Please find the attached Engineer's observation report regarding the "non-conformance related to 1) corrosion on lift accessories 2) Lift door
details are differ from approved model 3) unprotected control panel 4) openings at fire separation walls at machine rooms and elevators of
building 4" which is self explanatory.
The Engineer advises HKN to address the non-conformances reported in the attached report.
Further, Contractor is advised to submit no later than 20th December 2021, rectification plan/preventive measures and program that
includes start and completion dates.
Regards
Aruna Amarsena
1.1.1.1.1 Project : WATERFRONT INTERGRATED RESORT
Reference : GTEC - IRE - 0059
REPORT
Revision History
Recommendation Severely damaged components shall be replaced and remains shall be treated to
prevent condition get worst.
Image 03- Lift pit baseplates Image 04- Lift pit baseplates
Image 05- Lift pit baseplates Image 06- Lift Car Roller supports
Image 07- Rusting/discoloration of suspension rope (PL Image 08- Sill cover plates
4.4)
Building /Level Building 04
However, it is observed that the lift landing door end construction is differ than the
proposed model in the MSB, and also at some portions even clear gap can be seen
without end plate.
Recommendation Rooms shall be cleaned and all the control panels shall be vacuumed with immediate
interruption. Present situation could lead to permanent damage of electronic and
electrical components.
Image 10- Machine Room Image 11- Dust in Lift Control Panels
Image 12- Unprotected Openings with PFP Image 13- Unprotected Openings with PFP