Basic of Proposal
Our offer is based on design drawings presented below.
Drawing
Drawing / Document Title Rev Date
Reference
1. BMS SUB SYS Integration
2. CBS Station
Scope of work
1-Equipment connected to system through Physical I/Os.
This Part describe the electrical equipment for example fire alarm system & mechanical system for example AHUs, FCUs and
others connected to DDC controllers located in LCPs through physical I/Os (universal input, digital input, analogue out, digital
out) .
Page 2 of 36
/ Healthcare & Pharmaceutical Certified
7-Training Scope.
Training – Training is our responsibility, we submit (training material-training certificate-training on site-
training on our office).
Page 3 of 36
/ Healthcare & Pharmaceutical Certified
1- Assume that each building having only one Lighting control Panel
2- Assume that each Lighting Control Panel have maximum 15 contactors
3- Assume that each Contactor has only one status and start/stop signal
13- Notes.
1- Building Management System in All stations will be through Web browser.
Page 4 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:3) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Elevator Elevator should be supplied with BACnet/IP to be connected with BMS L.S
06 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
07 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
08 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 5 of 36
/ Healthcare & Pharmaceutical Certified
Imbaba Type A
1-LCP 01 Service:FANS (QTY:1) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 6 of 36
/ Healthcare & Pharmaceutical Certified
Boulaq Type A
1-LCP 01 Service:FANS (QTY:1) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 7 of 36
/ Healthcare & Pharmaceutical Certified
Bashteel Type A
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:4)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Elevator Elevator should be supplied with BACnet/IP to be connected with BMS L.S
06 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
07 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
08 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 8 of 36
/ Healthcare & Pharmaceutical Certified
TAMUH TYPE A
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 9 of 36
/ Healthcare & Pharmaceutical Certified
MARAZIQ TYPE A
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
01 PC PC & LED Monitor 32" , 3D optical mouse and full function keyboard 1
02 LASER-JET-PRN A4 Laser printer 1
Page 10 of 36
/ Healthcare & Pharmaceutical Certified
AYAT TYPE A
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 11 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 12 of 36
/ Healthcare & Pharmaceutical Certified
WASTA TYPE A
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 13 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 14 of 36
/ Healthcare & Pharmaceutical Certified
BENISUIF TYPE A
1-LCP 01 Service:FANS (QTY:3) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:3)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 15 of 36
/ Healthcare & Pharmaceutical Certified
Giza TYPE B
1-LCP 01 Service:FANS (QTY:1) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 16 of 36
/ Healthcare & Pharmaceutical Certified
HAWANDIYA TYPE B
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 17 of 36
/ Healthcare & Pharmaceutical Certified
BADRASHIN TYPE B
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 18 of 36
/ Healthcare & Pharmaceutical Certified
MAZGONA TYPE B
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 19 of 36
/ Healthcare & Pharmaceutical Certified
REEQA TYPE B
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 20 of 36
/ Healthcare & Pharmaceutical Certified
NASSER TYPE B
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:4) && DAMPER (QTY:4) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 21 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:2) && DAMPER (QTY:2) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 22 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:2) && DAMPER (QTY:2) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 23 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:2) && DAMPER (QTY:2) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 24 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:2) && DAMPER (QTY:2) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
04 Fire Fighting System Fire Fighting System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
Page 25 of 36
/ Healthcare & Pharmaceutical Certified
1-LCP 01 Service:FANS (QTY:2) && GAS FAN (QTY:2) && DAMPER (QTY:2) && LIGHTING (QTY:1)
2- SOFTWARE INTEGRATION
01 Water supply system Water supply system should be supplied with BACnet/IP to be connected with BMS L.S
Drainage and water Drainage and water system should be supplied with BACnet/IP to be connected with
02 L.S
system BMS
03 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
05 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
06 Access Control system Access Control system should be supplied with BACnet/IP to be connected with BMS L.S
07 SCADA SCADA should be supplied with BACnet/IP to be connected with BMS L.S
1- SOFTWARE INTEGRATION
01 Fire Alarm System Fire Alarm System should be supplied with BACnet/IP to be connected with BMS L.S
02 Split Unit Split Unit should be supplied with BACnet/IP to be connected with BMS L.S
Page 26 of 36
/ Healthcare & Pharmaceutical Certified
Page 27 of 36
/ Healthcare & Pharmaceutical Certified
Page 28 of 36
/ Healthcare & Pharmaceutical Certified
Page 29 of 36
/ Healthcare & Pharmaceutical Certified
Page 30 of 36
/ Healthcare & Pharmaceutical Certified
Page 31 of 36
/ Healthcare & Pharmaceutical Certified
Page 32 of 36
/ Healthcare & Pharmaceutical Certified
Page 33 of 36
/ Healthcare & Pharmaceutical Certified
Page 34 of 36
/ Healthcare & Pharmaceutical Certified
Page 35 of 36
/ Healthcare & Pharmaceutical Certified
Page 36 of 36