1 Project : WATERFRONT INTERGRATED RESORT


Reference : GTEC - IRE – 0201

REPORT

OBSERVATION REPORT FOR NONCONFORMANCE OBSERVED IN


INSTALLATION OF CABLES AND WIRES IN
LEVEL-04 KITCHEN CORRIDOR AREA
AND LEVEL 07 TOILET AREA
Building – 02

HKN Internal inspection Schedule item Nr 2 and 4 Dated 03rd October 2022

Revision History

00 06th October 2022 SHH/AEA FOR REFERENCE PGA GBE


Revision Date Prepared by Reference Checked by Approved by

Page 1 of 4
Introduction
This report refers to non-conformances observed during the internal inspection on 06 July 2022 for
01. Item Nr. 2/03.10.22: ‘Installation of Cables and Wires’ (TN, FD, SA, LT, EM and PA systems) in
Kitchen corridor areas at level 04 in Building 2 (2.30-2.40/2.A-2.L)
02. Item Nr. 4/03.10.22: ‘Installation of Cables and Wires’ (LT, EM, and OE) in Toilet areas at level 07
in Building 2 (2.32-2.36/2.J-2.L)

02/03.10.22 - Kitchen corridor areas at level 04 (2.30-2.40/2.A-2.L)


Observation:
01. It was observed that smoke detectors were mounted without providing the adequate clearance
gap as per the standard. Below shown are examples only.

Figure 1: Smoke detector was mounted on the beam exceeding top 10% void height from top

Figure 2: Smoke detector was mounted close to the beam without maintaining minimum 500mm distance

Page 2 of 4
02. It was observed that several fire detectors are obstructed by mechanical ducts and cable trays.
Below shown is an examples only.

smoke detector covered to


the cable tray

Figure 2: Smoke detectors obstructed by cable trays

03. Several smoke detectors were not securely fixed to the soffit.

Figure 4: Smoke detectors detached from the soffit

Remarks and Recommendation:

As stated in BS 5839-1 detectors shall be relocated as follows,


 The areas containing horizontal voids over 800 mm, sensing element of the fire detector
should be places within top 10% of the void or within the top height of 125mm, whichever is
greater. And
 As stated in BS05839-1 smoke detectors should not be mounted within 500 mm from
obstruction where it's greater than 10% of room height (Ex: beams).
 Further to that if obstruction down-stand is greater than 10% of the room height, treated as
a wall. Therefore, above should be considered in relocating the detector and coverage area
requirement should satisfy as per the design.

Page 3 of 4
03/03.10.22 - Toilet areas at level 07 (2.32-2.36/2.J-2.L)
Observation:
01. Provision for hand dryer was not provided in the female toilet area. (Grid: 2.34-2.35/2.K-2.L)

Figure 5: Highlighted power provision was not provided as per the HKN-SPD-EL-OE-21107D1

Remarks and Recommendation:

Provision for hand dryer shall be provided as per the spd ref HKN-SPD-EL-OE-21107D1 and upon
completion, the inspection shall be re-raised to witness the rectification.

Page 4 of 4