NABINAGAR POWER GENERATING CO. PVT. LTD.
Consultant:-
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISES)
ENGINEERING DIVISION
Project:
NABINAGAR SUPER THERMAL POWER PROJECT (3X660 MW)
Digitally signed
Title:-
Signature Not Verified
by Niraj Kumar
Date: 2014.10.13
13:40:59 IST
Reason: CAT I
Data Sheet of Diesel Engine for Fire water Hydrant, Spray and Booster
Location: Pumps
NTPCEOC
CONTRACTOR:
SURELAND INDUSTRIAL FIRE SAFETY LIMITED, BEIJING
Prepared Checked Approved Date Job No.
NP JNT MS 04.04.2014 SIFSL:535
NTPC’s DOC.No: Contractor’s Doc No.
0370-151-PVM-Y-002
Sheet: 1 of 12 Rev 1
SIFSL-535-PVM-Y-002
FROM : SURELAND INDUSTRIAL FIRE SAFETY LIMITED, BEIJING
TO : NATIONAL THERMAL POWER CORPORATION LIMITED
SUBJECT: NABINAGAR SUPER THERMAL POWER PROJECT ( 3 x 660 MW)
VENDOR DRG.NO:SIFSL‐535‐PVM‐Y‐002
NTPC DRG.NO: 0370‐151‐PVM‐Y‐002
NTPC DRG NO 0370 151 PVM Y 002
DRG.TITLE:Data Sheet of Diesel Engine for Fire water Hydrant, Spray and Booster Pumps
COMPLIANCE REPORT
Sr.No Comments Compliance ‐ Rev.01 Dated 24.09.14
Rev.00 (Reference: CC:PE151:5188, DATED:
24.04.2014
Indicate power requirement at duty point.Min.
20% margin shall be provided over the power
Document is revised inline with NTPC
1 required at duty point of the pump after
comments.
considering the effect of site elevation &
ambient temp.
temp
As per tech spec.,batteries & battery charger Document is revised inline with NTPC
2
for diesel shall be supplied. Mention the same. comments.
after considering the effect of site elevation Document is revised inline with NTPC
3
and ambient temperature comments.
(silencer),metal expansion bellow & Insulation Document is revised inline with NTPC
4
(asbestos roof exhaust piping) comments.
check.
Document is revised inline with NTPC
5 Also mention cooling water inlet/outlet
comments.
temperature
p and cooling
g water requirement
q
mention pressure and temp value to be Document is revised inline with NTPC
6
mentioned for which alarm will takes place comments.
Document is revised inline with NTPC
7 as per IS 563
comments.
whether engine provided with an adjustment
governor to control engine speed under any
Document is revised inline with NTPC
8 condition of load up to full load rating and the
comments.
governor set to maintain rated pump speed at
a max. flow-?
DATA SHEET OF DIESEL ENGINE FOR FIRE WATER HYDRANT, SPRAY & BOOSTER PUMP
PROJECT : NABINAGAR SUPER THERMAL POWER PROJECT ( 3 x 660 MW)
PACKAGE : FIRE DETECTION & PROTECTION SYSTEM
CLIENT : NABINAGAR POWER GENERATING CO. PVT. LTD.
CONSULTANT : NTPC LIMITED
CONTRACTOR : SURELAND INDUSTRIAL FIRE SAFETY LIMITED, BEIJING
SIFSL DOC.NO : SIFSL-535-PVM-Y-002 SHEET: 2 of 11
NTPC DOC. NO : 0370-151-PVM-Y-002 REV. 1 / DATE: 24.09.2014
Sl.No Description Main Spray & Hydrant Pump Spray Booster Hydrant Booster
Heat Exchanger Water Heat Exchanger Water
1.0 Type Heat Exchanger Water Cooled Engine
Cooled Engine Cooled Engine
2.0 Manufacturer Greaves Cotton Ltd Greaves Cotton Ltd Greaves Cotton Ltd
3.0 Model No 6G11TA 4G11TA 3G11T
4.0 QTY 2 1 1
5.0 Number of Cylinder; bore & stroke(in mm) 6;105x130 4;105x130 3; 105 x 130
6.0 Rated RPM 1500 1500 1500
7.0 Brake horse power rating of engine at rated of engine RPM(HP) 254 Hp 125hp 60hp
7.1 Power Required at Duty Point 201.41 HP 84.16 HP 34.66 HP
Net brake horse power available at shaft at rated RPM (HP) after 243.84 120 57.6
7.1.1 deductingall auxillary power consumption and also derating for site elevation
& temperature
Deration as per IS10000, ISO8528; ISO3046 (Derated HP at 1500 RPM)
7.1.2 Power Required at 150% of rated discharge/Capacity 233.65 HP 102.74 HP 41.46 HP
Margin provided over the power required at duty point of the pump when
7.1.3 R1 8.70% 21.66% 44.72%
delivering 150% of rated discharge / capacity
8.2 Derating factor values considered in 7.1.1 above 4% 4% 4%
Margin provided over the power required at duty point of the pump.after
8.2.1 R1 21.14% 42.57% 66.18%
considering the effect of site elevation and ambient temperature
The Engine exhaust piping will be taken outside pump house to a sutiable height and shall be sepereate with muffler
8.3.8 Stack
R1 (silencer) SS Metal Expansion Bellow & Insulation (Asbestos roof Exhaust Piping in Sureland scope)
12.0 High water temperature shut down switch provided as per specification? Yes
Privision of suitable single phase 230V fuel pump (portable) to fill in diesel
22.1 oil from diesel drim received from supplier of diesel. This pump shall also Provided
have the facility to operate by hand , if electricity fails.
As per IS: 1460 2005 with 5% to;erance and SFC figures are for a well run in engine
Note:1 The performance parameter are for a well run in engine running at ISO conditions (ISO 3046- Ambient temp of 25 deg C, relative humidity of 40% and at sea level altitude) with of 10200 kcal/kg
.Tolerance apply to power and fuel consumption is as per ISO 3046
Note:2 Inlet temp. to Cooler will always be higher and Post Cooling temp. Comes down and hence inlet to Cooler Temp. is higher than Outlet
PROJECT : NABINAGAR SUPER THERMAL POWER PROJECT (3X660 MW)
PACKAGE : FIRE DETECTION & PROTECTION SYSTEM
CLIENT : NABINAGAR POWER GENERATING CO. PVT. LTD.
CONTRACTOR : SURELAND INDUSTRIAL FIRE SAFETY LIMITED, BEIJING
REV.No. REVISION DESCRIPTION DATE PREPD APPD
1275
1200
1700
PLAN
CLIENT : NABINAGAR POWER GENERATING CO. PVT. LTD.
CONTRACTOR : SURELAND INDUSTRIAL FIRE SAFETY LIMITED, BEIJING
3700
LOUVERS
GLASS
750
1900
2200
500 DOOR
DOOR DOOR DOOR
BASE
RAIL
FOUNDATION
BED
200
100 100
2540 200 1100 200
2740
PACKAGE FIRE DETECTION & PROTECTION SYSTEM
CLIENT A/c. NTPC LIMITED
PROJECT MEJA THERMAL POWER PROJECT (2 x 660MW)
0
75 RETURN
HANDLE
BILL OF MATERIAL
1. MS PLATE - 3MM
LEVEL GAUGE 2. BALL VALVE 1 INCH-2NOS
3. HALLEN BOLT25X8MM-24NOS
800
4. BREATHER - 1 NO
5. PAINT - POST BOX RED
DRAIN VALVE
SUPPLY TO ENGINE
PROJECT : MEJA
PROJECT THERMALSUPER
: NABINAGAR POWER PROJECTPOWER
THERMAL ( 2 x 660 MW) (3X660 MW)
PROJECT
PACKAGE : FIRE
PACKAGE : FIRE DETECTION
DETECTION&&PROTECTION
PROTECTION SYSTEM
SYSTEM
CLIENT : NTPC
CLIENT LIMITED POWER GENERATING CO. PVT. LTD.
: NABINAGAR
CONTRACTOR
CONTRACTOR : SURELAND
: SURELAND INDUSTRIAL
INDUSTRIAL FIRE
FIRE SAFETY
SAFETY LIMITED,
LIMITED, BEIJING
BEIJING
1400
1000
990
PLAN
500
3300
LOUVERS
GLASS
750
1800
2100
500
DOOR DOOR DOOR
DOOR
BASE
RAIL
FOUNDATION
BED
200
100 100
2105 800
200 200
2305
PACKAGE FIRE DETECTION & PROTECTION SYSTEM
CLIENT A/c. NTPC LIMITED
PROJECT MEJA THERMAL POWER PROJECT (2 x 660MW)
0
70 RETURN
HANDLE
BILL OF MATERIAL
1. MS PLATE - 3MM
2. BALL VALVE 1 INCH-2NOS
LEVEL GAUGE 3. HALLEN BOLT25X8MM-24NOS
4. BREATHER - 1 NO
700
DRAIN VALVE
SUPPLY TO ENGINE
PROJECT : NABINAGAR
PROJECT : MEJA THERMALSUPER
POWERTHERMAL
PROJECTPOWER PROJECT
( 2 x 660 MW) (3X660 MW)
PACKAGE
PACKAGE : :FIRE
FIREDETECTION
DETECTION&&PROTECTION
PROTECTIONSYSTEM
SYSTEM
CLIENT : NABINAGAR
CLIENT : NTPC LIMITED POWER GENERATING CO. PVT. LTD.
CONTRACTOR
CONTRACTOR : SURELAND
: SURELAND INDUSTRIAL
INDUSTRIAL FIRE
FIRE SAFETY
SAFETY LIMITED,
LIMITED, BEIJING
BEIJING
1000
1400
990
PLAN
400
3000
PUMP SIDE VIEW L.H.SIDE VIEW RAD SIDE VIEW
LOUVERS
GLASS
750
1800
2100
500
DOOR DOOR DOOR
DOOR
BASE
RAIL
FOUNDATION
BED
200
0
70 RETURN
HANDLE
BILL OF MATERIAL
1. MS PLATE - 3MM
2. BALL VALVE 1 INCH-2NOS
LEVEL GAUGE 3. HALLEN BOLT25X8MM-24NOS
4. BREATHER - 1 NO
700
DRAIN VALVE
SUPPLY TO ENGINE