Professional Documents
Culture Documents
Powder Coating (On Steel) Audit Check Sheet - 23.02.2021 - Rev 1.0
Powder Coating (On Steel) Audit Check Sheet - 23.02.2021 - Rev 1.0
1 Certificate Type
2 Certified by
3 Certification Date
4 Certification Period
5 Valid up to
10
11
12
13
14
15
The Action plan should be submitted to TVSM within 6 working days from the date of audit.
Score
# CHECK POINTS
0 1 2 Remarks
Document Control ( Management
1.0
Responsibility ) 0x 1x 2x
1.01 Verify for latest drawings in TVS Motor company name
Verify for incoming inspection plan for all ( PT chemicals
1.02
& Powder from approved source)
Verify for List of Approved RM supplier list and Tier 2 /
1.03
Vendor list for special process (TVSM Approval is must)
Check for availability of latest TVSM Standard /
1.04
International standard /Customer requirement
Verify Operation standards, PFD,PFMEA,Control Plan
1.05
etc., (PPAP) (availability, adequacy, adherence)
Customer approval records for changes, deviations etc., (
1.06
Process Change, Source change or any 6M change)
Check whether Tier 1 source is following audit system of
1.07
AIAG CQI 12 with records
Check whether Tier 1 source is having auditing system
1.08
for tier2 with records
Check for availability of Supplier inspection report as per
1.09 latest TVSM Standard / International standard
/Customer requirement.
External test or 3rd Party (NABL) lab test plan /
1.10 adherence & Adequacy / records, in case of lack of
facility.
1.11 Availability of child part matrix and inspection plan.
3 Process Control 0x 1x 2x
3.01 Availability of qualified persons (Chemist)
3.22 Verify for Dry off oven Baking schedule. (with poke yoke)
4 Product Test 0x 1x 2x
Check inspection plan and records as per TSES 083
4.01
(except h & j other parameters to be tested on part)
Check whether separate inspection facility with adequate
4.02
light ( 1000 lux available )
a Visual 100 %
b Coating thickness
d Corrosion resistance
f Humidity resistance
g Acid resistance
n Ageing test
t CASS test
v Benzene/Petrol resistance
8 Maintenance 0x 1x 2x
8.01 Procedure for preventive and breakdown maintenance
12 Training 0x 1x 2x
12.01 Are operators / inspectors trained in related work
Procedure available but adherence not satisfactory / No procedure available but evidence of work
System in place but adherence is not satisfactory 1 practice found good which can be converted into procedure / Procedure available but not adequate
Procedure available and adherence is good. Evidence of complete activities available and improvement
System in place and adherence is good 2 action evidence through review minutes. PDCA improvement is seen