Site & Ground Floor Plan Basement 1 & Basement 2 (if applicable) Upper Floor Plans (Retail) Upper

(if applicable) Upper Floor Plans (Retail) Upper Floor Plans (Office) Terrace Floor Plan Sections Elevations Staircase Toilet

FHC shaft with access double door in the Fire Lift Fire Escape Staircase Head room
Boundary wall/ Site line Ramps with drains at the bottom end (proper annotation) FHC shaft with access double door in the Fire Lift Lobby Material hatch grid lines with bubbles grid lines with bubbles grid lines with bubbles
Lobby with Fire door

Fire escape staircase; Fire door connecting Fire lobby and Fire Fire escape staircase; Fire door connecting Fire Lift Machine room(s) - With steps material texture and
Entry and Exit Gates/ Points Parking (dimensions and driveway indications thick ground line All levels marked
escape staircase lobby and Fire escape staircase to reach the Lift machine room hatch all fixtures
Parapet details + Shaft Dog boundary wall with
Ramps with proper annotation Pump room with fire doors Detailed Retail Spaces Detailed Office Spaces with Partitions and Doors thick ground line approach till next space All levels marked
Houses setback line
Valley and Ridge Lines, Slope material texture and
kurbs Sumps (maybe in dotted if it is below) with top access manholes Store Space (if aplpicable) Toilets as per NBC calculation beams All levels marked
directions, Levels hatch
PHE shaft with access panel (600mm wide access Rain Water Downtake Pipes with columns & drop pannel (if
Greens/lanscape - what happens in the 2m space between site line and construction? STP and inspection room Retail Maintenance Office (if Applicable) Windows/openings
Min.) Khurras applicable)
Electrical Shaft with access panel - If a person has
to go in the shaft to maintain the shaft should be at
Rain water IC Manholes PHE shaft Slab cutout above Retail Lifts & Staircase inside the retail space least 600mm wide, if direct access to cables is Chiller Pedestal (if applicable) grid lines with bubbles
provided without the need t go in the shaft then only
300mm wide X 1000mm long shaft/cutout required

Part Plan Showing OHTS with


Sump Access Manholes (if applicable) Electrical Room (either on B1 or Gr. Floor level) Toilets as per NBC calculation (if applicable) DB Spaces All levels marked
ladder to reach the top
6m wide Fire tender movement road all around the building or 2/3 of site perimeter Electrical shaft slab cutout above PHE shaft with access panel (600mm wide access Min.) Wall Type hatch legend Sunken Slab
Electrical Shaft with access panel - If a person has to go in the
shaft to maintain the shaft should be at least 600mm wide, if
HT YARD & DG YARD - fencing and opening DB Spaces direct access to cables is provided without the need t go in the Door & Window Shcedule mumty room (if applicable)
shaft then only 300mm wide X 1000mm long shaft/cutout
required
Storm water drain covers Fire control room (either on B1 or Gr. Floor level) DB Spaces lift room (if applicable)
Ramps or Steps to the plinth FHC with doors Wall Type hatch legend basement ramp & curb wall
Basement 2 vent fans (either on this level or on the terrace) Loading/unloading (if applicable) Door & Window Shcedule
Basement 1 does not need a Fire escape staircase for exit, However
FHC shaft with access double door in the Fire Lift Lobby
B2 will need a fire escape staircase
Fire escape Staircase directly opening outside the building with fire door B2 ventilation wall cutouts and shaft
Fire Control room (2 X 2m); access from common space or outside (if applicable); ELV
B1 - Drains and MH for water collection from basement
cables for Smoke detectors and speakers from FHC go to this room
Electrical Room (3 X 2.5m) with fire door; access from common space or outide (if
Ventilators on the Ramp side
applicable)

Electrical Shaft with access panel (if outside elecrical room)/ Electrical Slab cutout (if
inside the electrical room) - If a person has to go in the shaft to maintain the shaft
Wall Type hatch legend
should be at least 600mm wide, if direct access to cables is provided without the need t
go in the shaft then only 300mm wide X 1000mm long shaft/cutout required

DB Spaces Door & Window Shcedule


Loading/unloading (if applicable)
Store room (if applicable) with Freight lift
Retail Entrance/ Exit
Toilets as per NBC calculation (if applicable)
PHE shaft with access panel (600mm wide access Min.)
HVAC shaft with access panel (600mm wide access Min.)
Rainwater Downtake shafts (if applicable)
Facade Glazing/ windows/ ventilatos etc.
Door & Window Shcedule