TRASPORT ORDER
STOCK TRASPORT ORDER
Integrated with mrp
Purchase req generated with mrp can be not integrated with mrp
converted into stock trasport order
The entire process is monitor in po
Can not be tracked
history
Delivery schedule can be planned Delivery schedule can nont be planned
The good receipt can be posted directly
Material can be only trasfer
to consumption
In involve purchasing + inventory both
It is inventory management function
function