Service We visit the site for inspection of package unit's : Note : All package units need to be service by pressure washer
Personnel Note: and when we fix the compressor need to be crane for lift the compressor. Material request : 1 ) Thermostat double
stage 5pcs
Symptoms:
Repair:
Equipment Model No. Product Line Equipment Serial No. Asset Tag
Scope of Work
Activity
Work Description
Completed?
Work Performed
Check and found the unit system one compressor taken high amps need to be replace the
compressor and system two working normal compressor contactor 3pole need replace.
1411S01399-CARRIER
12/09/2022 Material request : 1 - Compressor SM120 380v 1pc 2 - nitrogen 3pcs 3 - freon R22 1pc 4 - 01
PACKAGE UNIT
freon R141 1pc 5 - filter drier size 5/8 1pc 6 - welding set medium 1pc 7 - compressor
contactor 3pole 380v coil 24v
Check and found the unit both system working check amps and parameters unit working 1411S01401-CARRIER
12/09/2022 normal only need replace V-belts. Material request : 1 - V-belt A 74 2pcs PACKAGE UNIT 02
Check and found the unit system one compressor taken high amps need to be replace the
compressor and system two working normal Material request : 1 - Compressor SM100 380v 1411S01402-CARRIER
12/09/2022 03
1pc 2 - nitrogen 3pcs 3 - freon R22 1pc 4 - freon R141 1pc 5 - filter drier size 5/8 1pc 6 - PACKAGE UNIT
welding set medium 1pc
Check and found the unit system one compressor grounded high amps need to be replace
the compressor and system two working normal. Material request : 1 - Compressor SM120 1411S01403-CARRIER
12/09/2022 04
380v 1pc 2 - nitrogen 3pcs 3 - freon R22 1pc 4 - freon R141 1pc 5 - filter drier size 5/8 1pc 6 - PACKAGE UNIT
welding set medium 1pc 7 - compressor contactor 3pole 380v coil 24v
Check and found the unit both system working check amps and parameters unit working 1411S01404-CARRIER
12/09/2022 05
normal only need replace V-belts. Material request : 1 - V-belt A 73 2pcs PACKAGE UNIT
1411S01405-CARRIER
12/09/2022 Check and found the unit both system working normally check amps unit working normally. 06
PACKAGE UNIT
Check and found the unit system one gas leak need to be leak test by nitrogen then repair
1411S01406-CARRIER
12/09/2022 and system two working normal. Material request : 1 - nitrogen 2pcs 2 - freon R22 1pc 3 - 07
PACKAGE UNIT
welding set medium 1pc 4 - filter drier 1pc size 5/8 1pc
1411S01407-CARRIER
12/09/2022 Check and found the unit both system working normally check amps unit working normally. 08
PACKAGE UNIT
1411S01408-CARRIER
12/09/2022 Check and found the unit both system working normally check amps unit working normally. 09
PACKAGE UNIT
Check and found the unit system one compressor taken high amps need to be replace the
compressor and system two working normal condenser fan contactor 3pole need replace.
1411S01409-CARRIER
12/09/2022 Material request : 1 - Compressor SM120 380v 1pc 2 - nitrogen 3pcs 3 - freon R22 1pc 4 - 10
PACKAGE UNIT
freon R141 1pc 5 - filter drier size 5/8 1pc 6 - welding set medium 1pc 7 - condenser
contactor 3pole 380v coil 24v
Check and found the unit system one gas leak need to be leak test by nitrogen then repair
and system two working normal. Material request : 1 - nitrogen 2pcs 2 - freon R22 1pc 3 - 1411S01410-CARRIER
12/09/2022 11
welding set medium 1pc 4 - filter drier 1pc size 5/8 1pc 5 - blower contactor 3pole 380v coil PACKAGE UNIT
24v 1pc.
PARTS DETAILS
Total 0
OTHER EXPENSES
Subtotal 0
No
Technician Signature
Customer Signature
Customer Name:
Technician Name: Ayman Alobaid
Customer Email: