1blok 19 Tingkat292 Unit RMH Sederhana Norsyazreen
1blok 19 Tingkat292 Unit RMH Sederhana Norsyazreen
Type of Contract : PAM Form (Rev. Oct. 1998) with Quantities Cost Fluctuation: Yes / RM Int (JV)/L
No
Basis of Tender Open/Selected RM 34,791,747.25 L
Bill of Quantities / Competitive I Government
A-2-898
SUMMARY OF ELEMENT COSTS
GROSS FLOOR AREA : 42,639 m2 TENDER DATE : 11 OGOS 2004
Preliminaries Shown Separately
Total Cost Cost per m2 Element Element unit Element Unit Reinforced Reinf. Formwork
of Element GFA Unit Rate Ratio Concrete ment m2
RM RM Quantity RM per m2 GFA m3 kg
1 Substructure
1A Piling - - -
1B Work Below Lowest 2,193,832.35 51.45 6184.00m2 354.76 0.15 3487.00 414802.00 6552.00
Floor Finish
2 Superstructure
2A Frame Vibrated reinforced concrete column and beams.
2B Upper Floor Vibrated reinforced concrete pool deck slab, suspended floor construction.
2C Roof Vibrated reinforced concrete gutter & roof slab, elastomeric seamless waterproofing, concrete interlocking
roof tiles, timber trusses, galvanised iron flashin.
2D Staircases Vibrated reinforced concrete staircase, cement and sand paving, mild steel handrailing and balustrading.
2E External walls Precast concrete wall, vibrated reinforced concrete (swimming pool), half and one brickwall.
2F Window Top hung window, composit casement window, fixed glass panel, fixed glass panel.
2G Door Metal door frame, decorative honeycomb core flush door.
2H Internal wall and partition Half brick wall and one brick wall.
3 Finishes
3A Internal wall finishes Cement and sand (1:6) plastering to walls and columns generally, ceramic tiles and paint.
3B Internal Floor Finishes Cement and sand (1:3) paving and screed to receive ceramic tiles and waterproofing.
3C Internal Ceiling Finishes Asbestos free fibre cement sheet and Brefill skim coat.
3D External Finishes Cement and sand (1:6) plastering and two coats of emulsion paint.
5 Services
5A Sanitary appliances "Sime Inax" range of sanitary wares and fittings and UPVC floor trap.
5B Plumbing Installation & Soil, waste and vent pipes for sanitary plumbing services, Cold water services, storage tanks, pumps and
Sanitary Services valves.
5C Electrical & Telephone Installation Provision of H.V. and L.V. services and telephone
6 EXTERNAL WORKS
6A Road Pavement and Kerbs Kerbs and upgrading primix bituminous access toads
6B Surface Water Drainage Upgrading of existing surface water drainage
6C Reinforced concrete Sump Upgrading of existing surface water drainage
6D Reticulation Works Pilar hydrant, bulk water meter, sewerage reticulation works.
Description : GFA
unit Quantity
MS 459
Ground Floor
3.72
5.94
22.10
1.86 ( passageway
9.94
18.49
1.86
3.24
6.03
24.29 ( corridor
3.00
72.87
1.86 ( TNB
0.90
1.67
1.86 ( utility
3.00
5.58
JOB TITLE: ……………………………. Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : ……………………………
Description : GFA
unit Quantity
MS 439
First floor
1.20 1.80
1.65 3.10
1.98 5.58
2/ 7.95 439.38
2.70
42.93
8.54 ( office 12
5.93
50.64
unit Quantity
MS 574
Ground Floor
First floor
2.06 ( office 7
4.00
8.24
2/ 7.84
2.82
44.22
8.40 ( office 12
5.70
47.88
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
unit Quantity
MS 50
Ground Floor
1.74 ( TNB
0.79
1.37
1.74 ( utility
2.89
5.03
First floor
3/ 1.90
0.87
4.96
1.10
0.12
0.13
3/ 1.90
0.87
4.96
1.10
0.12
0.13
50.04
unit Quantity
MS 248
Ground Floor
2/ 1.69 ( passageway
3.60 18.29
5.94 61.8202
21.38
3.72
1.74 ( passageway 5.12
10.06 19.05
17.50
3.72
1.74 4.59
3.30 17.07
5.74
1.69
24.40 3.10
2.40 ( corridor 5.24
58.56
1.74 ( staircase
5/ 2.95 7.59
0.60 13.21
8.85
1.74
1.35 4.54
0.49 7.90
0.66
247.63
1.74
2.74 ( staircase
4.77
First floor
3.40
1.2 ( airlock
4.08
1.09
1.65
1.80
unit Quantity
MS 26
Ground Floor
2/ 10.17 2.09
0.12 0.12
2.44 0.25
2/ 9.83 4.5
0.12 0.12
2.36 0.54
2/ 19.00 4/ 8.43
0.12 0.12
4.56 4.05
2/ 6.76 4/ 0.59
0.12 0.12
1.62 0.28
3/ 1.69 2/ 2.82
0.12 0.12
0.61 0.68
unit Quantity
7.82
0.12
0.94
4.72
0.12
0.57
25.58
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity
JOB TITLE: …………………………… Taker off: Squaring by:
ELEMENT: ……………………………
BLOCK/TYPE: ………………………… Checked by: Editing by:
PAGE NO : …………………………..
Description :
unit Quantity