Professional Documents
Culture Documents
Skydeals - BOQ - BNE
Skydeals - BOQ - BNE
SHIPPER RECEIVER
A Ground Floor
A 2nd Floor
Wooden & Glass Partition - 100 thick wooden partition with Glass
embedded - Providing and fixing aluminium/GI frame work of thickness
75mm. Both side 12mm plywood cladded with selected laminate till
height of 4ft or as per requirement. After 4ft - 10mm toughened glass of
1 saint gobain brand to be embedded in partition upto 4ft height by edge
banding method and edges to be polished with matching laminate. After
glass again same plywood partition to be continued till slab soffit. Only
frame work to be provided above false ceiling level. Measurements to be
done till slab soffit level
1
Total For Ground Floor
A 3rd Floor
Wooden & Glass Partition - 100 thick wooden partition with Glass
embedded - Providing and fixing aluminium frame work of thickness
75mm. Both side 12mm plywood cladded with selected laminate till
height of 4ft or as per requirement. After 4ft - 10mm toughened glass of
1 saint gobain brand to be embedded in partition upto 4ft height by edge
banding method and edges to be polished with matching laminate. After
glass again same plywood partition to be continued till slab soffit. Only
frame work to be provided above false ceiling level. Measurements to be
done till slab soffit level
2
EIVER
Amount
3
4
Resonance Laboratories Office
Sl No. Description
A
Endamology
1 Storage below platform with Plywood and Laminate Finish
2 Korean Top Platform
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
4 Fundermax finish above koran top wall clading for hight of 2ft
5 Supply and fix VRF Split unit 1.5TR
5
2 Corian Wall Cladding Above Counter - Pasted on Wall Parition
3 Storage below platform
4 Auto Clave Chimney
5 Granite Skirting of 100mm above counter
6 Dado Tile Above Platform
7 Openable Storage Below Granite Counter
8 Open Shelves Above Granite Counter
9 Open Shelves - On Elevataion A and C
10 Fumehood Flixable Hanging Type
11 Water Bath Sero
12 Fundermax finish above koran top wall clading for hight of 2ft
13 Supply and fix VRF Split unit 2TR
Culture Room
1 Koran Top Platform
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
3 Storage below platform
4 Fumehood Flixable Hanging Type
5 Water Bath Sero
6 Fundermax finish above koran top wall clading for hight of 2ft
7 Supply and fix VRF Split unit 1.5TR
QC Lab
1 Korean Top Platform
Granite Platform
Supply and Fixing of Dish Washer
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
3 Storage below platform
4 Fumehood Flixable Hanging Type
5 Water Bath Sero
6 Fundermax finish above koran top wall clading for hight of 2ft
Skiting of Granite
7 Supply and fix VRF Split unit 1.5TR
Supply and fix VRF Split unit 0.75TR
Instumentation
1 Granit platform
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
3 Storage below platform
6 Granite Skirting of 100mm above counter
7 Supply and fix VRF Split unit 1.5TR
6
Resonance Laboratories Office
Nos. -
7
12'-10" x 2'-0" Sq.ft 25.66
12'-10" x 2'-8" Sq.ft 34.13
Nos. 1.00
Rft 5.00
4'- 11" x 2'-0" Sq.ft 9.66
4'- 11" x 2'-8" Sq.ft 12.85 1,400.00 17,986.92
4'- 11" x 2'-8" Sq.ft 12.85 1,100.00 14,132.58
4' -0" x 9'-0" & 7'-1" x 9'-0" Sq.ft 100.44 1,200.00 120,528.00
Nos. 1.00
Nos. -
Sqft 34.00
Sqft 16.00
Nos. 1.00
Nos 1.00
Sq.ft 72.50
Nos -
Nos -
Sq.ft 42.00
Rft 8.00
Nos 1.00
Nos 1.00
Sqft 114.00
2.00 Nos
Sqft 142.50
Rft 57.00
2.00 Nos
8
199.66
4.91
9
10
Resonance Laboratories Office
Sl No. Description Nos. UOM
A
Endamology
1 Korean Top Platform 1.00 Sqft
Supply and fixing RO Water wash basin (including plumbing and
2 1.00 Nos
drainage )
3 Storage below platform 1.00 Sqft
4 Fundermax finish above koran top wall clading for hight of 2ft 1.00 Sqft
5 Supply and fix VRF Split unit 1.5TR 1.00 Nos
Biochemistry and Formation lab
1 Koran Top Platform Sqft
Supply and fixing RO Water wash basin (including plumbing and
2 2.00 Nos
drainage )
3 Storage below platform
4 Fumehood Flixable Hanging Type 1.00 Nos
5 Water Bath Sero 1.00 Nos
6 Fundermax finish above koran top wall clading for hight of 2ft Sqft
7 Supply and fix VRF Split unit 1.5TR
Microbiology Lab
1 Koran Top Platform
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
3 Storage below platform
4 Fumehood Flixable Hanging Type
5 Water Bath Sero
6 Fundermax finish above koran top wall clading for hight of 2ft
7 Supply and fix VRF Split unit 1.5TR
Culture Room
1 Koran Top Platform
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
3 Storage below platform
4 Fumehood Flixable Hanging Type
5 Water Bath Sero
6 Fundermax finish above koran top wall clading for hight of 2ft
7 Supply and fix VRF Split unit 1.5TR
QC Lab
1 Koran Top Platform
Supply and fixing RO Water wash basin (including plumbing and
2
drainage )
11
3 Storage below platform
4 Fumehood Flixable Hanging Type
5 Water Bath Sero
6 Fundermax finish above koran top wall clading for hight of 2ft
7 Supply and fix VRF Split unit 1.5TR
Instumentation
1 Granit platform Sqft
Supply and fixing RO Water wash basin (including plumbing and
2 2.00 Nos
drainage )
3 Storage below platform Sqft
4 Fumehood Flixable Hanging Type -
5 Water Bath Sero -
6 Fundermax finish above koran top wall clading for hight of 2ft Sqft
7 Supply and fix VRF Split unit 1.5TR 2.00 Nos
Room No.1
Room No.2
12
QTY Rate Amount
13
114.00
148.20
114.00
14