GAMBAR SKET KONSTRUKSI

1. BAK PEMISAH LEMAK/ MINYAK


- Dimensi :
P = 3.00 m
L = 3.00 m
H = 2,75 (free board = 0,5 m)
Vol = 25 m3 3.00

3.00 2.75
0

3.00

Gambar 1 : Titik Pondasi dan lantai bak pemisah lemak Gambar Potongan Melintang

2. BAK REAKTOR EKUALISASI


- Dimensi :
P = 6.00 m
L = 6.00 m
H = 2,5 m (free board = 0,5 m)
Vol = 88 m3

6.0
0

6.0
0
Gambar 2 : Titik Pondasi dan lantai bak Ekualisasi
3. BAK REAKTOR BIOFILTER ANAEROB – AEROB (PRASEDIMENTASI)

Dimensi :
P = 5.00 m
L = 5.00 m
H = 2,5 m (free board = 0,5 m)
Vol = 63 m3

5.0
00

5.0
0
Gambar 3 . Reaktor I ( Pengendap Awal )

4. BAK REAKTOR BIOFILTER ANAEROB


Dimensi :
P = 3,50 m
L = 3,50 m
H = 2,25 m (free board = 0,3 m)
Vol = 27,5 m3

3.50

3.50
Gambar 4 . Reaktor I ( Pengendap Awal & Biofilter Anaerob)
5. BAK REAKTOR BIOFILTER AEROB
Dimensi :
P = 7.00 m
L = 6.00 m
H = 3,5 m (free board = 0,4 m)
Vol = 150 m3

6.00

7.00
0
Gambar 5 . Reaktor III ( Biofilter Aerob)

6. BAK REAKTOR PENGENDAP AKHIR


Dimensi :
P = 5.00 m
L = 5.00 m
H = 2,5 m (free board = 0,5 m)
Vol = 63 m3

5.00

5.00
0
Gambar 6. Reaktor IV (Pengendap Akhir)
PONDASI (BORE
PILE

0.30

0.30 Bore pile

8.00

30 CM

6 16

Sengkang D 10-100

Sloof 30/30

30 CM

30 CM
GAMBAR TULANGAN LANTAI

Tebal lantai 20 cm
Beton Lantai

Tulangan atas  13-15

20 cm

Tulangan bawah  13-15

20 cm

20 cm

Tulangan ulir  13-15

20 cm

Tulangan ulir  13-15

20 cm
CONTOH GAMBAR KONSTRUKSI :

2.50

3.00
2.50

6.00