Bill of Quantity NTPC Tanda (FIRST PARTY)

SUB CONTRACT AGREEMENT BETWEEN


M/s FIRST COMPANY & M/s Sub Contractor Name

This deed of Sub - Contract executed on the (date of agreement) by and between, M/s FIRST PARTY having Office at (FIRST PARTY office address)
hereinafter clled the "FIRST PARTY"
AND
Second party address With gst and all details
SECOND PARTY GST NUMBER SECOND PARTY PAN NUMBER

WITNESS THAT

WHERE AS THE FIRST PARTY has obtained a contract work of "Renovation of 374 no. III, II & I type quarters in township at NTPC Tanda" (LOI N.o : )
From NTPC , Hereinafter called Department.

Where as the SECOND PARTY approached the FIRST PARTY to undertake the execution of Coal Stock Pile area work and any other supplementary items
there on etc. and the FIRST PARTY hereby accepted the said terms & conditions.

Contract Amount - Full contract amount


AND
WHEREAS the parties here to have deemed it fit to reduce the terms and conditions of the Agreement onto writing.

THIS AGREEMENT WITHNESSES and it is hereby agreed by and between the paraties as follows:

1 The SECOND PARTY agreed to do the work "Renovation of 374 no. III , II & I type quaeters in thownship at NTPC Tanda"as per the certified
copy of BOQ issued to First Party By NTPC.

2 The SECOND PARTY shall agree to do work on terms & Conditions given in abouve said offer letter & All work related specification specified
that may be imposed on the FIRST PARTY by virtue of the agreement with the department in respect of the work entrusted to the extent of
"Renovation of 374 no. III , II & I type quarters i township at NTPD Tanda"

3 The first party will pay to the second party of the gross bill amount certified by NTPC on the work done by the Second Party. This amount shall
be the gross bill amount of M/s Second party Name

M/s FIRST PARTY shall disburse the paymeent to Second party name. after following hold, deductions and additions on gross amount of the
bill :-
a. : Deduction of BOCW (Labour cess) @ 1%
b. : Deduction of income Tax TDS @ 1% or as per prevailing rate of Govt.
c. : Add GST Extra as per applicable

4
NTPC shall be the department to finalize the measurment of the items executed by second party for the rinning bills of SECOND PARTY.
5
The FIRST PARTY will pay to the SECOND PARTY within 02 days as and when they are collected payment from the Client under this contract.

6 SECOND PARTY shall be responsible for PF, ESI and Labour Welfare Fund etc. for their employees and workman. The copy of callan shall be
submitted along with R/A Bill claimed.

7 SECOND PARTY shall agree to engage sufficient contruction plant and equipments at site as per their own requirement either from their own
stock or by hiring/purchasing from market. SECOND PARTY further confirmed that they would deploy all ficancial resources to meet the project
schedul. SECOND PARTY shall also deploy required work froce and ohter inputs including store, computer etc. as per work requirement for
execution of work withi time schedule.

8 All type of insurance for the project, are in the scope of FIRST PARTY plant and equipments, labour and staff and third party etc. as per NIT shall
be arranged by FIRST PARTY for total contract value except WORKMEN COMPENSATION POLICY.

9 SECOND PARTY has agreed that during the execution of the work, if in the opinion of the FIRST PARTY & DEPARMENT (NTPC) that the works in
the scope of SECOND PARTY are not progressing in time or are not being achived with in stipulated time frame or it is not possible to
compeleted within the balance period, then FIRST PARTY with consideration of CLEINT will be at liberty to terminate their contract partially by
giving notice of 10 days in writing and the SECOND PARTY should have to complete balance activities in their work area urgent basis.

10
If any disputed arising between the both parties in this contract that will be resolve amicably. If amicable settlement is not being possible then
NTPC shall to intervene for settlement & decision of NTPC shall be final and binding upon the Parties if NTPC not intervene due to unavoidable
circumstances then Arbitration shall be according to Indian arbitration and concilation Act. 1996 The arbirator shall pass a reasoned award and
the award of the Arbitrator shall be final and binding upon the Parties and the cost of arbitration shall be borne equally by the Parties.

11 The SECOND PARTY shall undertake to be responsible for the efficient execution of the said work as per the speciffication of the Department
for and on behalf of the FIRST PARTY. The FIRST PARTY shall have exclusive right to supervise the Execution of the work done by the SECOND
PARTY.

12 Any type of Security Deposit & LD will be recovered by FIRST PARTY from the SECOND PARTY only on the work proportionately executed by
SECOND PARTY.

13 BOCW at rate of 1% will be rrecovered on the gross value of the bills and paid to the BOWC LABOUR DEPARTMENT.

Income-Tax at the rate of 1% or as per prevailing rate will be recovered on the gross value of the bills and paid to the income Tax Department
14
and necessary TDS. C ertificate will be issued to the SECOND PARTY.

15 All Compensation if arising in the scope of work of SECOND PARTY under labour lows arising out of any fault or otherwise due to accident of
their labour shall be borne by the SECOND PARTY.

16 The SECOND PARTY Shall pay not less then fair wages to laborers engaged by them on the work. The Payment vouchers however to get
certified by the conerned Department Officers and the same submitted to the FIRST PARTY for the recored.

17 Incase if SECOND PARTY want to exit in any time or after the award of the work or in the middle term then FIRST PARTY & SECOND PARTY
finalize the reasonable exact scope of work and the SECOND PARTY shall liable to complete all the work of decided scope of work within
reasonable time.
Time Period to complete the whole work is 18 month from date of issue of this agreement

PROVIDED ALWAAYS AND it is hereby understood that the expressions 'FIRST PARTY' and 'SECOND PARTY' where they occur shall mean and
include their successors and assigns.

IN WITNESSES WHEREOF the parties hereto set hand to this agreement in token of their acceptance on this (DATE OF AGREEMENT)

FIRST PARTY SECOND PARTY


NAME AND SIGN STAMP NAME AND SIGN STAMP

WITNESSES

ANNEXURE A ITEM RATE OF WORK

Name of Work : Renovation of 374 No. III , II & I type quarters in thownship at NTPC Tanda
SR. Discription Unit Quantity Net Price Amount Remark

No. 1 Renovation of 374 no. Qtr.- Civil-DSR


1 1.1.1 Carriage of material- Lime - 1 KM M3 95 60 5700 Nil
2 2.8.1 Earthwork in excavation M3 725 102 73950 Nil
3 2.25 Filling available excavated earth M3 480 85 40800 Nil
4 4.1.5 P&L in position CC of grade 1:3:6 M3 45 3910 175950 With Material
5 4.1.8 P&L in position CC of grade 1:4:8 M3 85 3910 332350 With Material
6 4.11 P&L DPC 50mm thick with cc 1:2:4 M3 400 3400 1360000 With Material
7 4.12 Extra for providing water proofing EA 1100 42 46200 With Material
8 5.1.3 P&L RCC of grade 1:2:4 M3 20 4080 81600 With Material
9 5.3 RCC work in beam of grade 1:1.5:3 M3 32 4080 130560 With Material
10 5.9.3 C&Shutt including strutting,prop M2 450 255 114750 With Material
11 5.9.15 Small lintels not exceeding 1.5 m M2 450 255 114750 With Material
12 5.9.19 C&Shutt including propping in cha M2 310 255 79050 With Material

Issuing of Steel + Binding Wire etc


13 5.22.6 Reinf. for RCC upto plinth - TMT KG 7,500 7 52500
including

14 6.1.2 B/w in found. cemnt mortar 1:6 M3 480 1360 652800 With Material
15 6.4.2 B/w in SS with cement mortar 1:6 M3 20 2550 51000 With Material
16 6.12.2 half brick masonary infoun CM 1:4 M2 4,500 213 958500 With Material
17 6.13.2 half brick masonary in cement 1:4 M2 730 234 170820 With Material
Grenite to be supplied by FIRST
18 8.2.2.2 P&F 18mm th kitchen plat-Granite M2 980 383 375340
PARTY
19 9.1.2 Prov wood work in frames-Sal wood M3 20 0 0 Nil
20 9.21.1 P&F ISI marked flush door-35 mm M2 7,500 107 802500 Only Fixing
21 9.21.3 P&F ISI marked flush door-25 mm M2 1120 94 105280 Only Fixing
22 9.26 Extra for cutting rebate M2 1900 26 49400 Cutting Only
23 9.59.3 P&F M.S. single spring hinges-100 EA 520 17 8840 Only Fixing
24 9.96.1 P&F Alu sliding door bolts 300X16 EA 1,700 22 37400 Only Fixing
25 9.96.2 P&F Alu sliding door bolts 250X16 EA 1200 22 26400 Only Fixing
26 9.97.2 P&F Alu tower bolt 250x10mm EA 1500 13 19500 Only Fixing
27 9.97.3 P&F Alu tower bolt 200x10mm EA 1500 13 19500 Only Fixing
28 9.97.4 P&F Alu tower bolt 150x10mm EA 4,000 8.5 34000 Only Fixing
29 9.100.1 P&F Alum. Handles - 125 mm EA 2,200 7 15400 Only Fixing
30 9.100.2 P&F Alum. handles - 100 mm EA 4,500 7 31500 Only Fixing
31 9.101.2 P&F door stopper ISI marked EA 1200 4.25 5100 Only Fixing
32 9.119 P&F factory made P.V.C. door frame M 5,000 4.25 21250 Only Fixing
33 9.120.1 P&F factory made panel PVC door M2 1,700 106.25 180625 Only Fixing
34 9.127.1 P&F high pressure sheet- 1mm M2 7,200 0 0 Nil
35 10.25.2 Steel work welded in built up se M2 6,300 77 485100 With Material
36 11.1.2 Brick on edge flooring with 1:6 M2 1100 233 256300 With Material

37 8.31 P&F ceramic glazed wall tiles M2 12,001 238 2856238 Tiles to be Supplied By FIRST PARTY

38 11.37 P&F ceramic glazed floor tiles M2 2,200 213 468600 Tiles to be Supplied By FIRST PARTY

39 11.41.2 P&L Vitrified tiles in floors M2 35,000 247 8645000 Tiles to be Supplied By FIRST PARTY

40 11.46.2 P&L Vitrified tiles in skirting M2 2,120 255 540600 Tiles to be Supplied By FIRST PARTY

41 12.41.2 P&F PVC rain water pipe 110dia M 4,590 34 156060 Only Fixing
42 12.42.1.2 P&F PVC Coupler - 110 mm EA 900 17 15300 Only Fixing
43 12.42.6.2 P&F PVC Shoe 110mm EA 800 17 13600 Only Fixing
44 12.43.2 P&F PVC pipe clips 110mm EA 3,300 17 56100 Only Fixing
45 13.4.2 12 mm plaster of mix-1:6 CM M2 2,800 136 380800 With Core Sand
46 13.5.2 15 mm plaster of mix-1:6 CM M2 43,000 136 5848000 With Core Sand
47 13.16.1 6 mm plaster of mix-1:3 CM M2 8,700 128 1113600 With Core Sand
48 13.18 Neat cement punning. M2 3,800 13 49400 With Core Sand
49 13.26 P&applying plaster of paris putty M2 1,59,000 76.5 12163500 With Material
50 13.41.1 Distempering OBD Two or more coa M2 1,59,000 51 8109000 With Material
51 13.43.1 Applying one coat of water thinn M2 14,000 21.25 297500 With Material
52 13.50.1 Ready mixed primer pink or grey M2 11,000 25.5 280500 With Material
53 13.61.1 Painting with sy enamel paint-Tw M2 48,000 60 2880000 With Material
54 14.1.2 Repair to plaster of 12-20 mm th M2 39,000 170 6630000 With Core Sand
55 14.6.1 Renewing glass panes-Float-4 mm. M2 450 680 306000 With Material
56 13.88 Removing white or colour wash M2 27,000 4.25 114750 Nil
57 14.46 Removing dry/oil bound distemper M2 1,52,000 5 760000 Nil
58 13.111.1 Finishing walls with Acrylic ex M2 1,52,000 55.25 8398000 With Material

59 14.80.2 P&F white china W.C 580X440 mm EA 75 425 31875 S Trap & P Trap Including
60 14.84 Dismantling 15-40 mm dia G.I pipe M 2,900 1.7 4930 Nil
61 14.85 Taking out existing wooden door EA 1,900 127.5 242250 Nil
62 15.2.1 Demolishing CC1:3:6 or richer mix M3 20 680 13600 Nil
63 15.7.4 Demolishing B/work-In cement mort M3 75 510 38250 Nil
64 15.13.1 Taking out door, windows of area EA 1,950 42.5 82875 Nil
65 15.25 Dismantling stone slab flooring M2 740 68 50320 Nil
66 15.56 Dismantling old plaster/ skirting M2 60,000 15.5 930000 Nil
67 17.10.1.1 P&F Stain. Steel kitchen sink EA 35 51 1785 Only Fixing
68 17.18.1 P&F P.V.C. low level cistern-10L EA 75 42.5 3187.5 Only Fixing
69 17.25.2 P&F white wash basin 550x400 mm EA 450 51 22950 Only Fixing
70 17.28.1.1 P&F P.V.C waste pipe 32 mm EA 730 13 9490 Only Fixing
71 17.31 P&F 600x450 mm beveled edge mirror EA 450 51 22950 Only Fixing
72 17.33 P&F 600x120x5 mm glass shelf with EA 720 21.25 15300 Only Fixing
73 17.36.2 P&F joint with CM-100 mm CI Pipe EA 190 25.5 4845 Rassi will be yours
74 17.38.1.1 P&F bend of 100mm dia EA 35 21.25 743.75 Only Fixing
75 17.39.1.1 P&F plain bend 100mm SCI EA 20 21.25 425 Only Fixing
76 17.57.1.1P&f collar: 100 mm as IS 1729 EA 45 12.75 573.75 Only Fixing
Only Fixing, Dhaga & Safeda will be
77 18.11.1 P&F GI pipe-15mm dia with chase M 1,980 34 67320
yours
Only Fixing, Dhaga & Safeda will be
78 18.15.1 P&F brass bib cock - 15NB EA 720 17 12240
yours
Only Fixing, Dhaga & Safeda will be
79 18.18.2 P&F PVC connection pipe EA 450 12.75 5737.5
yours
Only Fixing, Dhaga & Safeda will be
80 18.21.2.1 P&F PVC connection-45cm-15mmNB EA 2,980 12.75 37995
yours
Only Fixing, Dhaga & Safeda will be
81 18.46.1 P&F G.I union 15 NB EA 720 34 24480
yours
Only Fixing, Dhaga & Safeda will be
82 18.46.2 P&F G.I union 20 NB EA 1308 34 44472
yours
83 18.48A P&P on terrace water storage tank L 12,328 0.255 3143.64 Only Fixing
84 22.14.1 Grading roof for water proofing M3 310 4080 1264800 With Material
No. 2 Renovation of 374 no. Qtr.- Civil-NSI
1 NSI-1 P&F mosquito proof SS wire mesh M2 3,980 106.5 423870 Only Fixing
2 NSI-2 P&F CP Brass Basin Mixer EA 720 42.5 30600 Only Fixing
3 NSI-3 P&F CP Brass L band Wall Mixer EA 720 64 46080 Only Fixing
4 NSI-4 P&F CP Brass short body Bib Cock EA 1,898 21.25 40332.5 Only Fixing
5 NSI-5 P&F CP Brass Long Body Bib Cock EA 1230 21.25 26137.5 Only Fixing
6 NSI-6 P&F CP Brass Angle Cock EA 2,780 8.5 23630 Only Fixing
7 NSI-7 P&F CP Brass Overhead Shower EA 720 42.5 30600 Only Fixing
8 NSI-8 P&F Shower Arm EA 720 21.25 15300 Only Fixing
9 NSI-9 P&F C P Brass towel ring EA 720 21.25 15300 Only Fixing
10 NSI-10 P&F CP brass waste coup for Wash EA 720 8.5 6120 Only Fixing
11 NSI-11 P&F C.P. brass towel rail -600mm EA 720 21.25 15300 Only Fixing
12 NSI-12 P&F aluminium hasp and stpl 115mm EA 450 12.75 5737.5 Only Fixing
13 NSI-13 P&F C.P. brass soap dish EA 720 12.75 9180 Only Fixing
14 NSI-14 P&F stainless steel side brackets EA 18,900 8.5 160650 Only Fixing
15 NSI-15 P&F stainles steel flo jali 100mm EA 720 8.5 6120 Only Fixing
16 NSI-16 Deployment of workers - SSW MD 650 382.5 248625 PF & ESI in your Scope
17 NSI-17 Deployment of workers - USW MD 1230 340 418200 PF & ESI in your Scope
18 NSI-18 P&F SS wire gauge mango wood M2 1650 106.5 175725 Only Fixing
19 NSI-19 P&F panelled or panelled and glaz M2 4,890 106.5 520785 Only Fixing
20 NSI-20 P&F NRV for G.I. pipe line work EA 1230 42.5 52275 Only Fixing
21 NSI-21 P&F SS curtain rod curtain rod 25 M 380 17 6460 Only Fixing
22 NSI-22 P&F 8 mm dia bolt with nut for EA 380 8.5 3230 Only Fixing

No. 3 ELECTRICAL DSR ITEMS


1 1.10.1wiring light/fan etc group A P 4,300 81 348300 Only Fixing
2 1.10.2wiring light/fan etc group B P 16,890 85 1435650 Only Fixing
3 1.11 WIRING FOR 2 way point M 430 117.5 50525 Only Fixing
4 1.14.1 Wiring with earth wire 3X 1.5 M 4,500 17 76500 Only Fixing
5 1.14.2 Wiring with earth wire 3X 2.5 M 65,980 19 1253620 Only Fixing
6 1.14.3 Wiring with earth wire 3X 4 M 47,000 22 1034000 Only Fixing
7 1.14.4 Wiring with earth wire 3X 6 M 4,800 28 134400 Only Fixing
8 1.14.9 Wiring with earth wire 6X 6 M 1,230 44.5 54735 Only Fixing
9 1.24.1 5A switch existing board EA 2,786 8.5 23681 Only Fixing
10 1.24.4 5A socket existing board EA 2,786 12 33432 Only Fixing
11 1.24.6 telephone socket EA 1780 12.75 22695 Only Fixing
12 1.31 S/E of 5A switch/ socket EA 1,780 21.75 38715 Only Fixing
13 1.32 S/E of 15A switchand socket EA 3,420 21.75 74385 Only Fixing
14 2.18 S/E of 20 A AC point EA 1243 42.5 52827.5 Only Fixing
15 1.38 S&E of call bell EA 690 21.25 14662.5 Only Fixing
16 1.45 I/t&c ceiling FAN 1400 mm EA 2,100 63.75 133875 Only Fixing
17 1.25: S&E electronic fan regulator EA 2,100 21.25 44625 Only Fixing
18 1.50.1 I/t&c OF EX FAN 450mm sweep EA 2,130 42.5 90525 Only Fixing
19 1.51 for fixing the louvers/ shutters EA 2,130 12.75 27157.5 Only Fixing
20 2.4.3 8 way 4pole MCB box EA 480 382.5 183600 Only Fixing
21 2.15.3 63 A 4pole RCCB 63A EA 490 102 49980 Only Fixing
22 2.3.4 16 way DP MCB box EA 420 297.5 124950 Only Fixing
23 2.14.3 63 A 2pole RCCB 63A EA 420 119 49980 Only Fixing
24 2.10.1 32 A single pole MCB EA 8,230 42.5 349775 Only Fixing
25 2.11 MCB blanking single pole EA 3,110 2.55 7930.5 Only Fixing
26 5.2 earth pit 4.5m EA 450 2125 956250 Only Fixing
27 5.15 earth strip 25x5 M 6,980 4.25 29665 Only Fixing
28 1.18.2 telephone wiring M 28,900 4.25 122825 Only Fixing
29 1.27.1 S&F GI box (75mmX75mm)-1/2M EA 1700 21.25 36125 Only Fixing