Title Document no. Rev.

Page Of
4 1 3
930 G 0031
Confidential class 2
Project Document state
Inspection Form
Project number
- Issued
PRE-COMMISSIONING TEST SHEET
Customer Supplier

Doc. type Issued by Language Product / Structure Derived from

930 G Engineering English -/- 930G0031 rev.3


Rev. Revisions

3 REN 01/06/95
4 Upload in Document Management System

Scan QR code to verify revision validity


or
check on http://212.78.221.90/

JTH IA-TSM AKL

30-10-2017 30-10-2017 30-10-2017

Created/Revised Checked Approved Authorized

Ansaldo Thomassen reserves all rights on this document that can not be reproduced in any part without its written consent.
Title Document no. Rev. Page Of

4 2 3
PRE-COMMISSIONING TEST SHEET 930 G 0031
Confidential class 2

MOTORSTARTER in AC/DC MCC and ELECTR. MOTOR in FIELD\

System: Project:

1 CHECK OF L.V. MOTORSTARTER RESULTS INITIALS


1.1 Visual inspection of contactor
1.2 Operation of all moving parts and mechanisms
1.3 Withdrawable motorstarter easily with-drawn and re-inserted
1.4 Mechanical interlock between isolatorswitch and paneldoor
1.5 All dust seals undamaged
1.6 Electrical connections correct and tightened
1.7 Fuse ratings correct and fuses inserted
1.8 Shrouds intact on "live" terminals
1.9 Correct thermal overload rating and adjustment
1.10 Ammeter scale correct
1.11 Push button operation
1.12 Indicator lamps
1.13 Anti condensation heater
1.14 Cable core connections correct and identified correctly
1.15 Cable terminations satisfactory
1.16 Cables identified correctly
1.17 Label correct
1.18 Earth fault relay test (if applicable)

2 CHECK OF FIELD-MOUNTED CONTROL EQUIPMENT RESULTS INITIALS


2.1 Ammeter scale correct for Motor FLI (where applied)
2.2 Check local starter operation (where applied)
2.3 Control cables correctly terminated
2.4 Power cables correctly terminated

3 PERFORMANCE TEST OF MOTORSTARTERS: RESULTS INITIALS


3.1 Correct operation of safety switch near motor
3.2 Start function of turbine control panel
3.3 Stop function of turbine control panel
3.4 Running indication in turbine control panel
3.5 Motorstarter failure indication in turbine control panel

Ansaldo Thomassen reserves all rights on this document that can not be reproduced in any part without its written consent.
Title Document no. Rev. Page Of

4 3 3
PRE-COMMISSIONING TEST SHEET 930 G 0031
Confidential class 2

4 CHECK ON L.V. ELECTRICAL MOTOR RESULTS INITIALS


4.1 Equipment undamaged
4.2 If applied: bearing lubrication satisfactory
4.3 Nameplate details conform to driven equipment design data (device list)
4.4 Stator windings connections (star/delta)
4.5 Anti-condensation heaters
4.6 Earthing of motor and driven equipment
4.7 Cable core connections correct and identified
4.8 Cable terminations satisfactory
4.9 Cables identified correctly
4.10 All covers replaced and fastened
4.11 Insulation resistance test completed
4.12 Check "ex" marking and glanding on motor (where applied)
4.13 Check that all main and auxiliary terminal boxes are correctly gasketed with all fixing
screws/bolts tightened down

5 INSULATION RESISTANCE TEST


DEVICE RESULT MEGOHMS TEST DATE INITIALS
5.1 Elec. motor
5.2 Power cable See E/I Contractor
5.3 Control cable See E/I Contractor

6 ROTATION TEST RESULTS INITIALS


6.1 Perform jump start for rotation check
6.2.1 Measure running current L1 .............. Amps
6.2.2 Measure running current L2 .............. Amps
6.2.3 Measure running current L3 .............. Amps

Test performed by Ansaldo Thomassen: Customer:

Signature: Signature:

Date: Date:

Ansaldo Thomassen reserves all rights on this document that can not be reproduced in any part without its written consent.