Underdeck Insulation Measurement(1st FL)

Area Identification on No of Area x no of Area of Un-


SI NO TAG NO Area Type Length Width Area insulated Net Area
measurement dwg side side surface
1 ZONE-01
2 A1 Slab+Beam Bottom Magenta 54 17.7 955.8 N/A 955.8
3 CSAOC Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 8 14.4
4 Net of A1 Slab+Beam Bottom 955.8 941.4
5 B1 PT Beam Black 54 0.7 37.8 2 75.6 75.6
6 B2 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
7 B3 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
8 B4 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
9 B5 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
10 B6 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
11 B7 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
12 B8 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
13 B9 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
14 B10 PT Beam Black 16.2 1.7 27.54 2 27.54 27.54
15 ZONE-02
16 A2 Slab+Beam Bottom Magenta 55.1 8.1 446.31 N/A 446.31
17 CSAOC Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 8 14.4
18 Net of A2 Slab+Beam Bottom 431.91
19 B11 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
20 B12 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
21 B13 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
22 B14 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
23 B15 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
24 B16 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
25 Blue Star STT CBRE
26
27 sign…………………………………….. sign……………………………………………. sign………………………………………….
28 B17 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
29 B18 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
30 B19 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
31 B20 PT Beam Black 55.1 0.7 38.57 2 77.14
32 PT Beam Un-insulated Beam surface Vertical 1.5 0.7 1.05 8 8.4 8.4
33 PT Beam Un-insulated Beam surface Vertical 1.2 0.7 0.84 4 3.36 3.36
34 PT Beam Un-insulated Beam surface Vertical 1 0.7 0.7 6 4.2 4.2
35 Net of B20 PT Beam 68.74 61.18
36 B21 PT Beam White 55.1 0.7 38.57 2 77.14
37 PT Beam Un-insulated Beam surface Vertical 1.5 0.7 1.05 8 8.4 8.4
38 PT Beam Un-insulated Beam surface Vertical 1.2 0.7 0.84 4 3.36 3.36
39 PT Beam Un-insulated Beam surface Vertical 1 0.7 0.7 6 4.2 4.2
40 Net of B21 PT Beam 61.18
41 ZONE-03
42 A3 Slab+Beam Bottom Magenta 53.15 17.7 940.755 N/A 940.755
43 CSAOC Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 4 7.2
44 Net of A3 Slab+Beam Bottom 933.555
45 B22 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
46 B23 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
47 B24 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
48 B25 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
49 B26 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
50 B27 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
51 B28 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
52 B29 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
53 B30 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
54 ZONE-04
55 A4 Slab+Beam Bottom Violet 15.1 9.7 146.47 N/A 146.47
56 CSAOB Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 1 1.8 1.8 148.27
57 Net of A3 Slab+Beam Bottom 144.67
58 B31 PT Beam Black 13.57 0.7 9.499 2 18.998 18.998
59 Blue Star STT CBRE
60
61
62 B32 PT Beam Black 14 0.7 9.8 2 19.6 19.6
63 B33 PT Beam Black 7.55 0.7 5.285 2 10.57 10.57
64 ZONE-05
65 A5 Slab with Beam Pink 13.75 7 96.25 N/A 96.25 96.25
66 A6 Slab with Beam Yellow 4 2.5 10 N/A 10 10
67 A7 Slab with Beam Yellow 5.9 5 29.5 N/A 29.5
68 Slab with Beam Un-insulated slab surface 2.98 2.98
69 Net of A7 26.52 26.52
70 B34 PT Beam Black 11.7 0.7 8.19 2 16.38 16.38
71 B35 PT Beam Black 7.5 0.7 5.25 2 10.5 10.5
72 B36 PT Beam Black 11.35 0.7 7.945 2 15.89 15.89
73 B37 PT Beam Black 12.7 1.7 21.59 1.5 32.385 32.385
74 B38 PT Beam Black 3 0.7 2.1 1.5 3.15 3.15
75 B39 PT Beam RED 19 1.7 32.3 N/A 32.3 32.3
76 B40 PT Beam RED 40.5 1.7 68.85 N/A 68.85 68.85
77 ZONE-06
78 A8 Slab Magenta 64 4 256 N/A 256 256
79 C1 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
80 C2 Support Beam Blue 4 0.35 1.4 2 2.8 2.8
81 C3 Support Beam Blue 4 0.35 1.4 2 2.8 2.8
82 C4 Support Beam Blue 4 0.35 1.4 2 2.8 2.8
83 C5 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
84 C6 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
85 C7 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
86 C8 Support Beam RED 9.6 0.6 5.76 N/A 5.76 5.76
87
88 ZONE-07
89 A9 Slab Magenta 52.6 4 210.4 N/A 210.4 210.4
90 C1 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
91 C2 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
92 C3 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
93 Blue Star STT CBRE
94
95
96 C4 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
97 C5 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
98 C6 Support Beam RED 8.3 0.7 5.81 1 5.81 5.81
99 Total Area with Un-insulated 5170.078
100 Total Un-insulated Area 72.7
101 Net Billable Area 4157.888
93 Blue Star STT CBRE

sign…………………………………….. sign……………………………………………. sign……………………………………..

Note:CSAOC=Cross Sectional Area Of Column


MATERIAL HANDOVER LETTER
HANDOVER OF FPS DISMANTLING PIPE
Dear Sir,

As per your request,the following materials have been handed over to…..………………………...
on /0 /22,so please please check and then acknowledge this letter with your
signature.

Handover of FPS Existing Pipe

SI No: Pipe Dia Unit Total including all floor

1 25 dia Rmt 1520


2 32 dia Rmt 672

3 40 dia Rmt 237

4 50 dia Rmt 150

5 65 dia Rmt 120

6 80 dia Rmt 105

7 100 dia Rmt 183

8 150 dia Rmt 273


9 UP-Right Sprinkler Nos 800

10 Pendent Sprinkler Nos 45


Handover By Blue Star Takeover By DLF

Name: Name:

Sign:……………………………….. Receiver Sign:……………...……………………


MIR
MIR No Material Discription Issue1 Issue2 Issue3
25 Puff IOM need Code A None

26 Mnual-BFV MTC Code B>Code A None

27 Bal-Valve None Code B>Code A None


28 DPCV MTC Code B>Code A None

29 Auto Air Vent None Code B>Code A None


30 Motorised-BFV MTC Code B>Code A IOM,ITP
comments Action
No Comment called to supplier
1) For comment please refer pg no 5,9,10,

2) Quantity & sizes shall be as per final approved dwg


3) Please share a final TDS after incorporating all
above comments before installation on site for
status A

Quantity & sizes shall be as per final approved dwg

Diameter and quantities shall be as per final shop


shematics drawing
ok
SI No Work description Process
1 row & coloum hide and unhide select row left side>format>hide&unhide>
2
3
4
5
6
7
8
9
10
11
12
13
14
e&unhide>
Underdeck Insulation Measurement(2nd FL)
Area Identification on No of Area x no of Area of Un-
SI NO TAG NO Area Type Length Width Area insulated Net Area
measurement dwg side side surface
1 ZONE-01
2 A1 Slab+Beam Bottom Magenta 54 17.7 955.8 N/A 955.8
3 CSAOC Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 8 14.4
4 Net of A1 Slab+Beam Bottom 955.8 941.4
5 B1 PT Beam Black 54 0.7 37.8 2 75.6 75.6
6 B2 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
7 B3 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
8 B4 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
9 B5 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
10 B6 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
11 B7 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
12 B8 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
13 B9 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
14 B10 PT Beam Black 16.2 1.7 27.54 2 27.54 27.54
15 ZONE-02
16 A2 Slab+Beam Bottom Magenta 55.1 8.1 446.31 N/A 446.31
17 CSAOC Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 8 14.4
18 Net of A2 Slab+Beam Bottom 431.91
19 B11 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
20 B12 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
21 B13 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
22 B14 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
23 B15 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
24 B16 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
25 Blue Star STT CBRE
26
27 sign…………………………………….. sign……………………………………………. sign………………………………………….
28 B17 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
29 B18 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
30 B19 PT Beam Black 5.1 0.7 3.57 2 7.14 7.14
31 B20 PT Beam Black 55.1 0.7 38.57 2 77.14
32 PT Beam Un-insulated Beam surface Vertical 1.5 0.7 1.05 8 8.4 8.4
33 PT Beam Un-insulated Beam surface Vertical 1.2 0.7 0.84 4 3.36 3.36
34 PT Beam Un-insulated Beam surface Vertical 1 0.7 0.7 6 4.2 4.2
35 Net of B20 PT Beam 68.74 61.18
36 B21 PT Beam White 55.1 0.7 38.57 2 77.14
37 PT Beam Un-insulated Beam surface Vertical 1.5 0.7 1.05 8 8.4 8.4
38 PT Beam Un-insulated Beam surface Vertical 1.2 0.7 0.84 4 3.36 3.36
39 PT Beam Un-insulated Beam surface Vertical 1 0.7 0.7 6 4.2 4.2
40 Net of B21 PT Beam 61.18
41 ZONE-03
42 A3 Slab+Beam Bottom Magenta 53.15 17.7 940.755 N/A 940.755
43 CSAOC Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 4 7.2
44 Net of A3 Slab+Beam Bottom 933.555
45 B22 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
46 B23 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
47 B24 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
48 B25 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
49 B26 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
50 B27 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
51 B28 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
52 B29 PT Beam Black 16.4 0.7 11.48 2 22.96 22.96
53 B30 PT Beam Black 16.2 0.7 11.34 2 22.68 22.68
54 ZONE-04
55 A4 Slab+Beam Bottom Violet 15.1 9.7 146.47 N/A 146.47
56 CSAOB Slab+Beam Bottom Un-insulated surface 1.5 1.2 1.8 1 1.8 1.8 148.27
57 Net of A3 Slab+Beam Bottom 144.67
58 B31 PT Beam Black 13.57 0.7 9.499 2 18.998 18.998
59 Blue Star STT CBRE
60
61
62 B32 PT Beam Black 14 0.7 9.8 2 19.6 19.6
63 B33 PT Beam Black 7.55 0.7 5.285 2 10.57 10.57
64 ZONE-05
65 A5 Slab with Beam Pink 13.75 7 96.25 N/A 96.25 96.25
66 A6 Slab with Beam Yellow 4 2.5 10 N/A 10 10
67 A7 Slab with Beam Yellow 5.9 5 29.5 N/A 29.5
68 Slab with Beam Un-insulated slab surface 2.98 2.98
69 Net of A7 26.52 26.52
70 B34 PT Beam Black 11.7 0.7 8.19 2 16.38 16.38
71 B35 PT Beam Black 7.5 0.7 5.25 2 10.5 10.5
72 B36 PT Beam Black 11.35 0.7 7.945 2 15.89 15.89
73 B37 PT Beam Black 12.7 1.7 21.59 1.5 32.385 32.385
74 B38 PT Beam Black 3 0.7 2.1 1.5 3.15 3.15
75 B39 PT Beam RED 19 1.7 32.3 N/A 32.3 32.3
76 B40 PT Beam RED 40.5 1.7 68.85 N/A 68.85 68.85
77 ZONE-06
78 A8 Slab Magenta 64 4 256 N/A 256 256
79 C1 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
80 C2 Support Beam Blue 4 0.35 1.4 2 2.8 2.8
81 C3 Support Beam Blue 4 0.35 1.4 2 2.8 2.8
82 C4 Support Beam Blue 4 0.35 1.4 2 2.8 2.8
83 C5 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
84 C6 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
85 C7 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
86 C8 Support Beam RED 9.6 0.6 5.76 N/A 5.76 5.76
87
88 ZONE-07
89 A9 Slab Magenta 52.6 4 210.4 N/A 210.4 210.4
90 C1 Support Beam Blue 4 0.6 2.4 2 4.8 4.8
91 C2 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
92 C3 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
93 Blue Star STT CBRE
94
95
96 C4 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
97 C5 Support Beam Blue 4 0.3 1.2 2 2.4 2.4
98 C6 Support Beam RED 8.3 0.7 5.81 1 5.81 5.81
99 Total Area with Un-insulated 5170.078
100 Total Un-insulated Area 72.7
101 Net Billable Area 4157.888
93 Blue Star STT CBRE

sign…………………………………….. sign……………………………………………. sign……………………………………..