Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

SARATH CITY CAPITAL

- HYDERABAD
INTRODUCTION:
• The largest mall in India.
• It rises 8 floors into the sky and each floor is a humongous 250838.208 square meters in expanse. That
makes the mall retail space 179395.77 square meters.
• It has a clear carpet space of 118822.98 square meters for over 430 brands across. Other attractions
coming soon to the mall are Tridom – the Indoor Adventure Park, Sky zone – The Trampoline Park, Ski
Capital – the Snow theme Park in large spaces and many more making the mall the most happening
destination.
• The mall features AMB Cinemas, a luxury 7 screen multiplex co-owned by Asian Cinemas and Mahesh
Babu, the Telugu cinema superstar.
• Sarath city capital mall is situated in the busy neighborhood of hyderabad’s technology corridor – hi-tech city
, gachibowli – miyapur road that serves the entire cosmopolitan community of this part of hyderabad.

LOCATION: SITE

• Sarath city capital mall is situated in the busy neighborhood


of hyderabad’s technology corridor
• Hi-tech city , gachibowli – miyapur road
• That road serves the entire cosmopolitan community of this
part of hyderabad.

INFERENCE: Development can be done either a


HYDERABAD popular site or the most demanded area , I think
the due to the site the develop has started , new
constructions around the mall , quality life , new
flyovers, roads, etc… so we should use either the
popular site for right use or create the popularity

INDIA TELANGANA

BUILD UP AREA : SITE APPROACH :


……..

YEAR OF CONSTRUCTON:

Sarath city capital mall As Constructed In Dec ,2016

Designed by : ERA ARCHITECTS.

GEOGRAPHY :

coordinates :

17.45° N 78.36°E From M.G.B.S Bus Terminal


From Rajiv Gandhi International
From Nampally Railway to Sarath city mall
Airport to Sarath city mall
Station to Sarath city mall - 20 kms
- 31 kms
- 17 kms - 37 mins drive
MEAN SEA LEVEL : - 35 mins drive
- 32 mins drive GONGABU BUS PARK
TRIBHUVAN INTERNATIONAL AIRPORT
INFERANCE : As the INFERENCE : As bus transport is
INFERANCE : The airport is located
railways are the major one of the major mode of access bus
around 31km, we can reach the
source for the people stand location is one of the aspect to
Elevation above sea level: 116 m = 381 ft shopping mall as soon as possible
from different states to be considered . for this mall bus
through ORR( outer ring road ) , as
the city , it takes 35 stand is located at a 40 min journey
vistors try to experience the city
min drive from that due to traffic which can be
mall they can reach max time in 35
nampally railway considered that public mode of
mins , but the roads around sarath
station. Again same as transportation is easier to the site.
city mall are heavy busy all the time
the roadways. But still as the rate of buses are more
basically it will take more than ½ hr
traffic Can be caused and disturbance
time to get in because the roads
is created in surrounds of the
are under construction since
building noise enters to the building .
3years.

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
CLIMATIC CONDITIONS: VEGETATION:
Lush green and tropical vegetation Teak and palm
Average Temperature & precipitation in Hyderabad are the vegetation's used in this mall Internal
courtyards were made with bushy plants and
palm trees . Like White cheesewood,Money plant
,Parlor Palm Money plant Red Sister plants
(Cordyline fruticose "Red Sister") area variety of
evergreen tropical shrub that belongs to the lily
family

Inference : At site level general landscape is used to carve pathways and seating
spaces at food courts canopy projections at food courts in the open spaces were made .
INFERENCE :
• As the rainfalls are high in June-october ,The average rainfall in hyd is
160mm so preventions to be taken and the building is constructed in such
a way that openings are minute and major part of the building has no TOPOGRAPHY–
openings and total Construction is of closed planning . To reduce Climatic Most of this region has a plain land and some of its
effect this type of planning is adopted. part is hilly but the site has a flat land
• As the Hyderabad city is arid climate. Temperatures are genarallly warm at
daytime and cool breezes at night time .As internal temperaturs are always
maintained at mall through air conditioning systems, so we can be Inference :Inference : Proper usage of land is
comfortable at daytime in the mall. made through connectivity and proper planning
at the site level ..
Humidity in hyderabad
GEOMORHOLOGY :
Ferralitic soils arehighly weathered and leached
soils of the humid tropics enriched in iron and
aluminum relative to silica and all major cations.
Primary minerals are generally absent except for
quartz, and the dominant secondary minerals are
some combination of kaolinite, gibbsite, goethite
and hematite.

Inference : as some parts of area is hilly area and soil conditions are loose type to
INFERENCE : make them earth quake resistive structures and pile foundations are used in this
• As area .

WIND FLOW

INFERENCE :
• As the winds are high from west , southwest ,
southeast, east side directions
• so as the mall was surrounded with apartments,
tress ,small trees at west , southwest, south side
directions
• As the east direction there is a road construction
there will be some air pollution , and
discomfortable to see if there were strong winds

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
Sun path:

6:00 AM 12:00PM 4:30PM INFERENCE :-


March month has general day length .
During day time and morning shade
M areas are more in this month sun light
A enters the building towards east and
R during mid time light with high intensity
,which gives more light thorugh atrim

July month generally has a long day


J length Sunlight entry is more in this
U area during this season Southwest
L side heat entry should be controlled
y .so Panelling is used and openings
are made at those areas.
December month has the least day
length and sun raises late and sets
D early .
E
C

SITE ORIENTATION : SITE SHAPE :

Shape of the site is irregular shape on one side it almost forms a


INFERENCE : rectangular form .
Site is oriented in such a way that its connected to roads on three sides of the
site proper entries to the site can be made and also for control of traffic on INFERENCE :
the road the division on exit and entry can be made . due to its central Site shape has been properly utilised by making a pathway for vehicles
orientation its totally exposed building on either sides so this way scope of and outdoor canopy for food courts and stalls . also sitting spaces at
mall would have been increased . landscapes .

LAND USE :

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
NORTH : Towards north side there is a welly designed apartments which are citizens will live EAST : Towards east the road leading the main road, mall entrance also is provided
In this direction.
INFERANCE:
As there is a apartment but not fully occupied , so as soon as the road construction finishes the INFERANCE:
will be huge development The entry ways to the mall are provided towards this direction its not directly accessible.

Under Construction Apartments

Commercial Complex

WEST : Towards west there are again apartments , but they are in
construction SOUTH : Towards south there is a road which is the pathway of the mall ,and adjoining the road there are
apaertments
INFERENCE:
As the construction not yet done, once it completed it would be attractive INFERANCE:
place This road allows service entries of mall and easy accessibility.

AMB CINEMAS
SITE ENTRYS AND EXITS: TERRACE FLOOR
GAMING ZONE
SIXTH FLOOR SHOPPING MALL
SHOPPING ZONE
INFRENCE: FIFTH FLOOR • There are 10 staircases , 2
ADMIN DEPT.
• As there is only one entry for FOURTH FLOOR
SERVICES escalators and 7 ramps.
vechiles and the exit also lies • Food court is present on the
behind the entry
lower ground floor of capacity of
• As there is one pedistrain entry
to enter the mall THIRDFLOOR nearly 1000 people.
SECOND FLOOR SHOPPING MALL • Major drawback is there are no
Entry to FIRST FLOOR FOOD COURT toilets provided in the food court
the mall GROUND FLOOR and the walking distance is more
to access mall toilets.
Exit from • Ample seating is provided in the
the mall corridors.
BASEMENT FLOOR - 1 • They could have added barier
BASEMENT FLOOR – 2 PARKING free elements like tactile flooring
BASEMENT FLOOR - 3 SERVICES in the corridors.
BASEMENT FLOOR - 4

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
TERRACE FLOOR
AMB CINEMAS
TERRACE FLOOR
GAMING ZONE
SIXTH FLOOR FIFTH FLOOR
SHOPPING ZONE
FIFTH FLOOR
ADMIN DEPT.
FOURTH FLOOR
SERVICES FOURTH FLOOR

THIRD FLOOR
THIRDFLOOR
SECOND FLOOR SHOPPING MALL SECOND FLOOR
FIRST FLOOR FOOD COURT
GROUND FLOOR FIRST FLOOR

UPPER GROUND FLOOR

BASEMENT FLOOR - 1
LOWER GROUND FLOOR
BASEMENT FLOOR – 2 PARKING
BASEMENT FLOOR - 3 SERVICES
BASEMENT FLOOR - 4 BASEMENT FLOOR - 1

BASEMENT FLOOR - 2

BASEMENT FLOOR - 3

PARKING DETAILS: BASEMENT FLOOR - 4

SEPARATE ENTRY/EXIT INTO THE MALL WITH GOOD


CIRCULATION:
• SITE AREA AROUND 4300 SQM
PARKING:
• Multilevel car parking
• No of levels : 4
• All the services are in the fourth basement.
• Two lifts are provided for services.
• Given parking space for1400 cars and 4000 bikes
• Around 10,00,000 sq.m area is provided for parking.
• There are three lifts from the fourth Basement Which are
exclusively for people who take Lounge tickets.
• If someone is going to the cinema,he/she is required to show
the cinematicket and he pays a low price for the parking fees.

CIRCULATION:
BASEMENT FLOOR PLAN-1 BASEMENT FLOOR PLAN-2 • There are 10 staircases , 2 escalators and 7 ramps.
• The layout is in a grid like pattern.
• The entry and exit ramps are separate.
• The parking layout is simple for the users.

BASEMENT
PARKING

BASEMENT FLOOR PLAN-3 BASEMENT FLOOR PLAN-4

STILT FLOOR RAMP STILT FLOOR LIFTS

LOWER GROUND FLOOR


SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:
Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
SHOPPING MALL
• There are 10 staircases , 2 escalators and 7 ramps.
• Food court is present on the lower ground floor of capacity of nearly 1000 people.
• Major drawback is there are no toilets provided in the food court and the walking
• distance is more to access mall toilets.
• Ample seating is provided in the corridors.
• They could have added barrier free elements like tactile flooring in the corridors.
• Floors 1 to 3 have the same layout.
• A loop pattern circulation is observed.
• The mall is divided in two wings basically having two atriums in both the wings providing natural light into the mall.
• Floors 4,5 and 6 have the same layout.
• A service balcony is given around the building.
• Floors 4,5,6 is basically the multiplex in one part of the floor and other retail shops inthe other part.
• The total area of the multiplex is 46054.95 square meters.
• The amb handles all the food court services in the lower ground floor.
• Staircase is provided between escalators for one vertical circulation per floor
• which is helpful during emergency situations. But a column is given in front of staircase which is a back draw for aesthetics and circulation.
• Chillers and all other ac ducts are open to sky

UPPER GROUND FLOOR

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
FIRST FLOOR
PLAN

SECOND FLOOR PLAN

THIRD FLOOR PLAN

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
AMB FOURTH FLOOR PLAN:

FIFTH FLOOR PLAN

TERRACE FLOOR PLAN

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
AMB CINEMAS:

• 4th floor theatre entrance and exit.


• 5th floor m-lounge.
• 6th floor projection room.
• Designed by : ERA ARCHITECTS.

SPACES AND CIRCULATION:

BANQUET AREA CORRIDORS AND EXIT FROM AUDI’S


LOBBY

VIP CINEMA +BANQUET AREA AUDI’S RIGHT WING

AUDI’S LEFT WING

BOX OFFICE:
MAIN LOBBY WITH SEATING AREA

LIFTS:
No of lifts: 3 + 4 ( still under construction )

• Self serving digital kiosks are provided beside the box office which can be
accessed bywheel chair users also.
• Baggage counter is placed to the right side of the box office.

SNACK COUNTER

BOX OFFICE
DIGITAL KIOSKS

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
REST – ROOMS

• 5 WASH BASINS in both men and women rest rooms.


• 12 WC FOR LADIES.
• 63 urinals and 4 wc for gents.
• One janitor room each in ladies and gents toilet.
Mechanical air ducts are provided for ventilation.

BARRIER FREE TOILETS


LOCATION :
• Beside the escalator which leads to m-lounge.
• Wc is placed 300mm from the ground level.
• Washbasin is at a height of 1m from the ground level.
• Trolley park is provided beside the toilet for wheel chair.
• Flooring is made of the rough marble which acts as anti skid.

M-LOUNGE:
•Waiting area and display of mahesh babu’s achievements

•There are is a height


difference near the
entry to 4 5 6 7 audi
because of the
ENTRY TO AUDI’S FOR M-LOUNGE MEMBERS
mezzanine floor which •Provision of ramp.
is placed above the 4th •But the major fault is it will be difficult for the wheelchair people to
and 5th Audi For
projector room. climb the ramp. Since the ratio of the ramp is high

1,2,3 AUDI’S ENTRY 4,5,6,7AUDI’S ENTRY

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
SCREEN – 1:428+14 SEATS(recliners)
Largest screen in AMB.

SCREEN 2 AND 3: 312 SEATS

SCREEN 5:
•VIP SCREEN (50 seats)
•Double Recliner cubicles

SCREEN 4

SCREEN 4 : 162 seats


SCREEN 6 : 218 seats
SCREEN 7 : 164 seats

SCREEN 6

SCREEN 7

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
SPACESPROVIDEDANDCIRCULATION

Corridors and lobby


Kiosks
Admin areas
Kitchen and storage

VIP LOUNGE

WASHROOM FOR
M-LOUNGE
MEMBERS WITH A
SHOWER CABIN

SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:


Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:
Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141
SHEET TITLE: ROLL NO: SIGNATURE: SHEET NO:
Y19AP0108
Y19AP0115
Y19AP0119
Y19AP0127
PROJECT TITLE: Y19AP0130
Y19AP0140
Y19AP0141

You might also like