You got 70 of 70 possible points.


Your score was: 100 %

Question Results

Question: Score 1 of 1

What are some of the available ABC segmentation methods in IBP?


There are 2 correct answers to this question.

Response:

By Pareto Principle (Sorted and Cumulated %)

By number of items (Sorted values)

By number of items (Sorted Average)

By Pareto Principle (Sorted and Calculated Values)

Question: Score 1 of 1

You are reviewing the master data types for supply planning. Which master data
types are compound master data types?
There are 2 correct answers to this question.

Response:

SOURCEPRODUCTION

SOURCELOCATION

LOCATIONFR

SOURCECUSTOMER

https://www.erpprep.com/user/quiz/2181519/userresults 1/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which of the following fields can be overwritten in the New Planning view by
fixed default value settings?
There are 3 correct answers to this question.

Response:

Currency to ID

Language

Unit of Measure to ID

Default Display Time

Planning Unit

Question: Score 1 of 1

You are designing the planning area granularity. How do you construct the
granularity of the data which is saved?
Please choose the correct answer.

Response:

Define a base planning level and assign a storage profile with the required
granularity

Assign a time profile and a storage profile in the planning area header configuration
and for any additional planning level

Assign a time profile and define the smallest granularity for every additional
planning level

Assign, besides the base planning level, a separate time profile for every additional
planning level in the planning area

Question: Score 1 of 1

Which of the following modes can you use when creating a constrained plan?
Please choose the correct answer.

Response:

https://www.erpprep.com/user/quiz/2181519/userresults 2/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Resource maximization

Profit maximization

Production maximization

Question: Score 1 of 1

Which of the following SAP Integrated Business Planning modules supports


Operational Supply Planning?
Please choose the correct answer.

Response:

SAP IBP Response and Supply planning

SAP IBP Supply

SAP IBP Sales and Operations Planning

SAP Integrated Business Planning for Inventory

Question: Score 1 of 1

Which type of object do you use to create an offset for Period ID?
Please choose the correct answer.

Response:

Attribute for time profile level

Stored key figure with time profile attribute

Attribute transformation with stored key figure

Calculated key figure with IBP_CAGGR function

Question: Score 1 of 1

You are working on a mid – range plan that spans the seasonal peak and you are
evaluating the need for additional crewing. Which of the following parameters

https://www.erpprep.com/user/quiz/2181519/userresults 3/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

can you model to plan production with extra shift(s)?


Please choose the correct answer.

Response:

Production source validity at the start of seasonal peak

Incremental production values

Adjusted production interactive values

Cost based capacity expansion.

Question: Score 1 of 1

What function would you use to configure year to date calculation?


Please choose the correct answer.

Response:

IBP_LPA with static configuration as you are aggregating across broader time
period

IBP_CAGGR with aggregation mode parameter set to SUM

IBP_CAGGR with parameter for time profile level restart of a quarter

IBP_LPA with dynamic configuration to query key figures at request level

Question: Score 1 of 1

Which action that can be performed with an existing configuration object will
result in the creation of a D record in the database?
Please choose the correct answer.

Response:

Modifying the inactive record

Performing the active deletion

Generating any new object

Modifying the active record

https://www.erpprep.com/user/quiz/2181519/userresults 4/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which library is used by the forecasting engine for the Demand Sensing
algorithm?
Please choose the correct answer.

Response:

Supply Chain Algorithm library

Demand library

Predictive Analytics library

Heuristics library

Question: Score 1 of 1

What are the main benefits of using SAP IBP Control Tower?
There are 3 correct answers to this question.

Response:

Control which orders are going to be processed first by assigning rank via priority

To create suitable application job chains

Collaborate, communicate and monitor performance of the supply chain

Gain holistic visibility across internal and external supply chain planning and
execution systems and networks

Understand the impacts and cause of exceptions, and take action to solve the
problem

Question: Score 1 of 1

Which forecasting algorithms leverage the SAP HANA Predictive Analysis


Library?
There are 3 correct answers to this question.

Response:

https://www.erpprep.com/user/quiz/2181519/userresults 5/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Pre-Processing

Accuracy Measurements

Demand Sensing

Time-Series

Best Model Selection

Question: Score 1 of 1

Which of the following key functions are supported by IBP for Sales &
Operations planning?
There are 2 correct answers to this question.

Response:

Supports a basic demand planning process

Supports manual creation of feasible constrained plans

Supports a finite resource planning

Supports an advanced demand planning process

Question: Score 1 of 1

What are S&OP operator (optimizer) parameters associated with demand fair
share?
Please choose the correct answer.

Response:

- Number of fair share segments


- Additional tiering costs (default)
- Target inventory violation cost

- Number of fair share segments


- Maximum days of coverage
- Number of fair share segments late delivery

- Number of fair share segments


- Additional tiering costs (defaults)
https://www.erpprep.com/user/quiz/2181519/userresults 6/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

- Number of fair share segments

- Number of fair share segments


- Maximum inventory
- Additional tiering costs (default)

Question: Score 1 of 1

You are setting up a drill down chart in the Advanced Analytics application to
allow the planner to drill down in a predefined sequence for consensus demand.

Which of the following levels are in the correct sequence?


Please choose the correct answer.

Response:

Product Sub Family, Product Family, Product ID

Product Family, Product ID, Product Sub Family

Product ID, Month, Product Family

Product Family, Product ID, Month

Question: Score 1 of 1

You are configuring a complex calculation using helper key figures. What must
you take into account while completing this task?
There are 2 correct answers to this question.

Response:

You can expose the helper key figure to the user in planning views.

You can use the helper key figure at different planning levels.

You need to apply a helper key figure if you have more than three inputs at
different planning levels in one calculation.

You must check if the helper key figures have a base planning level.

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/2181519/userresults 7/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Which of the following are features of tag – based snapshots?


There are 2 correct answers to this question.

Response:

They are created in the configuration app for a fixed time range.

Target key figures are exposed to the user in planning views.

They are automatically assigned to a snapshot operator

Target key figures for theses snapshots must have lag as a root attribute.

Question: Score 1 of 1

By default, all charts and dashboards are pubic. What should be done to make
charts and dashboards private?
Please choose the correct answer.

Response:

Enable the relevant settings in the Advanced Analytics and Advanced Dashboards
application

Choose only relevant key figures and filters in Analytics Advanced application

Enable the relevant settings in the Global Configuration parameters

Set restrictions for charts in the Permission filter application.

Question: Score 1 of 1

What is a prerequisite for modelling outsourced manufacturers with production


capacity?
Please choose the correct answer.

Response:

Model target inventory and stocks at the outsourced location.

Model production cost for internal and external production resources to model
priority.

Ensure set up of multiple modes of transportation.

https://www.erpprep.com/user/quiz/2181519/userresults 8/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Use production lead times and offsets to manage components at the outsourced
location.

Question: Score 1 of 1

You are creating a Handling resource. What Resource Type do you need to
specify?
Please choose the correct answer.

Response:

Question: Score 1 of 1

You have set up a planning area and data is available. You adjust the necessary
time profile settings and run the consistency check.

Which settings can you change and still run a successful consistency check?
There are 2 correct answers to this question.

Response:

Remove an attribute assigned to the time profile level if the attribute is used in a
planning level.

Add a new time profile level to the time profile.

Change the past and future horizon of the levels in the time profile.

Change the description of the attributes in a time profile.

Question: Score 1 of 1

What kinds of algorithms can you combine to come up with the best forecast in
IBP?
There are 2 correct answers to this question.

https://www.erpprep.com/user/quiz/2181519/userresults 9/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Response:

Mid-term ones, and long - term ones.

Mid-term ones, and machine - learning ones

Short - term ones, and mid-term ones.

Short - term ones, and machine - learning ones

Question: Score 1 of 1

What are the mandatory when creating a new time profile?


There are 2 correct answers to this question.

Response:

A start and end date

At least one attribute for the time profile levels

Description

ID and name

Question: Score 1 of 1

When you promote calculated and approved inventory parameters from SAP IBP
for inventory, what other IBP modules can be receiving them?
There are 2 correct answers to this question.

Response:

SAP IBP for response and supply

SAP IBP for SandOP

SAP IBP for demand

DDMRP

https://www.erpprep.com/user/quiz/2181519/userresults 10/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which header name displays are available in the report options menu of the
Excel interface?
There are 2 correct answers to this question.

Response:

Captions

Changed number names created by user

Business meaning, as defined in configuration

Full unique name including technical name

Question: Score 1 of 1

Why would you use a reference master data type?


Please choose the correct answer.

Response:

To reference a master data type from an external master data type.

To reference an existing master data type.

To create a join between two or more master data types.

To combine two or more simple master data types.

Question: Score 1 of 1

Which of the following are functions of SAP IBP for Demand?


There are 3 correct answers to this question.

Response:

Detailed statistical analysis of demand data using the supply chain algorithm library

Demand Sensing of demand data using the supply chain algorithm library

Detailed statistical analysis of demand data using predictive analytics tools

https://www.erpprep.com/user/quiz/2181519/userresults 11/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Embedded, on the fly, demand analytics

Demand Sensing of demand data using predictive analytics tools

Question: Score 1 of 1

What must you do to enable change recording for a key figure?


There are 2 correct answers to this question.

Response:

Set the planning levels to active for change logging.

Set the change log to active for master data type used.

Set the key figure to active for change logging.

Set the planning area to active for change logging.

Question: Score 1 of 1

Co-production allows you to model co-products. The output of a production


process is several different products, which are produced concurrently.

Which parameters apply to the co-product?


Please choose the correct answer.

Response:

Production Lot Size

Capacity Consumption

Consumption of components

Output Product Coefficient

Question: Score 1 of 1

Which of the following data can be tracked using change history enabled key
figure?
There are 3 correct answers to this question.

https://www.erpprep.com/user/quiz/2181519/userresults 12/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Response:

Scenario ID

Attributes

Reason code

Modified date

Key figure type

Question: Score 1 of 1

What global config parameter can be used to limit the number of planning
versions in a system?
Please choose the correct answer.

Response:

PLAN_VIEW->PV_COUNT_MAX

ANALYTICS->MAX_RECORDS

SCENARIO->SCN_COUNT_MAX

Question: Score 1 of 1

Which of the following are the key features of SAPIBP Control tower?
There are 3 correct answers to this question.

Response:

Create a feasible plan

Smart alerts

What if simulation capabilities

Task and case management

Balance demand and supply and attain financial targets

https://www.erpprep.com/user/quiz/2181519/userresults 13/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

Which of the following are features of the S&OP process templates?


There are 2 correct answers to this question.

Response:

New instances of templates allow for re-use of the same processes again

All process templates are assigned to dashboards.

Each step depicted in the template can have tasks associated with it

The number of steps in a process template is the same for all implementations

Question: Score 1 of 1

Which of the following combination of nodes can be connected using the C-rule
and T-rule sourcing rules?
Please choose the correct answer.

Response:

Customer-Warehouse and Warehouse-Plant

Warehouse-Warehouse and Warehouse-Plant

Customer-Plant and Warehouse-Supplier

Plant-Supplier and Customer-Supplier

Question: Score 1 of 1

What does ABC/XYZ segmentation allow you to do?


There are 2 correct answers to this question.

Response:

Identify inventory items that require closer attention.

Tailor your forecast strategy and inventory optimization to segment characteristics.

Assign more appropriate inventory algorithms to planning objects.

https://www.erpprep.com/user/quiz/2181519/userresults 14/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Analyze forecast accuracy by product class

Question: Score 1 of 1

You model the following supply chain:

- A finished product is manufactured on 2 different packaging lines


- Production takes place for 40 % on line A. 60 % on line which varies over time
- Produced products are immediately shipped to two warehouses, respecting the required
minimum safely stock values
- One warehouse is temporarily closed sometime during the next three months.

Which sourcing rules do you use?


There are 2 correct answers to this question.

Response:

P-rule

T-rule, time independent

U-rule

T-rule, time dependent

Question: Score 1 of 1

You created a time profile and want to use time levels. In which of the following
cases is it mandatory to set the time level?
There are 2 correct answers to this question.

Response:

Choose a time profile level in a planning view in Microsoft Excel.

Maintain a time profile level as parameter in a disaggregation planning operator.

Assign a time profile level for a planning level of a planning area.

Assign a time profile level during the load of key figure values with the Data
Integration Jobs app.

Question: Score 1 of 1

https://www.erpprep.com/user/quiz/2181519/userresults 15/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Which algorithm type can you use to plan the supply?


Please choose the correct answer.

Response:

Local updates

Time-series based optimizer

Statistical forecasting

Compute quotas

Question: Score 1 of 1

How is minimum resource utilization considered by the optimizer?


There are 2 correct answers to this question.

Response:

Achieved in short term and then tail off in future buckets, due to discounts.

For all buckets and all quantities that represent the minimum utilization.

Minimum resource utilization may not be achieved in full for restricted storage
capacity.

It depends on demands in future buckets; if there is no demand, no utilization.

Question: Score 1 of 1

Which of the following is one of the functions of Multi-Echelon inventory


optimization?
Please choose the correct answer.

Response:

Ability to optimize lead times between different locations

Ability to optimize delivery costs between different locations

Ability to maintain high external service levels with low internal service levels

Ability to maintain high external service levels with high internal service levels

https://www.erpprep.com/user/quiz/2181519/userresults 16/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

What objects do you need to upload before key figure data?


Please choose the correct answer.

Response:

Time periods and relevant master data

Time periods and business roles

Time periods and time profile attributes

One simple master data record and one compound master data record

Question: Score 1 of 1

Which objects can you query on in the Advanced Analytics application?


There are 2 correct answers to this question.

Response:

Only on the base version

On all versions

On simulations

On scenarios

Question: Score 1 of 1

For which of the following jobs can you enter planning filters as parameters?
There are 2 correct answers to this question.

Response:

Create Time Periods for Time Profiles

Purge Key Figure Data

Purge Master Data

https://www.erpprep.com/user/quiz/2181519/userresults 17/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Purge Non – Conforming Data

Question: Score 1 of 1

Which master data types can you reference to create a reference master data
type?
There are 2 correct answers to this question.

Response:

Virtual

Simple

Compound

Reference

Question: Score 1 of 1

What are the ways to achieve period shift in SAP IBP calculations?
There are 2 correct answers to this question.

Response:

Use an attribute as a key figure.

Use a local member.

Use eisting IBP formula.

Use attribute transformation.

Question: Score 1 of 1

Model a large machine with high capital request, where you need to run it cost
effectively with minimum utilization, even if it is means producing more than
required/ demand.

Which solution would apply to this scenario?


There are 2 correct answers to this question.

Response:
https://www.erpprep.com/user/quiz/2181519/userresults 18/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Enough demands can be pulled forward and pull production will occur.

Capacity levelling will be possible for production and storage resources.

Balance between excessive prebuild and minimum utilization by incorporating


violation costs.

Excess stock to be staged in an overflow warehouse.

Question: Score 1 of 1

Which of the following are functions of the Snapshot Key Figures feature?
There are 3 correct answers to this question.

Response:

A snapshot takes a copy of a key figure at a particular point in time

You can create up to nine time snapshots at periodic intervals, producing a time-
lapsed view of your data

The most recent snapshot is numbered with the highest number

Not exposed to the user in planning views

A snapshot is taken only if a snapshot operator is run

Question: Score 1 of 1

How can you define new key figures?


There are 2 correct answers to this question.

Response:

You create a new key figure with one key figure attribute.

By converting an attribute into a key figure in the configuration application.

You create a new key figure in in the configuration application.

You create a key figure in the IBP Excel Add In UI.

https://www.erpprep.com/user/quiz/2181519/userresults 19/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Question: Score 1 of 1

How many different time levels can be selected within one planning view?
Please choose the correct answer.

Response:

All time levels available in the time profile. Restricted by global configuration
parameter

All time levels available in the time profile

Only time levels from base planning level of selected key figures

Only base time levels of planning area

Question: Score 1 of 1

For a PA you need to create time periods for the time profile. What should you
take care of when executing the Create Time Periods application job?
Please choose the correct answer.

Response:

The planning area with this time profile must be activated so that the application
job can proceed.

A time profile has to be activated so that the application job can proceed.

Multiple time profiles can be run with this application job.

Job cannot be scheduled to start immediately.

Question: Score 1 of 1

What are some of the ways to create network visualization?


There are 2 correct answers to this question.

Response:

Use the Analytics Advanced app and create a supply chain network

Chart functionality in the planning view

Dedicated supply chain network app


https://www.erpprep.com/user/quiz/2181519/userresults 20/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Use an application job for network visualization

Question: Score 1 of 1

You are creating a planning view in the SAP IBP for Microsoft Excel add-in.
Which settings can you maintain as default values?
There are 2 correct answers to this question.

Response:

Default Display Time (Zone)

Default Planning Area

Permission filter

Language

Question: Score 1 of 1

Which of the following chart types can be used to represent distribution in the
Advanced Analytics application?
There are 2 correct answers to this question.

Response:

Heat map

Dual Y-Axis Line

Dual Stacked Column

Scatter

Question: Score 1 of 1

Which of the following approaches could you take to reduce run times of an
optimizer?
There are 2 correct answers to this question.

Response:
https://www.erpprep.com/user/quiz/2181519/userresults 21/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Avoid telescopic time buckets.

Use a sub network ID.

Split into multiple planning areas to support weekly vs. Daily planning needs.

Increase the use of incremental lot size beyond the frozen horizon.

Question: Score 1 of 1

End users are validating the SAP IBP solution, and are concerned with how long
it takes to open templates. Which can impact performance the most, that should
you consider checking?
There are 2 correct answers to this question.

Response:

Key figures complex calculation

Excessive IBP formatting in Excel UI

Number of analytics charts displaying Key figures’ values

Number of local members and complexity of calculations

Question: Score 1 of 1

What are the main features of alert key figures?


Please choose the correct answer.

Response:

They can be set to both calculated and stored

Data for these key figures can be loaded into the system

They check the conditions of other key figures

They can be defined as a key figure in the same way as the unit price

Question: Score 1 of 1
https://www.erpprep.com/user/quiz/2181519/userresults 22/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Which input parameters can you use to limit the scope of your supply planning
run?
There are 3 correct answers to this question.

Response:

Product locations

Subnetwork

Versions

Time periods

Permission filter

Question: Score 1 of 1

You want to enable versions for your planning area. Which activities must you
perform?
There are 2 correct answers to this question.

Response:

Assign master data to the version.

Create a version using the Web UI.

Assign key figures to the version.

Create a version using the Microsoft Excel Add-In.

Question: Score 1 of 1

You would like to persistently enhance the layout, for example by underlining a
key figure, of your planning view template. What can you use to do this?
Please choose the correct answer.

Response:

ABAP

Microsoft Excel with Power Pivot

https://www.erpprep.com/user/quiz/2181519/userresults 23/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

SQL

Microsoft Excel with EPM

Question: Score 1 of 1

A time profile is defined with the levels week, month, quarter, and year. Which
PERIODID will be assigned to quarter?
Please choose the correct answer.

Response:

PERIODID2

PERIODID1

PERIODIDO

PERIODID3

Question: Score 1 of 1

Which of the following configuration options are part of the New Key Figure
creation process?
There are 3 correct answers to this question.

Response:

Hiding or displaying totals for the key figure.

Enable fixing for the key figure.

Enable planning notes for the key figure.

Setting disaggregation logic for the key figure.

An option to set allowed planning levels.

Question: Score 1 of 1

You are using Resource Location master data type. How do you specify Capacity
Supply as time-dependent?

https://www.erpprep.com/user/quiz/2181519/userresults 24/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Please choose the correct answer.

Response:

Set the Capacity Supply Time Series indicator attribute as a key.

Set the Capacity Supply additional attribute in the Time Profile.

Maintain the CAPASUPPLY key figure values in the Planning Area.

Set the Capacity Supply Time Series indicator in the Resource Location master data
type.

Question: Score 1 of 1

What do you have to do to connect to the SAP IBP database with SAP IBP Add-In
for Microsoft Excel?
There are 2 correct answers to this question.

Response:

Install the SAP IBP add-in for Microsoft Excel.

Check that you have access to the Planning area.

Install the EPM Add-In for Microsoft Excel

Activate the time profile

Question: Score 1 of 1

You need to define a new logic for key figure to split values from the PERPRODC
USTREGION level to the PERPRODCUST level.

Which of the following configuration options are possible for this process?
There are 2 correct answers to this question.

Response:

Spitting the values from aggregated to detailed level based on time profile attribute

Splitting the values from aggregated to detailed level using multiplication by the
proportions

Splitting the values from aggregated to detailed level based on stored split factor

https://www.erpprep.com/user/quiz/2181519/userresults 25/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

key figure

Spitting the values from detailed to aggregated level by using copy operator

Question: Score 1 of 1

Which of the following conditions are relevant for subtotals in planning view?
There are 2 correct answers to this question.

Response:

The values of the attribute-based total at the highest attribute level in the planning
level can be changed.

Total number of attributes that can use subtotals in the planning view can be
restricted.

Total value can be added before or after the selected attribute.

Only attribute-based totals can be added.

Question: Score 1 of 1

Which of the following are the functions of Local Member key figures?
There are 2 correct answers to this question.

Response:

Refreshing of a planning view deletes Local Members key figures

Local member can be added as a row or column in planning view

Inserted in the front-end by the add-in and calculated using an Excel formula

Inserted in the back-end by the Web UI and calculated using a key figure
calculation

Question: Score 1 of 1

Which of the following can be used as an input for inventory level optimization?
There are 2 correct answers to this question.

Response:
https://www.erpprep.com/user/quiz/2181519/userresults 26/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Reorder point

Target inventory level

Lot sizes

Lead time variance

Question: Score 1 of 1

You are creating an Advanced Simulation (ADVSIM) operator. Which operations


are supported?
There are 3 correct answers to this question.

Response:

Disaggregate key figures

Create time periods

Pre-copy

Post-copy

Simulate statistical forecast

Question: Score 1 of 1

You are working with Inventory Optimization Process and you want to use a
What If analysis. What parameters are assessed by this analysis?
There are 2 correct answers to this question.

Response:

Number of planning combinations

Capacity consumption

Changed variability

Service levels

https://www.erpprep.com/user/quiz/2181519/userresults 27/28
3/28/2021 SAP Certified Application Associate - SAP Integrated Business Planning - Full | ERPPrep

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us

https://www.erpprep.com/user/quiz/2181519/userresults 28/28

You might also like