Professional Documents
Culture Documents
2021.04.06 BQ 56009 - Apartment
2021.04.06 BQ 56009 - Apartment
2021.04.06 BQ 56009 - Apartment
ARCHITECTURE WORKS
BILL SUMMARY
Summary
PRELIMINARIES
GENERAL NOTES :-
PRELIMINARIES (Cont'd)
GENERAL NOTES :- (Cont'd)
GENERAL
DOCUMENTS
PRELIMINARIES (Cont'd)
CONTRACT AND PRICING OF PRELIMINARIES
(Cont'd)
PRELIMINARIES (Cont'd)
ADMINISTRATION OF CONTRACT AND WORKS
(Cont'd)
PRELIMINARIES (Cont'd)
SITE AND WORKS (Cont'd)
PRELIMINARIES (Cont'd)
COMPLETION
PRELIMINARIES (Cont'd)
OTHERS
A ……………………………….. Item
B ……………………………….. Item
C ……………………………….. Item
D ……………………………….. Item
E ……………………………….. Item
3003 MEIKARTA BLOCK 56009 - AB MIRROR
ARCHITECTURE WORKS
BILL 1 - PRELIMINARIES
1.0 - GENERAL
F The rates inserted herein shall form the basis for Item ###
valuing all variations under the Contract. All items
or quantities (as the case may be) stated in the
Bills of Quantities unless otherwise provided, have
been adopted as a basis for measurements
together with the Trade Preambles.
1.0 - GENERAL
Sub-Collection
Internally
Total Amount
Ref Description
(IDR)
Sub-Collection
3.2 ROOFING
A Roof floor; roof deck, roof LMR, roof dog house m2 1,304
C Wiremesh M6 m2 1,242
Total Amount
Ref Description
(IDR)
3.2 ROOFING
Sub-Collection
TIMBER DOORS
Total Amount
Ref Description
(IDR)
Sub-Collection
BALUSTRADES
RAILING
D Railing; to LMR m 12
FIRE-RATED DOORS
SUNDRIES
Total Amount
Ref Description
(IDR)
Sub-Collection
IN-SITU FINISHES
Internally
Skimcoat
Internally
Externally
Gypsum
Grooveline
WATERPROOFING SYSTEM
IN-SITU FINISHES
A To AC out m2 534
B To staircase m2 2,051
WATERPROOFING SYSTEM
E To bathroom m2 2,501
F To balcony m2 1,487
G To kitchen m2 692
H To AC out m2 534
I To canopy LMR m2 6
PVC FINISHES
FLOOR HARDENER
E To staircase m2 2,051
Sub-Collection
Total Amount
Ref Description
(IDR)
Sub-Collection
3.8 GLAZING
MIRROR
3.8 GLAZING
Sub-Collection
EMULSION PAINT
WEATHERSHIELD PAINT
Sub-Collection
3.10 OTHERS
Allow herein for any other work not mentioned above but
specified and/or shown in the Specification and/or
Drawings which are considered necessary for the full
and satisfactory completion for the works.
The Contractor is to list out the items below and indicate
the cost breakdown against each item
3.10 OTHERS
Sub-Collection
Total Amount
Ref Description
(IDR)
Collection
Externally
Concrete
Total Amount
Ref Description
(IDR)
Sub-Collection
ALUMINIUM DOORS
External Doors
Sliding Doors
ALUMINIUM WINDOW
Total Amount
Ref Description
(IDR)
Sub-Collection
IN-SITU FINISHES
Externally
Skimcoat
Externally
E To wall and column ; roof deck, dog house and LMR m2 1,284
WATERPROOFING SYSTEM
Total Amount
Ref Description
(IDR)
WEATHERSHIELD PAINT
C To wall: unit outside; SL Super Lenaflex (ex. SKK)- non texture m2 16,879
To wall; roof deck, dog house and LMR; SL Super Lenaflex (ex. SKK)-
H m2 335
non texture
Sub-Collection
4.5 OTHERS
Allow herein for any other work not mentioned above but
specified and/or shown in the Specification and/or
Drawings which are considered necessary for the full
and satisfactory completion for the works.
The Contractor is to list out the items below and indicate
the cost breakdown against each item
4.5 OTHERS
Sub-Collection
Total Amount
Ref Description
(IDR)
Collection
Externally
Concrete
Ref Description
Sub-Collection
ALUMINIUM DOORS
External Doors
Sliding Doors
ALUMINIUM WINDOW
Ref Description
Sub-Collection
IN-SITU FINISHES
Externally
Skimcoat
Externally
WATERPROOFING SYSTEM
wp G To wall; balcony m2
Page : Bill 4.3/1
Ref Description
WEATHERSHIELD PAINT
M106 C To wall: unit outside; SL Super Lenaflex (ex. SKK)- non texture m2
To wall; roof deck, dog house and LMR; SL Super Lenaflex (ex. SKK)-
H m2
non texture
Ref Description
Sub-Collection
4.5 OTHERS
Allow herein for any other work not mentioned above but
specified and/or shown in the Specification and/or
Drawings which are considered necessary for the full
and satisfactory completion for the works.
The Contractor is to list out the items below and indicate
the cost breakdown against each item
C
Page : Bill 4.5/1
Ref Description
4.5 OTHERS
Sub-Collection
Ref Description
Collection
3,904
4,472
9,615
361
40
5,430
41
4
To Sub-Collection
Total Amount
(IDR)
To Collection
To Sub-Collection 3,649,689,052
To Sub-Collection 4,361,728,163
5,685,532,075
3,649,689,052
4,361,728,163
328,865,411
To Collection 14,025,814,701
10,083
20,886
29,632
335
1,284
1,348
472
To Sub-Collection
Total Amount
(IDR)
To Collection
8,205
5,471
16,879
1,261
526
335
136
210
306
To Sub-Collection
14,025,814,701
To Summary 14,025,814,701
Ref Description Unit
Externally
Concrete
Ref Description
Sub-Collection
ALUMINIUM DOORS
External Doors
Sliding Doors
ALUMINIUM WINDOW
Ref Description
Sub-Collection
IN-SITU FINISHES
Externally
Skimcoat
Externally
WATERPROOFING SYSTEM
wp G To wall; balcony m2
Page : Bill 4.3/1
Ref Description
WEATHERSHIELD PAINT
M106 C To wall: unit outside; SL Super Lenaflex (ex. SKK)- non texture m2
To wall; roof deck, dog house and LMR; SL Super Lenaflex (ex. SKK)-
H m2
non texture
Ref Description
Sub-Collection
4.5 OTHERS
Allow herein for any other work not mentioned above but
specified and/or shown in the Specification and/or
Drawings which are considered necessary for the full
and satisfactory completion for the works.
The Contractor is to list out the items below and indicate
the cost breakdown against each item
C
Page : Bill 4.5/1
Ref Description
4.5 OTHERS
Sub-Collection
Ref Description
Collection
3,904
4,472
9,615
361
40
5,430
41
4
To Sub-Collection
Total Amount
(IDR)
To Collection
To Sub-Collection 3,649,689,052
To Sub-Collection 4,361,728,163
5,685,532,075
3,649,689,052
4,361,728,163
328,865,411
To Collection 14,025,814,701
10,083
20,886
29,632
335
1,284
1,348
472
To Sub-Collection
Total Amount
(IDR)
To Collection
8,205
5,471
16,879
1,261
526
335
136
210
306
To Sub-Collection
14,025,814,701
To Summary 14,025,814,701